CProjects installation with xRPM and xPD

Dear All,
             I need a small information on the installation of cProjects including xRPM and xPD from scratch. Also i want to know the additional requirements like EP server for the xRPM and cProjects hosting. I want to install cProjects outside of SAP R/3 server. Please let me know the hardware sizing for 5 to 10 concurrent users and any other useful information..
regards,
rajesh.

Hi,
Sizing: http://service.sap.com/sizing -> Sizing Guidelines -> Solutions & Platform -> Sizing cProjects
and about client sizing read Note 1124236.
Is this usefull?

Similar Messages

  • Office Administrative Template installation with 32 and 64 bits clients

    Hello,
    I would like to install the Office Administrative Templates (2007, 2010, 2013) but I don't really understand how.
    I have several clients computers :
    -Windows XP and 7 (the XP will disappear but not now so I have to handle with)
    - 32 and 64 bits (OS and associate Office version)
    - two Office languages (English and French)
    In this case, what I have to put in the domain controllers (or in the central store for GPO, not matters), to cover all the cases ?
    I do not understand the x86 or x64 Office administrative templates versions neither how the languages are managed.
    Thanks a lot.

    The Office2013 Admin Templates+OCT is available in both 32bit and 64bit formats
    http://www.microsoft.com/en-us/download/details.aspx?id=35554
    Because the download contains the Templates *and* the OCT (OPAX/OPAL and various DLLs etc), and, the OCT itself and also the OCT output file (a customization MSPfile) is architecture-specific, that is why there is a 32bit and a 64bit download.
    The ADMX/ADML files themselves, are not architecture-specific.
    ADMX and OPAX, is language-neutral, the language-specific details are contained within ADML/OPAL.
    https://technet.microsoft.com/en-us/library/cc178992.aspx#section2
    Don
    (Please take a moment to "Vote as Helpful" and/or "Mark as Answer", where applicable.
    This helps the community, keeps the forums tidy, and recognises useful contributions. Thanks!)

  • Installation with Oracle and Solaris 9

    Hi Everyone,
    I'm trying to install EP 6.0 sp8 with WAS 6.40 (java) on a Oracle 9.2.0.4 DB and Solaris 9 OS.
    I have installed this EP version with SQL/Win without problems, but now I have several errors.
    Somebody has installed this successfully ?   Any clue would be helpful.
    I have 2 errors by the moment:
    1) ERROR at line 1:
       ORA-00988: missing or invalid password(s)
       ORA-06512: at line 17
    2) Some problem related with network adapters (My server has 4 network adapters)
    thanks a lot for your help !
    Regards from Mexico,
    Diego Hernández

    Hi Diego,
    you should edit the /etc/hosts file.
    Change the frontend ip adress to the servername and delete other entries for this ip adress(eg XXX-b,XXXX-c).
    Start a new installation(even Database)->then you won't get different profile Startup Scripts.
    Regards,
    Toni

  • Installation with LVM and gpg-encrypted key, what to tell Grub

    Hi,
    after years of using Gentoo Linux I grew tired of the compilation effort, so I decided to give Arch Linux a shot. I like the idea of a basic system which I can fit to my needs instead of a bloated distribution.
    I want to encrypt my disk and did this with the following tutorials:
    Official Arch Linux Install Guide
    DM Crypt with LUKS
    Basic Cryptsetup
    Gentoo DM-Crypt with LUKS
    So far, the installation worked well, but I'm stuck with this problem:
    I have a gpg encrypted key stored on a SD-Card.
    My mkinitcpio.conf has the hook line:
    HOOKS="base udev autodetect pata scsi sata mmc usbinput fsck keymap encrypt lvm2 filesystems
    /etc/default/grub contains:
    GRUB_CMDLINE_LINUX="cryptdevice=/dev/sda6:vg root=/dev-mapper/vg-root ro cryptkey=/dev/mmcblk0p1:jfs:/Key.gpg"
    However, if I am booting, there are the following outputs:
    No key available with this passphrase.
    Invalid keyfile. Reverting to passphrase.
    A password is required to access the vg volume:
    Enter passphrase for /dev/sda6:
    So, obviously, he isn't able to gpg-decrypt the key, or am I missing something?
    I do really need some help at this point.

