Create Maintenance Order for the Sub assembly and the top assembly together

Hi
We create repair order for an equipment when it comes for maintenance.
We want to create repair/maintenance order for all the sub assemblies for the equipment along with the order for the top assembly at the same time.
Appreciate your guidance.

Dear Srini K
Please create the order for the main equipment & create suborders for the sub assembly is one way to do it. so that main order & other orders may have link to each other.
Another way if you want to store history that which are the assemblies are affected or you have worked on it you can enter these in all assemblies in object parts tab of the orders.
Also you can create the notification & maintain the object parts code, Damage code & cause code for each assembly & sub assembly sothat you can keep history.
But if you can tell me the business requiremennt it detailed i can guide you ini correct direction.
I hope this will satify your requirement.
Regards

Similar Messages

  • Create Maintenance Order for Object Link

    how can I create a notification or order through an object link?
    it doesn't work here. it doesn't use object link number in order.

    Greetings Daniel,
    It's not possible to create a Notification or Order for the Object link - unless you create a technical object for the object link itself, which is entirely possible in CN04 / CN07 (for example, a cable connects 2 circuits - create 3 FLs and 1 Object Link, assign the cable FL as the link itself)

  • I have a Mac Book Pro with the Sub Keyboard and the sub keyboard has kicked in

    The numbers under the letters are active and I can not type using  these key letters which makes a wireless keyboard the only way to have this in a normal way. .
    The keyboard works right on the Mac side but the problem exists with the Windows bootcamp. How can I turn off the sub keyboard part and have a normal keyboard?

    ajfcrf,
    I’m afraid that I don’t understand what you’re asking. What is a “sub keyboard”, and which numbers under which letters do you mean?

  • BAPI - Goods receipt and then create transfer order for a production order

    Hello Everyone
    We need to do goods receipt and then create transfer order for a production order (Material for WM scenario)
    We are using BAPI 'BAPI_GOODSMVT_CREATE'
          i_items-orderid = wa_afpo-aufnr .
          i_items-order_itno = wa_afpo-posnr.
          i_items-mvt_ind = 'F'.
          i_items-stge_loc   = wa_afpo-lgort.
         i_items-stge_type = '901'. "wf_styp.
         i_items-stge_bin = wf_sbin.
          i_items-entry_qnt  = wf_qty.
          i_items-entry_uom = wa_afpo-meins.
          i_items-entry_uom_iso = wa_afpo-meins.
          i_items-batch      = wa_zmobtag-charg.
          i_items-move_type  = '101'.
          i_items-move_reas  = wl_3131.
    We are passing i_items (like line of goodsmvt_item) along with other parameters to BAPI and its creating material document and Transfer order automatically. Problem is the TO created is showing destination storage bin as default storage bin( from material master).
    The field goodsmvt_item-stge_bin is just changing the Source bin details. There is no field for bin in the BAPI so that we can change the Destination storage bin as per our requirement.
    My requirement : Creating material doc and then TO. Material should move to specified storage bin.
    Please let me know any alternate way( No BDC) so that my requirement is achieved.
    Regards
    Swetabh

    Hi ,
    can u check these fields ,
    STGE_TYPE_PC     UBTYP     CHAR     3     0     Storage type for transfer posting
    STGE_BIN_PC     UBPLA     CHAR     10     0     Storage bin for transfer posting
    Regards
    Prabhu

  • Bapi's for creating Maintenance order in IW31 with notification

    Hi All,
       Is there any bapi's for creating Maintenance order with Notification number in the transaction iw31.
      Also is there any bapi's for creating measurement document.
    Points will be awarded.
    Regards,
    vinoth

    RFC MeasDocument: Individual Processing, Create
    MEASUREM_DOCUM_RFC_SINGLE_001
    RFC MeasDocument: Individual Processing, Change/Display or Read
    MEASUREM_DOCUM_RFC_SINGLE_002

  • It's so annoying!! I have created a new Apple ID but after I click verify it just goes back to the previous page!!! It''s really frustrating I have tried for more than 4H, and the problem is not about the apple ID. I can download apps with the apple ID, w

    It's so annoying!! I have created a new Apple ID but after I click verify it just goes back to the previous page!!! It''s really frustrating I have tried for more than 4H, and the problem is not about the apple ID. I can download apps with the apple ID, which means IMessage is the problem! I restarted my iPad, I logged in and out of the apple ID in the store, AND YET IT STILL WON'T WORK, PLEASE HELP!

