Hi Experts,
My requirement is warranty should be determined when equipment reading is less than u201C10u201D and when counter reading exceeds 10 warranty should not be determined.
I have created new counter. Counter category-equipment, counter type-forward counter, counter unit-HR(hours),minimum value-1,maximum value-20,overflow value-21
I have created counter dependent warranty. Warranty type-customer warranty, warranty basis-counter dependent, counter attribute-equipment running hours, counter attribute value-10(warranty is applicable till counter value is less than 10) and counter unit-HR(hours).
Then I have assigned new counter and warranty to install base object.
*When I create service order and enter this install base object reference object, warranty(counter based) is getting determined. Then if I enter counter reading greater than u201C10u201D,still warranty is shown being determined(it should not be determined because counter reading is more than u201C10u201D
Request experts opinion on this. What settings need to be done so that counter based warranty is determined till counter value does not exceeds u201C10u201D.
Regards
Naresh

Hi Roypurohit,
Thanks for the response,
As you said..there is no specific reason for not downloading material and serial number from ECC. We can download these combination as Installed base.
My concerns are
The installed base coming from ECC is not carrying Warranty information, and as per out client it is not impossible to assing warranty to each installed base and IOobject manually. it has to be automated.
secondly, installed based is getting created after outbound delivery in ECC and replicating to CRM. But as per client process, warranty only starts after Invoice document created in ECC system. Then how to capture invoice creation date details in warranty and how to assign it to respective installed base / IO object automatically.
In SAP CRM where can we see the downloaded Ibase and IO Objects? What is the difference between these two?
I hope you have understood the requirment. Please help me that how to resolve this issue.
Your suggestions are highly appreciated.
Regards
Raghu ram

Similar Messages

  • Error while creating measurment documents for a counter (counter based strategy Plan)

    Dear Experts
    Pl suggest the possible solution for below case
    I have a counter based preventive maintenance Plan of 100km, 200km,.....  with op1,op2,..... respectively.
    Now I have done maintenance for 600 km and going to enter another reading in IK11.
    Here, system is giving error
    Counter reading in doc. 251591 larger than in subsequent doc. 251585
    Message no. IR171
    Diagnosis
    No counter overflow reading has been defined for the measuring point, and the counter reading that you have entered is larger than the one in the subsequent measurement document.
    This is not allowed, since the counter is not marked as running backwards.
    System Response
    Processing will not be continued.
    Procedure
    Check your entries and the counter data of the measuring point.
    screen shot for measurement document earlier created is as

    Hi Akhilesh
    okay . I have not found any error in my last and current reading date and time
    screen shot is attached again here for ur reference
    now, what thing I have to checked, pl suggest.

  • Condition Based Interface Determination in ICO (AAE) - PI 7.1 EHP1

    Hi Friends,
    We have PI 7.1 EHP1 - SP 04.
    In our scenario, we have 1 outbound interface and 2 inbound interface. Based on condition, it needs to select the first inbound interface or second inbound interface.
    In the normal configuration, we are able to select. (By click + icon and add condition in the Receiver Interfaces in Interface Determination Step)
    When we create configuration using ICO (Integrated Configuration), there is no option in "Receiver Interfaces" Tab to add two inbound interfaces with condition.
    Could you please clarify how do we do this in ICO?
    Kind regards,
    Jegathees P.

    IMHO, condition based interface determination is not possible in ICO.
    Use Multiple inbound service interfaces... You can handle in design level .. ESR level. 
    Check the Abhishek's blog... This  might be helpful.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/90dcc6f4-0829-2d10-b0b2-c892473f1571?quicklink=index&overridelayout=true
    Note: Since in your case you need two receiver agreements, you cannot handle through ICO. The above link might be helpful to do multimapping without BPM.
    Edited by: Baskar Gopal on Apr 26, 2011 9:53 AM

  • How to store multiple counts based on creation date

    Hi,
    I want to retrieve the count of number of risk  for each date and render it on line graph. I am retrieving data from sharepoint list where the number of risk counts increase with its creation and decreases after it is closure which maintained in another
    column. Like if a risk is created on 02/02/2015 and closes on 03/03/2015 and an another risk is created on 17/02/2015  and closes on 14/03/2015. Then the count of the risk from 02/02/2015 to 16/02/2015 is 1 and from 17/02/2015 to 03/03/2015 is 2  and
    then again till 14/03/2015 is 1. I want to retrieve the count based on the dates rendered dynamically on X-axis that is from current date back to past 24 days. I tried to create two datasets with one storing the risks after being queried based on creation
    date and closure date and retrieving the count from Graph Y values but it is returning me count 0.
    Please help.
    Thanks in advance. 

