Creating Roles for Purchase Req. release strategy with classification
Hi friends,
Since I have created Purchase req rel strategy where I have four release strategy
1. For Plant 1 When value <= 5000 (Officer) will release , release code 01 release release strategy r1 and rel code L1
2 For Plant 1 When value >= 5000 (Manager) will release , release code 01 release release strategy r2and rel code L2
Now the manager will have 2 release code,if officer is absent he could release the requisition.
Same has to be done for plant 2
The release Group and code needs to be assigned to the Roles , could anybody tell me where i could know about roles and will be able to create roles and assign authorisation objects to the Roles , and release group and code to the enduser.
though its a basis job , since I have no idea , I mean I have never worked with Roles ,as now I have created the Release strategy with classification I need to assign authorisation objects to the Roles as I have four release strategy
1. For Plant 1 lower value of requisition 1 codeL1(Officer)
2 For higher value of requisition 2 code say Li and L2(Manager)
Manager should have 2 codes if officer is absent he could release
Same has to be done for Plant 2
Thanks N Regards
Siddhartha
Hii,
Steps:
1) Create a Role
2) Add the authorization Object M_EINK_FRG by taking the manual option
3) Assign Release Code and Release Grp
4) Assign the Role to the User ID which has the authorization of the Release Code and Grp.
Regards,
Kumar
Similar Messages
-
Tranposrt - Purchase Requisition Release Strategy with Classification
Gurus!
Tell me if I want to Transport the Purchase Requisition release strategy with classification. The Data in each charisteristics in each PR Strategy that I have set in Dev is not getting transported to Quality.
Do I have to enter the data in characteristics again in Quality and the same procedure I have to apply for Production.
If yes, in this scenario, Can I make Production modifiable.
Regards
SajidHello,
Create a special ID in PRD with access to change characteristics. This ID should be released for specific purposes and with approval (project manager/SAP support manager). You can also turn on auditing so that all activites performed are logged which can be used to satify auditors.
Cheers ! -
Purchase Requisition Release Strategy with classification
Hi there,
Please help,
I have the release strategy and workflow working. (Overall Release)
Problem is that Org Structure is not updated so workflow has been configure going to (US) user. As i am using workflow option 1 which is resolved via Group, Code & Plant, I have to have a code for every region and manager to resolve the workflow. I am not using plant as business requirement is overall release.
Scenario is that there are 8 regions with 1 senior region manager and 1 executive.
The region managers can each release up to 20k. Senior region manager must release from 20k - 50k. Executive must release from 50k -250k.
Release Codes:
Regions = L1 - L8
Senior Region Manager = SR
Executive = X1
Characteristics are:
DocType = NB
AccAsingment = K (Cost Centre requisitions)
Purchasing Group = (Each region has own group)
TotValue = 0k -20k, 20k - 50k, 50k - 250k.
Now the release strategies.
Even though it is the same senior manager and executive why do i have to create a new strategy for every region's escalation above 20k taking into account that the business requirement is that the correct region manager has to release before the senior manager can release? It just seems so pedantic when i would rather just add the correct Purchasing Group everytime.
This is only one leg of the Org Structure there are over 40 depts, and managers that will create and release. Do i really need a strategy for every single scenario?
Thanks for taking the time to read.Hello,
Create a special ID in PRD with access to change characteristics. This ID should be released for specific purposes and with approval (project manager/SAP support manager). You can also turn on auditing so that all activites performed are logged which can be used to satify auditors.
Cheers ! -
User Exit for Purchase Order Release Strategy
Hi,
I am a little new to this, how do I search for a user exit for purchase order release strategy (TCode ME29N).
Thanks in advance.
