Create material in multiple plants collectively!

Can i create a material in multiple plants collectively??Kindly specify the T Code ASAP.

hi Gurbir
Ans is no
u can extend material to another plant but 1 plant at a time
Also using LSMW and BDC u can upload material to single plant at one time
Vishal...

Similar Messages

  • Creating material in multiple plants and storage locations

    Hi Gurus,
    I am wondering if someone could help me out in this issue,
    I frequently get 1's and 2 materials creation requirement , is there any simple way , while creating material in MM01 , I could create/extend to all plants and storage locations.
    I know we can use LSMW , but this is not bulk requirement,it is frequent but in 1or 2 nos.
    Any help highly appriciated and rewared.
    Thanks.

    Hi,
    To my knowledge I doubt if both MM17 & MM50 can meet your need, as MM17 is to mass change the values already existing in the MMR, while MM50 is to extend the views in a given plant & not to extend across plants.
    A suggestion would be to use the BAPI's -
    BAPI_MATERIAL_SAVEDATA         Create and Change Material Master Data
    BAPI_MATERIAL_SAVEREPLICA      BAPI for Mass Maintenance of Material Data
    Give your requirement to your abaper & inform him / her to use the above BAPI's. I am sure your abaper can write a simple & user friendly program to meet your exact need.
    Regards,
    Vivek

  • Extending the material to multiple plants

    Hello Experts,
    I am trying to extend the material to multiple plants and storage locations based on the source material storage locations.
    I am retrieving the data from mard and marc table to check whether that material is already got extended to the given plant.
    I am putting one check in the program to check the material is extended to given plant or not? If the material is already extended then i need to check whether it got extend to the given plant and storage location combinations.
    Can anyone give me some idea how to go with it...
    Here I am giving piece code where I got stuck.....
      READ TABLE RT_MARC
                   TRANSPORTING NO FIELDS
                   WITH KEY MATNR = LW_DATA-MATNR
                            WERKS = LW_DATA-IBL
                                     BINARY SEARCH.
        IF SY-SUBRC = 0.
          MESSAGE I468 WITH LW_DATA-MATNR LW_DATA-IBL.
          CLEAR : LW_DATA.
          CONTINUE.
        ENDIF.
    In IT_MARC I am getting the storage locations related to the source material for the given plants. How to verify this to check of the target plants with the combination of storage locations.
    In the above code after sy-subrc = 0 I need to check for the storage location combination also. I can't retrive the storage locations related to the target plants intially into IT_MARC.
    Waiting for your response.

    Hi , Thanks for the reply.
    But the plants for which data is automatically getting populated , I am selecting only the Foreign Trade view and not all the views.
    Regards

  • Creating Authorization for multiple plants

    Hi,
    I have one requirement that, Creating Authorization for multiple plants
    SELECT-OPTIONS:    s_werks FOR mseg-werks.
        AUTHORITY-CHECK OBJECT 'M_MSEG_WMB' 
               ID 'ACTVT' FIELD '03'
               ID 'WERKS' FIELD s_werks.
    1. If have no of plants in s_werks then how to authorize the plants?
    2.if i dont enter any plant in my selection screen how to authorize that?
    3. if i have 5 plant only then how i can authorize those perticular plants only?
    Thanks in advance,
    Thanks,
    DP.

    S_WERKS is not a field; it's a set of fields.  Use simple ABAP to select your plants and loop at the selection(s) to check...

  • Selling Material From Multiple Plants

    Hi Experts,
    I have two questions.
    1. Is it possible to have more than one division for a material. If Yes, how we can do this.
    2. How to sell a material from multiple plants. What is the procedure,
    Thanks,
    Shan.

    hello, friend.
    1.  is it possible for a material to have 2 or more divisions?  yes and no.
    yes, if you leave the division in the material master blank.  the material, when processed in the sales order, then copies the division from the sales area of sales document.
    yes, if you configure cross-division, or if you configured the 'check division' options in the sales document type via VOV8.
    no, if you specified the division in the material master and you have made a sales transaction.  (it would still be a yes, if you made the right configurations using VOV8 described above).
    2.  how do you sell material from different plants?  by extending the material to the different sales org-distribution channel-plant using MM01.  be sure to maintain the Sales org 1 & 2, and Sales general/plant views for each combination.
    regards.

