Create multiple single unit wip jobs for total sales order line qty

Hi all,
I want to know if there's a standard way to create multiple single unit wip jobs from a sales order line which has 2 or more units, i mean...
I have a sales order line with item A with 3 units. If I progress the sales order, a single job is automatically created in WIP with 3 units to be created. What i want is to create 3 jobs with one unit each, all of them linked to the sales line order...
Thanks in advance!
Regards!
Answered.........
Edited by: user604737 on Nov 10, 2010 3:51 PM

Hi Sandeep
We have similar requirement (SO qty = 3 then 3 WIP jobs should be created). However when planning releases WIP jobs it does not tie back(reserve) the jobs to sales order.
Are you aware of any standard way to do the same??
Regards
Mudit Gupta

Similar Messages

  • How to Find Out The Production Order Number For The Sales Order Line Items

    Hi All,
    I want to know the number of production orders for each sales order line item. I know the sales order number .Can anyone tell me how the tables can be linked to get all the production order numbers for each sales order line item.

    I think it depends on your configuration. But check fields KDAUF and KDPOS in table AUFK.  or in table AFPO.
    Regards,
    Rich HEilman

  • Select aentries from table Z-Table for all sales order line items

    Hi friends,
    can anyone please explain me about the "Select entries from table Z-Table for all sales order line items".
    Thanks.

    Moderator message - Welcome to SCN.
    But
    Moderator message - Please search before asking. Press F1 on SELECT and look at the FOR ALL ENTRIES addition. - post locked             
    Rob

  • Billing schedule Dates using a BAPI/FM for a sales order line

    Hello,
    I am trying to update a sales order line with an Item category which inturn updates the Billing Plan.
    I am able to update the sales order with required details and the default billing plan.
    Now I want to change the Billing schedule i.e the Billing Plan dates Invoice end date and the percantage etc whcih I am trying to do using
    SD_ORDER_BILLING_SCHEDULE AND BILLING_SCHEDULE_MAINTAIN AND THEN BILLING_SCHEDULE_SAVE.
    This for some reason will not update the Billing schedule.
    It triggers the user exists etc but even though I pass all the required details in the Old and new FPLA and FPLT tables...it is not helping.
    When I tried using BILLING_SCHEDULE_DIALOG it opens the screen with the Billing plan in edit mode.
    Is there any other way to do the updates.I tried changing in the User exist etc. I also checked the program sdfpla02.
    Many thanks,
    Krishna.
    Edited by: Krishna on Mar 21, 2011 8:30 PM

