Creation of Inspection Lot in QM Module without inspection lot origin

I want a solution regarding creation of inspection lot without assigning inspection lot origin to material code.
We have developed function which creates inspection lot for the material against which PDI is envisaged on the material of a particular Purchase order. In my view we do not require assigning inspection lot origin on the material code as process has been mapped through Qinfo record. By assigning the inspection lot origin on the material is unnecessary step in our process.
Can any body suggest solution regarding above problem.
Yatindra Bahuguna

Dear,
We have developed function which creates inspection lot for the material against which PDI is envisaged on the material of a particular Purchase order.
Little bit stuck up.... can you explain the above in detail...
As I understood you developed a function -
                     - Which creates material inspection lot
                                         - Which Pre Delivery Inspection applicable on particular purchase order.
YES?
Regards,
Syed Hussain.

Similar Messages

  • Stock Transfer to quality without Inspection lot creation

    Hi,
    I want to do stock transfer from unrestricted stock of Plant A to quality stock of Plant B. However I don't want inspection lot to be created.
    Is this possible?
    I am using Movement type 301 and Inspection Lot of type 08 is active in Material Master.
    If I deactivate QM for movement type, can I post to quality without inspection lot creation.
    Thanks

    Do you have any inspection type setup for material in plant B? If yes then you would be not able to transfer stock in QI without creating an inspection lot. If inspection type is active in material master of plant B(destination) then system would through you error message saying - "transfer stock in QM only". The reason is you would not have an option to move stock from QI using 321 (QI to UNR) in plant B if QM is active. 321 managed by an insp lot.
    If inspection type is not setup in material master at plant B then you would be able to post stock in QI without creating an inspection lot. Then move stock from QI to UNR using 321 (MB1B).
    Hope this clarify you.

  • Change of Inspection Lot Specifications at the time of lot creation

    Hi,
    We are using In-process inspeciton.
    At the time of Production Order release an Inspection Lot is created automatically.
    We want the Lot Specification values to be changed based up on the Configuration of the Sales Order.
    Is there any User Exit or BADI  that can be used for this purpose?
    Ramakanth

    Hii,
    Lot specifcation values cannot be changed once inspection lot is created. If u know specification only after creation of inspection lot then u include unplanned inspection charcteristics. Here u can define spec after lot creation also.
    with regards,
    K.Lokesh.

  • Inspection Char without Inspection lot generation

    Hi
    We are trying to model a customer requirement in PP for which a few production steps have a few characteristics to be monitored (status checked); for example - in a process of "spraying fertilizer", qty of 4 fertilizers have to be noted in the operation. Now these cannot be included in the BOM for some costing issues. We are apportioning the cost using an internal order in FI.
    Can these be modelled in PP as inspection char. for which values (readings) have to be noted without generation of inspection lot?
    Any ideas?
    Deepak

    Hi Deepak,
    One thing you need to clear is that without inspection lot generation you cannot record the values. Instead, you can create the inprocess inspection lot which does`nt effect the actual production, you can record results such as quantity etc.. for each operation for ur reference.
    The secong thing you can do is select any field or the text box that you are not usingit currently in the confirmation and enter the characteristics in that field.
    Final option is to create a document and save it with reference to ur order no. , bom etc..
    Reward if cleared and close the thread.

  • QM - Inspection lot release without inspection characteristic

    Hi experts, have initially created an inspection plan without inspection characteristics and a few lots have been Goods Receipt and inspection lot created. However due to no sample size is being defined at the inspection characteristics level, system is currently expecting:
    Insp lot quantity: 5
    Actual quantity: 5
    Sample size: 0
    Now that the inspection characteristics had been added into the inspection plan. Is there anyway to update the inspection lot to reflect the latest change and allow processing? Or do you have any better recommendation besides reversing GR?

