Dear folks,
I have following requirements:
Customer orders Material A and for some reason (e.g. low stocks), the mrp controller decides to produce an alternative material (B) which is
equal to Material A. This also counts for planned independent requirements.
How can I maintain this in SAP? I tried to use alternative item group in the BOM, but this does not solve my requirement, since this is just a function to assign an alternative BOM position for Material A. I really need to assign an alternative material on header level.
The assignment has to take place before actual production. We cannot use Material Determination (SD) - Transaction VB11.
Any ideas? Is this something we have to develop?
Kind regards,
Peter

Hi Peter,
Check these links for discontinuation parts:
Discontinued Parts - Material Requirements Planning (PP-MRP) - SAP Library
Concept of Discontinuation Data - Material Master and BOM
Regards,
Anupam Sharma

Similar Messages

  • PR( purchase requ) for Alternative material in BOM

    Hi PP expert,
    I am using alternative material in BOM. As for example my Header BOM material is u2018Yu2019 and his alternative components  are  X1 and X2
    I have done setting in BOM
    For -
    X1,------
    Priority  ---1
    Strategy  -  2 ,100%
    Usage prob     100
    For -
    X2----
    Priority  -
    2
    Strategy  - -
    2 ,100%
    Usage prob    -
    0
    My client want when  run the MRP , PR should be  generate  of material u201CX2u201D ,because there is no X2 stock and Material  u201CX1u201D  have more stock and want to consume X1 material 1st  then X2.
    X1 has been blocked for procurement.
    Kindly suggest me how will generate PR of X2 when the run MRP. X2 is alternative material..
    Regards,
    Aqueel

    Hi Aqueel!
          As I know, standard SAP cannot solve your problem. Howerver, you can try with these way:
              1/ Try to estimate how long your company will consump all X1(Ex 3 days). Use Alternative BOM 1 for X1, Alternative BOM 2 for X2. And allocate Alt 1 to Production version 1 with valid to 8/10/2010, Alt 2 to production 2 valid from 9/10/2010.
              2/ Change:
              For -
    X1,------
              Priority ---2
              Strategy - 2 ,100%
              Usage prob 0
              For -
    X2----
              Priority -
    1
              Strategy - -
    2 ,100%
              Usage prob -
    100
    And Run MRP, system will take X2 into accout. If you want to savage X1. Need to calculate it and manually change in comonent list of Production order (Now, X2 will consider) with X1 until X1 stock finish.
    Hope it can solve you problem(not perfect).
    Regards
    Tony

  • Material ledger production start up

    Dear expert,
    we are working on a project that has two main objectives:
    1) now the customer is using the mtv 103/105 and we want to move to the 101
    2) now the customer is using a custom 'medium price calculation' and we have to activate the material ledger.
    I red the note 596558 and I have some question; first at all I would like to find some documentation about this activity and the effects of  a Material ledger production startup, could someone tell me we can I find info ?
    The question are
    At point f) is wrote
    u201CYou should always transfer purchase orders and purchase order histories before activating the material ledger. This ensures that the system translates the purchase order history in all additional currencies.u201D
    What does it means? Why it is necessary translate? How?
    If a company has only the local currency is it necessary the translation?
    At point j) is wrote
    u201CWe recommend that you close open orders before activating the material ledger and recreate them after the activation if required.u201D
    WHY?
    The posting logic for postings that reference a purchase order is changed in the parallel currencies due to the activation of the material ledger. As a result, there may be unexpected price postings and exchange rate difference postings for purchase orders that are not closed in business transactions (goods movements and invoices) that are posted later.
    Which unexpected postings? Refers to new u2018Transactionu2019 (e.g. BSX, WRX, PRD, KDM, u2026) used after the material ledger start up? 
    Now the customer is using a custom u2018medium price calculationu2019; we think to reverse all movements in the year (103, 105, invoices) for order item not closed and recreate the goods movement with  the new model (101, invoices) after the ML activation.
    Thanks in advance.

    In our case CKMSTART was definately done before Inventory load. This Tcode was part of config prior to Master data creation and migrated data loads....

  • How to maintain alternative material in a BOM for a component.

    how to maintain alternative material in a BOM for a component.if stock for existing bom component is less then it should consider other alternative material in the same BOM

