Creat Shipping point configuration for plant

Hi
I want create shipping point for plant XYZ.
I need to create shipping point, so that I can maintain country and Transportation zone for the same.
Request you please tell me where i can configure in IMG?
What is the step by step process for setting shippong point for anty plant ?
Vicky

Hi Vicky,
Shipping Point Configuration:
1) SPRO->Enterprise Structure->Definition->Logistics Execution->Define, copy, delete, check shipping point...  for Defining the Shipping Point
2)SPRO->Enterprise Structure->Assignment->Logistics Execution->Assign shipping point to plant... for linking Shipping Point with Plant.
3)SPRO->Logistics Execution ->Shipping->Basic Shipping Functions->Shipping Point and Goods Receiving Point Determination->
             ->Define Shipping Conditions
             ->Define Loading Groups
             -> Assign Shipping Points ........ here you enter the combination of Shipping Condition, Loading Group, Plant for  determing the Shipping Point which can be one default and many manual.
Regards,
Karthik

Similar Messages

  • Shipping point configuration for selected materials

    We have configured one working day as our rounding-up period for shipping point in the system.  This forces the material to be available one day before shipping for preparation and traffic time.  
    The abpve has worked well for us since we have been make to order company till now.  Today we are moving towards keeping stocks for seasonal and fast moving items.  Problem:  In our current configuration, we can not ship on the same day even when we have stock.  The shipping point will add the rounding-up period for all materials on a SO.
    We would like to allow for same day shipping for in-stock items, as long as ATP confirms the qty.  At the sametime, continue to add the extra day for shipping point for anything that is not in stock.
    What can we consider to allow for such flexibility.  I would appreciate any pointers or help to point a rookie in the right direction.. 
    Thank you in advance,

    hi,
    u can achieve teh stocking scenario by creating a new shiiping point with 0 lead times (i assume u will continue with the MTO scenario too). for teh other requirement check the settings in ovz9- especially the tab 'recepits in the past'.
    saurabh

  • 2LIS_12_VCITM populates the same Shipping Point and Receiving Plant

    Hi Gurus,
    We are using 2LIS_12_VCITM extractor which answers all delivery-related requirements. However when I checked the data in RSA3, Shipping Point and Receiving Plant are the same. So I checked some sample deliveries in table LIKP and it shows the correct shipping point and receiving plant (which are different to each other). I checked VL03N and table LIKP is giving the correct shipping points and receiving plants. Receiving Plant or LIKP-WERKS and Shipping Point or LIKP-VSTEL. My question is how this happened? Consequently, when I initialized in BW, shipping point and receiving plants are the same which should not be.
    Thanks for all the help.

    The data for the 2LIS_12_VCITM is not just sourced by LIKP (Delivery Header), but by LIPS (Delivery Item) too.
    Plant, in this extractor, is sourced by LIPS-WERKS instead of LIKP-WERKS. The receiving plant is LIPS-UMWRK. If you require this data, you will have to enhance the structure and create the User Exit code in tcode CMOD to extract that particular data.

  • Delete Shipping point assignment with plant

    In my current system there are a lot of shipping points assigned to Plants. It is taking a lot of time to delete them. Is there any easier way to delete all these assigments in bulk? Please let me know if there is any report that I can run inorder to delete them.
    Thank you,
    Ravi

    GO TO SPRO -> Enterprises structure -> Assignment -> Logestic Execution -> assign shipping point to site then search for plant and delet the shipping point which you don't want to keep,
    and
    SPRO -> Logestic Execution -> SHIPPING -> assign shipping point and delet the shiping points from shipping point determination
    Regards,

  • Multiple Shipping Point in One Plant

    Hello.
    How to decide if we create another shipping point or not.
    We have two warehouses, located far from each other.
    The design is to have just one plant, and create two storage locations.
    Should I make two shipping points for each warehouse and assign to just one plant?
    Share you ideas...
    Thank you,