    Hello
    please do the following
    1) Go to QA02, input the lot number
    2) Menu > INspection lot > Reset Sample
    3) Enter & Save
    4) QA02
    5) Inspection specification > Assign task list by click on Task/ specification
    6) Go to Sample, do the SAmple calculation
    7) Save
    Regards
    Gajesh

  • Quality certificate receipt without inspection lot

    Hi Expert,
    I have activated QM control key with certificate type but no quality inspection type activated but will take material in quality inspection through IM.
    In this case where i can confirm certificate receipt.
    Regards,
    sandy

    Dear,
    Thanks for reply pls let me explain the scenario.
    I am taking material in quality through IM, mean i have not activated any stock relevant inspection type but ticked post to inspection stock in QM view.
    Made PO and received the material it went to Quality stock while making GR i have selected certificate received NO as i can select Yes AND NO both are possible.So where i can receive certificate in this case here through movement type i can post material from quality to unrestricted.
    So where i can restricted material should not post to unrestricted before Quality certificate confirmation.
    As per Normal situation when lot is created i have to confirm certificate receipt at either of three steps.
    1.While GR(Yor N) 2.Through QC51 3.Before UD .so generally i confirm certificate receipt before UD and can post material in unrestricted stock.

  • DMR with skip lots & without inspection severity

    Hi,
    I have a requirement where my user needs the DMR at lot level where they do not need the inspection severity to be picked from DMR because the inspection plan has got different sampling procedures for respective MIC's.
    Example:
    Create a inspection  plan with 3 MIC's for a material as shown below which is having active inspection type as 01: Inspection lot against GR
    MIC
    Sampling procedure
    Inspection severity for sampling procedure
    Temperature
    SAMP1
    SEV1 (for 100 lot size, sample size =5)
    Length
    SAMP2
    SEV2 (for 100 lot size, sample size = 8)
    Width
    SAMP3
    SEV3 (for 100 lot size, sample size = 2)
    DMR at lot level is assigned to the inspection plan
    DMR is defined as given below:
    Stage
    Insp severity
    Skip
    Initial
    No. of OK inspections
    New stage if OK
    No. of not ok insp's
    New stage if not OK
    1
    sev1
    yes
    2
    1
    2
    yes
    1
    1
    When a inspection lot is created against a GR for 100 lot quantity for this material then system will show the sample size in the results recording screen by considering the DMR inspection severity for all MIC's as shown below.
    MIC
    To inspect
    Inspected
    Result
    Temperature
    5
    Length
    5
    Width
    5
    My requirement is system should propose me the sampling size as per the sampling procedures assigned to the MIC's in theinspection plan as shown below:
    MIC
    To inspect
    Inspected
    Result
    Temperature
    5
    Length
    8
    Width
    2
    Lots should be skipped normally as shown in the DMR but sample size should be calculated from the sampling procedure assigned to the MIC.
    Please help me out if there is any standard practice in SAP for this requirement.
    Thank you.

    Dear Craig,
    I am concerned about the sample size calculation here.
    Yes I have defined three seperate severities for those sampling procedures.
    Each sampling procedure has many inspection severities assigned to it and I am defining the default inspection severity in the additional tab of sampling procedure so that where ever i use the sampling procedure automatically the default inspection severity will be considered for calculating sample sizing,
    For example:
    I have assigned normal, reduced, tightened and loose inspection severity to SAMP1 sampling procedure, then here I will default the inspection severity for the sampling procedure as reduced inspection. In this case where ever I use SAMP1 sampling procedure automatically reduced inspection severity will be considered for sampling sizing.
    Similarly, I have assigned normal, reduced, tightened and loose inspection severity to SAMP2 sampling procedure, then here I will default the inspection severity for the sampling procedure as loose inspection. In this case where ever I use SAMP2 sampling procedure automatically loose inspection severity will be considered for sampling sizing.
    The procedure which I have given above is standard practice in SAP, but here I want to assign DMR at inspection lot level.
    DMR: If 1 lot is created then 3 lots should be skipped. Here inspection severity should not play any role.
    Inspection severities should be picked from the sampling procedure assigned to the inspection plan and sample size should be calculated as per the default inspection severities assigned to the respective sampling procedure for an MIC.
    Thank you.