    On my gentoo installation, I had to tell cryptsetup to use the decrypted key as password for the new key. In fact
    gpg -q -d <GPG-Keyfile> | cryptsetup luksOpen /dev/<encryptedPartition> <cryptContainer>
    did exactly what I wanted.
    I wanted to have my system highly secured, so a password-protected keyfile on an extern medium was the best choice.
    Edit: There has been another tutorial: System encryption with gpg encrypted keys, but it's out of date.
    Last edited by iarumas (2012-12-05 22:50:34)

  • First time installation with WRT54GX2 and having problems...

    Attempting to setup my wireless network and used the setup disk and that a wireless broadband g router is not found, make sure power is on and all connections are correct.  After confirming this I download the easylink and it says that wired lan needs to be enabled.  Check status and it is.  Try to access web based utility, 192.168.1.1, it asks for username and password.  put it the default admin in password and it attempt to load the web utility with no success.  It let attempt for about 20 minutes or so with the windows icon in the top right hand corner waving.  I'm using a different router from my previous setup that I had in another apartment.  I was using the befw11s4 with the cox high speed internet with no problem.  Moved in new place with bellsouth dsl (according to website dynamic ip) with router wrt54gx2 and can't get it setup.  I have 2 desktops, PS3, and Nintendo Wii that I want sharing internet connection.  I need some advice.

    Make sure all your devices are wired correctly then with a WIRED pc connected to the router open your browser.  Then when your browser is open type in http://192.168.1.1 and enter your password if you changed it.  That will get you into the routers set up page.  Since you have a DSL connection set the router to use PPPoE and enter the user name and password provided by your ISP and save settings.  Also you may want to set the Keep Alive setting to 30 seconds.  Then go to the wireless tab and configure your SSID to something you can identify has your wireless network and set the rest of the settings as your network requires. You may need to open your ports if needed for your PS3 and Wii.
    Richard Aichner (Ikester)

  • Arch installation with Raid0 and Windows 7

    Hi
    I am not a newbie at Arch but I am a newbie at Raid0 i never had Raid0.
    So my problem is i want to Install W 7 and Arch on Raid0.
    I make the Raid0 in the Bios (Asus P5E  Mainboard) and Install the Windows System,
    after that i try to boot the Bios CD it ends at grub command line.
    I downloaded the Arch Net Install and with this i boot.
    But my problem how the install now i try the Raid/LWM howto from the Wiki but i dont know it doesnt
    work.
    I hope some can me help
    And Sorry for my english
    CU

    loosec wrote:
    Follow http://wiki.archlinux.org/index.php?tit … _Fake_RAID carefully and you are on your way.
    Software raid will not work in a dualboot setup with Windows 7.
    Fake-Raid will work if your chipset is supported by the dmraid driver.
    Also a lot of threads about this in the forum so a search for 'Windows RAID dualboot' should be able to help you.
    GL HF.
    Ok thanx I will try it and report here if it was sucsessfull

  • New installation with curve and desktop 7 on PC

    After first sync, desktop manager crashes as soon as I try to change my settings.
    Many of my contacts not on my phone (but they are on outlook) and now way to send them to my phone since desktop is crashing

    There is an audio group - yet...
    Note: None of these groups is needed for standard desktop permissions like sound, 3D, printing, mounting, etc. as long as the logind (or consolekit) session isn't broken (for example by starting X on a different VT than where you logged in).
    https://wiki.archlinux.org/index.php/Us … ser_groups
    If you are using logind, check to see if you are an active user.
    https://bbs.archlinux.org/viewtopic.php … 4#p1187774

  • Oracle 10g R2 installation with ASM+RAC

    Gurus,
    Need some suggestuon on Oracle 10g R2 installation with ASM and RAC option.
    We have found many documents on the Oracle, HP, HP-Oracle CTC and third party web sites, but nothing that is specific to this particular combination of separate
    ORACLE_HOMEs, ASM and 10g RAC CRS. It is unclear for me from the documentation how this combination of ASM and 10.2g RAC may best be installed.
    The high level steps i got after reading lot of docs as follows - but i am not sure whether these are correct or not. if they are correct, can any one share their experience/notes please?
    1) Install CRS
    2) Install RDBMS for ASM HOME - create separater oracle home for ASM instance using OUI
    3) Install RDBMS for RAC Database Home - create separater oracle home for RAC database using OUI
    4) Create ASM database using DBCA -
    5) Use dbca to create database.

