Creating planned orders with BAPI_MOSRVAPS_SAVEMULTI3
Dear all,
I have to create planned orders in our APO-system ... This works fine with function BAPI_MOSRVAPS_SAVEMULTI3, until I try to create a planned order with a configurable material ... I added values to the following tables: cfg_headers, cfg_instances and cfg_values but still I am not able to create a planned order ... Maybe I don't fill the correct fields in the mentioned tables ? Can anyone tell me which fields they fill to create planned orders with configurable materials ? I used the fields that are required according to the SAP-help, but it seems that my values are possibly wrong ... Maybe an example can help me too ?
Thanks in advance !!!
Greetz,
Kurt.
Hello Babu,
I am facing the same error in BAPI_PIRSRVAPS_DELMULTI. Could you revert with the solution if you have got one.
Thanks,
Ankit
Similar Messages
-
Problem when creating planned order with MRP run
Hello,
I create a material with a fix reorder point, MRP type VB. When I run MRP with MD03 on this material I have several problems :
- planned order is created with an opening date in the past, so I have error 'Opening date in the past' in MD04. How can I generate a planned order with opening date not in the past
- when changing manually opening date, after running again MD03, I have error 'No BOM selected'. Material is configurable, has a text BOM, a routing and a configuration profile. What is the problem? When modifying planned order, I have message :
Material requires configuration
Message no. 61259
Diagnosis
Orders and requirements for a configurable material must have characteristic values.
Usually, you should create a variation for configurable materials managed in inventory management which has the default variant configuration.
System Response
MRP: Requirements without characteristic values for a material cannot be planned in MRP.
Procedure
Check requirements or orders.
Create a configuration evaluation for the material in the material master record if necessary.
Thanks in advance.Hi
I am facing the problem. Could you please tell me if you have resolved the above problem? If yes, Could you please provide me as how you resolved? Thanks in advance.
Thanks
Nagesh. -
Where/ how do I set SNP to create Planned orders with multiple line items?
Hi
Currently our SNP is generating planned orders on a daily basis, it creates a single order with a single line item per location.
Where/ how do set SNP to create planned orders on a daily basis to generate a single order with multiple line items per location, so therefore one planned order with multiple line items for a single location.
Thanx
KeeganHi Keegan,
In SNP (APO) it is not possible to create order with multiple line items.
But you can do some settings so that while planning system can do aggregation and disaggregation.
But your requirment should be set on Aggregation/Dis-aggregation logic.
Please follow the follwing links:
http://help.sap.com/saphelp_scm2007/helpdata/en/2c/c557e9e330cc46b8e440fb3999ca51/content.htm
Aggregation:
http://help.sap.com/saphelp_scm2007/helpdata/en/42/f731d078e73ee4e10000000a1553f6/content.htm
Disaggregation:
http://help.sap.com/saphelp_scm2007/helpdata/en/a6/ebefaf32e22e468355da304cc59387/content.htm
Please be sure that the setting of this logic will be at planning area level.
You can't change aggregation/disaggregation logic further.
Regards,
Santosh -
Error when creating planned orders with BAPI_POSRVAPS_SAVEMULTI3
Hello,
I am working on a program which duplicates planned orders from one planning version to another. To do this, I am using the BAPI BAPI_POSRVAPS_SAVEMULTI3.
When I run the program, I get this error messae from the BAPI: A different planning version is being used.
The flow of my program is the following:
- Reading target planning version
- Deleting orders with the same selection criteria than the orders to be duplicated
- Reading source planning version
- Creating read orders to target planning version (where it goes wrong)
I worked before on another program which does the same but with manufacturing orders, and I did not encounter such a problem.
Can someone help ?
Thanks in advance.Hello Babu,
I am facing the same error in BAPI_PIRSRVAPS_DELMULTI. Could you revert with the solution if you have got one.