  • I can change system status without canceling lot,,"CRTD CHCR SPRQ"

    HI
    A insp lot have (System status) "CRTD CHCR SPRQ" system can not allow for any recording at the lot,, But Question is that i want to change status without cancleing this lot, Have any idea for this lot status.. "CRTD CHCR SPRQ"
    thanks Expert
    regards
    kazz

    Hi kazz, i can't tell if your issue was resolved but if not then you should check the 'valid from' date on the ECM used to setup the inspection plan.  this is assuming that you are using ECMs to create inspection plans and maintain revisions on the material.  the valid from date on the ECM used to create/assign the inspeciton plan to the material must have a date that is equal to or before the valid from date on the ECM used to assign the revision to the material.
    for example,
    ECM 123 has a valid from date of 01.01.2013 and was used to assign revision A to the material
    then the ECM used to create/assign the inspection plan to that same material must have a valid from date of 01.01.2013 or prior...otherwise SAP will not find a valid inspection plan that's valid on the date for the inspection lot and revision of the material in the inspection lot.
    hope this helps!
    nicole land

  • How can I set the gain on a SCXI-1102 module without having my computer lock-up for 3 seconds?

    Forgive my insolence, but did it never occur to anyone that spinning in a hard loop while polling a status register to set a gain for 3 seconds isn�t a great idea?
    I have a number of SCXI-1102 modules to set the gains on, and it takes several seconds for each. Reading the documentation on the subject indicates that the SCXI_Set_Gain call polls a status register waiting for the gain to settle before returning � and it doesn�t even yield while doing so.
    Are there any other ways I can set the gain? Is there a way that doesn't poll the register that returns in a reasonable amount of time?
    AFAICT, there's no good reason to only allow one module to be s
    etting its gain at a time. An asynchronous call it really needed - one that makes it the API programmer's responsibility to check the status of the register, or one that spawns a thread and sleeps between polls, and signals an event or invokes a callback or some-such-thing. Or you could even just sleep for three seconds after setting all the gains, this way the delay would be 3 seconds total � not 3 seconds for each gain set.

    This NI-DAQ function call directly accesses the nidaq32.dll. While the nidaq32.dll is multithread safe, it is not a multithreaded DLL. This is also described in the KnowledgeBase entry 1V9DSHDM: "Can NI-DAQ Handle Different Operations at the Same Time? Is It a Multi-threaded DLL?"
    You are correct that the SCXI_Set_Gain function is not asynchronous. Thus, you do have to wait till that function returns before calling the next one. LabVIEW has found a way around this. So, you can actually use the LabVIEW functions to set the gain on these modules without having to wait as you do with SCXI_Set_Gain.
    Regards,
    Geneva L.
    Applications Engineer
    National Instruments
    http://www.ni.com/ask

  • What is the best way of accessing application module without page binding?

    Hi All
    I am using Jdeveloper 11g R2 (11.1.2.3) & Weblogic 10.3.5.0
    What is the best way of accessing application module without page binding?
    In my application after user authenticated from LDAP
    I need to read some information from database and set my menues.
    Thanks
    Mohsen

    Hi,
    if you don't have a binding the I am not sure the binding context is created. Anyway, try
    BindingContext.getCurrent().findDataControl("name here as ID in DataBindings.cpx") and see if it returns a valid instance
    Frank

  • One insp lot per day for 04 inspection

    Hi,
       In finished material insp type 04 is active, a production order run for several days, each day several GR is done for that production order, I want only one inspection lot everyday for each order. Please let me know how to do it?
    Regards
    Syed

    Hi
    See
    Several lots will be created but System will do the UD for the rest of lots.
    I thiough this is what your requirement was.
    or
    if only one GR  is to be created then in QM view-->inspection type 04
    in inspection control maintain
    'Y' An inspection lot for an early goods receipt inspection
    This setting is only relevant for inspection lot origin 04.
    But this will not create only one lot per day.this is one lot per Production order.
    Regards
    Sujit

  • Material without inspection setup goes to quality inspection

    Hello Gurus
    We have material without inspection setup, but the system say the stock type is Quality Inspection.
    Then we get problems in the goods receipt. We checked the PO has stock type quality inspection, how can we solve this situation?, please give advice.
    Best Regards
       Jimmy

    Hello,
    No changes like you mentioned, the problem is if you create a PO with some materials the system says the stock type is Quality inspection , then at GR we are dealing with problems, but the material do not have flag for inspection and also the PO has the stock type Quality inspection, so if you create a new PO it will go to Quality inspection...

