Creation of control cycles for lean WH

Hi All,
Is it possible to create control cycles (backflush) for LWH, if so how?

HI ,
There is one more way to create control cycle.
1. PK05 - create supply area ( earlier explained the procedure)
2. PKMC - enter plant - go to change mode ( click on change icon ) - in the right hand window - you can see the create / copy icon.
3.click on create icon
4.select option - classic Kanban or event driven kanban
5.enter material/ plant/ supply area.
6.enter no of kanban / qty.
7.In replenishment strategy - select appropiate option ( in our case it is stock transfer)
8.enter - the tab will change from replenishment strategy to stock transfer.
9.enter storage location.
10.enter destination- storage type- bin
11.enter if any additional data required to enter.
12. save- control cycle will get generated.
thanks
Om

Similar Messages

  • Issue in creation of control cycle

    Dear Gurus,
    During creation of control cycle (LPK1), the fields for source information is not appearing in my system.
    I compared control cycle in a different ECC system where source information is appearing.
    How can make the screen appear in my ECC system.
    Please find the screenshots.
    Any pointers will be highly appreciated.
    This thread is further to the threads in Production Planning and LE/WM Forum. I could not resolve the issue with the threads.
    Hope that I will get any pointer in EWM forum.
    http://scn.sap.com/thread/3609441
    http://scn.sap.com/thread/3610822
    With Regards,
    Malay

    Hello Malay,
    Can first contact your ABAPer and ensure the bottom screen is not an Screen Enhancement?
    If it is a some custom development, your ABAPer can help you on the logic behind it.
    Else, Let us know.
    Regards,
    Sathish

  • Issue during creation of control cycle

    Dear Gurus,
    During creation of control cycle (LPK1), the fields for source information is not appearing in my system.
    I compared control cycle in a different ECC system where source information is appearing.
    How can make the screen appear in my ECC system.
    Please find the screenshot.
    Any pointers will be highly appreciated.
    This thread is further to the thread in Production Planning Forum
    http://scn.sap.com/thread/3609441
    With Regards,
    Malay

    Manish,
    I do not understand how this going to solve the issue because why we need both KANBAN and WM control cycles for one material withdrawal for production?
    Br
    KK

  • Control cycle for production staging SAP WM

    We currently have control cycle for kanban purchase orders. Do I need to create new control cycle production staging. Actually I will be using fixed bin for production consumption. Kindly confirm whether existing control cycle of purchase order can be used.

    Material Staging Indicator for Production Supply
    The material staging indicator defines the method of how needed materials can be supplied for production with the assistance of the Warehouse Management system.
    As with the location coordinates (warehouse number, storage type, and storage bin), the system files this indicator in the control cycle.
    The following staging types are supported:
    "1": Pick parts
    These materials are picked according to the required quantity specified in the production order.
    "2": Crate or kanban parts
    These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.
    "3": Release order parts
    Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.
    "4": Manual staging
    Materials are staged manually. For example, you can transport individual components using manually created transfer orders, or you can use the bypass method to transport them directly from the goods receipt zone to production. In goods receipt posting, postings are made to the production storage bins from the control cycles.
    "0": Not relevant to WM-PP
    These materials are not relevant to WM staging. They cannot be requested using the WM system.

  • Control cycle for KANBAN.

    I want to cosume componenets using my KANBAN BINS.
    I maintained my supplying areas.  and when coming to the control cycle. Do I have to maintain control cycle for each component that I use in maufacturing against each supply area?  or is it only for FERTS

    Hi,
    1. When you tell consume compoenents means you are talking about Goods issue.
    2. Kanban needs to be done for a Inhouse prodcued material or externall procured material
    3. In both cases it does a Goods receipt and relevant goods issue posting.
    4. so if you only need to do consumption it is not possible.
    5. Genearlly it can be maitained for the FERT or halbs which has  bom, routing releavent master data
    6.For the inhouse manufacture kanban below is the highlevel step
    7. and wehen you do status cahnges like full to empty a planned order or prod order will be created.
    8. when you change status empty to ful then GR will be posted and GI will be done immediatelly ( based on the control cycle)
    9. Kindly refer the attached link for further details.
    [KANBAN|http://sap-pphelp.blogspot.com/2010/01/kanban-inhouse-production.html]
    also let me know if you have any specific querry
    Reg
    dsk

  • Kanban - Control cycle

    Hello all!
    I am trying to create a control cycle for Kanban in my test system. I have created replenishment strategy in Customizing for Kanban and this was transferred all to my test system. When I want to input the address for a vendor it says: Replenishment strategy in plant ... does not exist.
    I suppose there must be a problem with my Replenishment strategy which I have created in Customizing for Kanban. I was not sure about what I need to specify. I have specified plant, type of Procurement:it is an external Procurement, working with Scheduling agreements, Order type - LP, GR - 101, Signal lock- 0. These are all information, which I have specified I was not sure about the rest.
    Please could anyone help me ??