    See the following example
    * Read the billing plan
        CALL FUNCTION 'BILLING_SCHEDULE_READ'
          EXPORTING
            fplnr = hfplnr
          TABLES
            zfpla = hfpla
            zfplt = hfplt.
        MOVE hfpla TO hfpla2.
    *READ TABLE zfpla2 INDEX 1.
        hfpla2-lodat = p_stat.
        hfpla2-tndat = p_end.
        hfpla2-rfpln = ''.
        hfpla2-lodar = ''.
        hfpla2-tndar = ''.
        hfpla2-fpart = p_bplan.
        hfpla2-perio = p_bplan.
        hfpla2-horiz = p_hori.
    *** Very important to set field updkz = 'U' ***
        hfpla2-updkz = 'U'. "--> UPDATE!!
        APPEND hfpla2.
        CLEAR pos.
        CALL FUNCTION 'BILLING_SCHEDULE_SAVE'
          TABLES
            fpla_new = hfpla2
            fpla_old = hfpla
            fplt_new = hfplt " --> NEW
            fplt_old = hfplt.
        CALL FUNCTION 'SD_SALES_DOCUMENT_SAVE'
          EXPORTING
            i_no_messages = ' '.
        CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
          EXPORTING
            wait = 'X'.
    CALL FUNCTION 'SD_SALES_DOCUMENT_READ'
            EXPORTING
              document_number = doc.
          MOVE zbill-itm_number TO pos.
          CALL FUNCTION 'SD_SALES_BILLINGPLAN_READ'
            EXPORTING
              i_vbeln                = doc
              i_posnr                = pos
            IMPORTING
              e_fpla                 = e_fpla
            TABLES
              e_fplt                 = e_fplt
            EXCEPTIONS
              no_billingplan_allowed = 1
              no_billingplan_found   = 2
              OTHERS                 = 3.
          IF sy-subrc NE 0.
    * MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
    * WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
          ENDIF.
    * Read the billing plan
          CALL FUNCTION 'BILLING_SCHEDULE_READ'
          EXPORTING
          fplnr = e_fpla-fplnr
    * I_VFKDAT =
    * I_BFKDAT =
          TABLES
          zfpla = zfpla
          zfplt = zfplt.
    * Upddate the ZFPLT2 table with the new values
    *MOVE zfplt TO zfplt2.
          MOVE zfpla TO zfpla2.
    *READ TABLE zfpla2 INDEX 1.
          zfpla2-lodat = zbill-datesfrom.
          zfpla2-tndat = zbill-datesto.
          zfpla2-rfpln = ''.
          zfpla2-lodar = ''.
          zfpla2-tndar = ''.
          zfpla2-fpart = p_bplan.
          zfpla2-horiz = p_hori.
    *** Very important to set field updkz = 'U' ***
          zfpla2-updkz = 'U'. "--> UPDATE!!
          APPEND zfpla2.
        ENDLOOP.
        CLEAR pos.
        CALL FUNCTION 'BILLING_SCHEDULE_SAVE'
          TABLES
            fpla_new = zfpla2
            fpla_old = zfpla
            fplt_new = zfplt " --> NEW
            fplt_old = zfplt.
        CALL FUNCTION 'SD_SALES_DOCUMENT_SAVE'
          EXPORTING
            i_no_messages = ' '.
        CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
          EXPORTING
            wait = 'X'.

  • Availability Check at Multiple Plants for the Sales Order line Item.

    Hi Friends,
    We are having two plants, Plant A and Plant B. Plant A is used to issue the orders to the vendors and stock them, while Plant B is used to manufacture the Product and Stock.
    When we create the sales order, we want to check the Current Stock Plus Incomming Purchase order stock for plant A and also check current stock plus Production orders in plant B.
    for ex if the current stock is 100 in Plant A and No physical stock in Plant B but there are some production orders for 400 Qty which will be ready in 1 week.
    If i create a sales order for 500 qty which is scheduled for delivery 10 days later.  then we want to commit to the customer ( Looking at both the plants stock situation )  the system should check the stock availability for both the plants and automatically create two different line items , Line item 1 for plant A and line item 2 for plant b.
    I know there is a user exit for Multiple plant selection USEREXIT_PLANT_SELECTION  in program RV03VFZZ. The Description of the USer exit says ( This user exit may be used to provide a list of plants for which availability is to be checked)  But we have never used this one. Will this user exit do exactly what i want ??
    Did any of you, have used the above User exit in your implementations ? If so please let me know whats the purpose of this user exit
    Your reply is much appreciated.
    Thanks & Regards
    Srinivas

    Hi
    I dont know about the userexit which you are referring about
    But this is not available in R3 The system makes a Availability Check only in the plant which has got determined in the item details shipping tab and stops there
    The same is available in APO
    If there are 2 plants say 1000 and 2000
    In sales order the plant determined is 1000 and there is no stock
    In R3 system stops there
    But in APO  system checks the plant 2000 and if stocks are available it creates an STO in the background automatically from 2000 to 1000 if configured accordingly
    Even if the material is maintained in 10 plants the system will make a  Availability Check at all 10 plants and act accordingly
    Regards
    Raja

  • How to create deliver and billing...for existing sales orders?

    Hi Guru's,
    I had uploaded the 10 sales orders using BAPI ..
    now i wanted to create deliver and billing  for the existing 10 sales orders...thru BAPI(let me know if any alternate process also).
    could please guide me how create..?
    please provide me the step by step process..and please provide me the documentation if you have that would be helpfull to me...
    please let me know if my question is not clear..
    Thanks in adavance
    Srinivas....