    Hi Vmanfromusa!
    It sounds like you are having an issue with activating your iMessage app on your iPad. An article outlining some troubleshooting steps for this issue can be found here:
    iOS: Troubleshooting FaceTime and iMessage activation
    http://support.apple.com/kb/ts4268
    Thanks for using the Apple Support Communities. Have a good one!
    -Braden

  • I gave my father a mini ipad and he forgot the icloud password and the e mail for recovering it.  How can I recover the password or create a new one if I have no idea at all of the info he configurated.?? ;(

    I gave my father a mini ipad and he forgot the icloud password and the e mail for recovering it.  How can I recover the password or create a new one if I have no idea at all of the info he configurated.?? ;(

    He will have to contact Apple and speak to someone in account security if he can't recover it at https://iforgot.apple.com/appleid

  • I'm trying to place an order for 3 iPhoto Albums, but the system won't take the billing address. I'm in Costa Rica and will send the albums to an address in Miami. Can't find any support live chat for billing issues.

    I'm trying to place an order for 3 iPhoto Albums, but the system won't take the billing address. I'm in Costa Rica and will send the albums to an address in Miami. Can't find any support live chat for billing issues.

    You need to use a credit card with a billing address in the same country as the delivery address.  Since there's no Apple Print Store for Costa Rica I assume you're using the United States print store.  Therefore you'll need a credit card with a billing address in the US.
    OT

  • Why has Apple decided that online orders for Macbook Air display and speak VO when first opened from the box? I"m guessing 1%or 2 % of your customers know what it is or want it.

    Why has Apple decided that online orders for Macbook Air display and speak VO when first opened from the box? I"m guessing 1%or 2 % of your customers know what it is or want it.

    You are not talking to Apple, we are just users like you.  Only Apple knows that answer.

  • HT5624 my child created a passcode for my i phone and he forgot that what will be the reset procedure

    my child created a passcode for my i phone and he forgot that what will be the reset procedure

    Locked Out, Forgot Lock or Restrictions Passcode, or Need to Restore Your Device: Several Alternative Solutions
    1. iOS- Forgotten passcode or device disabled after entering wrong passcode
    2. iPhone, iPad, iPod touch: Wrong passcode results in red disabled screen
    3. Restoring iPod touch after forgotten passcode
    4. What to Do If You've Forgotten Your iPhone's Passcode
    5. iOS- Understanding passcodes
    6. iTunes 10 for Mac- Update and restore software on iPod, iPhone, or iPad
    Forgotten Restrictions Passcode Help
                iPad,iPod,iPod Touch Recovery Mode
    You will need to restore your device as New to remove a Restrictions passcode. Go through the normal process to restore your device, but when you see the options to restore as New or from a backup, be sure to choose New.
    You can restore from a backup if you have one from BEFORE you set the restrictions passcode.
    Also, see iTunes- Restoring iOS software.

  • Problem in creating Maintenance Order with multiple operations

    Hello all,
    I am facing problem while creating Maintenance Order with multiple operations and sub-operations. I am using BAPI : BAPI_ALM_ORDER_MAINTAIN.
    For single operation it is working fine,but i am unable to create MO with multiple operations and sub-operations.
    Please, provide me the inputs required,
    I have used methods :
    ORDER        CREATE,
    OPERATION CREATE
    and SAVE.
    Regards,
    Siddhartha

    Hi,
    The FM you are using is a perfect one. This FM is bit tricky to use. You need to perfectly pass the Reference number field. which links various input table parameters of this FM.
    Thanks & Regards,
    Navneeth K.

