Create/ Change BOM

Hi,
I want to create BOM for several (thousands) of materials. These BOM's consist of the same components. Is there a way to link a "components list" to all the materials so that I can avoid to create a BOM for each and every material? Or maby create 1 BOM and link this to the rest of the material numbers?
Thank You,
NM

Hi Nicsherda,
BOM has to be created for every material which is an assembly. The simplest thing which i would recommend is to create a dummy material with phantom assembly defination and create a BOM for this material with the components list you wanted.
Now you create BOM for all the materials using LSMW/BDC and assign only this dummy dummy phantom assembly component to it.
This way if any changes are required in the BOM you need not change the BOM for the several thousand materials, instead need to change only for the dummy phantom assemble material.
Hope this would certainly help....
Regards,
Prasobh
Please reward your points if this was useful/solved

Similar Messages

  • Inbound BOM IDOC for create / change BOM

    Hello,
    I can use function IDOC_INPUT_BOMMAT_MDM with MSGFN '005' to create new BOM via WE19, but can't use IDOC_INPUT_BOMMAT with MSGFN '005'  to do the same thing. Can anybody help tell what's the difference between IDOC_INPUT_BOMMAT_MDM and IDOC_INPUT_BOMMAT?
    Thanks a lot,
    Martin Li

    Pls check if the GR has already happened manually.
    Hope this helps.

  • Change BOM and Production Order

    Hello Expert,
    I have recuuring problem, hope you can lean help to me. Can you explain to me why this happen?
    we have change a component BOM in CS02, first we create change number in CC01. with effective date for 30.09.2008.
    In BOM 6083, there exist a component 10020379. we want this component to be deleted on 30.09.2008 and be replace with a new component material 10060530 effective on the date 30.09.2008. that was the new set up of the BOM of material 6083 (at this date august).
    Today (27.08.2008) we create a production order for material 6083, relesed it and when we will look at the PO Component Overview of our created PO both BOM component material 10020379 and 10060530 was present both backflushed was tick. but 10060530 component has zero req. qty compared to 10020379 it has a value on req. qty.
    why that even we create the PO in August replacement material 10060530 was exploded and included in PO since this material will be effective on 30.09.2008?
    and when we confirmed the PO via CO11N, we have a COGI error for the replacement material 10060530 "Enter Storage Location"?
    How all this happen Guru?.
    Thanks and more Power

    Hi,
    in this scenario, you can control the BOM explosion better with Revision Levels.
    say you have created the Revision Level with CC11, using the same change master which is effective from 30.08.2008.
    Every time, when you create an Order, system will pick the latest/relevant Revision level.
    If you create an Order on 01.01.2009, suppose there is a chanege again to your BOM, still at the time of confirmation/backflush system will explode the BOM as on 30.08.2008.
    Hope this helps..
    Regards,
    Siva

  • Is it possible for creating draft BOM and fix approvals in SAP BI

    Can we create draft BOM and set approval for BOM ? If any changes are made in BOM after approval this can be set as amendment to the original BOM.

    Actually to which of the infocpackage it will give priority. 3.5 or 7.3?
    Also I just want to ask that , as in your first reply you said that the cubes cannot be upgraded .... but why?
    And if I am doing new fresh implementation ...........will there be any prerequisites?

  • Error while changing BOM with change number

    Hi ALL, Please help me with followed error message, I am using ECM. I created ECR and converted to ECO and then released.
    Object management record cannot be generated
    Message no. 29046
    Diagnosis
    You want to change the BOM with the entered change number.
    One of the following situations triggered this error message:
    1. The indicator that allows automatic generation is not set for object type BOM in the change master.
    2. The indicator generation only on initial creation is set for object type BOM
    3. You are processing a change request.
    System response
    The system checks whether the indicator object management record will be generated is set in the change master.
    If the indicator generation only on initial creation is set, the system checks whether the BOM exists in the system.
    Procedure
    If you are authorized to change the change master, execute the following steps:
    For 1.)
    Set this indicator for object type BOM or create the control record in the change master.
    For 2.)
    If the BOM already exists in the system and the generation only on initial creation indicator is set, the system can no longer generate the control record automatically.
    In this case you have to add the object control record to the change master first, then you can change the BOM in relation to the change number.
    For 3.)
    You cannot generate any object control records for a change request.

