Creation of lot with 04 type

Dear Gurus,
Can we control the creation of Inspection lot with the control key in routing for a production Order.
Our requirment is system should create a inspction lot when a particular key is defined in routing.
Please tell the step by step config
regards
Aadi

Can we control the creation of Inspection lot with the control key in routing for a production Order.
Dear Creation of inspection lot is depends on Inspection type 04  and it's settings for a production order which we assign in MM QM view but we can control with control key when exactly we want to create a lot whether at production order confirmation time or at the time of header material GR time.
Our requirment is system should create a inspction lot when a particular key is defined in routing.
If you activated 04 inspection type and post to quality inspection tick activated in MM QM view and  it is a Auto GR and mile stone confirmation key is assigned in routing last operation when you confirm the production order it will post the header material to QI check in MMBE and create a lot check in QA32.
If it is not a auto GR control key which is assigned in last operation then at the time GR for production order through MB31 or MIGO it will generate inspection lot based on 04 inspection type and 101 movement type settings.
Cheers
KK

Similar Messages

  • Inspection lot creation during GR with respect to Purchase Order

    Dear Experts,
    Here is my Question
    Inspection lot creation during GR with respect to Purchase Order
    Inspection type 01 set in the material master
    inspection lot will be created during GR for a Purchase order
    from my understanding for every GR a inspection lot will be created
    No batch Management
    but the requirement is irrespective to GR qty and number of times of GR
    we need inspection only one inspection lot
    For Instance
    There is a PO for 1000 kg no batch management
    now i do GR for 100 kg for 10 times with different dates
    now i need to have only one inspection lot
    not 10 inspection lot for each 100 kg
    can any one suggest a solution, please advise my understanding is correct
    Many thanks
    Raj

    Dear Raju,
    There is a solution for that .The setting can be done two ways, either in the material master or in the configuration
    1) Material Master
    MM02> QM View> Inspection Setup> 01> Control Insplot> 'X' An inspection lot for each purchase order item/order item 0r  An inspection lot for each material document and material
    a) 'X' An inspection lot for each purchase order item/order item
    This Means
    This setting is limited for use with the inspection lot origins 01 and 04.
    An inspection lot is only created during the first goods receipt for each PO item or production order.
    b) '1' An inspection lot for each material document and material
    If you set this indicator, the system creates only one inspection lot for a material document (in a goods receipt transaction) for each material. This setting is useful, if several purchase orders or partial deliveries are processed for the same material in a goods receipt transaction.
    2) You can do this default in the config
    SPRO > Quality Management >  Quality Inspection > Inspection lot creation >  Define Default values for inspection type > 01> Control Insp lot
    Hope this helps
    Regards
    gajesh

  • Automatic UD for the in-process lots with 03 inspection type

    Kindly provide me the list of steps to perform the Automatic UD for the inprocess lots with 03 inspection type.
    AYK

    Hello,
    please find the steps
    1) QA41
    2) Create variant - give a name to the variant
    3) click on create
    4) give the plant
    5) condition for orders.
    6) Usage decision catalogs(selected sets, UD code , code group, UD plant)
    7) Save with a variant name
    8) Shedule as u do normaly
    Hope this helps
    Regards
    Gajesh

  • Creation of Recurring Inspection Lots with Serial numbers

    Hello,
    We have the following scenario at our client :
    <i>MIGO_GR</i> is used to create GR for materials with Serial number requirement. The serial numbers can be generated automatically or manually entered on the screen. At this point of time, the Shelf Life expiry date & Next Inspection date are calculated based upon the Production date. The Batch gets created with Next Inspection date, Inspection Lots are created and the Serial numbers are assigned by the system. The stock moves into QI.
    The stock is moved from Quality restricted to Unrestricted stock via <i>QA11</i>. The serial numbers are handled by the system or can be managed on screen.
    Transaction <i>QA07</i> (Deadline Monitoring of Batches) is used to create Recurring Inspection. QA07 gives error message IO304 that "<b>Only 0 serial numbers entered instead of 1</b>". The problem is that system doesn't pick up the corresponding serial numbers.
    OSS # <u>497845</u> mentions that Transaction QA07 can not handle serial number. The serial numbers are very critical to the business process.
    Has anyone come across this situation before ? Please suggest solution or workaround. I tried using BAdI "<b>INSPECTIONLOT_UPDATE</b>" & was able to create Inspection Lots with serial number assignment, also manipulated Batch to change the Next Inspection date. The problem is Material Movement (322) Document does NOT get created.
    Also tried implementing BAdI as per OSS # <u>608830</u> but doesn't give desired results.
    Any help is greatly appreciated.
    Best Regards,
    Homiar Kalwachwala.

