Creating "rough cut"

I don't know how else to ask this question or how to find it if it has already been answered. So if this is posted incorrectly please let me know and I will amend my mistake.
I am trying to get a low res version of a project from across the country. A friend has been working on a documentary for the last year and wants me to take a look before she finalizes things.
She wants to render the whole thing and overnight me a DVD.
This seems a bit overkill to me. With 5gigs of storage in my MobileMe, she should be able to make some sort of "rough cut", and then drop it into my mobile me.
Am I wrong?
IF this is possible step by step instructions would be very helpful as she is not very tech savvy and I am amazed that she has gotten this far....... she should have help from from her "college friends", but they don't know final cut all that well..... or are not experts.
thank you.

Depends how long the cut is but I often export H.264 versions and just e-mail them. I have to keep what I send to under 12 Mgb so it's usually just a question of adjusting the export parameters a few times, depending on the show length, to get the right size.
rh

Similar Messages

  • Error while creating Rough cut planning profile

    Facing the following error while creating rough cut planning profile (mc35) in SOP for product group. "Work center x plant y does not exist for task list type 3". pls advise- do i need to create tsk list for product group? pls advise with tcode to be used.

    pls check the (task list ) usage you have maintained in the Work center.
    In OP45 , pls ensure that for the usage ,
    task list type 3 (Rough cut planning profile) is included.
    If it is not included there , pls include the TL type 3 for your usage and now the prob will get solved.
    Regards.,
    Sheik

  • Error while creating rough cut plannin profile using Info structure

    Hi,
    I got the following error while creating rough cut planning profile for Info structure,
    Capacity planning is not possible for this info structure S504
    Message no. MA489
    Diagnosis
    In the planning parameters for info structure S504, no key figure for capacity planning has been entered.
    Procedure
    If you want to capacity planning to be possible for this info structure, you need to enter a capacity key figure in the planning parameters for the info structure in the Implementation Guide.
    The info structure which i used here is created by me. Can any one help me to overcome this error
    Waiting for your replies
    G.Muthamil Murugan.

    Hi addy,
    Thanks for your reply. I have maintained the following Info structure which I created,
    Under characteristic I have maintained the following,
    1.Sales Organisation.
    2.Sales group
    3. Sales office
    4. Distribution channel
    5.Division
    6.Material
    Under Key figure I have maintain the following,
    1. Order items
    2. Production
    3.Sales
    4. Stock level
    5. Target stock level
    6. Day's Supply
    7. available capacity
    8.Target days supply
    I don t know where i did mistake. can you correct me.
    Regards,
    Muthamil Murugan.G

  • Creating Rough Cuts from an Extension in Prelude CC 2014

    I am building an extension panel using extension builder 3 for Prelude CC 2014 and want to have a button to create rough cuts from a selection of markers. After looking at the CSXS API I can see that the events which I would need to use, such as com.adobe.browser.event.CreateRoughCut only seem to be available in Library mode. Therefore is there no way, now or in the future that I can program the panel to create rough cuts in Prelude if I want to run in native mode?
    Thanks,
    Jonathan

    Ok sorry, I get 25 FPS rough cut if I drag that clip onto the rough cut icon. I can't create the rough cut first and then add the clip to it.
    Would be handy to be able to decide in advance.
    Thanks!

  • Rough cut planning

    Dear Experts ,
                       I have done foll setting :
    Work center ugage : all task list type ( 009)
    OPU3 : SelID:roughPlng 03
    OPU5 : RCutPlg horizon 100
                SelID:roughPln 03
    Sche and general cap req is activated .
    Created rough cut profile in mc35 after putting work center its not automatically proposing time . I mean SOP is done and it has not transferred to demand ( AS capacity planning is not done )
    Secondly when I go to MC82 and check capacity situation there is blank , I mean show option is gray not selectable .
    Please help .
    Neal

    My steps in Mc35
    Entered prod group , plant + execute
    Time span 30 days
    Status 4
    From Lot Size 1 to 9999
    Usage 1
    Clicked on lense Work center,Plant,Unit- ( tried min and HR )
    after entering this there are just blank columns coming ahed of it and system wont let me save without entering values in those columen , I am suppose to enter some time or system will propose according to me SOP plan ?
    Neal .