    Hi
    With your question regarding changing BOM with change number  it looks lke there may be problem in defining the Object types,objects.Moreover whenever converted to ECO you need to enter into cs02 tcode for changing the bom with relevant change number and valid from date.
    Hope this gives you a clear idea.let me know if you need anyfurther inputs.
    Regards
    Praveen

  • IDOC Type for Tcode CC01 and CC02 (Create / Change Change Numbers)

    We are trying to integrate Change Master from a 3rd party system to SAP R/3 4.72.What is the IDOC Type for Tcode CC01 and CC02 (Create / Change Change Numbers)

    Thanks...
    We have looked at this IDOC Type. However we are not very sure how the components (Material/BOM etc.) will be mapped into E1AEEFM segment in the IDOC.

  • General task list with component : creating standard BOM

    Hello,
    When adding a component to a general task list , i get a "create standard BOM" screen , see below for example :
    Standard object PA00000212            
    Plant                                 
    BOM Usage       4                                                          
    Change Number                        
    Valid From           07.09.2009      
    Can someone explain to me the relation between standard BOM and component within a general task list ?
    Thanks,
    P.

    Hi,
    Pls find some of the points below for your referece
    Standard BOM:
    Can used for assigning the material from the BOM to Task list operation
    That is, BOM  components for the object (Equipment, Functional Location , Assembly) can be retrived and assigned to maintenance Task list of the operation
    Condition: BOM corresponds exactly to the content of the structure list
    Free Material Assignment:
    Assigning Stock Material (Material number) those are not listed in the BOM of maintenance object directly to the maintenance task list
    Condition:  Setting to be done as BOM usage for Plant Maintenance (4)
    Path: Maintenance plans, work centers, Tasl Lists and PRTs>>>>>Tasl Lists>>>>>Control Data>>>>Define Presetting for Free Assignment of Material-----BOM Usage as 4
    Pls note that, while making free assignment, system creates an internal BOM  and this can not be processed from application.
    Hope this may useful
    Thanks
    Siva

  • User exit to create change pointer as soon as network is created(CN21)

    Hi All
    I have to use function module change_pointers_create_direct . This function module i have to use in a exit which is called as soon as a network record is created(CN21).
    Then I will use SMD tool to track changes made to these pointers.
    can anyone tell me which user exit can I use for this?
    Or do anybody have idea whether CN21 creates change documents by default or not in CDHDR.
    Actual requirement is to send the network records to third party system through IDOC using program RBMIDOC which is scheduled every 15 minutes. This program will read the change pointers created in 15 minutes.
    Please advise on this...

    hi,
    CCOWB001            Customer exit for modifying menu entries
    COIB0001            Customer Exit for As-Built Assignment Tool
    COZF0001            Change purchase req. for externally processed operation
    COZF0002            Change purchase req. for externally procured component
    PPCO0001            Application development: PP orders
    PPCO0002            Check exit for setting delete mark / deletion indicator
    PPCO0003            Check exit for order changes from sales order
    PPCO0004            Sort and processing exit: Mass processing orders
    PPCO0005            Storage location/backflushing when order is created
    PPCO0006            Enhancement to specify defaults for fields in order header
    PPCO0007            Exit when saving production order
    PPCO0008            Enhancement in the adding and changing of components
    PPCO0009            Enhancement in goods movements for prod. process order
    PPCO0010            Enhancement in make-to-order production - Unit of measure
    PPCO0012            Production Order: Display/Change Order Header Data
    PPCO0013            Change priorities of selection crit. for batch determination
    PPCO0015            Additional check for document links from BOMs
    PPCO0016            Additional check for document links from master data
    PPCO0017            Additional check for online processing of document links
    PPCO0018            Check for changes to production order header
    PPCO0019            Checks for changes to order operations
    PPCO0021            Release Control for Automatic Batch Determination
    PPCO0022            Determination of Production Memo
    PPCO0023            Checks Changes to Order Components
    STATTEXT            Modification exit for formatting status text lines
    regds,
    paras

  • While creating change number

    At the time of creating change number do i need to give the material numer whose BOM need to be changed using that change number Or while changing the BOM of a material using that change number in the change no. master the material is updated in Object tab.

