Creating/Copying a Work Centre,also a Production Scheduler and Cost Centre.

Hi All,
I am trying to create a new work centre based on the settings of a previous one? First of all,how I can do this?
Secondly,after I have created the new work centre (having copied being copied from another),I need to create a new production Scheduler and Cost Centre? How I will be able to do so,also?Will the Production Scheduller and Cost Centre assignments fom the old work centre be copied,too,or I will need to create/copy these from scratch?
All help greatly appreciated,will award points to all useful answers.
PAPJ1.
Edited by: PAPJ1 on May 20, 2011 11:01 AM

Hello,
You can create a new work center by copying an existing work center. in the cr01 screen in the copy from column put the plant name and Ref. work center name and put enter. all the existing data will be copied to the newly created work center. no need to create new assignment to  Production Scheduller and Cost Center.
Hope it helps.
Regards
Alok

Similar Messages

  • Creating control area,Company codes and Cost centres

    Hello experts,
    I want to create a new controlling area,company code and cost centres for a new client. I know the transaction codes/menu path, but I would like to get an exact guidance for creating these. Experts pls comments on this, I want exact procedure for all not only tcodes.

    Hi,
    This is the work of FICO Consultant.
    However, Refer to this website for creating Creating controlling area, company code and cost centres.
    Creating controlling area, company code and cost centres
    http://www.sap-basis-abap.com/sapco.htm
    Also refer to SAP Best Pratices
    http://help.sap.com/bp_bblibrary/600/BBlibrary_start.htm
    V08: Basic Controlling
    Additionally refer to this book
    www.amazon.com/Configuring-SAP-Essential-Financial-Controlling/dp/0782125972
    Please let me know if you need more information.
    Assign points if useful.
    Regards
    Sridhar M

  • Itunes is not working on my mac. I'm trying to redeem a gift card and everytime I enter my password it does not work.  Also, when I try and browse songs, everything is blank

    HELP!
    Itunes is not working on my mac. I'm trying to redeem a gift card and everytime I enter my password it does not work.  Also, when I try and browse songs, everything is blank

    It's been a while but it should work on a Mac because Macs can read Windows formatted devices. Otherwise, you can perform a restore operation to return it to the Mac format. If you go to support.apple.com/manuals/ you can find a copy of the user manual for the model you have in which this is all explained.

  • Cost centre not displying in FS10N if cost centre is created with catg 11

    Hi All,
    If cost element is created with catg 11 (revenue) then in FS10N for document cost centre is displaying as Blank. But if Cost element is 1 then Cost centre is displaing in FS10N report. Is there is any solution for it.My customer wants to display cost centre even if cost element is 11. Can any one help/guide me.
    Thanks in advacne.
    Nagendra

    Hi,
    FS10N is totals report; I guess, you mean FBL3N (which is drill-down of FS10N). If the document is posted on cost centre, then it will be displayed. Notice, that cost element 11 (income) is usually posted with another cost object, as it could not be posted only to cost centre, since incomes are posted statistically to cost centres. So, veirfy that the documents in question are posted to cost centre at all.
    Regards,
    Eli

  • BI FI and Cost Centre Reconciliation

    Hi
    I have a requriement to create a GL reconciliation report between Finance and Cost centre data, i have a multi sitting over the relevant cubes and the data is coming through.
    The report is as follows
                     |_FI Total__|___Cost Centre Total__|__Difference_(should = 0)
    GL Account |                  |                                  |                   
    For the cost centre data the report should bring through the data where the cost element = GL account in the row,
    ie GL Account - 60000
    FI Total - GL Account - 60000
    CC Total - Cost Element - 60000
    Difference - FI - CC
    Any ideas on how i can do this or if this is possible?
    Thanks
    Josh

    Hi Harshal
    Yes i was able to create this report, i had to create an infoobject ZFI_GLCE with 0GL_ACCOUNT as a ref. characteristic.
    Then i created a cube and had transformation going from YCOOM_C02 (CO-OM: Costs and Allocations (Delta Extraction)) to the cube where i mapped the Cost Element to ZFI_GLCE and then also had another transformation from YFIGLO02 (General Ledger: Line Items) to the cube mapping the GL Account to ZFI_GLCE.
    Could you further explain the problem you are having with the GL Accounts?
    Josh

  • Asset and cost centre

    hi,how can i create my own asset and cost centres?