  • Rough cut planning in SOP for resource levelling

    Hello,
    I am trying rough cut planning in SOP.
    I have created rough cut planning profile for a product group by using MC35.
    The task list exits for the product group.
    In task list , work centre is maintained and the same is given while creating the rough cut profile.
    This product group contains some part number.
    When I try Views--->capacity situation -> rough cut planning--->show.
    System gives error that -
    > No resource load found.
    <u><b>Diagnosis given by system is as follows,</b></u>
    This situation may be caused by one or more of the following:
    •     No PP task list (rough-cut planning profile, rate routing, or routing) corresponding to the Customizing selection criteria has been defined for this material/product group at this scheduling level.
    •     Resources planning has not been configured appropriately in Customizing.
    •     The information structure which you are planning has not been configured appropriately in Customizing.
    System Response
    No capacity load could be determined.
    Procedure
    1. Check that a PP task list exists for this material/product group.
    2. Check that a lot size range has been maintained in the PP task list.
    3. Have your systems administrator check and, if necessary, change the resources planning settings in Customizing for Sales & Operations Planning (the steps "Scheduling levels" and "Routing selection").
    4. Have your systems administrator check that capacity planning has been defined for this information structure in Customizing.
    Please let me know how to maintain the resource planning settings for scheduling level and routing selection.
    Waiting for your reply.
    Regards,
    Ravindra Deokule

    Hi Ravindra,
    You can use t.code mc84 to create a product group.
    Pl follow the following steps to do SOP with product group.
    1. Create a Product group in tcode MC84.
    Enter a percentage for material say X & Y to be produced. X 40% & Y 60%. Total qty will be split in the ratio as per the %.
    2. Create Production Plan in tcode MC81.
    Enter the sales plan qty.
    Then goto menu,edit & choose create Prodn Plan synchronus to sales.
    3. Create Rough cut Planning Profile in tcode MC35.
    4. Enter the Status ,Usage & lot size.
    5. Choose resources tab & then choose work center & enter work center name which you consider as a bottle neck & then enter the unit of measure as 'min'.
    6. Use MC82,
    Choose inactive version and select your version.
    then goto menu->views> capacity situation>show
    7.Check for over loads & adjust your qty acordingly.once the load becomes 100 % save.
    8. Change the inactive version to Active version in tcode MC78.
    ie in the version enter the inactive version & in the target version enter'A00'
    9.In mc82 choose active version, you can see that the plan is activated now.
    10.In the menu choose extras & transfer to demand mgmnt.
    11.You can see the requirement in the md62 transaction.
    12.Then run mrp.
    Also regarding the unit of measure in t.code mc35,
    If you select your resource as 'workcenter' & choose min or hour & then you enter 1(eg) in the first field against the work center. This means it takes 1 min or hour to produce 1pc(base quantity) in that particular workcenter(bottleneck workcenter)
    Reg: Capacity calculation in mc87,follow the eg as above.Enter 1 min as time & base qty as 1 in mc35. Then check in mc87, you will get the load in %. ie if your work center is permitted to work for 8 hours/day & you pass a production plan of 480, then your load will match for 100%.
    Regards,
    Senthilkumar

  • Rough Cut Planning Profile-by Capacity category

    Hai,
    I am creating Rough Cut Planning Profiles in ECC6.0 for use in Standad SOP (S076). In MC35, I don't see a place where I can enter by Work center category- like I want both Machine and Labour categories as I have different times for each category.
    { when I view the rough-cut capacity situation in MC82, system displays both categroies, but it is based on only the hours I maintained for one of the categories- how do I maintain for both categories?}
    Thank you in advance:)
    Sonali
    Edited by: Sonali on Apr 28, 2009 3:05 PM

    Hello Sonali,
    Rough cut capacity planning is used only  for bottle neck resources.Analyze your process and you will come to know for the product group or material which category or machine is bottleneck.
    Create a rought cut planning profile for a production line or Workcenter or PRT or Cost(Relative cost not product cost).
    PS:Roughtcut capcity planning should not be used for all the workcenters.
    Thanks,
    Raj

  • Costs in Resource Leveling of Rough-cut planning Grayed out

    Hi PP Gurus,
    I have created PG and Rough-cut planning profille.
    In MC81-Create Rough cut planning, I have been not able to see Costs under Views->Capacity situation->Rough cut planning->Costs.
    Because Costs are greyed out.
    Please Help me.
    Thanks in Advance
    Shiva

