Creation of new cost center record

Hi All,
Using PP01 we are copying the current cost center record and changing the enddate to 12/31/9999 on the new record.  but when i go into PA30 to look at them, it is creating an extra record with different date and even it is not allowing me to delete the record (Message as :  Cost Center dones not exist). 
Appreicate your help.
-suresh

Hi,
I am not sure wheather we (HR) create the cost centers .It is to be done thro T.Code KS01 (FICO)., and anyway if you are able to then not able to delete it then go to T.Code kch6n..again a FI transaction  select extras from the menu bar and click on 'Ambiguity' which should solve your problem
Regards
Uday

Similar Messages

  • How to use new cost center field, new profit center field, new account field?

    As I create a new change request of adding new GL account, or that of new cost center, or that of new profit center, I normally enter the new GL code GL01, or new cost center CC01 or profit center code PC01 in "General Data" section on the change requst screen,  these codes (GL01, CC01, PC01) are landed in ECC upon data replication.
    I do see there is another field called "New Account" of GL change request, or "New Cost Center" of CC change request, or "New Profit Center" of PC change requst all of which is under "Administrative Data" section. I have never used it. but I was wondering what the purpose it will serve and how should I use them.
    Please advise,
    Thanks,
    LUO.

    Hi Kiran,
    Thanks for the info. I don't quite understand though. could you tell me more about the usage of each? Why it is used when GL or CC or PC is blocked? Would the new cost center code entered replace old cost center master record?
    Thanks,
    LUO 

  • I would like to insert new cost center for the existing layout in BCS

    Hi,
    I would like to add cost center to existing layout.
    Currently we are loading data into BCS using flat file .
    In BCS we have current layout existed with below format.
    Header
    Controlling area
    Fiscal year
    Posting period
    Data Rows
    Company 
    Item
    Profit Center 
    Functional area 
    Trading partner 
    Period Value LC 
    Period Value GC
    Even we are getting flat file from R/3 as above format.
    Now our Business required cost center in BCS as their requirment and need to be bring from R/3 to BCS.
    In R/3 our ABAP people are working to bring the cost center from R/3 and made a flat file for us.
    In BCS we need to load the file which has new cost center,which was comming as per the new requirment.
    Please advise me how to add cost center in  Data Rows of BCS.So that it can accomidate new cost center which is comming from R/3.
    Please some advise me on this and answer would be appreated.

    Prasad,
    I knew how to add char to cube in BW.But i am not sure about BCS .
    - What's the difference in assigning the infoobject (CostCenter) to the infocube, doesn't matter if it's the basic (ordinary) or the BCS totals cube?
    I will follow as you said.
    - Taking the BW310 or SEM240 is very useful.
    Once it is done then what are the next steps need to do it.
    - What's done? What's the question?
    I am assigning points to you
    - I do not need the points assigned for nobody knows what. Feel free to unassign them.

  • How to configure new cost center..

    HI
    my problem is untill now i used old cost center, to day onwards i want use new cost center... how to modify in my cost element in cost center.
    i want to modify my old cost center and put new cost center.
    Thank you.
    Ashok kumar

    hi Anil,
    Check your settings in the Transaction code OKB9. In this transaction, default cost centers are maintained for each Company Code and Cost element.
    Else you have defined default cost centers in your Cost Element. In such Case, use t-code KA02 and change the cost Center
    If you satisfied with the reply then plese assign points.
    Regards
    Mahendra

  • Regarding new cost center

    HI
    my problem is untill now i used old cost center, to day onwards i want use new cost center... how to modify in my cost element in cost center.
    i want to modify my old cost center and put new cost center.
    Thank you.
    Ashok kumar

    hi Anil,
    Check your settings in the Transaction code OKB9. In this transaction, default cost centers are maintained for each Company Code and Cost element.
    Else you have defined default cost centers in your Cost Element. In such Case, use t-code KA02 and change the cost Center
    If you satisfied with the reply then plese assign points.
    Regards
    Mahendra

  • To find out recently new cost center

    Hi all,
    I have a problem that I had updated one request new data(it's like 200904 transaction data) to cube,
    while the inexistent cost center in master data is added(0Costcenter).
        The problem arise,how could i find out which new cost center is added to 0costcenter,because I
    need to listed those new cost center to user.
        Thanks.