    HI,
    You can maintain alternate material for BOM Component by specifying Alternate Item group as below;
    Go to CS03/CS02--> Items-> Select Component and go to details->Basic Data Tab--> General Data
    Pls. find more details about Alternate Item group maintainance as below:
    Alternative item: group
    Consolidation of alternative items within a BOM. Every material in the assembly can be included in the alternative item group.
    Use
    As soon as you enter an alternative item group, you see an additional dialog box with the following data: ranking order, strategy, usage probability.
    You can maintain alternative items in the following situations:
    Alternative positions with specific usage probability
    These alternative items are incorporated with a specific usage probability. Enter the usage probability for each alternative item in the group, so that:
    dependent requirements are determined in requirements planning
    dependent requirements are changed to a reservation in the production order
    Alternative positions as information
    You can enter an alternative item for information purposes. This item would then, for example, only be taken into account in situations involving missing parts.
    As there should be neither dependent requirements nor a reservation for this item, enter no usage probability.
    Procedure
    Enter the same character string to denote the alternative items of an alternative item group.
    Enter the same strategy for all alternative items in the alternative item group.
    Dependencies
    Alternative items are valuated in the following way:
    Dependent requirements determination
    Requirements planning determines the dependent requirements according to the usage probabilities that have been entered.
    If the usage probability is 0%, then no procurement is planned for the item. For information purposes, however, dependent requirements with 0 as quantity are created.
    Withdrawal posting
    You can control the withdrawal posting for the resevation in the production order in the following way:
    Withdrawal according to usage probability (manual change is possible)
    Withdrawal if there is 100% availability
    (Check ranking order and strategy)
    Example: See Strategy for alternative position
    Further you can also maintain alternate material if you want to stop using this material at certain time as below:
    In material master of the material ,
    Go to MRP-4 View----> Under Discongtinued parts specify
    Discontinuation Indicator
    Eff-out.
    Follow-up matl
    So system will automatically consider follow up material in BOM as per the settings you have maintained for the material to be replaced.
    Hope this helps.
    Regards,
    Tejas

  • Material on Product & Customer heirarchy needed for practise

    Hello,
    Could anyone please send config material on Product & Customer hierarchies,
    Contracts,WarehouseManagement setup with Transfer order creation to the below mentioned ID. This is for practise purpose.
    Regards
    Innova
    [email protected]
    [email protected]

    Check the help.sap for Best Practices.
    The link is
    <a href="http://help.sap.com/bp_blv1470/BL_US/index.htm">Best Practices</a>
    Also, check the following links:
    <a href="http://help.sap.com/bestpractices/BBLibrary/documentation/J05_BB_InstallGuide_EN_DE.doc">Product Hierarchy</a>
    <a href="http://www.sap-img.com/sap-sd/customizing-customer-hierarchy-in-sd.htm">Customer Hierarchy</a>
    Regards,
    Gauravjit.
    Reward points if the solution is helpful

  • Mess SR 053 - Creation not possible (Mapping for product already exist..

    There is an error ocurring when the CIF is executed, this message I can see in the transaction SMQ1, the error " SR 053 - Creation not possible (Mapping for <product> already exists <product> ", the product really exists in APO but I don't know why this error occur because in this case the material should be updated. Anyone know why this error occur ?? and how can I fix ??
      When I try to execute only this material in CFM2 no errors occur.
      Regards,
    Edson Suzuki

    We did faced a similar problem. The reason was the external material number was different in both cases.
        ie the already existing record has the external material number padded with '0000' and the one coming doesn't have leading '0000'
    If this suggestion helps you, please reward by points..
    Shibu

  • Difference between alternative material and Materil substitution

    Hi,
    Can one explain me the difference between alternative material and material substitution?
    Where is alternative material for a material defined?
    When is the alternative material used and in which cases material substitution used?
    Thanks,
    Challa.

    Hi,
    Altenative material and material substitution is same.Material substitution is normally when the customer want the upgradation of the product or materila is not availabel of the particulat item material substitution is used.
    EX: customer order computer older version system automatically replace the ubdated computer.
    OR  customer order stock is not available also material substitution is use full
    U can go VB11 u can give the material determination of the particular product.
    Material determination type is -  A001
    Define substitution reason in OVRQ
    in the substitution reason u can give the reason what ever u requirement.
    regards , sridhar reddy

  • Costing shows high value due to BOM alternative material

    Hi,
    In BOM we have maintained alternative material for few line items.(not maintained alternative BOM) When we do the standard cost run system is taking main material and alternative material value. so the cost of the product is showing high.
    How system will behave this situation when doing standard cost estimate? how to avoid this excess value due to adding the alternative material?

    Dear Govindaraj,
    If there are alternative items maintained in the BOM,then as per the usage probability defined for each
    item the cost will be taken.
    say for one item if its 60% and for the another if its 40% means accordingly the cost gets captured.
    So goto CS03,say Items X and Y are defined under alt.item group A1,now select the first item(row) X
    and click on item details and check under Basic tab page you will be able to see the alt.item group
    along with priority,strategy and usage probability.
    So in CK11N or CK40N,it will be showing as 6 ea and 4 ea along with their prices for costing part.
    So as per to the usage prob it picksup for the costing part.
    Check and revert back.,
    Regards
    Mangalraj.S

  • Prevent creation of duplicate material master record

    Hi Experts
    1)  Is there any control or validation to prevent creation of duplicate material? I mean, if the description of new material is 100% or 95% matching with an existing material, there should be a validation.
    2) Is there any feature of usage of catelogs for creation of material master description?
    warm regards
    ramSiva

    Hi,
    Have a try to use Enhancement: MGA00001, user exit: EXIT_SAPLMGMU_001 for control you need.
    You can also use BAdI for this:
    BADI_MATERIAL_CHECK -> method CHECK.
    In both enhacements there is a structure STEXT - here short text(s) of new created material should be found for validation.
    Here you can make some ABAP works necessary.
    Hope it helps,
    regards,
    w.
    Edited by: Wojciech Zalech on May 19, 2010 9:43 AM