    Hi,
    In normal practice we upload only open sales orders from the legacy system and not the completed sales orders.
    There were no standard BAPi's to create the outbound delivery & invoice documents in SAP, as they are created with a reference documents.
    Use BDC to upload those documents, even if you find a standard BAPI they will not upload the complete information for you.
    Thanks,
    Mahesh.

  • Queries for Open Sales Order Lines and Open Purchase Order Lines

    Experts,
    Forgive me if these have been addressed elsewhere but I can't find them.  I'd like to create two queries to use as Alerts as follows:
    1.  Query of open lines in Sales Orders that are more than two weeks old
    2.  Query of open lines in Purchase Orders that are more than 2 days old
    Thanks in advance for your help.
    Steve

    Hi Steve,
    A couple of query templates you can use for your alerts are as follows:
    Purchase Orders
    SELECT T0.\[DocNum\], T0.\[DocDate\], T0.\[DocDueDate\], T0.\[CardCode\], T0.\[CardName\], T1.\[ItemCode\], T1.\[Dscription\], T1.\[Quantity\], T1.\[OpenQty\], T1.\[Price\] FROM OPOR T0  INNER JOIN POR1 T1 ON T0.DocEntry = T1.DocEntry WHERE T0.\[DocDueDate\] < (getdate() -2) AND  T1.\[LineStatus\] = 'O'
    Sales Orders
    SELECT T0.\[DocNum\], T0.\[DocDate\], T0.\[DocDueDate\], T0.\[CardCode\], T0.\[CardName\], T1.\[ItemCode\], T1.\[Dscription\], T1.\[Quantity\], T1.\[OpenQty\], T1.\[Price\] FROM ORDR T0  INNER JOIN RDR1 T1 ON T0.DocEntry = T1.DocEntry WHERE T0.\[DocDueDate\] < (getdate() -14) AND  T1.\[LineStatus\] = 'O'
    You can change the SELECT section to remove some of the columns or add extra columns if need be.  Once your happy with the query you can attach it to an alert and set the frequency.
    Regards,
    Adrian

  • How to delete or activate the deletion flag for the sales order line item

    Hi All,
    I  have one Cust order & with referance to that cust order one production order is created . The production order user has done the Goods issue with 261 movement type  & GR wi 101 before 4 months back , & he has reverse  the GR  with 102 on todays date . but in materila master the  variable prize is maintain thats why it is showing  a differance in the cost .
    User want to delete the Production order as well as the custemer order From MDO4 , So we have make the Production order TECO & save , it is gone form the MD04 but the Custumer order still there . It is not allow us to cancell or reject . We have tried to maintain the reason for rejection but it showing the message that you can not activate the deletion flag for the order .
    Could you please Help me to find out the way how can i delete the custemer order ?
    Thanks In advance
    Regards
    Piyush

    W ehave Settele that order & then activate the deletion flag for the order & then cancel the sales order.

  • User exit for changing Sales order lines.

    Hello experts ,
    I want to delete the field "ROUTE" from all of the orders lines in sales orders, I have been using "USEREXIT_SAVE_DOCUMENT_PREPARE"  but it does not seems to do the job.
    What is the name of  user exit that i have to use for this task and which structure should be used,  is it xvbap ? is it vbap ?
    Thanks for the help.
    Avi.