    Hello all,
    Just wanted to bring this on top to be noticed.
    Would appreciate any help, suggestions...
    Regards,
    Homiar.

  • Contract creation in Backend with Idoc message type BLAORD

    Hello,
    We are creating Backend contracts from the Bidding engine functionality. We only want to create backend contracts and did the necesary configuration.
    We activated BADI: BBP_DETERMINE_LOGSYS
    Method CONTRACT_LOGSYS_DETERMINE.
    We did not yet implement BADI:
    BBP_CTR_BE_CREATE in SRM 5.0
    In SAP R/3 Backend system (Version 46C) we see SAP is trying to create a contract via Idoc message Type: BLAORD.
    In the trx BD87 in the backend we get status 51 :
    Mesage number: 00 055
    "Make an entry in all required fields"
    In the segments of the Idoc however we do not see which field is missing!
    How can we best analise this problem. Or maybe anyone can give us a a hint what is missing.
    Thanks for any reply.
    Aart

    Hello RRK,
    In ref. to your mentioning to change the backend configuration from WKK to MKK might not be as easy to do for organizations.  As those configurations effect the overall creation of purchasing document types in R/3. 
    The Key issue is why the "Target Value" in the Header of the SRM GOA does not get transferred to the R/3 contract.  That's why the issue is still there. 
    Were you guys able to figure out why that was missing? In the BLAORD IDoc the Target Value seems to not get transferred from SRM - its 0.00 if the IDoc is reviewed in WE19.  This seems to be the problem.
    Just wanted to know if you see the same issue in ur system.
    Thanks.
    Sunny.

  • Inspection lot with stock tab for sale return from customer.

    Dear,
    In our organization there are two scenarios,
    1)     Make to order- Strategy group -20
    2)     Make to stock- Strategy group -10
    I have maintained 05 inspection types in QM view for sale return inspection from customer.
    1) In make to order scenario Inspection lot created with inspection stock tab which is OK.
    2) But in make stock scenario no inspection lot is generated.
        Remember I donu2019t want inspection lot without inspection stock tab as per insp. type-06
    So please suggest me, what can I do for getting inspection lot with stock tab for make to stock scenario.
    Regards
    Shabbir Kureshi

    Hi
    QCC0>Quality inspection>Inspection lot creation>Inspection for shipping>Assign Inspection Lot Origin to Delivery Type-->aganist delivery type Enter 05 inspection lot origine
    Also in OMJJ check whether QM in active for mnt type 651
    Regards
    Sujit

  • Want to do mass processing for inspection lots with status SPRQ

    Hello,
    My company using early lot creation for 04 inspection type. We have thousands of inspection lots with status "UD   ICCO SPRQ PRII PRSI STUP". Now due to SPRQ status, system is not closing process orders associated with thousands of inspection lots.
    Is there any transaction where I can do mass processing of inspection lots to change the status "SPCO" from "SPRQ"?
    Thanks
    Bhavesh

    Dear Bhavesh
    You may have to modify the standard program to do so. Modify this program RQEVAI30.
    This can help you
    Regards
    gajesh

  • Restricting Sales Order Creation for Customers with specific AccountGroup

    Hi
    We have 2 Accont Groups for Customers namely Actual & Prospective.
    We wish to allow Enquiry / Quotation and Order creation for customers with Account Group ACTUAL and wish to allow only Enquiry and Quotation creation for customers with Account Group as Prospective.Is there anyway i can apply Sales Order creation block on an ACCOUNT GROUP on whole and not on Individual customers...
    Regards
    Sanjeev Bagaria

    Hello
    I did this through Listing Inclusion / Exclusion.
    (1) We created a new Customer Group 99 for Prospective Customer
    (2) We then created a new Condition table xxx with Customer Group & Material Type(as footer)
    (3) We then created this new Access Sequence Customer Group / Material Type to Exclusion Procedure B00001
    (4) We then assign the Exclusion Type B00001 to Sales Documents ZDOM & ZEOR our Order Sales Documetn Types
    (5) And finally we created a record for Exclusion with 99 Customer Group and Material Type as FERT..
    This now restricts creation of Sales Orders for all my Prospective Customers provided Customer Group is maintained in Customer Master. We are now also able to make Enquiry / Quotation and Sample Sales Order for Prospective Customers sicne we have Different Sales Document Types for all these and have assigned Exclusion only to normal Sales Order Document Type.
    Thanks a lot for all the suggestions provided.
    Regards
    Sanjeev

