Creation of Insp Lot through FM QPL1_INSPECTION_LOT_CREATE

Hi Guru
Can any body help me to create Insp Lot through FM QPL1_INSPECTION_LOT_CREATE
based on fields of Z-table for following data:-
Z-table relevant fields
INSCALLNO- INSPECTION CALL NO
PSPID-PROJ DEFINITION OR PLANT
PACKCODE-PACKAGE NUMBER (PO NO.)
INSP OFFICE AS ART FOR QALS
MFR (MANUFACTURER CODE) AS LIFNR IN QALS
Record to be created throuhg FM for QALS table
following relevant fields are to be appended
Z Field as ZZEBELN (PO no.)
Z Field ZZINSCALLNO from INSCALLNO of Z-table
PRUEFLOS
LIFNR
HERSTELLER
MATNR
KTEXTLOS
ART
STSMA
ENSTEHDAT
OBJNR
ENTSTEZEIT
KTEXTLOS
ERSTELLER
ERSTELDAT
ERSTELZEIT
and other relevant fields.
Thnaks.
YPB

Hi
for Inspection lot origin : 01 ,03 ,04 You can create Inspection lot manuaaly.through QA01 tcode.
Regards
Sujit

Similar Messages

  • Manual creation of insp lot

    Can we manually create insp lot in QM?

    Hi
    for Inspection lot origin : 01 ,03 ,04 You can create Inspection lot manuaaly.through QA01 tcode.
    Regards
    Sujit

  • Insp. lot creation

    Dear all
    I have assigned insp type 06 (returns from customer) on a material.but when i make a return delivery after reapir request,No inspection lot generated.
    Why insp. lot is not generated.I have already checked the following things
    i- insp. type 06 is active in mat. master QM view.

    No.  Inspection lots 06 and 05 will both generate automatically.  You don't have to use QA01 for the 06.
    Check configuration - Inspection in SD.
    QM>Quality inspection>Inspection Lot creation-->Inspection at shipping 
    In here select "Assign Inspection lot Origin  to Delivery Type"
    Find the delivery type "LR" returns delivery.  Enter in 05 or 06 depending on what your preference is.  The primary difference is that 06 lots are not stock relevant while 05's are.  If you've created custom delivery types for returns you'll need to set those up too.
    Above info from 6.0 system.
    Craig
    Edited by: Craig Snyder on May 8, 2008 6:10 PM
    Edited by: Craig Snyder on May 8, 2008 6:13 PM

  • Restrict creation of inspection lot for certain work centers

    Hi
    My client needs to restrict the creation of inspection lot at certain work centers although QM is active for all material processed in these work centers.
    I am using the  function module 'EXIT_SAPLQAAT_002' of QAAT0001 for this purpose. Z04 inspection type ( with Post to insp stock) is maintained for all these material.
    A different Z table is there , where material-work center combination is maintained for which no inspection lot is required.
    Logic provided so that system searches Material-Work center from production order then compares it with the Material-Work center combination with the maintained Z Table.If both found same then no inspection lot will be generated.
    But an error message (Change the inspection stock of material XXXXXX in QM only) appears for all those material while doing confirmation in CO11N . Hence system does not allow to complete confirmation for those material where QM is active.
    Please suggest if i am using the correct Exit or any further improvement is required.
    Thanks and regards
    D Mohanty

    Hi
    Actually the issue is resolved now.The problem was with coding where we were using Table-AFRU for reading prod order details.But AFRU does not consider fresh orders for which it was replaced with AFKO.
    Also the Z table must be maintained as Plant-Material-Work center combination prior to go for any order confirmation.
    Thank you all who have gone through the post , hope this will help those who have to map the same scenario at their end.
    Regards
    D Mohanty

  • Creation of Inspection Lot in QM Module without inspection lot origin

    I want a solution regarding creation of inspection lot without assigning inspection lot origin to material code.
    We have developed function which creates inspection lot for the material against which PDI is envisaged on the material of a particular Purchase order. In my view we do not require assigning inspection lot origin on the material code as process has been mapped through Qinfo record. By assigning the inspection lot origin on the material is unnecessary step in our process.
    Can any body suggest solution regarding above problem.
    Yatindra Bahuguna

    Dear,
    We have developed function which creates inspection lot for the material against which PDI is envisaged on the material of a particular Purchase order.
    Little bit stuck up.... can you explain the above in detail...
    As I understood you developed a function -
                         - Which creates material inspection lot
                                             - Which Pre Delivery Inspection applicable on particular purchase order.
    YES?
    Regards,
    Syed Hussain.