    Hi,
    find the user exit u required.
    This IMG step describes additional installation-specific processing in sales document processing. In particular, the required INCLUDES and user exits are described.
    Involved program components
    System modifications for sales document processing affect different areas. Depending on the modification, you make the changes in the program components provided:
    MV45ATZZ
    For entering metadata for sales document processing. User-specific metadata must start with "ZZ".
    MV45AOZZ
    For entering additional installation-specific modules for sales document processing which are called up by the screen and run under PBO (Process Before Output) prior to output of the screen. The modules must start with "ZZ".
    MV45AIZZ
    For entering additional installation-specific modules for sales document processing. These are called up by the screen and run under PAI (Process After Input) after data input (for example, data validation). The modules must start with "ZZ".
    MV45AFZZ and MV45EFZ1
    For entering installation-specific FORM routines and for using user exits, which may be required and can be used if necessary. These program components are called up by the modules in MV45AOZZ or MV45AIZZ.
    User exits in the program MV45AFZZ
    The user exits which you can use for modifications in sales document processing are listed below.
    USEREXIT_DELETE_DOCUMENT
    This user exit can be used for deleting data which was stored in a separate table during sales document creation, for example, if the sales document is deleted.
    For example, if an additional table is filled with the name of the person in charge (ERNAM) during order entry, this data can also be deleted after the sales order has been deleted.
    The user exit is called up at the end of the FORM routine BELEG_LOESCHEN shortly before the routine BELEG_SICHERN.
    USEREXIT_FIELD_MODIFICATION
    This user exit can be used to modify the attributes of the screen fields.
    To do this, the screen fields are allocated to so-called modification groups 1 - 4 and can be edited together during a modification in ABAP. If a field has no field name, it cannot be allocated to a group.
    The usage of the field groups (modification group 1-4) is as follows:
    Modification group 1: Automatic modification with transaction MFAW
    Modification group 2: It contains 'LOO' for step loop fields
    Modification group 3: For modifications which depend on check tables or on other fixed information
    Modification group 4: is not used
    The FORM routine is called up for every field of a screen. If you require changes to be made, you must make them in this user exit.
    This FORM routine is called up by the module FELDAUSWAHL.
    See the Screen Painter manual for further information on structuring the interface.
    USEREXIT_MOVE_FIELD_TO_VBAK
    Use this user exit to assign values to new fields at sales document header level. It is described in the section "Transfer of the customer master fields into the sales document".
    The user exit is called up at the end of the FORM routine VBAK_FUELLEN.
    USEREXIT_MOVE_FIELD_TO_VBAP
    Use this user exit to assign values to new fields at sales document item level. It is described in the section "Copy customer master fields into the sales document".
    The user exit is called up at the end of the FORM routine VBAP_FUELLEN.
    USEREXIT_MOVE_FIELD_TO_VBEP
    Use this user exit to assign values to new fields at the level of the sales document schedule lines.
    The user exit is called up at the end of the FORM routine VBEP_FUELLEN.
    USEREXIT_MOVE_FIELD_TO_VBKD
    Use this user exit to assign values to new fields for business data of the sales document. It is described in the section "Copy customer master fields into sales document".
    The user exit is called up at the end of the FORM routine VBKD_FUELLEN.
    USEREXIT_NUMBER_RANGE
    Use this user exit to define the number ranges for internal document number assignment depending on the required fields. For example, if you want to define the number range depending on the sales organization (VKORG) or on the selling company (VKBUR), use this user exit.
    The user exit is called up in the FORM routine BELEG_SICHERN.
    USEREXIT_PRICING_PREPARE_TKOMK
    Use this user exit if you want to include and assign a value to an additional header field in the communication structure KOMK taken as a basis for pricing.
    USEREXIT_PRICING_PREPARE_TKOMP
    Use this user exit if you want to include or assign a value to an additional item field in the communication structure KOMP taken as a basis for pricing.
    USEREXIT_READ_DOCUMENT
    You use this user exit if further additional tables are to be read when importing TA01 or TA02.
    The user exit is called up at the end of the FORM routine BELEG_LESEN.
    USEREXIT_SAVE_DOCUMENT
    Use this user exit to fill user-specific statistics update tables.
    The user exit is called up by the FORM routine BELEG-SICHERN before the COMMIT command.
    Note
    If a standard field is changed, the field r185d-dataloss is set to X. The system queries this indicator at the beginning of the safety routine. This is why this indicator must also be set during the maintenance of user-specific tables that are also to be saved.
    USEREXIT_SAVE_DOCUMENT_PREPARE