    Hi Lakshmi,
    Use BAPI_FIXEDASSET_CREATE to create assets and BAPI_COSTCENTER_CREATEMULTIPLE to create cost centers.
    Regds,
    Younus
    <b>Reward Helpful Answers!!!</b>

  • Reporting commitments for IO and Cost Centre

    Hello Help!
    I need your expertise please ..
    When reporting on a cost centre's commitments in Y_DEV_17000159, the commitments posted to the internal order (which is also attached to the cost centre) does not appear in the report.
    However, when I do a report on the cost centre only, it shows commitments except the IO. And when I execute a report on the IO, it shows all IO commitments.
    Is there a way to report on both IO and cost centre commitments in the one report?
    P.S. the order does have Statistacal Postings enabled.
    Many thanks for you help on this!
    ? Vanessa ?

    Hi,
    When you post to Real internal Order, and Cost Center.
    The Internal Order will take precedence always.  Cost center posting will become statistical.
    To your question "whether IO and Cost Center co-exists in one transaction?"
    Yes, very much, many cases this happens normally for transactions related to marketting campaigns etc
    Hope this would clarify your question
    Best Regards
    surya

  • How to get G/L account and cost centres from ECC to SRM...

    Dear All,
    How to get G/L account and cost centres from ECC to SRM...
    Please let me know the steps...
    Thanks
    Ravi

    Hi
    GL account - You can define in SPRO- Cross application settings--Account assignment ->Define GL account for product category and account assignment category.
    or you can use BADI BBP_DETERMINE_ACCT.
    In Organisation Strucute - You can Map the backend cost center via KNT  cost center attribute .
    Regards
    Muthu

  • Screen exit in MM01(VIEWS : Purchasing, MRP1, Work Scheduling, and Costing)

    Hi All,
    I have one requirement like I need to add one custom field in all views where the Plant-specific material status is available. i. e Views names are: Purchasing, MRP1, Work Scheduling, and Costing 1.
    The location of the new custom field is below the section that contains the Plant-Specific material status field. in above Views.
    Please help me to resolve this issue.
    Thanks in Advance.
    Amjad.

    Hi,
    Adding customer fields to MM01 screens involves customising.
    Go To SPRO>Logistics General->Configuring the Material Master.
    Here you will find a step-by-step guide with an example in the documentation as to how to add field on a screen on the Material Master.
    Regards,
    Ankur Parab

  • Real IO and Cost Centre

    HI all
    JV posting with real IO and Cost Centre.  Which will take precedent?
    Internal order and Cost centre, could these two co-exist in one transaction?
    regards
    Jana

    Hi,
    When you post to Real internal Order, and Cost Center.
    The Internal Order will take precedence always.  Cost center posting will become statistical.
    To your question "whether IO and Cost Center co-exists in one transaction?"
    Yes, very much, many cases this happens normally for transactions related to marketting campaigns etc
    Hope this would clarify your question
    Best Regards
    surya

  • How do I create a new Work Center for the transaction launcher and links

    Hi
    The requirement here is for me to find out if I can create a new Work Center that will contain up to 6 assignment blocks and each block having either links to websites and BW reports, or triggers to R/3 applications via the transaction launcher.
    Can I do this purely through customising or do I need to create a new view using BSPs? If I can do it through customising please could I have a few pointers to what component I would need to use/copy?
    Regards
    Declan

    Hi Robert,
    Thanks again for taking the time to reply.
    Just so I understand, if I want to show a work center I need to link it to a component / view? I think this was the original query - do I need a developer to create the view that contains the 6 blocks with their links to reports, transactions and websites? I think when I talk about blocks I mean 1 viewset containing 6 views. There is no SAP standard view that would suit my requirements is there? Even if the work center had 8 views, I can always hide the two views in configuration.
    After the developer has created the view, I then reference that component in the target Id in the define logical links section of my work center.
    If my understanding is right, then it follows that it is not possible to create a user specific work center without some development.
    Is this correct?
    Cheers
    Declan

  • Activity Types and Cost Centres

    Our PP is not yet live now.
    While going through the system settings, it is found that many activities (approx. 15 for indirect expenses also) are planned in the Production Cost Centres.
    However, these activities are not included in the master data of the Work Centre. Only one activity type is mentioned there for machining.
    Then, what is the purpose of other activity types planned if they are not mentioned in the Work Centre ?
    Is there any other way these activity costs will appear in the Cost report ?