  • Creating PO for multiple plants from central Pur Org

    Dear Friends,
    we assigned Central Pur Org as 0001 with all plants.  we want to make Purhcase Order for a particular material for all plants in single PO.
    how to define in Release Strategy for PR and PO.
    advice please.
    thanks in advance
    Rajesh

    Dear Mr. Deepak
    I entered all plants in Characterist... and assigned with release group and code... but still not showing release strategy in PO. 
    PO is accepting ... there is no error showing while making all plants in single PO...
    please advice
    Rajesh G

  • ME52N-Create PR with Multiple plants..

    Hi,
    Version of our SAP System is 4.6C..
    In ME52N transaction there is a tab called 'Release Strategy'...
    In this we have to enter materials belonging to same plant..
    for ex : if item1 is of plant 1011 then plant of item2 should also be 1011
    but according to our requirement it can be 1014 also..that is multiple plants..
    Is it possible to fulfill this requirement..if so any suggestion on how to proceed..
    Any help will be appreciated..
    Thanks & Regards
    Swathi

    Hi
    THis can be contolled via authorisation to the users. Please check with Basis consultant.
    [http://help.sap.com/saphelp_45b/helpdata/en/91/1a39516e36d1118b3f0060b03ca329/content.htm]
    Karthik
    Edited by: Karthik on Jun 29, 2011 5:59 PM

  • Multiple Plants for Material and customer

    Hi,
    I have downloaded the Plants from the R/3 to CRM using DNL_PLANT object. The BP with Role 'PLANT' are created.
    we  have multiples plants for the same material,
    I have downloaded the material master data, but in COMMPR01, the field DELIVERING LOC. is empty. Is that correct? How the system works with multiples plants.
    What I can do?
    Best regards
    Lidisaid

    Hi Lidisaid,
    Ideally, the field Delivery location must get populated. Just ensure that the followig settings have been maintained.
    1. Adapter Object MATERIAL
    Tcode: R3AC1
    Choose the tab Tables/Structures Within Object
    Add tables MARC and MARC_KEY
    Please also check that MARC_KEY that the field Inactive is not flagged for this entry.(This is needed to download the PLANT information as   interlinkages to CRM Online in the table COMM_IL_PRDLOC.)
    The plant information is seen in the Sales & Distribution tab of the product master by double clicking on the Distribution Chain.
    2. Add Relationship type PRDLOCS- LOCATION OF PRODUCTS
    Tcode: COMM_HIERARCHY
    Check if the corresponding Material Categories for which the PLANT information is to be downloaded has the interlinkage type LOCATION OF PRODUCTS maintained in the RELSHIP types for the products categories that are to be downloaded to CRM from R/3.
    Note:
    If no relationship types are assigned to the product category, the PLANT information will be downloaded to the interlinkage table COMM_IL_PRDLOC. But even if a single RELSHIP entry is maintained then additionally the RELSHIP type LOCATION OF PRODUCTS also have to be maintained. E.g. MAT_FERT
    Wish this helps.
    Regards,
    Shalini Chauhan

  • How to use Same Inspection plan for Multiple Plants?

    Hello,
    When I create a Process Order for material (M1), release and save it for a Plant A then I get the Inspection lot automatically.
    Now I have another Plant B that we have created. We would like to use the same Inspection plan that has been created for Plant A and M1
    So in the changed mode(QP02) of the Inspection plan for Plant A in the material assignment tab I added the Material M1 and the Plant B. I am assuming this means when I create the Process order for M1 in Plant B then it should use the same Inspection plan.
    But when I create the Process Order for M1 for Plant B, release and save it then it does not created the Inspection lot automatically(though I can create Inspection lot manually)
    Can you tell me if there is setting that will allow me to create the Inspection lot automatically on saving the Process order which should use the Inspection plan that I just assigned.
    And also let me know if there is a better way to handle same Inspection Plan for same material but multiple Plants.
    Thanks
    SAP Fans...