MickHi
Check the following Exits and BADI for Pur Requisition
Enhancement
MEVME001 WE default quantity calc. and over/ underdelivery tolerance
MM06E001 User exits for EDI inbound and outbound purchasing documents
MM06E003 Number range and document number
MM06E004 Control import data screens in purchase order
MM06E005 Customer fields in purchasing document
MM06E007 Change document for requisitions upon conversion into PO
MM06E008 Monitoring of contr. target value in case of release orders
MM06E009 Relevant texts for "Texts exist" indicator
MM06E010 Field selection for vendor address
MM06E011 Activate PReq Block
MMAL0001 ALE source list distribution: Outbound processing
MMAL0002 ALE source list distribution: Inbound processing
MMAL0003 ALE purcasing info record distribution: Outbound processing
MMAL0004 ALE purchasing info record distribution: Inbound processing
MMDA0001 Default delivery addresses
MMFAB001 User exit for generation of release order
MRFLB001 Control Items for Contract Release Order
AMPL0001 User subscreen for additional data on AMPL
LMEDR001 Enhancements to print program
LMELA002 Adopt batch no. from shipping notification when posting a GR
LMELA010 Inbound shipping notification: Transfer item data from IDOC
LMEQR001 User exit for source determination
LMEXF001 Conditions in Purchasing Documents Without Invoice Receipt
LWSUS001 Customer-Specific Source Determination in Retail
M06B0001 Role determination for purchase requisition release
M06B0002 Changes to comm. structure for purchase requisition release
M06B0003 Number range and document number
MEQUERY1 Enhancement to Document Overview ME21N/ME51N
MELAB001 Gen. forecast delivery schedules: Transfer schedule implem.
MEFLD004 Determine earliest delivery date f. check w. GR (only PO)
MEETA001 Define schedule line type (backlog, immed. req., preview)
ME590001 Grouping of requsitions for PO split in ME59
M06E0005 Role determination for release of purchasing documents
M06E0004 Changes to communication structure for release purch. doc.
M06B0005 Changes to comm. structure for overall release of requisn.
M06B0004 Number range and document number
Business Add-in
ME_PROCESS_REQ_CUST Enhancements for Processing Enjoy PReqs: Customer
ME_PROCESS_REQ Enhancements for Processing Enjoy PReqs: Internal
ME_PROCESS_PO_CUST Enhancements for Processing Enjoy Purchase Order: Customer
ME_PROCESS_PO Enhancements for Processing Enjoy Purchase Order: Intern.
ME_PROCESS_COMP Processing of Component Default Data at Time of GR: Custome
ME_PO_SC_SRV BAdI: Service Tab Page for Subcontracting
ME_PO_PRICING_CUST Enhancements to Price Determination: Customer
ME_PO_PRICING Enhancements to Price Determination: Internal
ME_INFOREC_SEND Capture/Send Purchase Info Record Changes - Internal Use
ME_HOLD_PO Hold Enjoy Purchase Orders: Activation/Deactivation
ME_GUI_PO_CUST Customer's Own Screens in Enjoy Purchase Order
ME_FIELDSTATUS_STOCK FM Account Assignment Behavior for Stock PR/PO
ME_DP_CLEARING Clearing (Offsetting) of Down Payments and Payment Requests
ME_PURCHDOC_POSTED Purchasing Document Posted
SMOD_MRFLB001 Control Items for Contract Release Order
EXTENSION_US_TAXES Extended Tax Calculation with Additional Data
ARC_MM_EKKO_WRITE BAdI: Enhancement of Scope of Archiving (MM_EKKO)
ARC_MM_EKKO_CHECK BAdI: Enhancement of Archivability Check (MM_EKKO)
MM_EDI_DESADV_IN Supplementation of Delivery Interface from Purchase Order
MM_DELIVERY_ADDR_SAP Determination of Delivery Address
ME_WRF_STD_DNG PO Controlling Reminder: Extension to Standard Reminder
ME_TRIGGER_ATP Triggers New ATP for Changes in EKKO, EKPO, EKPV
ME_TRF_RULE_CUST_OFF BADI for Deactivation of Field T161V-REVFE
ME_TAX_FROM_ADDRESS Tax jurisdiction code taken from address
ME_REQ_POSTED Purchase Requisition Posted
ME_REQ_OI_EXT Commitment Update in the Case of External Requisitions
ME_RELEASE_CREATE BAdI: Release Creation for Sched.Agrmts with Release Docu.
