CPM and SRM in BW7.0

Hy to all,
i'm interesting about bw7.0. I know that bps is integrated in it. Do you know if CPM and SRM are integrated in it too? Which are the transaction code of CPM and SRM.
Thanks in advanced
Best regards
Dario

Hi,
Even though BPS is intergrated into BI 7.0, still CPM, BCS, BIC, SRM are part of SEM 6.0.
Kumar

Similar Messages

  • Active Directory, single sign-on and  SRM Users

    We are in the process of installing SRM 7.0. using the Classic Scenario. I am seeking clarification around the creation of users in that system given the following:
    - My Basis colleagues are in the process of implementing single sign-on using Active Directory for our SAP Portal, SAP Business Warehouse and SRM systems.
    - Single sign-on will not  at this point be used for our SAP ECC 6.0 system
    My questions are:
    1. If active directory is being used do we need to create actual users within the SRM system?
    2. If actual users in the SRM system are not required, does this have any impact on the creation of the Organizational structure in SRM from the SAP ECC HR hierarchy?
    Many Thanks

    Hi Claire,
    The Single Sign On work only if user exist on every systemes.
    For example :
    If you connect trough portal to access ECC and SRM, your user id must exist in ECC and SRM.
    For Active Directory you can synchronize your user table to AD by using LDAP option.
    The best way is to configure a CUA for ECC and SRM, use the UME of Portal on ECC and synchronize the CUA to Active Directory.
    Finally use the SSO certificate between Portal ECC and SRM.
    Regards,
    Gilles SEBBAG
    Sap Technical Consultant.

  • Data Consistency when Copying/ Refreshing ECC 6.0 and SRM-SUS 5.0 Systems

    Hello,
    We are planning a refresh / system copy of an ECC 6.0 and SRM-SUS 5.0 system
    The refreshes will be completed from backups taken of production systems refreshed onto the QA Landscape.
    I have referenced the following SDN thread that provides some guidelines on how to refresh R/3 and SRM systems and maintain data consistency between the systems using BDLS and changing entries that correspond to backend RFC destinations:
    [Is there a process/program  to update tables/data after System Refresh?;
    This thread is fairly old and relates to earlier versions of R/3 (4.7) and SRM (3.0).  We have heard that at higher system versions there may be technical reasons why a refresh canu2019t be performed.
    Does anyone have experience of completing successful refreshes of landscape that contain ECC and SRM systems at higher SAP versions (ideally ECC 6.0 and SRM-SUS 5.0)  Does anyone know whether it is technically possible?
    Are there any additional steps that we need to be aware of at these higher SAP versions in completing the copy to ensure that the data remains consistent between ECC and SRM?
    Thanks
    Frances

    I have seen this somewhere in the forum: See if this helps you
    BDLS: Convertion of logical system (SRM).
    Check entry in table TWPURLSVR.
    Check RFC connections (R/3 and SRM)
    SPRO, check or set the following points:
    Set up Distribution Model and distribute it
    Define backend system
    Define backend sytem per product category
    Setting for vendor synchronization
    Numbe ranges
    Define object in backend sytem
    Define external services (catalogs)
    Check WF customizing: SWU3, settings for tasks
    SICF: maintain the service BBPSTART, SAPCONNECT
    SE38:
    Run SIAC_PUBLISH_ALL_INTERNAL
    Run BBP_LOCATIONS_GET_ALL
    Update vendor BBPUPDVD
    Check Middleware if used.
    Run BBP_GET_EXRATE.
    Schedule jobs (bbp_get_status2, clean_reqreq_up)
    Convert attributes with RHOM_ATTRIBUTE_REPLACE

  • What's the difference between SNC and SRM?

    we will sell SNC in Q2.But i don't know what is the difference between SNC and SRM.
    i've heard SNC suit Direct procurement better than SRM...
    Pls give me the advice and information.
    good regards kenji

    Hi Kenji,
    SRM is more of Supplier Identification and SNC work of building
    relationship with Supplier starts after this Supplier identification.
    SNC is very Good tool to handover Inventory replenishemnt
    to Suppliers and it gives Visibility of inventory information over Web UI.
    SNC has many processes like PO Collaboration, SMI, DR,DCM, SNI,
    Invoice Collaboration,Release process...to accomplish above mentioned task.
    SNC is designed for direct materials procurement.
    SRM has contract negotiations,bids,auctions for sourcing to identify suppliers
    SRM is good for basic purchasing fuctionality and suitable for indirect materials.
    In addition to all these SNC has Customer Collaboration functionality also.
    Regards,
    Vasu