    Dear Deriada Gemma 
    Shipping point requirement is based on physical locations from which shipment is done, in case you are using Logistic execution then based on shipping point shippings will be done.
    If you have two wh and want to create seperate deliveries for both wh use two seperate shipping points
    you can automatically determine based on plant, loading group and shipping condtion.
    from help you will find few other reason for which seperate shipping point decision can be made
    list list, printing ...etc
    Define, copy, delete, check shipping point                                                                               
    In this step, you define the shipping points in your company or edit              
        shipping points that already exist. In order to adapt the functional              
        scope of a shipping point to the organization in your company, you                
        should process the following check list:                                                                               
    o   The shipping point is the top level in the organization for                   
            shipping.                                                                               
    o   A shipping point can be allocated to several plants.                                                                               
    o   A shipping point can be divided into several loading points.                                                                               
    o   A delivery is always initiated from exactly one shipping point.               
            Thus, all items of a delivery belong to one shipping point. Groups            
            of deliveries also belong to exactly one shipping point.                                                                               
    o   You can influence delivery scheduling via allocation to departure             
            zones.                                                                               
    o   The shipping point can be proposed automatically during order                 
            processing depending on the plant, loading group and shipping                 
            condition.                                                                               
    o   A shipping point has an address.                                                                               
    o   The shipping point is used as a selection criterion for lists of              
            deliveries and the work list deliveries.                                                                               
    o   The shipping point is used as a selection criterion for processing            
            deliveries like printing, picking or goods issue.                                                                               
    o   You can determine the printer destination for messages differently            
            for every shipping point on account of shipping documents.                                                                               
    Regards
    Jitesh

  • OVXC - Shipping Point assignment to plant problem

    Dear Gurus,
    I have created a shipping point called: BER1 in EC02
    When I want to assign it to my plant which I created earlier with the same name BER1 in OVXC, the system can't find the plant.
    How is that possible when both structural objects have been created?
    Please help.
    Kind regards
    Christian

    Hi There,
    I had attached the plant to the company code OK.
    However I forgot to assign the plant to: Sales Organization + Distribution Channel
    How stupid have I been...
    Many thanks for your input anyway.
    Kind regards
    Chris

  • Shipping Point Determination for Sub contracting Process

    Dear Experts,
    While processing the GR for a Sub Contract Purchase Order, we are getting an Error  'VL 100 - Shipping Point XXX doesn't exists'
    However, I am not understanding where from this Shipping point is picked.
    Checked the Shipping point determination based on Loading Grp, Shipping conditions & Plant. But that is a different shipping point, and it is being picked while processing the outbound delivery for sending components thru 541 Movement.
    It is clear that the Shipping point XXXX is not existing, but not sure, as where from that Shipping point is being determined while doing GR
    Request for your inputs please
    Thank you,
    Best Regards,
    Ramakrishna Mangena

    Hi Ramakrishna ,
    What u earlier said is perfectly right : Shipping point determination based on Loading Grp, Shipping conditions & Plant
    Check the following :
    Are u posting GR through VL31N .
    If yes, just check the receiving pt entered in Header Data - Shipment Tab.
    Regards
    Ramesh Ch

  • Shipping Point Assignment to Plant

    Hi,
    Can anyone tell me the T Code to assign Shipping point to plant.
    Though. I have defined plant in Enterprise Structure, when i go the assignments and try to do this assignment there is only the standard plant appering in the structure and hence am not able to assign the Shipping point for my plant.Am working on ECC 5.0
    Regards,
    Tommy

    Hello Tommy,
    Shipping point to plant assignment T Code : OVXC
    Shipping point determination path:
    spro>logistic execution>shipping>basic shipping function>shipping point & goods receiving point determination-->assign shipping point
    Reward if helpful.
    Regards,
    Priyanka
    Message was edited by:
            Priyanka Dixit

  • How to create Process level configuration for RFx N-step approval in SRM7.0

    Hello experts,
    Can any body guide me to create the Process schema for N-level approval in RFx.
    My requirement is based on RFx target value, Document type N some custom fields like (Mode of Tendering).
    For this purpose, we are going to maintain one custom table with the above said fields like If the value falls under $1000 with the Tender mode as '101' N the Document type as 'BID' then need to go for 2 level approval like that.........
    Appreciate your quick reply.
    Regards,
    Krishna Prasad M.