ME_DEFINE_CALCTYPE Control of Pricing Type: Additional Fields
ME_CHANGE_OUTTAB Enrich ALV Output Table in Purchasing
ME_CHANGE_CHARACTER Customer-Specific Characteristics for Product Allocation
ME_CCP_DEL_DURATION Calc. of Delivery Duration in CCP Process (Not in Standard)
ME_CCP_BESWK_AUTH_CH BAdI for authorization checks for procuring plant
ME_CCP_ACTIVE_CHECK BAdI to check whether CCP process is active
ME_BSART_DET Change document type for automatically generated POs
ME_BAPI_PR_CREATE_02
ME_BAPI_PR_CREATE_01
ME_BAPI_PO_CREATE_02
ME_BAPI_PO_CREATE_01
ME_BADI_DISPLAY_DOC BAdI for Internal Control of Transaction to be Invoked
ME_ACTV_CANCEL_PO BAdI for Activating the Cancel Function at Header Level
MEGUI_LAYOUT BAdI for Enjoy Purchasing GUI
ME_CHECK_ALL_ITEMS Run Through Items Again in the Event of Changes in EKKO
ME_COMMTMNT_REQ_RE_C Check of Commitment Relevance of Purchase Requisitions
ME_COMMTMNT_REQ_RELE Check of Commitment Relevance of Purchase Requisitions
ME_COMMTMNT_PO_REL_C Check for Commitment-Relevance of Purchase Orders
ME_COMMTMNT_PO_RELEV Check for Commitment-Relevance of Purchase Orders
ME_COMMITMENT_STO_CH BadI for checking if commitments for STOs are active
ME_COMMITMENT_RETURN Commitment for return item
ME_CIP_REF_CHAR Enables Reference Characteristics in Purchasing
ME_CIP_ALLOW_CHANGE Configuration in Purchasing: Changeability Control
ME_CIN_MM06EFKO Copy PO data for use by Country version India
ME_CIN_LEINRF2V BADI for LEINRF03 excise_invoice_details
ME_CIN_LEINRF2R BADI for CIN India - Delivery charges
ME_CHECK_SOURCES Additional Checks in Source Determination/Checking
ME_CHECK_OA Check BAdI for Contracts
Reward points if useful
Rgds,
Naren -
Badi for Purchase Requisition Release Strategy
Can any help me to know about the BADI for Purchase Requisition Release Strategy .Is their any BADI to control the PO Price for a PR release strategy
Thanks for your helpThis badi is for schedule agreement ?
BAdI: Release Creation for Scheduling Agreements with Release Documentation
Use
You can use this Business Add-In (BAdI) to influence release creation.
This BAdI is used in the application component Scheduling Agreements (MM-PUR-OA-SCH).
This BAdI includes the following methods:
Change Data Before Release Creation (BEFORE_CREATION)
Change Data After Release Creation (AFTER_CREATION)
This BAdI is called during manual and automatic release creation. -
PR release strategy with classification
As part of a rollout, we are migrating an instance of SAP to the template SAP. Both the SAP instances are following u2018PR release strategy with classificationu2019.
The limitation is that I can configure only two release group in PR release strategy with classification. One for overall release and one at item level release. Also, I cannot assign two different release class for the same release group. If I add additional characteristics in the existing class and keep other irrelevant characteristics as blank the release strategy doesnu2019t works. the release strategy does not triggers.
Any pointers to solve this will be highly appreciated.Hi Ashish,
If your requirement is to have release strategy with more or different characteristics than in the existing system,you may create a new release group and assign the same to release class.There no restriction for having multiple release groups for same release class.Then create new release strategies for the newly created release group and so on.
Regards,
Edited by: Dayanandan Kamath on Oct 20, 2010 7:52 AM -
Release Strategy With Classification
Hey All,
I would like to get some information about release strategy with classification for purchase requisation and purchase order.
Please send me some information regarding this.
Thanks
Kawalhi,
To see the all the linkages firstly see the classifcation and class defined in the sap system at:
SAP easy access --> Cross application components --> classification system --> master data --> characteristics and classes(CT04 and CL02)...
TO see the customisation, check:
Spro --> MM --> Purchasing --> PO/PR etc --> Release procedure --> Rel procedure with classification --> Here check for all the different transactions...like Relase codes, release stategy, access sequence, schema etc...
Also one important point abt it is:
PR is possible to release at header as well as at item level...
But PO and other external docs are only possible to release at header level only...
In the customisation check all the linkages you will get best out of it....
Regards
Priyanka.P -
Purchase order release strategy with multiple characteristics
Hi All,
We have Purchase order release strategy based on the following characteristics:
Total Net Order Value
Purchasing Organization
Release strategy Type
a few other custom fields
We would like to have PO's with release strategy based on a particular Material Group [say X]. I have created a new Characteristic with respect to CEKKO-MATKL and added this characteristic to the same class.