    Dear,
    For your message my understanding is that you are not getting Inspection lot created in Plant"B". Inspection lot for a material would get created based on the Inspection Setup for the material master "QM View", so compare the QM for the material in both plants and correct it for Plant "B".
    Probably I feel Inspection Setup is not complete for the material in Plant "B" - Generally when extending material by copying referance, in the QM view you need to click the Inspection Setup Button, for the data to be copied...otherwise it does not copy the Inspection setup from the referance plant.
    Regards,
    Prasobh

  • Single Subcon Vendor for multiple Plants - CTM

    Dear friends,
    We are planning some materials with Subcontracting scenario using CTM
    Facing issue when same vendor is executing sub-con process of same material for multiple plants
    Total demand of lower level material is flowing to a single plant instead of flowing to the corresponding multiple plants
    Because of which excess planning is happening in one unit & no planning is occuring at other units which is leading to a mess
    In library, it is provided to proceed with 1050 Location type but not clear on how to proceed further
    Kindly guide on this
    Regards,
    Antony

    Hi,
    Now Planning has to happen at dummy location of type 1050 and not at 1011 to transfer demand to correct plant.
    Please check following-:
    1. If you are using PPm create product in new location of type 1050.
    2. Also check whether Tlane is created for components from plant to this new location.
    3. Suggest to retransfer all master data including your subcontracting inforecord post creation of location of type 1050.
    If you are using PDS product should get created in new location automaticaly.
    Regards,
    Santosh

  • Restrict PO creation for multiple plants for same company code

    Hi Gurus,
    We want to restrict PO creation for multiple plants in the same company code. Based on Standard SAP settings for Purchasing organization assignment with multiple Plant and multiple Plant assignment with single company code, this is happening. Is there a way that we can restrict by doing some customization change.
    Any thoughts or ideas will be highly appreciating.
    Thanks and Best regards,
    Karun Kumar

    Hi,
    Said functionality is not available in SAP standard.
    To avoid the same ,i can suggest implement release strategy for PO,and then higher authority / commercial team can check created PO,if multiple plants available in single po then they have the option of rejection for the same.
    Or else check BADI-ME_PROCESS_PO_CUST,take the help from abapor and apply the restriction to select multiple plant in PO.
    Hope this will resolve your query,
    Thanks & Regards,
    Sandesh Sawant

  • MRP Run for Multiple plants

    Hi Guys:
    IN SAP R/3
    My client has requirement to merge planning of material for multiple plants and run the MRP under one head plant.
    For example:
    Plant : 1000, 1001, 1002, where plant 1000 is a head plant who had authorization to perform MRP run.
    if I run MRP Sepeartely:Each plant has below requirement for one material number (M1)
    Plant 1000 : 3 EA
    Plant 1001 : 2 EA
    Plant 1002 : 5 EA
    Instead of running MRP per plant, my client needs to run MRP for multiple Plants  that Consolidate  total requirement for all plants.
    and generate PR--->PO , In the PO, M1 should be delivered to 3 different plant locations by vendor and Po Will be issued from Head Plant 1000?
    Is there any Report in SAP , Where MRP Controller can See Requirements from Different Plants @ Central Purchasing  level after one Multi Plant MRP run, So that he can decide on how much to allocate to each plant?
    Thanks for help
    Thanks
    Sweth

    Hi,
    If u want to perform the MRP in one plant for all the plant requirement is depends on the bussiness process.
    You can try the following scenario:
       Planning in one plant nd production in other plant - Respective master data and special procurement have to maintain.For 
    further clarity please follow the below link
    http://help.sap.com/saphelp_46c/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm.
    We can evaluate the PR and PO by providing the authorisation object for the multiple plant to the respective users.
    Revert me back in case of clarification.
    Thanks
    P.Srinivasan

  • Creating a PO Using BAPI For Multiple PLants Or Multiple Line Items

    Hi All
        Can you please suggest me how to create a Purchase Order Using BAPI_PO_Create1 for Multiple Plants Or for Multiple Line items. The Requirement is like the PO is for single material for single vendor but for mulple stores i.e plants
    NOte:  Suggest me the  Creation of PO for MUltiple Line items or for multiple plants Using BAPI . Hope you people will give me the needful.
    Regards
    Shivakumar Bandari