    You can just add the process levels one by one and change the agent (approver)
    I realized this as the following:
    For BUS2200
    Process Schema: 9EV_RFQ_00S (Returns the constant : 9C_BUS2200_EX01)
    In 9C_BUS2200_EX01
    There is only two levels in the standard, one is the manager approval , the other is the auto-approval.
    I added one after the first one , and change the "Resp. Resolver Name" to "RR_MANAGER_OF_MANAGER".
    Wish it helpful.
    Regards,
    WuLin.

  • Access Point configuration for flat network

    We have recently aquired a remote location which has a pre-existing flat network (172.16.X.X/16). Before we are able to convert them over to our new IP scheme, they have a need to have wireless connectivity on site. We have 4 1142's which I need to configure for them. I have experience configuring WLC's and autonomous AP's for networks with multiple vlans but have never configured AP's for a flat, single subnet network. I need to configure them for either guest access (internet only) or corporate access to network resources with radius authentication. Do I configure a native vlan as I would for a typical multi vlan network? Do I configure the switch port as an access port as opposed to a trunk beacause of the lack of layer 3? I basically need a sample configuration for this situation.

    since you are on flat network, you just need to configure the SSID, no need for subinterfaces.  With the AP only servicing the one VLAN you can leave the port as an access port as well.
    as they are on the only subnet, I wouldn't do a 'guest' SSID.  I would go with just the corporate SSID with WPA2/AES/802.1x.  So the config is exactly the same for the RADIUS server and the SSID, but greatly simplified since you don't have to sub-interface anything.
    Steve

  • Creating a central DC for plants that have mutliple company codes

    Hi,
    We are looking to consolidate all of our distribution from 5 manufacturing plants (which all have different company codes) to one central distribution center in a single company code.   Has anyone had any experience with this scenario?  We will need to turn on warehouse management at the central DC and have been told that any plants connected to a warehouse in WM, have to be all in the same company code.

    Karen,
    We are looking to consolidate all of our distribution from 5 manufacturing plants (which all have different company codes) to one central distribution center in a single company code. Has anyone had any experience with this scenario?
    Yes
    We will need to turn on warehouse management at the central DC
    Presumably this is for reasons other than the consolidation.  Using or not using WM will have no impact on company codes.  From what little I know about your business model change, there is no reason for you to use WM (other than the additional functionality, which will intrinsically improve warehouse efficiency).
    and have been told that any plants connected to a warehouse in WM, have to be all in the same company code.
    This is not a SAP limitation!  There may, however, be business reasons why you need to do this.
    A Distribution Center is not the same as a Warehouse in SAP.  A DC is a special kind of plant.  Plants are assigned to company codes, and the ownership of the goods in this plant are generally held by that one company code.
    As Jurgen mentioned, a SAP Warehouse can encompass many plants, with many storage locations, each of which may belong to several company codes.  WM doesn't care. 
    Storage locations are members (subsets) of plants.  A given storage location will always be connected to a single plant, and the inventory of all storage locations in a given plant will be owned by the company that owns the plant.
    From your short list of requirements, I believe that your logistics model should be to ship the product from your originating plant(s) to the DC (plant).  The traditional way to do this is via Stock Transport orders.  STOs can be intercompany or intracompany, required financial documents and postings can be configured to meet your company's needs.  Other methods are also possible.
    You mentioned that your DC would be one company code.  Therefore, the sales orders will be placed against one plant (the DC).  Delivery splitting would not be an issue.
    Now, I notice in subsequent responses you seem to be thinking that you will ship from multiple company codes (plants).  This is contrary to your original requirement list.   As asked by Jurgen, where do you wish to consolidate your stock and where do you wish to consolidate your shipments?
    Best Regards,
    DB49