  • Creation  of PO with reference only

    Dear Fiends,
    Can anyone explain,how can we make creation of PO with Reference to PR mandatory for Certain documents types of PO.
    Regards
    SAPMM

    Hi,
    Copy the field selection key NBF(Define screen lay out at document level in spro>Matmgmt>Purchasing>Purch.order>)
    In new field selection key go to reference data item and make mandatory to PR
    Define some PO document type and link this New field selection key at "define document types"
    Regards,
    Sattuj

  • Creation of PO with referance to PR

    Hi,
    I have one requirement,
    Creation of PO with referance PR,but the condition is
    1.It should take the qty from PR
    2.Price should from PIR
    3.This requirement is specific to one Document type ,PR has been created fro MRP and then need to convert the PR to PO.
    I tried with Functional authorization,it is working fine but it is having effect on other document types also.
    Can you please suggest me is there any User Exit available for this.
    Thanks In Advance.
    Jagadish

    Hi
    First configure Release Statergy such that All PR's generated from MRP should be converted into PO  with out Release Procedure  and Other manually generated PRs should be converted in to PO after Release Procedure only......( For that you have to create Doc.type as a one charecter....Table: CEBAN...Field: BSART  and MRP generated PRs should have one document type and Other manually created PRs should have diff. Doc. type)
    Then follow the below steps..
    1)In Material Master,Purchasing view....you maintain Purchasing Group and Check Auto PO Check Box.
    2)In Vendor Master,Purchasing Date view Maintain Purchasing group and check Auto PO Check Box..
    3)Maintain Proper  PIR with Valid Conditions
    Then after creation of PR from MRP...assign source for the PRs IN ME57..
    If you configure release Statergy  such that PRs generated thro MRP need not under go Release procedure ....then go to T.Code: ME59  and convert all PRs in to PO...
    In this way without having any user exit you can solve your problem...We are doing in this way only..
    Reward if useful
    Regards
    S.Baskaran

  • Creation of new condition type: MWST

    Hi, Everyone.
    I would like to ask for some help regarding this issue: Creation of new condition type: MWST with the following details:
    1. For the country French Polynesia, Create a new VAT condition of 10%.
    2. Create a new one called : Class : Z u2013 Designation : France : TOM corresponding to 10 % of VAT to be invoiced
    and then associate this new VAT code u201CZu201D to the applicant Nr 221860
    If you could provide me a step by step process on how to resolve this, it would be very much appreciated.  Thank you so much.

    Hello
    What type of condition type you want.
    It is always advisable to create a new conditon type copying a standard condition type.
    For gross price condition types select PB00/PBXX
    For freight charges, Copy FRA1/FRB1
    Regards

  • 04 inspection lot with status SPST

    Dear Experts,
    We are using Handling Unit (HU) functionality in FG material,
    1. We create HU's (say 50 HU's) using tcode COWBPACK,
    2. On creation of HU, an inspection lot of type 04 is created for 50 HU's.
    3. In regular scenario, we do GR of all 50 HU's using tcode COWBPACK,
    4. All 50 HU's are posted in to unrestricted & UD is given using tcode QA32 & status UD SPCO.... is updated in inspection lot,
    5. The HU posting in unrestricted can be happen before GR also (which observes no problem),
    But in rare scenario, we need to cancel / delete the some of HU's at that time following steps are involved -
    1. We create HU's (say 50 HU's) using tcode COWBPACK,
    2. On creation of HU, an inspection lot of type 04 is created for 50 HU's.
    3. HU posting in unrestricted is done for 45 HU's (System status SPST is updated in inspection lot),
    4. Balance 5 HU's are deleted from system using tcode HUMO,
    5. UD is given to inspection lot & status UD SPST.... is updated in inspection lot.
    Now the problem is, after settlement & variance calculation of production order when we try to update status CLSD (Close) in production order the system give an error "Inspection lot 040000XXXXXX for order XXXXXXXX has not yet been completed" this is due to system status SPST is there instead of SPCO.
    As the 5 HU's are deleted hence the stock posting can not be completed. Even we can not cancel the inspection lot due to status SPST.
    Please suggest how to resolve this issue to update the status CLSD in prodction order.
    Thanks in advance,
    Leena.

    See if these OSS notes help you
    Note 622758 - Stock posting cannot be completed (HU)
    Note 532946 - HU lots: Status SPST f.stock proposal in usage decision code

  • Inspection lot with 01 origin for stock transfer (Intra company STO)?