    Oracle provides 'paint by numbers' tutorials called 'Oracle By Example'. (Go to OTN, check under the Training tab)
    They have one for a Windows based ASM/RAC that you might want to review. Not your specific environment, but the steps will be dag-nabbed close.
    I recommend walking the path (http://otn.oracle.com >> training:OBE >> Database 10g Release 1:VMWare:Installation
    http://www.oracle.com/technology/obe/obe10gdb_vmware/install/racinstallwin2k/racinstallwin2k.htm

  • Oracle 11gR2 RAC installation with DNS

    Dear Guru's,
    I want to configure RAC on two node cluster with DNS(For SCAN) in my testing server.
    O.S: RHEL5.4(64 bit)
    Oracle Version: 11gR2(11.2.0.2)
    Note: Am creating nodes in VMware ESXi server.
    Just I want to know whether DNS should be configure in any one of those NODES or in separate machine.
    Bala :)

    Hi Bala,
    I want to configure my Database with & without DNS. (Will try both installation in different servers)I think, you have already received a link on very good article about Oracle RAC installation without DNS and DHCP (I mean Jeffrey Hunter's article).
    There is one more about Oracle RAC installation with DNS and DHCP (http://gjilevski.com/2011/10/05/build-two-node-oracle-rac-11gr2-11-2-0-3-with-gns-dns-dhcp-and-haip/).
    And want to know how it forwards the client connection if a node fails.. Can anyone update the URL for this..There are a lot of information about it:
    - http://www.oracle.com/technetwork/database/features/oci/taf-10-133239.pdf
    - http://docs.oracle.com/cd/E14072_01/java.112/e10589/apxracfan.htm
    - http://www.oracle.com/technetwork/database/app-failover-oracle-database-11g-173323.pdf
    Very good videos:
    - http://www.dsvolk.ru/oracle/racdd4d/demos/video/taf/session/session_viewlet_swf.html
    - http://www.dsvolk.ru/oracle/racdd4d/demos/video/taf/select/select_viewlet_swf.html
    - http://www.dsvolk.ru/oracle/racdd4d/demos/video/taf/callback/callback_viewlet_swf.html
    - http://www.dsvolk.ru/oracle/racdd4d/demos/video/fan/fan_viewlet_swf.html
    Hope it helps,
    Best regards,
    Gena

  • I cannot update FCP 7 to 7.03 on a installation with Yosemite

    I set up a new installation with Yosemite and installed Final Cut Studio from my original disks. FCP 7.00 work properly, but it will not update to 7.03. Now I cannot open my projects, that I was working on with FCP 7.03,

    Oh...yeah. It can't update when FCX is in the Apps folder.  Since I don't use FCX, I don't know the actual solution, but I know that FCX needs to not be in the Apps folder, or needs to be hidden in some sub folder, in order for the update to work.  I think I read that you need to install and then update FCP 7 before you even install FCX. 

  • Resource planning in cprojects with xRPM or MRS?

    Dear Experts,
    To my understanding there are four options to perform resource planning in combination with cprojects:
    1.     Do a planning in cprojects only
    2.     Use resource planning application (RPA) from SAP CRM
    3.     Schedule resources with xRPM
    4.     Schedule resources with SAP MRS (Multi Resource Scheduling)
    I have a couple of questions:
    (a) Is it correct that I cannot assign resources to project roles in xRPM based on qualification matching? Is it right that xRPM is used rather for a long-term view to define the available capacity of projects/roles than assigning specific resources to roles?
    (b) How can help SAP MRS in comparison to option 1 (planning in cprojects)? I assume that I can do also in cprojects itself a qualification matching. MRS provides a more detailed qualification object to cover complex requirements, right? What else provides MRS what cannot be managed in cprojects itself?
    (c ) If we want to use a staffing process were project lead and resource manager doing the staffing and have the option to suggest or reject roles, we have the option to use xRPM or MRS, right? What are the differences? In MRS we have options like using several resource managers, softbooking/hardbooking or itu2019s possible to define the workflow who proposes resources and who is doing the final staffing (project lead or staffing manager), reasons for rejections can be configured etc. Are these options in xRPM available as well?
    Thanks,
    Angie