    Hi,
    I answered to few of the threads, hope it will help you, if required any further info please let us know.
    Re: Implementing KANBAN-WM
    Re: Creation of control cycles for lean WH
    thanks
    Om

  • Control cycle mass creation with staging indicator 4

    Hi All,
    Is there any way to create control cycles in mass for staging indicator other than 3 - rel order parts?

    You can define a generic control cycle for manual staging parts and it will be valid for parts w/o control cycle. Please read SAP online help:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/c6/f841494afa11d182b90000e829fbfe/frameset.htm
    For manual staging, you can define one control cycle per production supply area for all materials. This control cycle is then valid for all the materials in the production supply area, for which you have not defined an individual control cycle.
    If you want other mass cration / change tool, you have to develop it on your own.
    Edited by: Csaba Szommer on Dec 13, 2011 9:59 PM

  • WM-PP Control Cycle

    I've created a WM-PP Control cycle for Pick parts in HU- WM managed storage location and by releasing a production order I'm getting a message:
    No WM relevant components exist (function not possible)
    Message no. CO577
    I've est-up everything from WM stand-point, I'm not sure what I'm missing, Can someone please help me
    Thanks in advance

    Issue Resolved, WM-PP Interface Config issue

  • SNC Kanban Issue - Control Cycle Master Data

    Hi,
    We are testing the SNC Kanban scenario with contracts (PO) between ECC & SNC.
    We have created a control cycle for the ECC material and have sent the Master Data to SNC. We are now trying to send over the control cycle info to SNC and are getting hte following message when we run KANBAN_MD_TRANSMIT:
    "Kanban control cycle 70666: No address data available; processing terminated"
    Any suggestions would be appreciated.
    regards.

    Hi Anjan Bellur
    As per the error message, the address details for your supply area are not maintained
    Kindly go to the transaction PK05 in r/3 system
    For your plant and Production supply area, Shift+F5
    Maintain the address details
    Then the reported error message will not appear
    Best Regards
    Vinod

  • Control Cycle & JIT outbound calls

    Hi,
          Here requirement is that need to archive JIT outoutbound calls and delete control cycle. for this please explain the what are the configuration needed?  Also explain me how to block a control cycle?
    Regards
    Maria
    Edited by: Maria on Feb 11, 2011 8:01 AM

    no answer

  • Routing and Control Cycle

    hi........
            Is there any link or connection between Routing and Control Cycle?...........if there is connection then what are the parameter that are interlinked?.......
    thanks in advance
    regards
    Nilesh

    It is correct that there are 2 ways of creating control cycles for materials.
    One is thru Kanban way and the other is regular WM way of control cycles.Here for WM control cycles again, it is just the way of driving materials to particular supply area while in kanban, the control cycle is driven with kanban signals.
    If you want to define Kanban, you need to identify first what way you would want the replenishment to occur.
    There are two options, classic and even driven Kanban replenishment. In the former one, the replenishment is triggered thru kanban signal in kanban board and replenishment quantity is equal to what is mentioned in control cycle.
    In a event driven kanban, replenishment is triggered the same way but the quanity of replenishment can differ.
    Classic KANBAN:
    Quantity of material (target quantity) that is specified for a kanban.
    Event-driven KANBAN:
    Proposed value for the quantity of material in a kanban that is used by the system when no order quantity is entered at a kanban signal.
    AH

  • Manual Staging in control cycle TR creation WM/PP integration

    Hi,
    We defined Material Staging Indicator as 4 in Control Cycle
    How do we trigger TR for this materials ly??? Do we need to create TR manually? OR any transaction which will allow to create TR automatically for desired quantities
    When i go to Change production Order and WM pick list Requested quantiry/confirmed Quantory is Blank only requirement qty column has values
    How i can enter quantities manually and trigger TR
    Can i have in Prduction Order few materials manually staged and few option 1 [pick parts]