Thanks,
Ankit -
Creating SNP planned order using ''BAPI_MOSRVAPS_SAVEMULTI3'
Hi Experts,
I am new to SAP-APO, kindly clarify my question. I am using 'BAPI_MOSRVAPS_SAVEMULTI3' with source of supply PDS for creating SNP planned order by passing 'EE' in the table parameters 'ORDER_HEAD-MASTER_ATPCAT'. It is creating a planned order which is PPDS planned order with number range starting from '1000...' rather than creating SNP planned order with number range starting from '8000..'. Please let me know what might be the reason for the BAPI misbehaving incorrectly. Also kindly let meknow what are specific parameters to pass to above bapi to create SNP planned order.Hi,
The BAPI BAPI_MOSRVAPS_SAVEMULTI3 is used for creating PPDS inhouse orders.
You will have to use BAPI_MOSRVAPS_CREATESNPORDER for SNP inhouse orders creation from SNP PPMs( there is no explict mention of SNP PDS- you may please check).
Regards
Datta -
Creating a planned order with error "Material requires configuration"
Dear All,
I am facing a problem for creation of a planned order with error "Material requires configuration".
To follow the note 180317, I change Account Assignment Category to "U" (Unknown).
However, the system still does display the same error.
Could you please help provide possible solution for this?
Regards,
PhongSee also the following blog post:
Configurable planned order for material variants: Exception "53: No BOM explosion due to missing configuration"
BR
Caetano -
MRP Run can not create Planned order to Sales order
Hi,
I have a problem with planning run to sales order. We have a configurable material which have make to order strategy. MRP Run does not create planned order to some of our sales order. I think it has relation with schedule lines but i can not understand the problem.
If schedule line has 1 as confirmed quantity MRP run can not plan but 0 as confirmed quantity MRP Run creates planned order. How can i solve this problem?
Regards,
techmastereHi,
Order for which qty is confirming, check which schedule line is determined and which requirement type system is determining.
then in VOV6 for schedule line tick mark availability check & Transfer of requirement
for requirement class OVZG tick mark availability check & Transfer of requirement
Note: if schedule line is not relevent for availability check & ToR then system always defaul confirm quantity.
kapil -
Error while creating Planned order in SAP PP
Hi ,
I am creating planned order for finished material and system has given below error - Please specify the order deadlines in ascending order.
SAP Message Error- Message no. 61009 Please specify the order deadlines in ascending order
Very first planned order get saved and we declare the production and business completed
Now creating second planned order , while saving system giving above error.
I am Taking Planned Order Profile LA -Stock order
Any solution ...?
Thanks in advance !!!
Deepak.Hello Deepak,
Please adjust the order dates in the scheduling of the planned order. In normal production scenario operation completed end of the night shift and order finish date is possibly moved one day in the future for this reason we need to set the operation timing in 24:00:00 format
In your issue change date like this
End date : 30.06.2014
Start : 31.05.2014
Opening date : 31.05.2104
Check with this date, it’s work for you
Regards
Umesh Mali -
Error message while creating production order with KMAT material strategy25
Hi PP Gurus I am running variant configuration cycle...Strategy 25, Custermer Req KEK (KMAT Matrl)
Sales order & MRP Picked the components correctly as per the dependencies
written. So Planned order generated against sale order.
When I tried to convert planned order to Production order...I am getting the
below error message..
Error Message:
You cannot make an assignment to make-to-order stock Message no. CO684
Diagnosis The component cannot be allocated to an individual stock because
make-to-order production and engineer-to-order production cannot be executed
with this order.
A possible cause is that you are trying to create an order with reference to a
sales-order/project, where an account assignment to a sales order/project is not
allowed in the settlement profile that is assigned to the chosen order type.
This is inconsistant.
System response The following responses are possible:
Order processing is cancelled.
The system resets the special stock indicator back to the original value.
Procedure Choose another order type.
I used order type with SD1 as settelement profile.
OVZG: default 046, settlement profile = SD1
OPJH: Settlement profile = SD1
Plz through some light on this if u have worked on Variant Configuration/MTO
settlements.
Question:
1) Is creation of production order with KMAT material supported by SAP?
2) If yes, why the above error occurs?