  • Use of Emigall for creation of masters in the production environment

    Hi,
    The EMIGALL objects are normally used for migrating legacy master data and/or cut-over data before production environment is up.
    I am contemplating to use EMIGALL object for creation of contract account masters in production environment. One more option that I have is to use standard BAPI for creating contract account masters.
    Can anyone tell me whether it is proper to use EMIGALL object for day to day creation of master day in production environment. Is there any disadvantage or risk involved in it.
    Kindly reply soon.
    Regards,
    Ganesh

    I've already used emigall multiple times to do delta migrations into an operational prod environment.
    Purely looking at the functionalities, it should/would/must be possible to use emigall as a master data generator. I just think you need to look into the requirements:
    who will use it? end-user/application manager/...
    what's the amount of data to be loaded?
    what's the time window of the load? Day/night
    how is the data supplied?
    As you know, emigall EATS system resources like mad, so using it during the day might not be preferable. emigall is also very picky about the file format, whereas in a custom report you can define the input structure yourself.
    On the other hand, the error handling and follow-up of emigall is great...
    Personally, I'd go for a custom report with a BAPI... It'll give you more flexibility than emigall.

  • Excess Issue of Material against Production Order

    Hi
    For Goods Issue of Material against Production order , i want the system to control excess issue of material against Production order.  How can it be controlled.
    Regards
    Madhesh Kumar

    Hi Madhesh,
    there are many loop holes to issue excess stock against production order
    so better you use user exit so that when ever any material issued against production order and it is in excess then throw error
    Thanks
    Bala

  • Throw error during PO creation if a material is not extended to storage loc

    Hi,
    Users require for SAP to throw an error during PO creation if a material is not extended to the storage location that is entered on the PO.
    Presently it neither gives warning or error message.
    Please advise.
    Regards,
    Pratap

    SAP does not validate that, if you want it, then you have to do such check in a user exit.
    SAP can be customized to create the material master storage location segment itself when posting the goods receipt, so it is not necessary to check this in the PO.
    Further this design  speeds up the process, you can already order before others have finished the material master maintenance.

  • Product Allocation: Removing a Material from Product Allocation

    Hey folks! 
    I am new to the forums, so hopefully some of you sharks will bite on this one.  I work for a consumer products company and we're having issues with product allocations.
    We have had a material on product allocation for the past 3 months.  We used a allocation rule that is modeled off of the S140 rule on the basic data of the material view.  However, our production has now ramped up sufficiently to produce this product and provide normally. 
    1) How do we remove the material from product allocation?
    We deleted the rule from the basic data view, but is there anything else we need to do?  There are many remaining open sales orders that get the error "No Feature Combination exists for this selection error".  I have ran rescheduling (V_V2) and have also ran the SDRQCR21 to rebuild requirements, but it still remains with this error.
    2) Is there something we have to do with the infostructures?  Something we have to do in MC64 or MC94? 
    3) Do we need to go through each sales order and delete the line item and replace the line item to get the normal ATP to function (we would rather not do this as we have EDI information connected to each line item)
    4) Is there another report out there I need to run that I just do not know about?
    Any help would be great.  We are on ECC5.0 Hotpack 15.  I will reward points if I can figure out how to.

    Use MC94 to remove the quantities allocated.
    Use MC62 to remove the planning hierarchy.
    I believe that in your situation MC94 will work.

  • Block sales order creation based on material qty

    Hi,
      In my scenario i want to block the sales order creation based on material qty , how i can do this?
    Example:
    Material qty below 100 = able to create sales order
    Material qty above 100 = not able to create SO
    Thanks,
    Arun

    Hi
    For restricting the order if it is less than a specified qty, you can maintain the 'min order qty' in material master.
    But your requirement is the other way round - Restrict order if it is more than specified qty.
    In this case, you need to use the following sales order exit  in progran MV45AFZZ
    u2022     USEREXIT_SAVE_DOCUMENT_PREPARE
    Use this user exit to make certain changes or checks immediately before saving a document. It is the last possibility for changing or checking a document before posting.
    The user exit is carried out at the beginning of the FORM routine BELEG_SICHERN.
    Hope this helps.
    Regards
    Madhu

  • Error while issue material against production order

    Hi,
      In our development server recently we have created on ecompnay code and plant by copying the one existing company code and plant,  now for this new plant I have created new profit center with KE51  and after that I have create done cost ceneter in that this new profit center is assign   now while goods movment with MB1A with movmen type 201, 202  it works OK system is not giving any error  but while issue the material against production order in MB1A with movement type 261 system is giving error message
    No postings can be made to profit center DUMMYBAOPC in company code MT50
    Message no. KM183
    Diagnosis
    Profit center DUMMYBAOPC cannot receive postings in company code MT50.
    this profit center DUMMYBAOPC we use in old compnay code and for this new company code is not activated  for new we have new profit center  then it is  linking to that  what can be the solution.
    regards,
    zafar

    Hi,
      After asigning new profit center in the Production order problem solve.
    regards,
    zafar