    Hi,
    I want to retrieve the count of number of risk  for each date and render it on line graph. I am retrieving data from sharepoint list where the number of risk counts increase with its creation and decreases after it is closure which maintained in another
    column. Like if a risk is created on 02/02/2015 and closes on 03/03/2015 and an another risk is created on 17/02/2015  and closes on 14/03/2015. Then the count of the risk from 02/02/2015 to 16/02/2015 is 1 and from 17/02/2015 to 03/03/2015 is 2  and
    then again till 14/03/2015 is 1. I want to retrieve the count based on the dates rendered dynamically on X-axis that is from current date back to past 24 days. I tried to create two datasets with one storing the risks after being queried based on creation
    date and closure date and retrieving the count from Graph Y values but it is returning me count 0.
    Please help.
    Thanks in advance. 

  • CIN - with TAXINJ and "condition based excise determination"

    Dear All,
    Can I use TAXINJ with "condition based excise determination" for CIN implemenation. We already have TAXINJ and some plants are already working on it.
    If anyone already using the same, please share the problems faced / experience.
    Actually I done settings for above scenario, but while GRN I am getting Message as " BED, AED and SED for the excise item is zero". And BED not getting populated while doing GRn.
    I have created a tax code "C1" and assigned to company code.
    THen I have maintained condition record for JMOP in FV11 for BED. ALso settings done J1ID.
    PO is created with this tax code C1, taxes are getting calculated when
    checked at Invoice tab at PO.
    But while making GRN message comes "BED, AED and SED for the excise
    item is zero" and excise values dont shows at excise tab in MIGO
    Regards

    Go through
    https://wiki.sdn.sap.com/wiki/display/ERPLO/CIN+Configuration
    and
    http://help.sap.com/saphelp_47x200/helpdata/en/09/ebf138cdd78a4be10000000a114084/frameset.htm
    Hope you will get good idea

  • Performance/Counter Based Maintenance Plan

    Dear All,
    Please guide me the detailed process related with "Performance/Counter Based Maintenance Plan" with step wise(with Tcode) .
    its urgent
    Please help.
    Sushant

    Hi Sushant,
    as it's urgent, I simply refer to a blpg document created by Maheswaran KD:
    Behavior of Performance Based Plan in SAP Plant Maintenance
    Please, all credits to Maheswaran!
    Regards,
    P.

  • Reg. condition based receiver Determination

    Hi,
        I need to send the records to two systems based upon the value
    For Ex. All the material group record letz say (1,2,3,4,5,6) Shuld go to Receiver1 and only the records which belongs to material grp shud go to Receiver2.
    I am trying using Condition based Receiver Determination
       For Receiver 1 :-
                  I didnot give any condition.Coz all the records have to go to Reciver1.
       For Receiver 2 :-
                     I have written the condn in the Interface determination
                i.e) Material Group = 2.
    But  All the records are going to these two receivers.I have tried everything.
    Thanks in advance
    Regards
    Anandan

    Anandan,
    Similar situation has worked for me. Please check the condition you have mention in Interface Determination.
    In the Interface determination you need to have 2 inbound interfaces. Specify the respective condition for each inbound interface.
    Example: if the Response field has the value as "Success" or "Failure" the message has to go to first interface. The message has to go to second interface only if the response is "Failure". so you can provided following condition in the interface determination:
    <b>Condition 1:For first inbound interface</b> (/p1:MessageType/RecordSet/Response = F) OR (/p1:MT_RESPONSE_FROM_PS_BI/RS/Response = S)
    <b>Condition 2:For second inbound interface</b> (/p1:MessageType/RecordSet/Response = F)
    The above condition has worked for me. Hope this would be helpful to you.
    Regards,
    Sridhar