  • QI Stock without Insp Lots

    Hi QM Champs,
    My problem is that as per requirement of my client i mapped Inventory Posting VMENGE08 to post Other Quantity( NON-Valuated stock ) to Un-restricted use stock with movement type 311 from Q stock specified in QM config. This scenario is running fine in development and quality Servers, but after Live when i look at the posting done at VMENGE08 are gone to Quality Inspection Stock and there is no Inspection Lot for that.
    Is there anything gone wrong ??
    Sanjeev Sehgal

    My guess is that in your develpment/quality systems, the tick box for "QM inactive" is ticked on for MT 311 while in production it is not.
    Please check that in config for material movements.
    If you look via QA32 for lots with a CRTD status I suspect you'll find some '08' inspection lots sitting out there.
    You might have the material mastes set up differently.  It might be possible that you have the 08 inspection type set up in production, but not in the development/quality systems.  And it may be that the 08 SHOULD be set up for other business processes so that doesn't mean that is really wrong.  Only the business would know that.
    Craig

  • I have been using Macromedia Contribute 3 to maintain my website so my needs are pretty simmple. But I would like to upgrade but don't know what to download. I want the new software to handle my existing website without a lot of challenges. What do you re

    I have been using Macromedia Contribute 3 to maintain my website so my needs are pretty simple. But I would like to upgrade but don't know what to download. I want the new software to handle my existing website without a lot of challenges. What do you recommend?

    Hello,
    There is no upgrade path available from Macromedia Contribute 3 to Adobe Contribute 6.5. However you can buy the latest version of Contribute which is 6.5 from the link mentioned below.
    http://www.adobe.com/products/contribute.html
    Regards,
    Rajeev

  • Why can't I see the Lightroom Presets in the Develp Module without having an image open?

    Why can't I see the Lightroom Presets in the Develp Module without having an image open?

    If it's in the Spam mailbox, then Spam Mailbox would show there.
    In my example above, I'm looking in the Sent Mailbox as a whole (main mailbox, not the subfolder account) and it's showing the account I sent from. If I had sent messages from my other accounts, it would show those also. The only purpose of showing the mailbox in the message list is to know which of your accounts it's to or from when you have multiple accounts. If you only have one mail account, then it provides no use to have Mailbox shown in the message list.
    When you are looking at the Sent Mail, then the message list shows the person who it was sent to.
    All other mailboxes show the person who the message was sent from in the list.
    Unless you're moving recieved mail and sent mail to a common mailbox, then it's not a big deal.
    Maybe Apple will change it in the future to show the actual Fields in the message list.

Maybe you are looking for

  • Addning new properties in customization file of OSB

    Hi, We have option to find and replace few properties of proxy and business services in OSB through customization files. Our requirement is to have few additional properties like client certs, https enabling which are not available when a customizati

  • Nokia X6 simple question to start with

    Hi, just bought a X6 and struggling like many. I think I know how to use the GPS (will try this weekend) but I am used to the GPS pointing towards the actual position, not the north. A car GPS or a Tomtom point in the direction you're going or pointi

  • My Movie Won't Start on Frame 1? Newbie

    Hi! This is my first shot at creating a flash website. I have three layers and I've divided the timeline up into sections so I have one for Contacts, Press, News, Home, etc... However, the home section starts on frames 1-10 but whenever I test the mo

  • Net value changes......,

    Hi gurus, I have a problem in Netvalue KF..., when i am trying to upload data from flat file which resides in application server.., i have 3 KF related to price..., i have the data like the following..., 1stKF    2nd KF     3rd KF 837,23    9834,75  

  • New doc facing pages?

    I'm trying to simply create a new doc starting on page 2 with facing pages. I can handle all except for the start page being 2 (or any even number). The resulting document has to be manually re-numbered starting with 2. Any way to create the new doc