    closed

  • Rough -cut plan with capacity requirment calculation

    Hi all,
    We checking SOP with rough-cut plan
    We created Rough-cut profile in mc35 for our bottle neck work center with base quantity -1 and time span - 1
    then we selected new work center (there is no existing cap req). and assigned base unit measure:min.
    and we assigned 1min for each day and saved the profile.
    Now we went to mc88 and checked the material's active version production plan. (period split- DAY)
    in View -> capacity situation -> rough cut planning -> show.
    System calculates some capacity requirement for our production plan.
    Say for tomorrow's date i given 1000 qty - production plan.
    but system showing capacity req
    Work center:  TESTWC3                  Plant: 0001         Capacity:  001
    Info structur  Material          Plant   Order qty     Unit     From              To          Capacity reqmts      Unit
    S076            TESTFERT14    0001  1000.000       EA    29.01.2010  11.02.2010   9000.000              MIN
    with 9000min and cap load more than 652% ( Actuallly  it has to show 1000min as per rough cut plan profile)
    Our available capacity of work center per day - 1380 min
    We cant understand the capacity requirement calculation in MC88..
    Help us out...
    Thanks in advance

    Hi,
    Rough cut planning is genrally done for the group of material say product group, group of workcentre rather than individual material or workcentre.
    As standard, in resource table whatever the value you enter that corresponds to no. of days. Each column represents one day.
    Pl. refer this link for clear understanding of the same.
    http://help.sap.com/saphelp_47x200/helpdata/en/a5/63212e43a211d189410000e829fbbd/frameset.htm
    Madhava

  • Rough cut planning-sop

    Dear Friends,
    For doing roughcut plan for one finished good , first i have created versions as per product group.then next step is disaggregate to sub groups. then after to material. now i got planning qty's for particular material. to do roughcut planning as against material quantites i have created one rough cut plan by selecting one workcentre as constraint(via t-code mc35).After doing this system is giving message roughcut profile is generated. then i went for mc88 to look after my work centre capacity load. i am getting gray position on view tab. so that iam not able to click on the view tab to serve the desired.how to de-gray.
    extras>capacity situation> ______view.
    pls.suggest how to solve the problem or is there any settings involved at workcentre or routing level or any setting is needed to pop up view tab. it will be very helpful to me.

    Hi,
    Create a prod group using mc84.
    create a rc plan using mc81.
    create a rc cap profile using mc35, here give the base qty as 1, lot size etc...
    Then in the resource , give the bottle neck workcenter . & enter the time to produce one piece in that particular work center.
    use mc82, & choose the corresponding inactive version no.
    In mc82 view, after checking the capacity situation(By choosing view, capacity situation, show) you can check the load for that particular resource. Once the load is 100 %. You can save it.
    Use mc78, copy the inactive version no to active no. (a00).
    Then in mc82 view, go to Extras,
    transfer to demand management,
    Choose the strategy as LSF/VSF... according to your scenario & then click transfer.
    Hope this helps...
    Regards,
    Senthilkumar SD

  • Rough cut planning profile

    Hi Gurus,
    Our scenario is we have two plants.The sales orders and the PIRs will be created in the Plant 1 and these requirements will be transferred as Stock transport orders to plant 2(with special procurement key) .All the materials will be manufactured in plant2.BOMs and routings are maintained in Plant 2.
    In this case if i want to maintain the rought cut planning profile , how can i map the scenario.
    Please help me in this.
    Thanks in advance,
    Ravi

    Hi Krishna,
    There are two plants.
    Plant 1
    Plant 2
    We will be creating PIRs in Plant 1.There is a special procurement key maintained for material which will say stock transfer from plant 2.
    The below are the steps:
    1. Create PIRs in the plant1.
    2. Run MRP
    3. STO req. will be created in Plant 1 against the PIRs.
    4. As the special procurement key is maintained in material master Planned orders will be generated in plant 2 against these  STOs from plant1.And production will be done in plant 2.
    So, now if i want to do rough cut plannig profile how can i proceed.
    Thanks,
    Ravi

  • Rough cuts from Prelude lack audio source

    Hey everyone,
    this is my first project with a Prelude to Premiere Pro workflow and so far everything worked just fine.
    Although after creating a couple of rough cuts in Prelude and sending them to Premiere Pro I am experiencing a problem with the imported audio:
    All clips within a rough cut do not play back any audio even though they did in Prelude. I found out that after beeing sent to Premiere all clips seem to loose their audio track source.
    So what I can do to relink my audio is to righclick->audio channels -> choose the right source. If I want to do this for multiple clips at once it will only work for clips shot with the same camera / format / channel names.
    As I am working with footage of three different cameras I am trying to understand what's going on.
    Has anyone of you experienced a similar issue?
    Thanks for your help.