  • Stop Automatic Creation of Inspection Lot for a condition

    Dear Gurus,
    While Creating a Delivery through a Sales Order, Config is maintained such that "Inspection Lot" will be automatically Generated.
    Now Business wants to Stop this Automatic Creation of Inspection Lot only for a Particular Delivery Type and for a particular mode of Transport.
    Do we have any User Exits / BADIs to achieve this requirement.
    Please let us know.
    Thanks in advance.
    Regards,
    Vinay Mutt

    Hi
    To meet you above mentioned requirement you have to modify the program RQAAAS10 as per your logic both to create lot for Expired Material and to consider project stock or vendor stock as In standard SAP these stock are not considered.
    regards
    Manish

  • Scenarios for "manual creation of inspection lot"

    Hi QM gurus!!
       I would just like to ask the main function of QA01 or "<b>Manual creation of inspection lot</b>"
    What are the cases/scenarios where this tcode is used? I would really appreciate if you could help me.. Thank you.
    Regards,
    Heinrick Palad

    HI,
    The table below provides a brief overview of the functions you can use to process inspection lots. Appropriate cross references are included for the more extensive tasks or for those for which additional information is available.
    Prerequisites
    The inspection lot processing functions can be linked to various authorizations that are checked by the system whenever you try to process an inspection lot. The following types authorizations are relevant to inspection lot processing:
    Material authorizations
    The material authorization for QM is stored in the material master. For more information, see  Creating and Changing QM-Specific Data for a Material.
    Inspection type authorizations
    This authorization controls which inspection type the user can access in order to create an inspection lot. The inspection type authorization is plant-specific.
    No authorization checks are executed in QM when an inspection lot is created automatically.
    Features
    Function
    Pushbutton / Menu path
    What you should know
    Accessing the initial screen for the inspection lot processing functions
    Logistics ® Quality management ® Quality inspection ® Inspection lot processing ® Inspection lot
    Creating an inspection lot manually
    See Creating an Inspection Lot Manually
    Changing an inspection lot
    Choose Change
    Enter the number of the inspection lot you want to change and then choose Enter.
    Displaying an inspection lot
    Choose Display
    Enter the number of the inspection lot you want to display and then choose Enter.
    Creating a new batch in an inspection lot
    See Batch Creation in Inspection Lots
    Cancelling an inspection lot
    Call up an inspection lot in the change mode and choose Inspection lot ® Functions ® Cancel lot.
    See Cancellation of an Inspection Lot
    Blocking/unblocking an inspection lot
    Call up an inspection lot in the change mode and choose Inspection lot ® Functions ® Block lot.
    To unblock an inspection lot, choose Inspection lot ® Functions ® Unblock lot.
    When you block an inspection lot, you cannot process the lot further. You must unblock the lot if you want to perform any additional operations.
    Transferring stock in an inspection lot
    See Stock Transfers
    Making corrections to inspection lot quantities
    See Corrections to Inspection Lot Quantities
    Creating a QM order
    Call up an inspection lot in the create or change mode and choose Goto ® Insp. lot acc. assgnmt.
    See QM Order Creation
    Resetting the sample calculation
    See Resetting the Sample Calculation
    Printing inspection instruction/sample-drawing instruction
    See Printout of Instructions
    Approving a task list
    Call up an inspection lot in the create or change mode and choose Inspection lot ® Functions ® Give approval
    If the task lists in your company must be approved before they can be used, you should make sure that only approved task lists are assigned to an inspection lot. If the system selects a task list that has not yet been approved, you can use this function to approve the task list (provided you have the necessary material authorization).
    this link help u.
    http://help.sap.com/saphelp_erp2004/helpdata/EN/be/00bbe7ca5311d2961800a0c930e04c/frameset.htm
    reward is usefull.
    tahnks.