    Use this user exit to make certain changes or checks immediately before saving a document. It is the last possibility for changing or checking a document before posting.
    The user exit is carried out at the beginning of the FORM routine BELEG_SICHERN.
    User exits in the program MV45AFZA
    USEREXIT_MOVE_FIELD_TO_KOMKD
    Use this user exit to include or assign values to additional header fields in the communication structure KOMKD taken as a basis for the material determination. This is described in detail in the section "New fields for material determination".
    USEREXIT_MOVE_FIELD_TO_KOMPD
    Use this user exit to include or assign values to additional item fields in the communication structure KOMPD taken as a basis for the material determination. This is described in detail in the section "New fields for material determination".
    USEREXIT_MOVE_FIELD_TO_KOMKG
    Use this user exit to include or assign values to additional fields in the communication structure KOMKG taken as a basis for material determination and material listing. This is described in detail in the section "New fields for listing/exclusion".
    USEREXIT_MOVE_FIELD_TO_KOMPG
    Use this user exit to include or assign values to additional fields in the communication structure KOMPG taken as a basis for material determination and material listung. This is described in detail in the section "New fields for listing/exclusion".
    USEREXIT_REFRESH_DOCUMENT
    With this user exit, you can reset certain customer-specific fields as soon as processing of a sales document is finished and before the following document is edited.
    For example, if the credit limit of the sold-to party is read during document processing, in each case it must be reset again before processing the next document so that the credit limit is not used for the sold-to party of the following document.
    The user exit is executed when a document is saved if you leave the processing of a document with F3 or F15.
    The user exit is called up at the end of the FORM routine BELEG_INITIALISIEREN.
    User-Exits in program MV45AFZB
    USEREXIT_CHECK_XVBAP_FOR_DELET
    In this user exit, you can enter additional data for deletion of an item. If the criteria are met, the item is not deleted (unlike in the standard system).
    USEREXIT_CHECK_XVBEP_FOR_DELET
    In this user exit, you can enter additional data for deletion of a schedule line. If the criteria are met, the schedule line is not deleted (unlike in the standard system).
    USEREXIT_CHECK_VBAK
    This user exit can be used to carry out additional checks (e.g. for completion) in the document header. The system could, for example, check whether certain shipping conditions are allowed for a particular customer group.
    USEREXIT_CHECK_VBAP
    This user exit can be used to carry out additional checks (e.g. for completion) at item level.
    USEREXIT_CHECK_VBKD
    The user exit can be used to carry out additional checks (e.g. for completion) on the business data in the order.
    USEREXIT_CHECK_VBEP
    This user exit can be use to carry out additional checks (e.g. for completion) on the schedule line. During BOM explosion, for example, you may want certain fields to be copied from the main item to the sub-items (as for billing block in the standard system).
    USEREXIT_CHECK_VBSN
    You can use this user exit to carry out additional checks (e.g. for completion) on the serial number.
    USEREXIT_CHECK_XVBSN_FOR_DELET In this user exit, you can enter additional criteria for deletion of the serial number. If the criteria are met, the serial number is not deleted (unlike in the standard system).
    USEREXIT_FILL_VBAP_FROM_HVBAP
    You can use this user exit to fill additional fields in the sub-item with data from the main item.
    USEREXIT_MOVE_FIELD_TO_TVCOM_H
    You can use this user exit to influence text determination for header texts. For example, you can include new fields for text determination or fill fields that already exist with a new value.
    USEREXIT_MOVE_FIELD_TO_TVCOM_I
    You can use this user exit to influence text determination for item texts. For example, you can include new fields for text determination or fill fields that already exist with a new value.
    User-Exits for product allocation:
    The following user exits all apply to structure COBL, in which the data for account determination is copied to item level.
    USEREXIT_MOVE_FIELD_TO_COBL
    Option to include new fields in structure COBL.
    USEREXIT_COBL_RECEIVE_VBAK
    Option to assign values from the document header to the new fields.
    USEREXIT_COBL_RECEIVE_VBAP
    Option to supply values from the item to the new fields.
    USEREXIT_COBL_SEND_ITEM
    A changed field can be copied from the structure into the item. You could use the user exit to display a certain field in the account assignment block (see also MV45AFZB).
    USEREXIT_COBL_SEND_HEADER
    A changed field can be copied from the structure to the header (see source text MV45AFZB)
    USEREXIT_SOURCE_DETERMINATION
    You can use this user exit to determine which plant will be used for the delivery. In the standard system, the delivering plant is copied from the customer master or the customer-material info record. If you want to use a different rule, then you must enter it in this user exit.
    USEREXIT_MOVE_FIELD_TO_ME_REQ
    With this user exit you can include additional fields for the following fields:
    EBAN (purchase requisition)