  • ALE/Change Pointer Configuration for ZSEGMENTS

    Hello all,
    I have been searching for a few days now trying to obtain my requirement with extending of an idoc.  I am working with the following:
    Message Type: HRMD_A
    BASIC Type: HRMD_A06
    Extension: ZHRMDA06
    I extended the idoc because I wanted to include 2 extra infotypes which are not on that idoc.  Infotypes 77 and 709.
    Here is what I have completed so far.
    WE30...Created ZSEGMENTS to include below.
    WE31...Extended the HRMD_A idoc to include the ZSEGMENTS defined below.
    WE82...Updated the output types and assignments to idoc.
    BD61...Activate Change Pointers
    BD50...Activated change pointer for HRMD_A.
    I change the address field in infotype 0006. 
    Run the BD21...idoc is generated with the changes to address, everything looks good.
    Do the same thing for the ethnic origin on infotype 77, no idoc is generated. 
    I turned on logging onto table PA0077.
    I am evaluating the change logs via SCU3, and I am seeing my changes on the field.
    What I have tried...
    I have tried creating a object in t-code SCDO (ZTEST)
    I have associated  ZTEST with table/field PA0077-RACKY.
    Tried running BD21...No iDoc generated.
    I have been researching for a few days and it feels that this should be able to be done through configuration and not custom coding.  Am I wrong to think that?
    Has anyone ever did anything like this before which they can point to documentation or even the appropriate search criteria on the SCN forums.
    Thanks in advance for your help!
    Jason

    Hi Jason,
    I believe you have to enter the fields that trigger the changing pointer in tcode BD52. In my case these are the fields for BOM:
    Regards,
    Custodio

  • How Do I Create Default System Configurations for On- and Off-Dock?

    I recently purchased a T510 laptop with WIndows 7 Professional 64-bit and a Series 3 minidock. I would like two create two default system configurations (namely specifying active montiors, screen resolutions, networking options, and power management). I'd also like the laptop to detect the presence or absence of the dock and automatically switch accordingly. How can I do this? Thank you.

        Dear DavidLeon65,
    Good afternoon. I am sorry to learn of the difficulties you are experiencing with the bluetooth connection in your car. I know this can be frustrating. It would be my pleasure to address your bluetooth concerns.
    When the bluetooth connection drops out, is the phone near you? Also, do you have Wi-Fi turned on? If so, please turn off Wi-Fi, then test. What software version do you have? For directions on how to check the software verison on your phone, click http://vz.to/SrMyDh
    Thank You,
    MichelleS_VZW
    VZW Support
    Follow us on Twitter @VZWSUPPORT

  • Unable to create Transfer Order manually for a new Shipping Point

    Hi folks
    After spending a couple of days investigating what the problem, I am resorting to my last option of posting here. I am hoping one of you can help me here.
    Due to a new business requirement, I am having to create a new Shipping Point. We use Lean WH. I have performed the following steps
    Created a new shipping point under Logistics Exec
    Created a new Shipping Point and assigned it to the plant (under ENT Structure)
    Created Shipping Condition
    Assign Shipping Point to Shipping Condition
    Changed Customer Master Shipping condition to the new SC.
    Assigned the storage location for the new Shipping Point and the Plant under SPRO-LE-Shipping-Picking-Determine Picking Location- Assign Picking Location
    When I create an Order, a delivery gets created automatically. Now when I try to create a TO in VL06P in the background, I get an error VLA029
    WM-TO: 0 deliveries successful, 0 with errors, 1 not relevant
    As far as I am concerned, all the steps are completed.
    Can someone please throw some light on how to get this fixed.
    Thanks in advance to everyone.

    For the said error, SAP have given the following procedure
    The above is self explanatory and have you tested in line with the above.
    G. Lakshmipathi

  • No transfer order created via VL10A for certain shipping point

    No transfer order created automatically via VL10A for a certain shipping point.
    For Shipping Point E004 the TO is automatically created in VL10A, but for Shipping Point E070 it's not automatically created.
    Could you kindly let me know why TO is not automatically created by Tcd VL10A?

    Automatic TO creation depends the warehouse number or movement type. Can you check the warehouse number for both shipping points?
    Regards,

Maybe you are looking for