  • Reg insp lot for material

    Dear all,
    One material which is sometimes used in plant and sometimes sent to subcontractor as a component , if it is procured from
    same vendor and when it is coming to plant for usage we should get insp lot and when it is sent to subcontractor we do logical
    GR in the plant and material is directly sent to subcontractor at which we donot want insplot .
    here material and vendor are same
    Please advice
    regards
    venkat

    Got your point.
    Look, when you are physically receiving it, in MIGO receive the material with mvt type 101, normally as you do.
    In case the material goes to the subcontractor and you make your GR, make the following:
    Receive the material with MIGO with mvt type 103, this will not create FI document yet, the material will be in the blocked stock, after that release it with mvt type 105, this will create the FI doc you need.
    Now the problem is the inspection lot, because in the standard system, mvt type 105 creates inspection lot, therefore deactivate QM on mvt types of 105, and that will stop the creation of inspection lots.
    Regards,
    Max

  • Insp lot- results recording

    Hi, activated qm for procurement. po generated and gr done and insp lot no taken from md04. pls note that the sys status here is crtd, chcr, sprq shows in MDO4 for that insp lot details.while searching same insp lot no in qe51n, it gives the message "no entries found". pls advise how tosolve and to do rsults recording.

    Hi,
    Check Whether you have created the Inspectionplan for that material(QP01 for creation). If not create it.
    And Check In Material master -
    > Inspection type deatiled view whether auto. Assignment Check box is selected or not. If not , Select it.
    Now Onwards  the Created Inspection lots will be released Status and you can do result recording for them.
    For Existing Lots with CRTD Status do the following steps.
    1) Create Inspection Plan(QP01)
    2) QA02 -> Inspection lot change> Insp.Specification Tab> Click On Task list/specification push button> It will Auto matically assign the Inspection plan and then Inspection lot get convert into Release Status. Then Save it.
    Noe you can do the result recording for it.
    Regards
    Praveen

  • Quality Management - Insp lot origin

    I am using insp lot origin 89 for certain inspections. I want to split the inspection into two types.I want different number ranges for those inspection types.
    Hence I think I should create new inspection lot origin by copying from '89' so that I can assign different number ranges to them.
    But I don't find the way to create insp lot origin.
    Pls advise.

    Hi Greetings
    As per standard SAP, you can not create a new Inspection type origin.
    The inspection lot origins are predefined by SAP in Customizing for Inspection Lot Creation. You cannot define your own inspection lot origins.
    Hence it not possible t assign different number ranges as you requested.
    Help.sap link
    http://help.sap.com/saphelp_47x200/helpdata/en/be/00bbd5ca5311d2961800a0c930e04c/frameset.htm
    Gobinathan G
    Edited by: Gobinathan Govindarajan on Nov 5, 2008 6:28 PM
    Edited by: Gobinathan Govindarajan on Nov 5, 2008 6:31 PM

  • Individual qm order for each insp lot

    Hi, i want system to generate individual qm order for each insp lot generated. please advise what are the steps involved here. thank you.

    Dear Raju
    Please follow the steps
    1) Maintain tick for individual QM order in Material master in QM view
    2) SPRO > QM > Quality inspection > Inspection lot creation >  Maintain inspection type >  order type as QL02
    when the inspection lot is created QM order will be created and you can post the cost
    But make sure that the inspection lot has an account assignment  (cost center specified in the purchase order )
    Regards
    Gajesh

  • REPORT TO CHECK DIFFERENCE G.R DATE AND U.D DATE FOR A INSP LOT

    Hi
    I want to track how many dates it has been taken to clear a insp lot for a G.R. So I am looking for a report which shows these days or a report which have G.R date and U.D for inspection lot.
    Please guide if there are any reports for this.
    Thanks
    Dhananjay

    Dear Dhananjay
    This is available in MCXA, MCXC report as lead time. Lead time is nothing but time taken for clearing the lot after GR
    Regards
    Gajesh