I have created a new release code [HR] [we need a different person to sign off] and a new release strategy [TR] for which I have assigned the release code HR. In this release strategy, I have set it to get activated for a particular Material Group that does seem to work, but the remaining PO's are not getting triggered for other material groups. For other release strategies, I have left the material group field blank, because they need to be triggered for any material groups except X.
Could you please let me know if I am missing something or is there an alternate approach to this ?
Thank you,
SatishHi,
Obviously system will not trigger release strategy in ur case since in the classification data for other strategies u have left it blank excepting X for one strategy.
Since u have added a new characteristic Material group and assigned it to class then system expects an input for Material group for triggering release tab.If this is left blank then system by default will not trigger release strategy tab.
Solution:
First add all existing material groups in values tab of mat group characteristic then maintain the required set of material groups except X in other strategies in classification data.
Hope this is clear to you.
Regards,
Uzair -
Workflow for purchase requisition release strategy
Hi all,
I need an urgent help on Workflow for Purchase Requisition Release. The requirement is that when a purchase requisition with a given combination (Purchasing Group, Material Group and Account Assignment Category) is created and saved, it should trigger a workflow for approval of release or rejection to one specific business manager. If he dont responds in 2 days, it should be sent to other business manager. If any one of them releases the requisition, it should send a mail to the requestor that the requisition is released. And if it is rejected, then also a mail to be sent to the requester informing that his requisition is rejected...
Can anyone take some pain and guide me step by step procedure to implement this or to use any existing one.... I know its BUS2009 thats used in this but really dont know how to implement it properly.
Its urgent...
Edited by: Hima on Apr 11, 2008 12:45 PMCheck this link
http://help.sap.com/saphelp_47x200/helpdata/en/04/92762546f311d189470000e829fbbd/frameset.htm
Thanks
Arghadip -
Purchase order release strategy with a characteristic value as a variable
Hi all,
We have Purchase order release strategy based on the following characteristics:
Total Net Order Value
Purchasing Organization
a few other custom fields
We would like to add a characteristic based on the creator of the PO. In the purchasing department there are two person which have the authorization to create an release POs. The goal is now to check if the actual user, who release the PO, is different from the PO creator. The value of this characteristic may not be a fix value, it must be contain the name of the actual user name.
Is there are a possibility to insert the characteristic value as a variable such as SY-UNAME instead a fix value?
Thanks,
Charlesthis is verymuch possible. You can use unsed fields user1, user2 etc in CEKKO or (ii) insert a new field in CEKKOZZ and use the new field. You need to build up logic in user-exit such that this field will take the value of person who had logged in. This can be done by ABAPer.
Hope this resolves ur problem -
Creating workflow for purchase order release.
Hi friends
I want step by step detail about creation of workflow for purchase order release..
After release purchase order it will goes to the two level of approval..
after that the workflow should be completed...
how can i develope the workflow for that scenario..
Thanks
GowrishankarHi Gowrishankar,
You can get step by step workflow for PO using standard workflow
<b>Release of Purchase Order :WS20000075</b>
And for two levels of approvals you have to configure in SPRO the path is
Purchase Order:
SPRO> Material Management->Purchasing->/Purchase order-->Release procedure ---> Procedure with classification ---> set up procedure with classification ---> double click on Release strategies and Workflow.
If you don't know about this configuration, you have to confirm with your MM consultant.
Thanks and Regards,
Prabhakar Dharmala -
Issue: Purchase order release strategy with storage loaction.
Hi Friends,
I have created release strategy for purchase order considering following characteristics.
1. Plant
2. Purchase organization
3. Purchase group
4. Document type
Hence the release strategy is working fine.
Now the requirement is changed, PO approves should be picked depending on the storage location wise. So i tried to create characteristic for storage location with table name CEKKO and with field LGORT. However system not allowing to create, telling that field LGORT not found in table CEKKO.
Can any one tell me how to maintain this LGORT filed in structure CEKKO.
Thanks in advance
ShashidharHI Shashi ,
Thanks for your quick response,
I have Appended a structure to Standard Structure CEKKO with Field LGOBE.
Also we written the code :move: i_cekko = e_cekko, in user User-Exit M06E0004 function exit
FUNCTION EXIT_SAPLEBND_002.