    Hi,
    Here is the sample code to do that...
    *---> po header data
      wa_poheader-vendor    =  your vendor..
      wa_poheader-doc_type  =  Your doc type..check with Functional contact....
      wa_poheader-purch_org =  Purchasing Org..
      wa_poheader-pur_group =  Purchasing Group
    *---> po header data (change toolbar)
      wa_poheaderx-vendor    =  'X'.
      wa_poheaderx-doc_type  =  'X'.
      wa_poheaderx-purch_org =  'X'.
      wa_poheaderx-pur_group =  'X'.
    *---> poitem data
    data: item like ekpo-ebelp.
    item = '0010'.
    loop at t_parts.
      it_poitem-po_item  =  '00010'.
      IT_POITEM-PLANT    =  Plant..
      IT_POITEM-STGE_LOC =  Sloc...
    *---> poitemx (item data change toolbar)
      it_poitemx-po_item  =  '0010'.
      it_poitemx-po_itemx  =  'X'.
      IT_POITEMX-PLANT    =  'X'.
      IT_POITEMX-STGE_LOC =  'X'.
    *---> add record's to internal table
      APPEND:  it_poitem,
             it_poitemx.
    endloop.
    *call bapi_po_create1
      CLEAR v_ebeln.
      CALL FUNCTION 'BAPI_PO_CREATE1'
        EXPORTING
          poheader         = wa_poheader
          poheaderx        = wa_poheaderx
        IMPORTING
          exppurchaseorder = v_ebeln
        TABLES
          return           = it_return
          poitem           = it_poitem
          poitemx          = it_poitemx.
    *---> check the return table for error message
      READ TABLE it_return WITH KEY type = 'E'.
      IF sy-subrc NE 0.
        CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
          EXPORTING
            wait = 'X'.
      endif.
    Thanks,
    Murali

  • Checking the stock in multiple plants by creating STO to fulfil an order.

    Hi All,
    The requirement is to do a Stock Transfer from different Plants for fulfillment of Configuration Order(putting together different components to make one product) which always be done at one central plant. When configuration order is created the Order Header requirement is always set to u2018Complete Deliveryu2019, which means that all the line items on the Order be delivered to the Warehouse in one delivery for Configuration completion. 
    There are multiple plants around the Central plant and the suggestion made was to create STO from other plants to the configuration plant whenever there is a shortfalls. Currently in legacy the STO process for meeting shortfall requirement is met through Automated STO. The system looks for inventory in nearby Plant in a Sequence until it finds the inventory in one of the Plant and not external Procurement is done for this configurable materials.
    Is there any way that this can be configured in SAP from MRP or planning perspective to look for the stock in a sequence of plants specified? I know using a Special procurement key u201Cstock transferu201D under the MRP view in Material master but I was not completely clear on this process.
    Can anyone provide me their thoughts on how to resolve this issue. 
    Regards
    Shane

    HI Csaba,
    Thanks for your thoughts. Yes it is not possible to acheive this with in Materials management. It looks like APO has the in built functionality to handle these kind of scenarios.
    Shane

  • Multiple Plant Material Master

    Hi,
    Following is the business scenario:
    The client has two plants: one is excise exempt and other is not. Same material is manufactured in both plants. They also have a registered sales office which is created as a depot in SAP. Profit centers are created plant wise. Hence, there will be three profit centers (Excise exempt plant, excise chargeable plant and depot location).
    The Material Master for material is extended to all three plants having respective profit centers.
    Now, when material gets manufactured from both plants and lands at Depot for sale, no differentiation could be made so as to know which material (Point of Manufacture) was sold.
    The requirement is to get a Revenue Minus COGS report for Materials manufactured from Excise-exempt plant but sold from the depot.
    One of the options is to create different material master for such material at Manufacturing Plants.
    I am looking for options where separate material master need not be created.
    Thanks & Regards.

    Hi Vinay
    The only option I can think of is to use Split Valuation in the Depot Plant..
    Create 2 Val Types as EXCISE and EXCEMP for Excise and Excise Exempt Plant.. WHen you receive Goods in the Depot, you need to receive them against these 2 Val Types
    Ofcourse, it should be identifiable by looking at the Label from which Plant the product is manufactured... May be you need to think of introducing Batch Management in the 2 Mfg Plants wherein the Batch for Plant 1 starts with A and for Plant 2 starts with B
    Obviously, the cost of Product from Excise Exempt plant will be more because you dont get duty set off there.. So, this is the only option i can think of
    I would be firmly NO for Duplicate material codes
    Br. Ajay M

Maybe you are looking for