  • Error while creating Maintenance order

    Hi,
    While creating Maintenance order with any order type (PM01,PM02 & PM03) & entering material in component Tab, the system is giving this Error 'Entry does not exist,check your entry'
    The used material is already maintained in the Material Master with all necessary information.
    Kindly suggest the best possible solution for this problem.
    Thanks in advance 
    Rohit8384

    Hi,
    The following error is coming while order processing.
    Entry    does not exist - check your entry
        Message no. 00 058
    Diagnosis
        Input values must be defined in Table MARA. The value or values '  ' are
        not specified in this table.
    Procedure
        Check whether the input is correct and correct if necessary.
    Procedure for System Administration
        If this is not an incorrect entry, check the system settings and change
        them if necessary.
        If there is a connection to the Customizing system, you can maintain the
        system settings by choosing Maintain entries (F5)
    Thanks in Advance.
    Rohit

  • Maintenance order for Refurbishment

    Dear Experts,
    I have created a maintenance order for the equipment E12000003 with order type PM01 and using the control key PM03.Material 12000003 representing the equipment E12000003 issued against the PM order .
    Purchase requisition is created at the background , which converted to PO and the material 12000003 issued to vendor through a deliver challan.
    Acceptance of service through service entry sheet and GR at the background.
    Confirmation of time for the order and GR for the PM order done .Settlement of the order against the material which issued against the order.
    We are planning to follow the above cycle instead of refurbishment process as we donu2019t want to have split valuation .  Please correct me if ia m wrong.
    Thanks,
    Ram

    Hi Ram,
    The method u are using is ok for some companies. But the following questions arise which are to be answered,
    1.How do you fix the cost of the refurbished material? will it be the original cost (cost, if bought from a vendor)
    2. You draw and use spare parts for refurbishing the eqpt. If the spare parts cost is more than the original equipment cost how do u account for it?
    3. The refurbished material must be certified to be as good as new, otherwise its cost must be split based on the condition. In your case all the time the cost will be same. Is it ok? Mind you once the refurbished material is returned to store, there is no replenishment and if the plant condition needs a new spare u do not have one!
    4. In the accounting it can happen that u refurbish few costly materials and in the end of the year return them to stores to bring down the maintenance cost vs budget. How these are controlled?
    But it does not mean the SAP way of refurbishment is an complete solution.
    regards,

  • Create maintenance order based upon notification in NWBC / Portal

    Dear experts,
    How to create a maintenance order based upon a notification, using the POWL for notifications ?
    I am using NWBC and would like to create a maintenance order, based upon a notification put in process.
    In R/3, this works fine using transaction IW22 / IW28 and all info from the noticiation is copied in the new order.
    How can I get the same functionality using  the role SAP_BPR_MAINTENANCE_TECH_12 ?
    Kind regards,
    Dirk

    Dirk,
       You should be able to select the Notification number from the POWL overview list and choose the "Create Order" push button on the Tollbar (along with display notification, change notification etc).
      What i have noticed is that once you are inside the notification from the Portal application, the create Order push button or functionality doesn't seem to exists. This is probably incomplete functionality taking into consideration the standard IW22 transaction /Or a  Bug  and maybe you could raise a OSS Note for the same.
    Regards
    Narasimhan

  • Object RESB within Critical Area - creating Maintenance Order

    Hi All,
    We are getting warning message while creating Maintenance Order. It says " Object RESB within Critical Area". After checking we found that 90% of the number range for reservation documents have been consumed and it is maintained in settings that the warning will come up when number range enters last 10%.
    we have changed this setting to 5% but still the issue is not resolved. We are still facing the same warning message.
    Kindly guide.
    Regards
    DM

    DM,
      This maybe due to the buffering of the number range numbers on the application servers.once these numbers are exhausted and new  block of numbers are picked up  from the database server this should go off.  Ideally you may want to adjust to a new  number range so that this warning message doesn't irritate the end users.
    Regards
    Narasimhan

Maybe you are looking for