However, the release strategy is not triggering when PO is saved,
also the user-exit is not getting triggered , even though i have included the statement ' Break-Point'
in it.
Kindly reply.
Thanks ,
Shashidhar -
Purchase Order Release Strategy with Dependency Condition
Hi
We have a scenario where we have to set up Purchase Order Release based on a combination of the following
Vendor + Purch Org + Dollar Value.
We have successfully set up the release strategy for which we have done the following
1) Create Characterstics for Vendor, Purch Org and Net Order Value
2) Assign the above characterstics to a Class
3) Assign Class to the Release Strategy in SPRO.
So far everything is good.
Now we try to define a Condition. With a Fourth Characterstic (TRIG_RELEASE ) attached to the same class.
And attached a Dependency condition to it.
$SELF.TRIG_RELEASE = 'Y' IF VENDOR = '1000' and PURC_ORG ='8500' and NET_VALUE > 1000.
When this dependency is set, the release doesnt trigger.
but modifying the condition to
$SELF.TRIG_RELEASE = 'Y' IF VENDOR = '1000' and PURC_ORG ='8500' .
Trigger the Release for that condition.
How can we base the dependency on Net Value also ? What are we doing wrong or missing ?
Regards
Aju PaulHi Paul,
I'm not sure why you really need that fourth characteristics. In my opinion, the three characteristics are good enough to achieve the desired release strategy. Why don't you just create a strategy that has those specifc characteristics value in your classification.
You can do that from SPRO or CL24N.
Define a new strategy in SPRO e.g "Vendor 1000 Porg 8500 > 1000"
In CL24N, enter the class name; e.g Z_PO_RELEASE.
class type 032
Hit the enter key for existing release strategies to be displayed. Select the one you one just created above. Then click on detail and your characteristics/Value is displayed below.
Then maintain the different values for the charateristics and then test with PO creation
Xtic Value
Vendor 1000
P.Org 8500
Value > 1000 -
Purchase Req release strategy help
PR's generated from MRP are being blocked, however when I convert a planned order from MRP into a PR it is automatically released. I want MRP generated Reqs to be also released. I tried creating a new class, characteristic and strategy group but ran into problems when assigning the class to the group. Basically we just want all reqs created from MRP to be released and not go through workflow. Any ideas? My inital thought was to use the creation indicator EBAN-ESTKZ with the value of B (MRP) and U (converted planned orders)
hi Ryan
U can use only one release class in PR release strategy
error is because ur trying to use another class add the charactaristics ib existing class and configure release strategy
Vishal... -
Purchase Req Release strategy - Requestor /Approver
We want to skip the Approver to release his own purchase requisition without workflow set up.Is it possible in ECC6.0 ?. Any help will be highly appreciated
Thanks
NickHi Nick
While configurating add P group as one of charactaristic.Then maintain values of all P. Group in this charactaristic
While defining Release strategy Do not tick against Approvers P group which means release strategy will be skiped for him
( Release strategy--classification here u difine value for P Group skip P group here)
Cheers!!!
Vishal...
Maybe you are looking for
-
Not seeing a DataType.ICON request when browsing with Adobe Bridge?
Hi All, I have followed the instructions in the "Customizing the UI->Displaying Thumbnails" section of the Adobe Drive SDK documents, but I have a problem. When I browse through my drive with Adobe Bridge, I am not getting the expected request for Da
-
Sql*loader and nested tables
I'm having trouble loading a nested table via sqlldr in Oracle 10g and was hoping someone could point me in the right direction. I keep getting the following error: SQL*Loader-403: Referenced column not present in table mynamespace.mytable Here's an
-
the apps on my phone are not working, only whatsapp is working. the media card isnt working either. cant disconnect the calls either. have to choose switch application option to exit. tried rebooting a lot of times but emails, messages they just dont
-
C# code for a start button
Hi, I'm trying to write a program/code for a start button. Basically the code will work in junction with an Adam module and all i need is for when inout 0 of the adam module is on, output 0 will turn on - otherwise a message will appear. Sp far i hav
-
Revision: 9180 Author: [email protected] Date: 2009-08-07 15:11:43 -0700 (Fri, 07 Aug 2009) Log Message: When another popup is going away as the alert is going up, the Alert can get validated inside of addPopUp and its centering logic never got