Waiting for Ur reply
With Best RegardsDear R.Brahmankar,
I have check on the note, but it is not relevant to ecc6. The current system default setting is :
Standrad setting for reqt class 046
Special Stock E
Acct Assgt Cat. M
Valuation M
Settlmt Profile SD1
However if I change the Acct Assgt Cat. from M to E. It resolve the problem. I would like to know is this the right solution?
Config in Acct Assgt M
Consumption Posting = E
Config in Acct Assgt E
Consumption Posting = ' '
In F1 key of Consumption Posting field it shown following:
To flag the sales order item as cost- and revenue-carrying, enter an "E" (settlement via sales order).
If you do not wish to flag the sales order item as cost- and revenue-carrying, do not enter anything.
Dependencies
If you are working with nonvaluated sales order stock, always flag the sales order item as cost- and revenue-carrying.
If you are working with valuated sales order stock:
In the case of complex make-to-order production, flag the sales order item as cost- and revenue-carrying
In the case of sales-order-related mass production, do not flag the sales order item as cost- and revenue-carrying
Should we change to E?
Regards,
Ong -
Create Planned order based on qty in APO or SCM
Hi All,
I am working product view in APO or SCM system .
Requirement is create new planned order with sales order individual length and planned order pegged to sales order in APO system.
Example
Sales order has factor 4 and individual length 1000( 4 x 1000 ). Total quantity is 4000M.
We need to create 4 planned orders. Each Planned order has a quantity of 1000M.
Please help me and let me if any function module is there.
Thank you,
Durga VintaHi All,
Thank you so much for your response.
I have placed a X pushbutton in product view- > Element tab.
If the user presses X then screen will display with sales order information based on Factor
Example Sales order has 4 x 1000 = 4000M
Factor individual length
1 1000
1 1000
1 1000
1 1000
If the user selects the 1st and 2nd and presses save button. We need to create two planned order for sales order. Each planned order has 1000 qty.
Please let me know if any function module or BAPI in APO system.
Thank you,
Durga Vinta
Edited by: Durga Vinta on Jul 16, 2010 11:38 AM -
No Account Assignment when I created Planned Order to Purchase Requisition
Hi ,
No Account Assignment when I created Planned Order to Purchase Requisition from Funds Management , where as If i change ( eq : PR item qty is 10 , i just changed to 0 , enter then replace back that 10 ) any thing in the PR , Account Assingment is populated and list of accountin documents are attached to PR.
Please suggest me , what might be the problem .
Thanks in advHi,
a) When you convert the PldOrd into PurReq it disappears from table PLAF, it ceases to exist. There will be no PldOrd-reference in PurReq (you will not find such field in EBAN). (if you check field RSNUM in PLAF before converting the PldOrd and you check field RSNUM in EBAN after converting the PldOrd into PurReq, you wlll find the same number)
b) It's not easy to say. You can check PLAF-PSTMP and PLAF-PUSER and compare these with data you get from trx STAD. But this is also not an exact methode since these field are in connection with the last date of change.
Firming indicator cannot help also since you can remove it manually... - even though the PldOrd was changed manually, no firming indicator will be seen...
(Of course, generally firming indicator helps if the user doesn't remove it intenionally)
Regards,
Csaba -
MRP: Delete Purchase Requisitions and Create Planned Orders
Hi there,
I have a scenario, where in a material (HALB) was marked as externally procured. MRP was run for FERT material. The dependent requirements for FERT were created. Planned orders of the HALB material were changed to Purchase Requisitions.
Later, the procurement type of material was changed to Inhouse Production.
Now, I want all the Purchase requisitions that were created to be deleted and Planned orders should be created when I run MRP.
I tried all the possibilities, but of no success.
Please lemme know if there is any possibility to delete the P.Rs and Create Planned orders by running MRP.
Regards,
ABCI Haven't read the Plan order is converted in to PR Before
If YOU convert the plan order in to PR, system will firm the Requirement, YOU need to remove the firm indicator FIxed iD in PR Before doing the MRP Run Again
Do the following thing in PR
In PR Remove the Fixed ID in Quantities and Dates tab of the item
and Rerun the MRP with Planning Mode 3 It will create a plan order
Edited by: Sundaresan . E. V on Oct 29, 2010 6:39 PM -
Planned orders with excesseption messages
Hello All,
I want to creates a customised report for the planned orders with exception messages. In which table I get the required information? User want the selection criteria as WBS, meterial codes and material groups. Thats why I can not use the MD04,MD05 etc.