    EBKN (purchase requisition-account assignment)
    USEREXIT_GET_FIELD_FROM_SDCOM
    Option to include new fields for the variant configuration. Fields that are included in structure SDCOM can be processed and then returned to the order.
    USEREXIT_MOVE_WORKAREA_TO_SDWA
    You can use this user exit to format additional work areas for the variant configuration. You will find notes on the user exit in MV45AFZB.
    User-Exits for first data transfer:
    The following user exits can only be used for the first data transfer.
    Note
    Only use the user exits if the names/fields do NOT have the same name.
    USEREXIT_MOVE_FIELD_TO_VBAKKOM
    Option to include additional fields in structure VBAKKOM (communiction fields for maintaining the sales document header)
    USEREXIT_MOVE_FIELD_TO_VBAPKOM
    Option to include additional fields in structure VBAPKOM (communication fields for maintaining a sales item)
    USEREXIT_MOVE_FIELD_TO_VBEPKOM
    Option to include additional fields in structure VBEPKOM (communication fields for maintaining a sales document schedule line)
    USEREXIT_MOVE_FIELD_TO_VBSN
    You can use this user exit to include fields in structure VBSN (scheduling agreement-related change status).
    USEREXIT_MOVE_FIELD_TO_KOMKH
    You can use this user exit to include new fields for batch determination (document header).
    USEREXIT_MOVE_FIELD_TO_KOMPH
    You can use this user exit to include new fields for batch determination (document item).
    USEREXIT_CUST_MATERIAL_READ
    You can use this user exit to set another customer number in the customer material info record (e.g. with a customer hierarchy)
    USEREXIT_NEW_PRICING_VBAP
    Option for entry of preconditions for carrying out pricing again (e.g. changes made to a certain item field could be used as the precondition for pricing to be carried out again). Further information in MV45AFZB.
    USEREXIT_NEW_PRICING_VBKD
    Option for entry of preconditions for carrying out pricing again (e.g. changes to the customer group or price group could be set as the preconditions for the system to carry out pricing again). Further information in MV45AFZB.
    User-Exits in Program MV45AFZD
    USEREXIT_CONFIG_DATE_EXPLOSION
    The BOM is exploded in the order with the entry date. You can use this user exit to determine which data should be used to explode the BOM (explosion with required delivery date, for example).
    User exits in the program FV45EFZ1
    USEREXIT_CHANGE_SALES_ORDER
    In the standard SAP R/3 System, the quantity and confirmed date of the sales document schedule line is changed automatically if a purchase requisition is allocated, and it or the sales document is changed (for example, quantity, date).
    If you want to change this configuration in the standard system, you can define certain requirements in order to protect your sales orders from being changed automatically. Use this user exit for this purpose. Decide at this point whether the schedule lines are to be changed.
    User-Exits in Program RV45PFZA
    USEREXIT_SET_STATUS_VBUK
    In this user exit you can you can store a specification for the reserve fields in VBUK (header status). Reserve field UVK01 could, for example, be used for an additional order status (as for rejections status, etc.).
    The following workareas are available for this user exit:
    VBUK (header status)
    FXVBUP (item status)
    FXVBUV (Incompletion)
    USEREXIT_SET_STATUS_VBUP
    In this user exit you can you can store a specification for the reserve fields for VBUP (item status).
    The following workareas are available for this user exit:
    FXVBAP (Item data)
    FXVBAPF (Dynamic part of order item flow)
    FXVBUV (Incompletion)
    USEREXIT_STATUS_VBUK_INVOICE
    You can use this user exit to influence billing status at header level.
    User exits in the screens
    Additional header data is on screen SAPMV45A 0309, additional item data on screen SAPMV45A 0459. These screens contain the Include screens SAPMV45A 8309 or SAPMV45A 8459 as user exits.
    Fields which are also to be included in the sales document for a specific installation should be included on the Include screens for maintaining. If an application-specific check module is needed for the fields, this can be included in the Include MV45AIZZ. The module is called up in the processing logic of the Include screens.
    For field transports, you do not have to make changes or adjustments.
    Example
    A new field, VBAK-ZZKUN, should be included in table VBAK.
    If the check is defined via the Dictionary (fixed values or check table) the field must be included with the fullscreen editor in the Include screen SAPMV45A 8309. In this case, no change has to be made to the processing logic.
    User Exits in Program MV45AFZ4
    USEREXIT_MOVE_FIELD_TO_KOMK
    You can use this user exit to add or edit additional header fields in the communication structure - KOMK- for free goods determination. For more information, see the New Fields for Free Goods Determination IMG activity.
    USEREXIT_MOVE_FIELD_TO_KOMP
    You can use this user exit to add or edit additional item fields in the communication structure KOMP for free goods determination. For more information see the New Fields for Free Goods Determination IMG activity.
    User Exits in the SAPFV45PF0E and SAPFV45PF0C Programs
    EXIT_SAPFV45P_001
    Best regards,
    venkatawamy.y