  • BAPI for Creation of inspection lot

    I have two scenario:-
    1.Can any body help to find BAPI for creation of Inspection lot for the material under PO envisaged for PDI.
    2. Can any body find me a BAPI or FM which can creates inspection lot in QALS table without inspection lot origin under 01 i.e. 0101 or Z01SI01.
    My objective is to creation inspection lot without assigning Inspection type of Z01SI01 or Z01SI02 and so on in the material code under a respective Plant 1004 or 1005 0r 1006 so on.
    In my Z Development for creation of inspection lot BDC is run for QA01 as this code created inspection lot on when material code has inspection type Z01SI01 i.e. location of source inspection and vendr code particular classification under 010 vendor class inspection type Z01SI01. System search both the inspection type for both material and vendor then create inspection lot in QALS table by assiging inspection matching inspection on the lot.
    I want to get rid of assignment of inspection on the materilal. If any BAPI or FM is avalable for creation of inspection without assigning inspection type on material code. I want to create inspection lot in which Inpsection type assignment can be done based on vendor class only.
    YPB

    2. Can any body find me a BAPI or FM which can creates inspection lot in QALS table without inspection lot origin under 01 i.e. 0101 or Z01SI01.
    I am very sure that this is not possible.You can not create inspection lot without inspection lot origin or inspection type.
    Regards
    Sujit

  • Manual creation of inspection lot

    on october 1st  i received the  material (QM is activated for this Material)  2000 qty from the vendor 100011
    system automatically created Inspection lot 2000 qty......in that i i have posted only 1000
    now in MMBE i am seeing 1000 in QI stock now today i have to move the stock from QI to unrestricted.....
    Manually i created inpection lot using QA01 for the Remaining 1000 qty......after that i am clueless how to proceed with pls guide me.............with the following steps.......

    Hi
    Creating Manual inspection lot for the remaining 1000 qty will not prompt for the stock posting. Here u can only record the results for the same.
    For the balance stock posting, u need to go to the same inspection lot( old one which was created for the 2000 qty against GR). To search for this lot, in QA32,
    select the radio button " select all inspection lots"
    Provide the date range. if u are not sure about the dates, keep blank
    provide material, batch etc.
    Now after execution, check the inspection lots for the status SPRQ or SPST
    Select the insp lot & click on Usage Decision. Post the balance stock to unrestricted.
    Thanks
    Sachin

  • Inbound Delivery creation in ECC6.0 through IDoc (DELVRY03.DESADV)

    Inbound Delivery creation in ECC6.0 through IDoc (DELVRY03.DESADV)
    From SCM ICH system Supplier creates ASN on the WEBUI & sends it ECC 6.0 using XI.
    This is Proxy (DespatchedDeliveryNotification) to IDOC (DELVRY03.DESAV) scenario
    But at the receiver end i.e. ECC6.0 its giving me error at Tcode WE02 as action is not supported.
    Can you suggest me how to tackle this issue.
    Thanks in Advance.
    Regards,
    N>B.Shanmukha

    hi,
    >>>giving me error at Tcode WE02 as action is not supported.
    there are many segments in delvry03 with a first field - action (like, delete, create, 001,002, etc)
    check all of them as probably you're using one which is not supported
    and this is the real cause of the error
    you can check it like this:
    open this IDOC in We19
    then open action field and F4 and see if the one you use in the idoc is in F4
    change the wrong one and it will work :for 100%
    Regards,
    Michal Krawczyk

Maybe you are looking for

  • Creating PL/SQL web services from object types

    Hello Jdeveloper, pl/sql web-services working successfully with object types.If we want to send the web-services to the client, do we need to send the entire folder that is created in the web-services folder of the external oc4j..? Creating the clien

  • What is the model number for the Airport Card?

    The Airport card in my late 2008 unibody macbook has broken and I'd like to buy another online, what is the part number?

  • Horizontal scroll bar disappears in URL isolation method iview

    Hello Experts, I am facing a strange problem. In MSS --> Reporting, when the report is generated, it is shown in a new window. That iview is basically having URL isolation method which has been disabled i.e. it cannot be changed(It is an iview create

  • Change the folder structure in Adobe Muse?

    I have a website created in Adobe Muse, but I don't like how all the pages are shown like this in the address bar: http://www.mydomain.com/musefile.html no matter where on the site you are. I'm publishing the site through Business Catalyst, but I'm a

  • Use of CountOfRefreshFailuresTillDisable

    Hi, I have recently run into a problem that requires me to use CountOfRefreshFailuresTillDisable...we've been running into network or DB availability problems that are causing our getConnection call on the DataSource to take up to 8 minutes to fail (