  • Reconcilation of Customer and Vendor from CRM and SRM to 0bpartner in BI

    Hi,
          I am having customer master data and vendor master data in ECC  both represents the same numbers .Ex: 10001 - customer1 and 10001 - vendor1.
    I am sending this data from ECC system to CRM and SRM system and again Iam loading this data into 0BPARTNER Infoobject in BW from CRM and SRM systems.
    In BW it is messing up, when i do a report on CRM cube it show me the vendor descriptions where i supposed to see customer descriptions .
    I can't change the ECC customer and vendor numbers since i need to change all other legacy systems depending on this .
    Can any one tell me how to fix this problem and your help is truly appreciated.
    Thanks,
    Ramkumar

    Hi,
    Please check following links
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/90f33e12-aeac-2a10-2186-ed8301f778ba?overridelayout=t…
    Cross company-code invoice posting and configuration - ERP Financials - SCN Wiki
    Regards,
    Tejas

  • ABAP Proxy connection Between PI and SRM for XMLs

    Hello Experts,
    We are trying to set up ABAP proxy connection between PI 7.1 and SRM so we can send XML from SRM into PI.
    Our SRM developer is getting an SLD error (below) and seems like something is not set up right in the SLD. Could you help me out with any kind of blog/documention on setting up an ABAP proxy connection between PI and an ABAP system. Something that talks about what steps we need to take in PI and SRM.
    error ...
    *We saw the error during debugging. This error is preventing XML output
    to be sent to PI.
    BBP_BD  002     An SLD system has not been assigned to logical system
    Thanks,
    Mayur

    Thanks all for a quick reply. I also had to take following step to achieve the task.
    adding the XI system to the SRM config - SRM Server -->
    Technical basic Settings --> Define  System Landscape?  (also please
    associated documentation in that link for XI)
    Thanks,
    Mayur

  • Key functional differences between SRM 7 and SRM 5

    Dear All,
    I urgently need to put togther a comparison document thst list key functional differences between SRM 7 and SRM 5.
    NB. i donot have access to service marketplace.
    sheena.roberts(AT)yahoo
    Thanks
    Edited by: Sheena Roberts on Jan 18, 2011 11:21 AM

    Hi Sheena,
                        Go to  difference between srm 5.0 and 7.0
    Regards
    Vishal Pd

  • Integartion with ERP and SRM

    Hi,
    We are looking for integration of E-sourcing 6.0 with ERP 4.6C and SRM 3.0 with Extended classic scenarion.
    Is it possible to do the integration, if not can you suggest how the above scenario can be acheived?
    Is it possible to integrate the MDM 2.0?
    Regards,
    Madhan

    Integration between ESO and SRM is a custom solution with help from SAP. We have implemented this recently.  However Intergration between ESO and ECC is standard.
    Please reach out to SAP for further assistance.
    Good Luck

  • Clariffications in MM SUS Scenario with ECC 6.0 backend and SRM 5.0

    Dear Team,
    We are implementing MM SUS Scenario with ECC 6.0 backend and SRM 5.0
    We need to following clarifications
    1 Once we create ASN in SUS, how to cancel the ASN. We are not able to see cancel button for ASNs
    2 When we create GRN in ECC against the inbound delivery and perform Return Delivery, this Return Delivery is getting updated in SUS. But the ASN status is not changing to canceled. We are not able to perform new ASN for this. Also invoice is being allowed for these ASNs. How to control the same.
    Request your inputs please
    Regards,
    Ravi

    HI can you tell me how you get it solve?
    thanks in advance.

  • Custom Integration between CLM and SRM

    Hi
    Can any body help me how to do custom integration between CLM 2.0 and SRM for contracts using PI. On SRM side we have customised API. More specifically I need what is to be done in PI for custom integration between CLM and SRM.
    Thanks in Advance
    M G REDDY

    Hi There,
    Has anybody managed to custom integrate CLM & SRM?
    If so please kindly share how this was achieved.
    Thanks,
    Sheena

  • Step by step screen shots fro APO and SRM, CRM , SCM extractions.

    hi friends,
    can i get step by step screen shots fro APO and SRM, CRM , SCM extractions.
    Thanking u
    suneel.