  • How update amount of charge line for a sales order  line id

    I have a modifier which are qualified for a order line id, i want to update the amount of charges if the Shipping date is > 1 day than resquest date, as I do not have the advances pricing module so i have to do a customization for this condicion.
    I want to now how to update these, Does exist a API in order to do that ? or Can i go directly to oe_price_adjustments table and modify the data ??
    Thanks
    Fernando

    Hi Fernando,
    I'd probably do this in Adv. Pricing using a dynamic formula + factor list (two diff charge levels dependent on schedule ship date minus request date) against a booking event modifier. Obviously, you don't have dynamic formulas in Basic Pricing but could you handle this via creating a new pricing attribute? The charge levels could be maintained on a lookup rather than hardcoded and used in the calculation by your new pricing attribute.
    Whatever approach you go for would also need to cope with the scenarios that you either rescheduled the order or manually amended the request date because obviously the gap between request date and SSD would change.
    Your first suggestion is feasible, the second not a good move - I'm not sure how much it costs to licence Adv. Pricing but you could always offset the cost against the cost of developing and maintaining a custom update routine.
    Regards,
    Jon

  • How to create multiple WIP jobs from a single Sales Order Line

    Hi all,
    I want to know if there's a standard way to create multiple single unit wip jobs from a sales order line which has 2 or more units, i mean...
    I have a sales order line with item A with 3 units. If I progress the sales order, a single job is automatically created in WIP with 3 units to be created. What i want is to create 3 jobs with one unit each, all of them linked to the sales line order...
    Thanks in advance!
    Regards!

    Assuming simplest of scenarios....
    In case of changes to Sales order qty, an unplanned order will simply disappear.
    If a wip job has already been created, you will get a cancel message (in case the job is not needed) or a reschedule out message (if the quantity needs to be reduced).
    ASCP will give you a reschedule in /out message if the dates change.
    Sandeep Gandhi

  • Creating multiple partner function for a sale order @ header level

    Hi All,
    I have a requirement where in i have to create more than one partner funtion for a sale order @ header level. But the system did not allow this sort of scenario and i got the error,
    Partner function ZZ can only occur  1 times in procedure TA (Sales Document Header)
    the function module that was giving this error was SD_PCHECK_PARVW_COUNT_OK
    here the function module checks if a partner function already exists if so it throws that error. This also updates the VBPA table where partner function is one of the key fields.
    Our issue is that we have to allow the system to enable posting 2 or more partner function for the same sale order. It was also verified that the unique key was unchecked during configuration.
    is there any other way of over coming this issue as we are updating the standard table. Is it possible??
    Thanks a lot in advance for your reply....

