Hi everybody,
I'm trying to use the tcode KE11 but I don't know how can I create new planning layout for sales and proft plan.
Anybody can help me?
Thanks & Regards

Hi,
Use T.code KE14 to create a Planning layout.
Hope this helps.

Similar Messages

  • Using Sets while creating a Plan Layout

    Hi All,
    Please let me know whether we can make use of sets while creating a planning layout using report painter.
    Thanks

    HI
    We can make use of sets while developing a planning layouts using report painter.
    Thanks
    Sandy
    Edited by: sandesh shetty on Feb 6, 2009 11:17 AM

  • Creating a planning layout in BW BPS(3.5 unicode) and use it in crm 5.0 ?

    How can i create a planning layout in BW BPS(3.5 unicode) and use it in crm 5.0 ?
    Any thoughts how to do it please.
    Regards,
    Rao

    Inform me if i am getting it right...
    Step 1 : You are loading data for 2007 for example, do the distributions, everything is ok.
    Step 2 : You are loading data for 2008, do the distributions, the data from 2007 are distributed too.
    If this is the case just create a data slice gor 0fiscyear, to restrict the data to be affected by the planning functions.
    Or is the Step 2 is that you are loading extra data for 2007 ?
    regards

  • Creating new planning application

    Hi All,
    i am try to create new planning apllication where i could'nt understand the significance of plan types. can anyone guide to get to know.
    thanks,
    varatharaj kannan

    A plan type is basically an essbase database, you create them based on the model you are building, if the design cannot accommodate one database then you have the option to use additional databases (plan types)
    You cannot add/delete plan types once the application is created though.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • GRC PC 10 - Create new plan and configure workflows

    Hello,
    I'm trying to create a new plan (I allready have 2 new plans created) and I want to configure it workflows.
    One is a replica of Self-Assessments and another is a replica of Test of Efectiveness.
    The difference is that their applies to differents certifications and must have differents uses.
    But I don't know where to configure or create the event to assign a role or determine the agent.
    For example, one of the new plans are PERF-AUISO.
    And the second question is, where can I define that my new plan (Self - Assessment) with a survey, don't have any final result? I don't want that the users who response says if it is "Adequate" or "Defficient". I want that only responds a text por a control.
    Thanks a lot!!
    BR
    Matias

    Hello Claudenir,
    the concept in GRC is not to delete master data but to delimit the validity.
    There is no deletion supported in the standard functionality.
    Best,
    Jürgen

  • Left over of Sales Order creates new planned order of whole batch

    Hi Gurus,
    We are using planning without Assembly strategy (52) and Sales order is created in our sales plant and Purchase order from sales plant creates STO on manufacturing plant which than produces material using process order.
    Now sales order says 5000 EA but actual production is if 4985 EA in Manufacturing plant which is transported into Sales plant and sales plant receives 4985 EA which keeps sales order of 5EA in the system
    When MRP runs overnight creates planned order for left over quantity and it is of whole batch 5000 EA. This confuse our planner.
    Can anyone provide me the solution please?
    Regards,
    SAPPPPI

    Hi,
    For strategy 52 FX never works so we have lot sixe "EX".
    We have set up tolerance limit of +/- 10% but when less quantity is received (4985 instead of 5000)  from manufacturing plant system thinks there is an open sales sales order of 15 and creates a new planed order.
    If we have materials 4980 in stock and we create  a sales order for 5000, tolerance will be considered for this and there won't be any open sales order but in our case Sales order allows us to procure and when GR quantity is less than sales order it is treated as left over and create planned order.
    Please help me by replying if any one knows.
    Regards
    SAPPPPI

  • Creating new keyboard layout

    My last Mac model was 7500 (long time ago) with Mac OS 7.x. Since then I used PC with Windows OS, and now I am back to the game again. Mac OS is changed significantly since then, so I have to start from begining.
    Now, because Macedonian keyboard has not the same layout as in Win OS I would like to redefine it, or to create a new one. I could do it then (with some tricks that I forgot) but not now. Can anybody help me to do it, please?

    you can use Ukelele to create a custom keyboard layout
    http://scripts.sil.org/cms/scripts/page.php?site_id=nrsi&id=ukelele

  • Cannot create new planning app following installation of 9.3.1

    Hi,
    I have installed planning including epma. I have registered everything with HSS and have created a data source through the config tool. However, I cannot see how to create a new app through workspace and planning is not listed as a project in HSS. I have created the sql repository etc
    Has anyone seen this before?
    Thanks,
    Nathan

    Hi,
    First of all there will not be a project in HSS, you can manually create one and call it whatever you like.
    Have you granted shared service roles :- Dimension editor and Application Creator.
    If you have and configured correctly you should be able to create an application through workspace > Navigate > Administer > Classic Application Administration > Planning Administration
    You should be also able to access planning directly to create an application :- http://<planning machine>:8300/HyperionPlanning/AppWizard.jsp
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Unable to create new Planning application

    I try create Planning Application:
    http://<myserver>:19000/workspace -> Log On -> Navigate -> Administer -> Classic Application Administration -> Planning Administration
    and receive an error on the page "Create Application":
    An error occurred while processing this page. Check the log for details.
    If I try http://<myserver>:8300/HyperionPlanning/AppWizard.jsp - I have this error too.
    Help, please

    Hi,
    I have the same problem. I installed 9.3.1 exactly in the order given in documentation.
    I also configured all products and planning data sources successfully.
    Products I Installed:
    Oracle Database
    1. Shared Services
    2. Essbase
    3. EPMA
    4. Reporting and Analysis
    5. HFM
    6. Planning
    I have created a user given access to all the glbal roles available but still get this error.
    Similarly in the Essbase user properties of (the default admin user and the user created by me), under Application Access type, only Essbase is enabled. Planning is disabled.
    regards
    H
    Edited by: user623259 on Sep 8, 2008 3:48 PM

  • How to create new "Planning delivery schedule instruction"

    Hi All,
    I need new call control parameters created in VA32 for all shipping scenarios.  For some new shipping frequencies. Kindly help how to create.
    Thanks in Advance.