  • Plz explain use of  MeasPoints & counters and counter based MaintenancePlan

    Hi!
    My dear PM Gurus
    Can any body explain how to create the measuring points and counters and detailed steps
    to create a counter based, performance based and condition based maintenance plans, plz.
    Regards
    MDSFR

    Hi
    Create the measuring point for the equipment in IK01. Before you need to create the characteristics for the measuring point in CT04.
    For the Maintenance plans, pls find link below from SAP help
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/f9/548ab8cdeb11d1950e00a0c93029cf/frameset.htm
    Sachin

  • Steps to create the counter based Maintenance plan

    Hi!
    Can any body give "Steps to create the counter based Maintenance plan"
    (Mater Data,Transactional Data and Customizing Data creation)
    Regards,
    MDSFR

    hi
    please refer the following link
    http://help.sap.com/saphelp_46c/helpdata/en/fe/67ef189d6f11d189b60000e829fbbd/content.htm
    regards
    thyagarajan

  • Counter Based Strategy Plan

    Hi Dear All,
    as per client requirement I want to create Strategy Plan (Counter Based) in which Maint call has to due on after every
    100Hr & 300Hr. for that I created Meas Counter & assigned Lower Range: 0Hr & Upper Range: 100Hr.
    after assigning Maint Strategy & counter to Maint Plan, I scheduled it. Initialy no any Meas Documents created so no any
    Maint call due but after 1st Overflow at 100Hrs their r number of maint calls due(near about 42 maint calls due) on same
    date for both maint packages. I didn't understand that, how miant call due for 300Hr Package(even it is not overflowed)?
    Could any one plz explain me in details?
    afterwords i created few more meas documents upto 320Hrs which would not make any effect on next scheduled calls. The
    Scheduled call Status list is same as it is after 100Hrs.
    Plz let me know where I was wrong?
    Thanks in Advance...
    Amol.

    Hi Amol,
    When you are maintaining a counter, you should not normally give Upper & Lower Limit.
    You should Maintain Annual Estimate. What is that you have maintained in your Counter. I hope you have maintained a very low value or none.
    Hence when you have created a measuring document of 100 Hrs, it has considered very short duration and calculated many calls same day.
    Just Enter a Annual estimate say 8000Hrs (maximum possible practically is 8760).
    Create anothert plan and just check with same measuring point after entering the annual estimate & removing limits. It should work.
    MLN Prasad

  • Counter based startegy plan

    HI Friends,
    We have created a counter based startegy plan. the order should be generated at 500/1000/2000 hours.
    Current counter reading is 5, still when the maintenance plan was scheduled 3 orders got generated for the same day.
    Could you let me know why this happened? isithis standard system behaviour.
    thnaks in advance
    Warn regards
    Vivek

    Hi
    counter based plan count the counter on the basis of annual estimate in measuring point
    and on the basis of that value only generate the order
    so enter the practical value in annual estimate
    keep the scheduling period small
    try background scheduling
    hope will be work
    Jitender

  • Counter Based Maintenance

    Hello All
    Can any one let me know how the counter based planning can be execute.
    If the maintenance is required oon one equipment after 300 hrs & 1000 hrs.
    I try to do this but not able to execute properly
    1) create equipment
    2) create 2 measuring point against the same equipment.
    3) create cycle (ip11z) with same frequency.
    4) create plan (ip43) and then assign the cycle set and then attach both counter to that plan.
    5) after scheduling ip10 then  creating measuring document
    6) finally move to dead line monitoring
    here at 260 hour the system is generating order but that order contain operation of both frequency (300 hrs &1000 hrs)
    i also check the hierarchy, in  (ip11z ) the hierarchy field is not available like as in ( ip11)
    Thanks in advance
    kapil

    Hello Sandeep
    Thnx for your reply but still i am in vain pl have a look elow what i did
    I create strategy (E)
    Scheduling indicator u2013 time
    Strategy unit- H also mention call horizon, n some other parameters
    In Packages
    1)     288           H          300 hour           1H                             1
    2)     984           H          1000 hour         2H                             2
    hour      UOM     Description     Short Descript            Hierarchy
    Then I create M-Plan via IP42 with the same strategy and attached the task-list. So there is no field to put the counter
    May be I am wrong some where ,just review the same and let me know if miss some thing
    Regards
    Kapil