    Let me rephrase
    We are using Standard PP/WM integration to stage materials from warehouse to production Bins.
    We defined Material Staging Indicator as 4 [Manual Staging] in Control Cycle of materials [as business wishes to move materials manually from warehouse to production Bins]
    How do we trigger Transfer requests[TR] creation to initiate movement of raw materials from warehouse to Production bins.
    Do we need to create TRu2019s manually? If yes How [As I understand TR doesnu2019t allow to move more than one material at a time from one Bin to another]
    When i go to Change production Order and select WM pick list I could see Requested quantity and confirmed Quantity column are not getting filled only requirement qty column has values. All columns are grayed.
    Can we have few materials manually staged and few via Staging indicator option 1 pick parts?  so that all critical parts will be moved manually and others SAP to create TRu2019s automatically
    PLEASE HELP

  • A trigger blocking function  for control cycle in Kanban

    Hi,
    I wantet to change the status in Kanban. I get this error u201CA trigger blocking function was defined for the control cycle in the replenishment strategyu201D. I don't want to set a period of blocking function. how can I deactivate it.
    Thanks

    Hi,
    Pls. check the following setting :
    First in PK13n ( KANBAN Board) check whether X is marked with KANBAN Number e.g. 1X.
    If so then replenishment will not be triggered because KANBAN is locked.
    To unlock the KANBAN pls do the following :
    Go to -
    > PKMC ( Control Cycle Maintanance) in Change Mode----> Select Control Cycle -> Go to Display Control Cycle ( Glass Icon)--> on top of details of kanban cycle choose option ---> Display Kanbans ( Spectacle Icon )
    Select it and go inside : Inside pop up appearing check first Column : Lkln ( Lock Indicator).
    Remove the tick in check box of lock indicator for respective KANBAN for which  you want to trigger replenishment.
    Pls. try above settings and revert back if still problem persists.
    Reward if problem solved.
    Regards,
    Tejas
    Edited by: Tejas  Pujara on Aug 1, 2008 12:25 PM

  • BAPI / FM for creating control cycles in WM(Tcode LPK1)

    Hi Experts, As per my requirement i need to develop a conversion object to create control cycles in WM either with BAPI or any std. FM . can you please do help me out this is urgent for me.
    TQ phalani

    Could some one please suggest on this. ? thanks

  • User Exit for PKMC (Kanban Control Cycle)

    Dear Gurus,
    I need to know if there is a user exit in PKMC (kanban control Cycle) to create a extra tab next to the print control tab in the bottom.
    Best Regards,
    Kumar

    List of exits available.
    Enhancement/ Business Add-in            Description
    Enhancement
    MPKR0001                                Customer fields in kanban control cycle
    MPKP0002                                Customer-Specific Fields Call Interface
    MPKP0001                                Customer Defined Display in Kanban Board
    MPKD0001                                Kanban output as EDI
    MPKCCY02                                Customer Error in SumJC Control Cycle
    MPKCCY01                                User-Defined Fields in Kanban Control Cycle (PKMC)
    MPKC0001                                User exit for kanban calculation
    MPKB0002                                Customer defined display in kanban board
    MPKB0001                                User's own functions in the Kanban processing
    Business Add-in
    BADI_PVBE_UPDATE_APO      PVB Publish Changes to the APO
    MPKC_REQ_SELECTION           BAdI for Requirements Selection for Kanban Calculation
    PK_CALL_INTERFACE              Customer-Specific Fields Call Interface
    PK_CCY_SELECTION               Selection for Maintaining Control Cycles
    PK_REVERSAL                          BAdI during reversal of Kanban

Maybe you are looking for

  • Turn off the iTunes and App Store links

    How do you turn off the iTunes and App Store links? I need to do it show that storeagent will stop using so much of my cpu.

  • SAP AP module

    Hello All, Does any one know what is AP module, please tell me the full form of it. Thanks, Hari

  • Process and cursors

    Hi, I would like to know if it's possible to declare a cursor in the source of a PL/SQL process? Right now I have this in the source: declare cursor cur_t is select * from p_client; begin end; And when I try to save I get this error message: ORA-0655

  • Why is control center not transparent on my iPhone 4?

    For some reason Control Center on my iPhone 4 is gray rather than transparent. Notification center is more black than transparent as well.

  • Stumped:  NPE being thrown in Tomcat Classloader

    All, This problem has been vexing me all morning. We have two identically set-up Unix boxes (well, probably not identically set-up as you will see). There is identical code running on both (this I can guarantee). Whenever, we view some JSP's on one b