    Xoxidine,
    Prelude CC, the new version that has the new feature to automatically conform clips after ingest, will be shipping June 17. http://www.adobe.com/products/prelude.html
    As to forcing a reconform, please try this:
    Quit Prelude
    Clear out your Media Cache Files folder, or if you can determine specifically the files to delete-- they're named in such a way you can tell which files go with which clips surgically remove the files for the clips you want to reconform
    Mac: delete the .cfa and .pek files located in ~/Library/Application Support/Adobe/Common/Media Cache Files/
    remember "~" indicates your Home directory. On my system this is located at /Users/wplate
    another point: On Lion and Mtn Lion the Library folder is hidden by default. Hold the Option key while selecting the Go menu in the Finder and "Library" appears. Choose that and a window pointing to ~/Library appears
    Win: delete the .cfa and .pek files located in C:\Users\<your user>\AppData\Roaming\Adobe\Common\Media Cache Files\AppData is a hidden folder. Once I was in \Users\Wes I then clicked into the address bar to type the AppData name and after hitting Enter that directory was opened.
    It is also possible your media cache files are set to be elsewhere. The setting is in the Prelude preferences in the Media category.
    Relaunch Prelude
    Open the clip again, it should reconform
    I tested this with Prelude CS6 on both Mac and Win and it worked for me on both platforms.

  • PP-PI:  Rough-cut capacity

    Hi Gurus,
    We are in a process industry and using descrete production. We are not using production group but we use product hierarchy.
    Now we want to run rough cut capacity to check resource capacity. Can anyone send me the complete scenario to check rough-cut capacity in my environment?
    Thanks in advance.
    Shiv

    1. Create a rough cut capacity planning profile in the Tcode mc35 using the infostructure.
    2. Then create your planning data for the flexible planning  mc93
    3. then when you create the Planning data in the View Tab - y ou have the capacity situation .
    4. when you select this it will branch to the Rough cut capacity planning - then select show in that
    5. Now based onthe values that you avhe maintianed in the RCCP you can see the capacity requirement in an additional screen below your planing values.
    Check the configuration for the
    Configure scheduling parameters in the SOP menu of the SPRO
    Let me know if you need more details

  • Rough cut planning & available capacity

    I need one clarification, in the rough cut planning, the existing load
    is not considering for available capacity.It is considering only from
    the resource capacity.
    E.g : Avaialble capacity of for Resource A (today) is 24 hr
          One Order is created and released for 4 hr with Resource A
          As per that now my available capacity of the resource is only 20 hr
          In SOP planning view, it showing as 24 hrs.
          And If i am running the SOP today at 1400hrs for calculating the
    resource capacity. Practically my avaialble capacity is 10hrs. But
    in the system it showing as 24hrs.
    How to capture the above both requirements?
    2. Through roughcut planning we can able calcualte the cost, material and
    PRT availability also. But it is not coming the the SOP screen.
    Is it any configuration i missed out? Help me out
    Regards,
    sakthivel
    <Title of the thread has been changed. Please use meaningful title.>
    Edited by: Csaba Szommer on Nov 15, 2010 9:52 PM
    Edited by: Csaba Szommer on Nov 15, 2010 9:58 PM

    Hi!
    Available capacity means the total capacity available for use in production. Presence of an requirement will not reduce the available capacity.
    Regarding SOP. Check for the starting time of the order or requirement. See if you can schedule from the current time instead of start of the day.
    Regards,
    S.Satish Kumar

  • Rough cut Capacity load in Standard SOP

    Hi there,
                 I have created some sales & production plan syncronous to sales......but when I try to see the capacity load thru View- > Capacity Situation - > Rough Cut planning- > Show
    It is showing me that No Resource load exists ...... please guide me how can I see the load for the same
    Regards
    Kaushik

    Hi,
    Please maintain the settings as mentioned below.Then you can see the load.
    Before you can carry out resource leveling in SOP, you must:
    1.) Create a PP task list (a routing, a rate routing, or a rough-cut planning profile) for the material, product group, or characteristic values combination whose resources you want to plan.
    2).Configure resources planning in Customizing for Sales & Operations Planning.
    3).If you use routings or rate routings to do resource leveling, define the key figure to which the resources are tied. Do this in Customizing for Sales & Operations Planning under Set parameters for info structures and key figures.
    4).Define the planning plant of any information structure whose plant is not uniquely identifiable (that is, either your information structure does not contain the characteristic "plant" or your rough-cut planning profile covers more than one plant). Do this in Customizing for Sales & Operations Planning under Set parameters for info structures and key figures.
    5).Set the default SOP plant for Sales & Operations Planning. Do this in Customizing for Sales & Operations Planning under Set planning plant for SOP.
    Thanks,
    DV

Maybe you are looking for