    Hi Angie,
    I have not implemented MRS or RPA so can only answer your first question. You cannot do a resource search via qualification in Portfolio Management (aka xRPM), typically you would do this in Project Management (aka cProjects) and this functionality works fine provided you have maintained qualification data for BP's and roles. Portfolio Management financial planning function can be used for a long term view as you have mentioned. However, it is also typically used to summarize and/or roll up resource demand / assignment to a bucket or portfolio level or summarize resources for multiple projects via initiatives or collections. You can also use a top down approach and at a high level plan values at the bucket level (i.e. forecasted demand or business case demand) and compare against detailed planned / assigned demand rolled up from project management.
    Hope this helps.
    Regards,
    Lashan

  • Message MOPZ_CHECK107 with RPM and cProjects

    Hi all,
    I'm using SAP Solution Manager 7.0 EHP1 SPS26. I want to upgrade our ERP EHP3 system to EHP5. I'm running a MOPZ session and I get following errors:
    Successor installed for SAP XRPM 4.0.
    Successor installed for SAP CPROJECT SUITE 4.00
    In fact SAP cProject Suite 4.50 is installed here.
    I already saw a similar problem in this forum (Error in maintenance optimizer), but it doesn't help me. I tried to apply recommendations of SAP note 1495419, without success.
    Our ERP EHP3 system is currently defined in SMSY like this:
    - SAP ERP 6.0, with SAP ECC Server marked as relevant and SAP cProject Suite marked as also installed;
    - EHP3 FOR SAP ERP 6.0, with Central Applications marked as relevant;
    - SAP CPROJECT SUITE 4.50, with cProject Suite with WFM Core marked as relevant;
    - SAP RPM 4.5, with RPM Core marked as relevant.
    Logical component Z_ERP (ERP 6.0) is in our solution.
    I also tried to use the Landscape Verification Tool (transaction LVSM), then ran a new MOPZ, but without success.
    Any suggestion is welcome.
    Kind regards,
    Christophe

    Hi,
    for the error - Successor installed for SAP CPROJECT SUITE 4.00
    try this solution:
    - Remove first SAP RPM, SAP CProjects Suite 4.50 and SAP Portf and Proj Mang 5.0 from the system.
    - Now, add only CProjects Suite 4.50 and while adding, say "NO" when this window with respect to Product Assignment appears. Save the system.
    - Now, add SAP Portf and Proj Mang 5.0 and save the system.
    Run a new MOPZ transaction and it should work.
    Regards,
    Mohan.

  • CProject, xRPM and PS integration

    I have some question about integration between SAP PS and cProjects/xRPM.
    I know that I can upload structure of project from SAP PS to cProjects and then to get some
    data to xRPM.
    Is this integration permament and in both directions?
    What I mean.
    When I change some data in PS eg. dates, structure or responsible persons will this be send
    automatically to cProjects and xRPM?
    The same in the opposite direction. When I plan some resources eg personnel will this be send
    to PS at the same time?

    Hi,
    yes, the integration is permanent.
    For Example....
    During transfer of work centers from Project System to xRPM, teams are created in xRPM for each of the work centre being transferred to xRPM. One can do this from SAP PLM PS by running the report RPM_WRKCNTR_UPLOAD,
    which transfers work centers to SAP xRPM and uses them to create team master data. The team name in xRPM is generated using a combination of plant and work center, because the work center ID is only unique within a plant and can be used again in a different plant.
    The resources assigned to the work center are used to create the resources assigned to teams in SAP xRPM. The employee IDs of resources in SAP PLM PS are used to search for business partners in SAP xRPM with identicalemployee IDs.
    If a match is found, the business partner is added to theteam.
    If the SAP PLM PS work center is created using organization units, the employees in the organization unit are derived during the transfer of the work center and used as the basis for creating teams. If new employees are added to the organization after you have run the report, these employees are not included in SAP xRPM system unless you run the program again. For
    this reason, you should run the program regularly (for example, weekly) or schedule it for background.
    Hope it helps you.
    Thanks
    Arbind