    Hi,
    You are almost on the right line, activity quantities will be triggered in the  cost center report based on the routing master and through  the confirmation from the production orders.
    For the creation of the  work center - Activity Planning KP26 is required. Cost center/Activity
    where we can plan the activity quantities.
    Prior to that KP06 is required to plan the  primary cost combination of (Cost Element/Cost center/Activity Type) where we can plan the cost.
    Based on the above information we can calculate the plan price - KSPI
    Based on the confirmation from the production orders activity quantities will be updated in the center report. cost will be updated with actual postings in the cost center.
    So that you can calculate the actual activity price.
    Please look into the blog for better understanding:
    Expenses Analysis and Its splitting  - Part 1
    Regards,
    Pavan Kumar Arvapally

  • Third party gratis order and cost centre allocation

    Hi all
    I have a problem with third party sales. When the sales order is gratis, the cost centre allocation is determined by our gratis order reason. This particular cost centre is locked for invoice receipt posting (as it is gratis), and so we cannot complete the 3rd party process.
    Is there any way around this - I can see in the IMG that you can create requirement classes for costing but I cannot see where you assign these requirements to items.
    Also, I am not sure about the implications of removing the lock on invoice receipt postings.
    Any help would be appreciated.
    Thanks
    Jon

    Please chck with FICO  team wether the cost center is loocked for same ?
    Points if helpfull
    Rg Ajit

  • Project Systems: Profit and Cost Centres

    Hi
    When maintaining a WBS element through transaction CJ02 or CJ20N for example; it is poossible to link a profit centre, ressponsible cost centre and requesting cost centre to each WBS element.
    My question is: When cost gets incurred against a WBS element the profit centre gets updated with the cost as well. However, the cost centres (responsible and requesting) do not get updated. Is there any automatic effect on these cost centres (such as is the case with profit centres)?
    I know that the requesting cost centre will be the cost centre allocated to AUC's assigned (if applicable) and that to get cost onto the cost centre a settlement rule must be maintained. What therefore is the use of having responsible and requesting cost centres assigned to a WBS apart from this?

    Hi
    Cost center and WBS elements are both cost objects hence at a time real posting can happen to only one of them. Since WBS elements are getting debited , it will not simultaneously debit a cost center. However profit center it is not the case , hence the data flow to the profit center happens as an when a posting is done to WBS element and also when WBS is settled to cost center then also there will be a posting to profit center.
    Anand

  • GL account and Cost Centre Info

    Hi All
    Where does the GL account / Chart of accounts / Cost centre information gets stored in SRM System?
    Are there any specific tables for this..
    Thanks and Regards

    Hi
    All the data that you mention is held in ERP. SRM uses RFC connections to validate if the data that a user enters is correct.
    The cost centres that a user can select can be maintained in the org structure or the search help functionality (that requires a dialog rfc connection) can be activated.
    The default GL account for a product category can be maintained within the SRM Server -> Cross-Application Basic Settings -> Account Assignment -> Define G/L Account for Product Category and Account Assignment Category img activity.
    Hope this answers a couple of your queries.
    Keith

Maybe you are looking for

  • Error #1009: Cannot access a property or method of a null object reference.

    Well I'm stumped. I have researched the issue for 5 hours now and can't seem to come any closer to understand what the issue is. I receive an error occurs while the program is adding elements to an Object. After 10 elements are added it goes into the

  • I have a gray screen and why won't it load my OS?

    Ok this is the deal I have been at this for three days.  I ran a disk verification and told me that my hard drive disk needed reparied.  I tried to repair it said to get as much stuff off that I can disk can't be repaired (it gave me a gray screen, w

  • Can I embed fonts in exported Word docs in 09

    As it says. Can I embed fonts in an exported DOC type document, in Pages 09, or 5.2 for that matter? thanks

  • JSP precompilation through Ant on Weblogic 8.1problem

    Hi, I updated the build.xml script such that it precompiles all JSPs. The environment is Ant and the server is weblogic 8.1. The Jsp classes get generated, but then all of a sudden at the end of compilation, during the resolving phase, I get the erro

  • Z-world Little Giant drivers

    Hi everyone, I`m actually looking for a labview serial driver for a Z-World Little Giant controler board ( Board Revision E, Dynamic C version 2). I actually took over an instrumental control project and it`s seems that it is the serial/board drivers