    I believe this is a configuration setting, based upon the details of your post.  Typically, a sales order can have multiple partner functions, but usually the partner type is not duplicated at a single level (header or one item).  For example, it would not be logical to have multiple ship-to partners at the header level...these would be unique at the item level, if required.
    Speak to your SD functional specialist about the configuration controls for partners, if you must have more than one partner with parvw = ZZ, for the entire order (header level).
    Edited by: DaveL on Aug 23, 2011 3:00 PM

  • How to see customers total sales orders value

    Dear all,
    How can I create a query to see all customers total sales orders value.
    I have tried MC+E transaction, it is not giving accurate values when compare for a customer with VA05N report.
    moreover it doesn't have filter option.
    Please help me to resolve the issue. Your suggestion will be highly appreciated.
    Best regards,
    Raghu ram

    Hi,
    Try S_ALR_87012171  and S_ALR_87012186.   or
    S_ALR_87012160, select customer lite items only, enter customer number.
    Click on dynamic selection (Shift+F4). enter RV in document type field and press execute.
    Regards,
    Chandra

  • What is the Program for Sales Order Line Item Rescheduling

    Hi,
    There is a background scheduled job which does sales order line items rescheduling but I could get the name of the Program/Function Module by looking at the Jobs log. Can any one please help me?
    When does the rescheduling happen? Does it happen while creating delivery for the order? I need to understand the rescheduling the process to solve a bug in the User Exit / Screen Exit.
    Appreciate your help in Advance.
    Thanks,
    Kannan.

    If you know the job name, than you can find out the associated program name.
    Go to SM37.
    Select your job from the list
    Select "Step" ... here it will show you the program name
    Put cursor on the program name and Go to > Variant to know what was the input to run this job.
    Regards,
    Naimesh Patel

  • VL10C double delivery notes for one sales order

    Dear all,
    Currently we encountered an very strange issue in our SAP.  we found that via VL10C, SAP create two duplicated ourbound delivery notes for one sales order, which resulted in a double items and amount in the billing document. These two deliveries notes are complete the same, which were created with 7 sec interval via VL10C. Check in the sales order, we can see delivery Qty was double against order Qty for all the items.
    does anyone have a clue on this issue? your effort and feedback will be most applicated!
    Thanks & Best Regards,
    Kyo NG

    Hi,
    I forgot this possible cause. Check Note 61148 - VL04 VL02 AME807 AME815: Insert to table VETVG and related notes, specially Note 931297 - VL10x, VL10HU - Duplicate entries displayed in STO.
    Regards,
    Eduardo

Maybe you are looking for

  • Linking external microphone to ThinkPad T430

    Hello,  we are trying to use our ThinkPad T430 to support an external microphone.  The microphone is coming in via a mixing desk.  Previously our laptops have had two input points - audio and microphone and we have connected via the microphone input.

  • Quick edit question

    i just cut up a 10 min. recording and now there's a ten min. track with sixty holes in it. Is there a quick way to delete all the holes and bump the new regions up all together or do I have to move each region 'by hand'?

  • Query Event Log

    I would like to use a PowerShell script to check compliance on several systems.  What I would like is a script that would: query the events in a specific event log for the last 24 hours, look for a specific event and report back compliant.  Can anyon

  • Converter Element - converter-for-class

    I assume a converter can be registered statically on a UI-Component, e.g. one can only remove the converter using java methods. In JSP code, one then does not have to add the converter each time. Again, the attribute and property elements confuse me.

  • Is there a microsoft excel equivilant program for imac?

    All I want is a simple spreadsheet similar to microsoft's excel program.  I'm a new mac user and cannot find anything like that on my computer.  (I can't even find a word program to type a document!)  Do I have to buy a separate app just for this? Ap