  • Counter based maintenance plan triggered improperly

    Hi,
    we have created one counter based maintenance plan with cycle unit 1000 hours  offset unit 0 hours this plan was created on 21.04.2008 . But 68 orders triggered on 19.04.2011 why it was happend.
    how find start of cycle reading  for the Maintenance plan?
    Regards
    Ganesh

    Hi,
    Counter based plan will work based on the Measuring point assigned to that.
    In Measuring Point, you would have defined the Annual Estimate. Based on the Annual Estimate & Cycle value in Plan & Scheduling period in the plan, based on all these, call object would be generated.
    Doubt in Single Cycle Performance based Plan
    Regards,
    Maheswaran.

  • COUNTING RECORDS AND DETERMINING AVERAGES IN REPORT WRITER

    I HAVE 10 GROUPS. I WANT TO BE ABLE TO COUNT RECORDS AND DETERMINE THE AVERAGE DAYS FOR EACH GROUP. I GET DAYS BY SUBTRACTING THE RECEIVED DATE FROM THE RESULT DATE. I WANT TO DETERMINE THE AVERAGE DAYS AND THE NUMBER OF RECORDS IN THE TOP 10%, THE TOP 20%, THE TOP 30%, THE TOP 40%, THE TOP 50%, THE TOP 60%, THE TOP 70%, THE TOP 80%, THE TOP 90%, AND THE TOP 100%. HOW DO I CODE MY LOOP IN PLSQL TO DO THIS? CAN I DO THIS IN REPORT WRITER?

    I am not sure about the exact thing that you are requiring. but you can get the top 100 and top 20 or top 300 etc. by using the ROWNUM function in sql statement.
    thanks

  • Territory Based Employee Determination

    Hi All,
    We are working on territory based employee determination in which Based on the territory, the system can automatically determine the employee responsible in the business transaction. For this,
    I have already assigned the access sequence 0030 to the employee responsible in the partner determination procedure.
    Now how will the territory get determined. I have maintained the attributes for sold to party assuming that the territory will get determined on the basis of that and then the employee responsible on the basis of territory.
    Please guide if I am missing some step.
    Regards
    Aakshi Suri

    Hi Aakshi,
    Have you checked to ensure that the territory structure is maintained correctly and that the partner you entered into the transactions fits the criteria?
    Access sequence 0030 is looking at the Sold-To partner function in the transcation. Can you please confirm that this is the correct partner you are trying to determine an employee from?
    Regards,
    David.

Maybe you are looking for

  • Trying to add goggle analytics widget to muse files

    Trying to add goggle analytics widget to muse files. When "master page" is referred to is adobe referencing the masters (at the bottom of the plan section) or are they referring to all the pages build on the original master. Also, if applying the ana

  • Oracle 11.2.0.1 & oo4o(32bit)で表関数を使用するとエラーとなる

    お世話になっております. 通常サーバー: asianux 3 (32bit) , Oracle Database 10g Enterprise Edition Release 10.2.0.1.0, ビッグデータ用サーバー: asianux 4 (64bit) , Oracle Database 11g Enterprise Edition Release 11.2.0.1.0 - 64bit クライアント: Windows 7 (64bit) Excel 2010(32bit) Oracle

  • Cannot create a GR for a subcontracting PO

    Hi I am not able to create a GR in MIGO for a subcontracting PO. It is givingthe error message " enter storage loc" but I have that field locked in the header details tab. Please advise. Thanks VV

  • Alias disappearing in oracle 11g whereas it worked fine in 10.2.0.4

    sql@10g>select * from v$version; BANNER Oracle Database 10g Enterprise Edition Release 10.2.0.4.0 - 64bi PL/SQL Release 10.2.0.4.0 - Production CORE 10.2.0.4.0 Production TNS for IBM/AIX RISC System/6000: Version 10.2.0.4.0 - Productio NLSRTL Version

  • JSplitPane resize problem (not a minimum size problem though)

    I created a JSplitPane and put a JPanel in both the top and bottom sides. This JSplitPane is in the center section of a BorderLayout of a JFrame. The minimum sizes are set and I can move the divider bar all I want. Instead, I am having trouble resizi