  • XRPM and cProjects Integration

    Hi!
    Has anybody got any docs on how cProjects can be integrated with xRPM..how cProjects project can be tranfered in xRPM?
    My email address is [email protected]
    Thanks in advance!
    Alex

    Hi,
    yes, the integration is permanent.
    For Example....
    During transfer of work centers from Project System to xRPM, teams are created in xRPM for each of the work centre being transferred to xRPM. One can do this from SAP PLM PS by running the report RPM_WRKCNTR_UPLOAD,
    which transfers work centers to SAP xRPM and uses them to create team master data. The team name in xRPM is generated using a combination of plant and work center, because the work center ID is only unique within a plant and can be used again in a different plant.
    The resources assigned to the work center are used to create the resources assigned to teams in SAP xRPM. The employee IDs of resources in SAP PLM PS are used to search for business partners in SAP xRPM with identicalemployee IDs.
    If a match is found, the business partner is added to theteam.
    If the SAP PLM PS work center is created using organization units, the employees in the organization unit are derived during the transfer of the work center and used as the basis for creating teams. If new employees are added to the organization after you have run the report, these employees are not included in SAP xRPM system unless you run the program again. For
    this reason, you should run the program regularly (for example, weekly) or schedule it for background.
    Hope it helps you.
    Thanks
    Arbind

  • My macbook pro was first installed with leopard and bootcamp 3.2. Now i updated to lion. The problem is now that it is not possible to update to bootcamp 3.3. or 4.0. The report: The installation source is not correct. What can i do? Thanks for answer.

    my macbook pro was first installed with leopard and bootcamp 3.2 under windows 7. After update to lion it is no more possible to update bootcamp to 3.3. or 4.0. The report: The installation source ist not correct. What can i do?
    auf Deutsch:
    Auf meinem Macbook pro war Leopard und bootcamp 3.2  unter windows 7 installiert. Nach dem update auf lion kann bootcamp nicht mehr upgedatet werden. Weder auf 3.3. noch auf 4.0. Folgende Fehlermeldung kommt: Boot camp Dienste: Das installierte Produkt stimmt nicht mit der Installationsquelle überein. ... Was kann ich tun?

    It means what it says. The "computer person" formatted it wrongly/ unsuitably. it needs to be formatted again.
    Error "Case-sensitive drives not supported" or similar install error | Mac OS
    Mylenium

Maybe you are looking for

  • GS70 2QE - Help needed.... non of my USB ports work :(

    Hi guys and gyals... First time posting here and I wish it was in a positive light but unfortunatley I have an error on my laptop thats preventing me from using it. So I purchased a GS70 2QE with 970m and 4720 processor. I was very happy for the firs

  • Table control in ABAP - beginner

    I am not able to fill data from database in TABLE CONTROL.The table is displayed with columns(which i added in layout using dict option) but on runtime there is no data in it.I am trying this for the first time so kindly guide me. Here is PBO and PAI

  • Internet plug in that Safari doesn't support

    Ouestion. Brand new Mac OSX 10.4 Not able to open Internet programmes, keep getting Safari doesn't support. Have tried ticking the Rossett box in Safari with no results. I had no trouble with G4 laptop with Panther. Would appreciate some help , thank

  • How can i backup the entire system ?

    Hi everybody, I'm running osx lion and plain to install windows 7 x64 running via bootcamp. Everybody knows, it takes a hughe times to tweaks boh systems and install all applications that we need. I would like to know if there's a tool that could all

  • Pushing Adobe 8 with Zenworks problem

    I am having a problem pushing Adobe 8 Pro with Zenworks. I push just the MSI from the CD and on first run an EPIC_APP error occurs and shuts down the program. The exact error is, "A serious error has been detected and Adobe EPIC_APP cannot continue.