    Hi,
    I am not sure that you can find something like you asked but from my point of view BI Content is enough.
    Regards,
    ®

  • Separate the Delegation for T&E and SRM in UWL

    Hello Experts,
    We have the integrated portal which is communicating to ECC and SRM system.
    There is a requirement to delegate the SRM tasks i.e Shopping cart approval alone.
    The T& E task should go as usual.
    By using the Manage Substitution rule if we set All then all the work items are going to the delegated user.
    Please help to achieve this.
    And also please share your inputs on Functional, Desciplinary, Strictly Confidential delegation.
    Thanks in advance!
    Regards,
    Senthil Kumar S.

    This can be achieved by maintaining task classes and assigning substitution profiles to task classes as per your needs.
    Then you can assign the required tasks to the task classes.
    There is a very well explained document on this scenario.
    Check this document to achieve what you are looking for:
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/109d2ea2-035c-2c10-06be-f6165ba7af11?QuickLink=index&overridelayout=true
    Hope it helps !!
    Thanks,
    Shanti

  • Difference between SCM, SEM and SRM

    Hi
    Can anyone help me to understand the difference between SCM, SEM and SRM ?
    Regards
    Srini

    SRM is a procurement tool like ARIBA .
    SRM is a web based tool to handle all procurement business process .
    to know more about SRM . here you go..
    http://wiki.sdn.sap.com/wiki/pages/viewpage.action?pageId=18926
    SAP SRM will help you move beyond spend reduction to gaining competitive advantage and supporting top-line growth. The application enables purchasing excellence, increases profitability, and helps transform sourcing and procurement practices and create new business opportunities - all of which translates into a measurable ROI. SAP SRM enables the full range of supply and procurement activities, closing the loop from strategy stage to execution. SAP SRM will help you optimize operations and put together a world-class supply and procurement operation, with a scalable platform and an easy-to-use business user interface that enables processes in the following key areas:
    Spend analytics
    Supplier performance management
    Strategic sourcing
    Contract management
    Operational procurement
    Catalog management

  • Compatibility between ECC 6.0 EHP4/NW 7.01 and SRM 5.0

    We have ECC 6.0 SPS 03 and SRM 5.0 System with the dual stack. We are planning to upgrade ECC 6.0 only to EHP4 SPS08. Will it lead to any compatbility issues with SRM 5.0? are there any dependencies? I
    have checked the Upgrade dependency tool and it did not find any dependency. I am not able to find out any note which explain impact of upgrading ECC to EHP with SRM.  Any help will be appreciated.

    Hi,
    I don't see any problem in having SRM 5.0 with ERP 6.0 EHP4/NW 7.01. You can have a look at SAP note 963000 which shows that SRM 5.0 is released with this release also. So, I think SRM 5.0 is fine with EHP4.
    Thanks
    Sunny

  • Material replication between SAP and SRM

    Howdy friends.
    Is there any way to stop having to manually activate the material replication queue between SAP and SRM each time please?
    Our admin team go to transaction SMQ2 each day and for 2-3 years have been manually activating each queue manually and doing this several times per queue as the entries do not reach zero. Surely, it is possible to set this up to be automatic as a job?
    Ciao,
    Mike

    Hello,
    I could not find the SDN Weblog but here a link to an article that migh help you....[url]http://searchsap.techtarget.com/tip/0,289483,sid21_gci1245134_mem1,00.html[url]
    That should help you check your settings, et al and resolve your issue.
    Regards, Dean.

Maybe you are looking for

  • Abap oo concepts

    Hi, I have used this code in my prog.I got "Cref is not an object reference" error..how to rectify it..please help if u know... data:cref type ref to c1. create object cref.

  • Why is RAM preview crashing my After Effects CC 2014?

    Using Windows 7 x64 After Effects CC 2014 I'm getting numerous crashes when using the RAM Preview. Until my current project started getting more complicated all was good - no crashes. As I've added more assets to it, it's become very unstable. When I

  • ITunes 7.1 asks for authorization every single time I synch, other issues

    Ever since updating to iTunes 7.1 I've had the following problems: 1.) It won't just sync new items when manually manage files is checked off. 2.) When I add one new file, it now tells me that I have to wipe and re-sync the whole thing instead of jus

  • Correct order to learn Adobe CS4 programs?

    I'm new to graphic design, I have all the Lynda tutorials I need so I want to know the correct order in which I should learn the CS4 suite Programs. For example - am I supposed to start with Photoshop, then Illustrator, then ??? (you get the idea)

  • DB links Oracle to Sql server

    Hi All, I am planning to create DB link from oracle to sql server 2005. Please provide the doc for creating db link from oracle to sql server 2005 and also let me know is their any freeware to do the same. Regards