    Tocde: VOZP
    Path: SD->sales->sales doc->sch.agr.with del.sch.-> maintain PDS instruction
    chidambaram

  • Planning Layout - BCS

    Dear All,
    I wish to create a new planning layout in BCS. the layout is as below, for a series of Commitment Item i also want subtotal. The summary table used is FMBDT. Could you please share some information/knowledge/document which will help me to meet the requirement.
    Funds Center I Commitment Item I Commitment Item Description I Amount I Distribution Key
    Best regards
    Abishay Solomon

    Hi,
    What you mean series commitment item for subtotal? for planning or reporting.
    To create new planning layout, just copy the standard planning layout and add the new column, select the attribute for distribution key.
    Regards,
    Dewi

  • Creation of new planning level in BPS0 in BW 3.5

    Dear Experts,
    I have to create a new planning layout in BW 3.5 BPS
    for this ,I have followed the below procedure:
    -Maintained the master data of new keyfigures in Info Object: Key Figure (0MEASURE) in RSA1
    -Copied the Similar Planning level in the same Planning area (in which I need to add the new one) and created a new planning level with its subordinate objects and then changed by deleting  the keyfigures except # and added the new keyfigures, to be maintained in new planning area and saved.
    -Changed the planning layout (which is created automatiacally whne we copied planning level) by deleting the existing key figures except 0KEYFG_FLAG and added the required key figure and saved.
    -copied the planning profile and created a new planning profile and changed it with required planning level and package and saved.
    -In T-code:upx_mntn1, I could see the new planning level with the required key figure there.
    But this new planning profile is not appraring in the CRM server.
    As I haven't  worked in BPS , please guide me if there is any thing needs to be done or any changes in the procedure followed.
    Please share any documentation or links you have ....regarding this
    Please share your Ideas
    Thanks in advance....
    Arjun

    Hi,
    The Planning Profile has been created in CRM also and hence the configuration is working

  • Planning Layout creation

    Hello All,
    We have a requirement from our customer to create two new planning layouts as per the data given below.
    Example     
    Costcenter     Costelement                          Amount     Distribution
    Costcenter 1     Costelement 1     Amount     Distribution key 1
    Costcenter 2     Costelement 1     Amount     Distribution key 2
    Costcenter 3     Costelement 1     Amount     Distribution Key 3
    Please suggest on how to create the planning layout as per the requirement.
    Also, how do we see the output of the layout?
    Thanks in advance,
    Vinod P

    Hi:
    To see the output you have to assign the layout to a planning profile and go to manual planning transaction picking the profile where you assigned the new layout.
    Besides, I believe to remember you can navigate from the layout (when you are creating it) to manual planning (look for it in the menu ("go to" or similar)). It is useful to test it.
    Br
    Jose

  • Planning Layout - Library/Reporting Table Assignement ?

    Hello,
    Anybody knows how to add characteristics/key figures to the ones available in standard when creating a planning layout for manual planning ? Via table KPPT you can deduct that planning areas are asigned to sort of libraries (1P1, 1P2...) but these libraries cannot be found in table T801K.
    Thanks for your help.
    Regards
    Thomas

    Paulo,
    When you create a new element as you describe, one can select among proposed characteristics/key figures but if I want to use one that is not proposed; is there a solution for that. My precise request is to be able to include budgeted costs in a cost element planning layout.
    Thanks and regards
    Thomas
    Edited by: Thomas Van Aken on Aug 3, 2009 12:03 AM

  • Planning layout for account based CO-PA

    Hi Gurus!
    I want to create a new planning layout in profitability analysis to be able to maintain planned values directly in profitabilty analysis on cost element level.
    But somehow there is no possibility to plan the value in comany code currency. When selecting costing based co-pa and then calling transaction KE16 -> create new layout,  you are asked by the system whether you want to plan in Controlling Area currency or also in company code currency. But, when selecvting account based co-pa this is not possible. You can only choose controlling area currency.
    Can somebody explain this?
    Thanks

    What's the reason to do this?

Maybe you are looking for

  • How can I change the ownership of a report in BW?

    I am trying to create a role and save a query in it but the query belongs to someone else. When I try to save the query in the folder, I cannot, but when she tries, it works fine. Does it have anything to do with the ownership since she was the one w

  • My Apple TV can no longer find my network - help?

    I've been using my apple tv for a LONG tme successfully until tonight. It can no longer find my network (airport network)! Resetting/restarting the apple tv has not helped. I can't update anything because it can't connect to the internet (even though

  • Jobs in SAP XI

    Hi, I am doing my Masters of Business in ERP System from Victoria Universit, Melbourne. I am doing course in SAP XI as well. Can you please let me know the job opportunities after I finish this course. Please suggest me how I can apply for entery lev

  • Preserving transparency using Contact Sheet II or similar

    Hoping someone can help with this. We currently print using a flat bed ink jet printer CMYK++(fixative) capable of printing several images at one time. We create the file using PS then use bridge and contact sheet II to create the print ready documen

  • I want to buy macbook pro 13 inch

    i would like to hear more about it from users who already own it though. i'd need it mostly for programming and reading and it won't be my main pc so it won't get a lot of load. most important factor for me is screen so my questions are 1) how does m