    Hi Sap Gurus,
    As per standard SAP configuration for 101 movement type, 08 is the inspection type used for stock transfers (Intra company STO). But, there is a requirement from business to use 01 for Intra STO. Is it possible to get an inspection lot with 01 origin while GR to the delivery created for Intra STO ( Stock transfer B/n plants from same company code)?.
    Thanks in advance
    Venkat V

    Hi All,
    Thanks for your replies..
    Its STO Purchase order between two plants under same company code. System triggers movement type 101 with movement indicator B - Goods movement for Purchase order and Receipt indicator X - Stock transport order. Here system expects inspection lot origin 08 as per standard SAP configuration(OMJJ).
    I just wanted to check, is it possible to get inspection lot from 01 origin for this type of stock transfers. If anyone who worked on this area, please share your inputs. 
    Thanks in advance
    Venkat V

  • Creation of PR with MD01

    Hi,
    Somebody knows if exists some parameter that allows the grouping creation of PR with transaction MD01? In my customer, the MD01 creates one PR for each material
    Thank you!

    Dear !!!!!
    I think the Possible Entry u can Make Individual/ Collective requirement = 2 Collective in MRP4
    Also if you want all requirement to get add monthly or by weekly then it can be get instead through lot size
    As in yours cases you want monthly then make MB in MRP1 view .Keep lot size MB.
    This will create only one PR for the entire month.
    Revert Back!!!!!
    With Regards
    Pushpalas
    Edited by: pushpalas on Oct 1, 2011 2:29 PM
    Edited by: pushpalas on Oct 1, 2011 2:36 PM

  • Why am I not able to do anything with Hotmail?? Go across the parking lot with a 3/4 inch pipe about 20 inches long and persuade the microsoft ******** to knock

    Hotmail is completely dysfunctional since the start of this week!! Go across the parking lot with a 3/4 inch pipe that is say 24 inches long and persuade them from screwing up the system!! If windows explorer was not a virus magnet maybe more people would use it. I don't care what they call it each year but windows is a horribly flawed op system thanks to YOUR BUDDY William Jefferson Clinton forcing them to disclose the code and rolling out the "welcome mat to every hacker in the universe so that they could write all types of malware imaginable. I just want to be able to open my email without having to switch rendering engines!

    Clear the cache and the cookies from sites that cause problems.
    "Clear the Cache":
    *Tools > Options > Advanced > Network > Cached Web Content: "Clear Now"
    "Remove Cookies" from sites causing problems:
    *Tools > Options > Privacy > Cookies: "Show Cookies"
    Start Firefox in <u>[[Safe Mode|Safe Mode]]</u> to check if one of the extensions (Firefox/Tools > Add-ons > Extensions) or if hardware acceleration is causing the problem (switch to the DEFAULT theme: Firefox/Tools > Add-ons > Appearance).
    *Do NOT click the Reset button on the Safe mode start window or otherwise make changes.
    *https://support.mozilla.org/kb/Safe+Mode
    *https://support.mozilla.org/kb/Troubleshooting+extensions+and+themes

Maybe you are looking for

  • How can I add a character globally to empty cells in an InDesign table?

    I have a document with 190 tables, each with many empty cells. Client now wants m-dashes in the empty cells. Is it possible to do this in an automated fashion, without having to go cell-by-cell?

  • IDOC Status:30

    hi I am sending Idoc other sap system Giving Error IDOC Status:30 IDoc: 0000000000252153 Status: IDoc ready for dispatch (ALE service) Receiver exists , No filters , No conversion , No version change Plz any solution s Thanking you Ram

  • Problem with that: 'MOLKPO+Calibri'.

    Someone can help me with that? I can´t open a file with Adobe Reader from my emial because I received the next mesage: No se puede extraer la fuente incrustada 'MOLKPO Calibri'. Algunos caracteres podrían no mostrarse o imprimirse correctamente. Than

  • CONVERT_OTFSPOOLJOB_2_PDF ?

    Hi all, When I developed smartform I kept particular printer in mind. Now since the client wants to print it on diffrenet printers, the allignment is going to change. I came to know about a function called, CONVERT_OTFSPOOLJOB_2_PDF which will conver

  • Runtime Error R6025 and DAQ-Driver

    Operating System Windows2000 Teststand  Version 3.0 DAQ-Driver  6.9.3f5 Serial Driver  1.7 LabvIEW RTE build with LabVIEW 6.1 hello, we have build a testsytem based on LabVIEW and Teststand. We use the NI-PCI boards 6713, RS232/16 and MIO-164E. We do