Please suggest the tables.
Regards,
MayurHello Ramagiri,
Thanks for the quick reply.
Table MDKP shows X tick in exception group but does not show the message number. In which table I will get these message number?
Mayur -
Advantage of creating Planned order first
"The advantage of creating planned order first is the additional procurement proposal check that is executed by the MRP controllers. Purchasing can only order material when the MRP controller has checked the planned order and converted it into a PR.
If directly PR is created during planning run, the procurement proposal is immediately available for purchasing."
What is additional procurement proposal?
Would anybody please explain the meaning of this with some example?
Regards,
VM - learning MMit is not "additional" procurement proposal, it is instead of requisition.
If the planner knows that his MRP data is good and trusts in the process, then he can create requisitions right away.
if a planner knows that his MRP data is worse, then the MRP run is better carried out with the option to create planned orders instead of requisitions. so the planner can check the proposals by sight and convert to a PR that is good.
A buyer will not see the planned orders at all.
Others, who dont like planned orders, create requisitions and implement release procedure to prevent that the buyer can use the requisitions.. (I dont see any sense in this alternative, because the planner would need to execute purchasing transactions, and does not have all the fuctions to check the background like he has in the usual MDxx transactions..)
If the procurement type in material master is X for internal/external procurement, then you get anyway planned orders instead of requisitions. -
MRP batch job not creating planned orders
Hi Experts,
Can anyone help with suggestions of where/what to look at with this situation. My MRP background (batch) job is not creating planned orders for materials in certain MRP planning areas as expected, but will create planned orders in other MRP planning areas. Running MD01 or MD03 creates planned orders for materials in all MRP planning areas of the plant as expected.Ben,
Any time you get a difference between interactive MRP and batch MRP, first look to the planning file.
Start out by finding some of the discrepant parts (no planned orders are being created) Review for the presence of a planning file entry in MD21. If an entry does not exist, create one in MD20. If an entry does exist in MD21, but there is nothing in the NETCH/ NETPL/reset ord/reexpl bom cols, then this means no relevant changes have taken place, and NETCH MRP will ignore the parts. You can optionally reset these flags in MD21.
If you discover that you have one material for which there is nothing in MD21 (no record at all), then you probably have others as well. Run MDAB in Background, which will mass create all the missing entries. Also a good idea to run MDRE in case something has been corrupted.
Here is [OSS note 205681|https://service.sap.com/sap/support/notes/205681] which explains a bit about the planning file. Also, See [OSS 371016|https://service.sap.com/sap/support/notes/371016] which describes a similar problem.
Rgds,
DB49
Maybe you are looking for
-
Metadata of Controller Usage 53RPU95UIS2SE3T5AV9BML88W Is Not Consistent
Hi All I moved TR from D73 to Q73 .In Q73 error is component is not active.And check the methods and it is showing error as Metadata of Controller Usage >53RPU95UIS2SE3T5AV9BML88W< Is Not Consistent. Please help on this .Its very urgent Thanks Vamsi
-
Hello, We are implementing financial analytics through OBIA on top of Oracle EBS, I am following the Informatica Configuration document. I am trying to set up the Segments in OBIEE btw I have updated all the CSV files according to the flex values. I
-
Why do I have to sign into every application each time? It's really getting tiresome.
Why do I have to sign into every application each time? It's really getting tiresome. It bothers me that I'm paying $54/month for CC, and I have to authenticate each and every time I sign into every application.
-
Problem faced in Downloading an attachment in BPM
Hi, I am facing an issue where in spite of being in administrator group,I couldn't be able to download an attachment against a human task from BPM. Whenever I am trying to download the attachment it is telling "You do not have permission to view the
-
Can I share ibooks with another person
Can I share my books with another persons iPad not connected to my iTunes?