    Dear Behera,
    1.At the time of change number creation in CC01,there is no need to mention the material code for which the change number is
    going to be used in change/creation of BOM or any other object.
    2.But if my understanding is correct means while creation of the change number let's assume you have included the check box
    for Gen New(say against Bill of materials as object type) also means,you can use for creation of BOM and not for change of
    any existing BOM(In that case you have to include the material code in the material you can BOM tab page in CC01 itself and
    save the data,and then only you can use this change number for change).
    Correct me if i'm wrong.
    Regards
    S Mangalraj

  • How to Change BOM and Document Lab/office only without using chagne number

    Hello expert.
    Is there any Function Module for change BOM and DOCUMENT  lab/office only without using change nuber.  or
    Please let me what are the tables i have to update for change BOM and Document Lab/office in report.
    Regards
    srinivas

    Nirav,
    The Integer type UDF is the answer.
    If you have a large amount of values to convert, you might create a new Integer UDF ("UDF_INT"), and use a GlobalChange to move them. Example: where "UDF_NUM" is not equal to " ", "UDF_INT" = "UDF_NUM".
    This will put your values in the new field without decimals.
    -Tom

  • To change BOM header

    Frndz,
    I have created a BOM with BOM usage flag as '3' i.e universal and saved it.Further I did not carryout any transactions over that BOM.Now, I want to change the BOM usage flag as '1',the system is not allowing since the header fields are being grayed out.Plz ....help.
    Regards,
    Srinivasan M

    Hi Muthu
    Once if you create BOM. It will not allow you to change the header data. You can only change the data's of items.
    To change the header data. Try with BDC with the help of ABAP's
    Regards
    J . Saravan

  • Changing BOM Header via CSAP_MAT_BOM_MAINTAIN

    Hello all,
    In the documentation of FM CSAP_MAT_BOM_MAINTAIN it states under the restrictions section that "To date, changes to the BOM header are not yet supported."
    I also know that sometimes the documentation is not always up to date.  Is this restriction still valid when using ECC 5.0?
    If the answer to my question is yes, then how can I make a change to the BOM header?  (I want to change the base quantity)
    Thanks,
    Larry

    You cannot change the header data. You have to delete and re-create the BOM with changes.

  • How to create multiple BOM of same parent item?

    Hi All,
    Please guide me, How to create multiple BOM of same parent item? I tried but system throws a message as same Parent Item already exist in the table. I am afraid if system supports this functionality or not?

    Hi,
    You are welcome.......
    Well the exact process would be as I mentioned in my previous post.
    1. Create the BOM for an item
    2. Choose this item in the Production Order
    3. Then in this Production order you can change/ delete/ add whichever item you want .
    OR
    If all the child items are completely different from the original BOM then you can use the Special Type BOM in which you can always create the BOM while creating the Production Order itself. There is no standard BOM here.
    J Nagesh

  • Problem to change Bom?

    Hi,
    Beacuse raw material be replaced, I need change the BOM.
    When I use T-code cs02 to operate, I find that "valid from" and "valid to" is disabled, I can't change it.
    If I directly change the material in the BOM, the changed of  BOM is activated at once, but I hope the BOM become effective on the specific date.
    Please give me the guide?
    Thanks & best regards
    Zhigang

    HI
    what you mentione dis write, it takes immediate effect,
    if you want the validity you need to use Change mangement.
    Engineering Change Management is a central logistics function that can be used to change various aspects of production basic data (for example, BOMs, task lists, materials, and documents ) with history (with date effectivity) or depending on specific conditions (with parameter effectivity).
    A change with history has the following distinctive characteristics:
    It takes effect under precisely defined conditions (precise date or specific effectivity parameter value).
    The changed object is saved twice: in its state before and after the changes.
    A change master record or ECR/ECO controls and documents the changes.
    Choose Logistics --> Central functions -->Engineering change management --> Change master -->Create.
    The Create Change Master: Initial Screen appears.
    Enter an change number.
    Do not enter anything if you want the system to assign a number itself
    Select the type:
    Change master
    Select the change master record's function:
    Without release key
    enter-> write descriptin, valid date , change number status,then you get the object types select tick for active and object for you required data(ex BOm or routing) and click onobject F7, and enter the BOM materi code and save.
    -ashok
    Edited by: Ashok Keerthipati on Nov 25, 2008 12:05 PM

  • Error while creating/changing/desplay cost element

    Gents
    Need urgent help. I am getting a below error while creating/changing/Displaying the cost element.
    Table CI_CSKB is not an active table
    Message no. AD 228
    Kindly help me to get the resolve this issue.
    Thanks and Regards
    Vinay Thakre

    hi
    In Cost Elements (Data is Dependent on Controlling Area), please go to extras and check your controlling area while creating the cost element, and make sure if u r creating Primary CE, it has been created as a G/L account and also make sure you use correct CE Category.
    Thanks
    plz award points if helpful.

Maybe you are looking for