    in the maintain master data screen for cost center give all the attributes a restriction to initial value.
    once you get cost centers search with them in the infocube and take out final list from there.
    or you write a abap report to check cost centers which have all fields initial and get it in a file.
    data: itab type standard table of /Bi0/pcostcenter with header line,
            itab2 type standard table of /Bi0/pcostcenter with header line
    select * from /Bi0/pcostcenter
    into table itab
    where objvers = 'A'.
    loop at itab.
    if itab-BUS_AREA is initial.
      if itab-0COMP_CODE is initial.
    .... keep checking for all the attributes.
         .... if all atributes are initial
          append itab to itab2
      endif.
    endif.
    endloop.
    CALL FUNCTION 'GUI_DOWNLOAD'
    EXPORTING
    filename = <give file name here>
    write_field_separator = space
    TABLES
    data_tab = iout
    EXCEPTIONS
    file_write_error = 1
    no_batch = 2
    gui_refuse_filetransfer = 3
    invalid_type = 4
    no_authority = 5
    unknown_error = 6
    header_not_allowed = 7
    separator_not_allowed = 8
    filesize_not_allowed = 9
    header_too_long = 10
    dp_error_create = 11
    dp_error_send = 12
    dp_error_write = 13
    unknown_dp_error = 14
    access_denied = 15
    dp_out_of_memory = 16
    disk_full = 17
    dp_timeout = 18
    file_not_found = 19
    dataprovider_exception = 20
    control_flush_error = 21
    OTHERS = 22.
    you will get all cost centers which doesn't has any attribute

  • How to add new cost center to cycle segments

    Hello SAP Gurus,,
    How to add new cost center to cycle segments?
    needed badly and ASAP

    Hi
    Go to KSu2 and give the cycle name ad select the segment that you need to add cost center.
    If you are deal with cost cneter groups add new cost center to your cost center group KSH2.
    Kesh

  • New Cost center Time-interval getting deleted automatically in Asset master

    Hi Friends,
    While changing the cost center in the asset master data with a new time interval, the check-box 'Deletable' gets automatically ticked and the new interval gets deleted and the new cost center is updated in the old time interval. The check-box is greyed out and cannot be edited.
    The right-most check-box in the 'More Intervals' button in the second tab of the asset master is the 'Deletable' check-box (Field Name: RA02S-XDEL).
    Please help me to make the check-box editable or help me to remove the default tick in the check-box.
    Regards,
    Shilpi

    Hi Murlidhar,
    Thanks a lot for the response.
    If the check-box gets deselected when we press the 'Save' button, still the new interval is getting automatically deleted.
    Earlier this was not happening, the new and the old interval was getting displayed separately. There are instances in the system, where both old and new interval is displayed.
    Of late, we notice that the new interval is getting deleted as soon as we save it.
    Please help to retain both the intervals.
    Regards,
    Shilpi

  • New Cost Center trigger

    I need sample code to implement a trigger so that when a new cost center (dept) value to the accounting flexfield is added, then it fires off and creates the corresponding row in the fnd_shorthand_flex_aliases table
    Does any one know how to create it?
    Thanks,
    Chiru

    Hi All,
    I create a trigger to insert data into the fnd_shorthand_flex_aliases table, if a new flex_value is created in the fnd_flex_values and fnd_flex_values_tl.
    However, I am getting the error:
    ORA-04091: table fnd_flex_values is mutating, trigger/function may not see it.
    More than likely it is due to the fact that I am trying to query the table fnd_flex_values to insert into the fnd_shorthand_flex_aliases table, while inserting into it at the same time.
    Does any one know how to get around this?
    Thanks,
    Chiru

  • New Cost Center

    Dear All,
    Scenario :
    New cost center or new location or new office has built by organization , how to handle this scenario without interference with existing database entries ?
    Is the following option is correct ?
    To create new database and punching entries in that database for new location or new branch.

    Hi
    Thats purely ur managment policy and decisson based.
    See as u said by defining numbering series, Diff G/L acc, Cost Centre,whse we can achive simply, finally management  will get consoldiated P&L as well Profit Centre wise also for all Profit centre wise...
    If they want to maintain different DB then that also ok, finally there is no option for consildaation the P&L,TB without Some addons....so this factor u have to look when u r going for different DB for same Business process.
    Some Companies will have lot of constraints like this branch sales details, customers and their details should not be shown to other branches but to achive this in default B1 it is tough to achive...so u have to think in multiple angle which is best.
    Cheers
    Giri

  • Creation Of new profit center group

    Dear Experts,
    I would like to know who will create profit center group. What is the role of an abaper in creation of profit center group. How much time will it take to create a new profit center group.

    Hi,
    Certainly, not. It's not a major development, but a standard data maintenance. Even for reporting, standard ones, the creation of a new group does not mean additional development, as it will be automatically reflexed in the reports.
    Regards,
    Eli

  • Creation of multiple cost center for one emplyee

    HI All,
    I have requirement . one emplyee is working two projects so need create two cost centers for one employee.
    please tell me how create multiple cost center for one employee.
    Thanks&Regards
    ramesh

    hai.
    if he works half the time... u can give 50%.. or just get it confirmed from core team member..
    manu

  • Adding a new Cost Center code to a 82ax Report painter

    Hi experts,
    I am asked about adding Cost center code to the left of a 82a Report painter(Where the Pepe element code and description is) without modifying the actual length of that colum....
    Is this possible??
    Thank you very much.
    Artur.

    Ok, no reply for this

  • Creation & Assignment of Cost Center?

    Hello Experts,
    I have done all the configuration in SAP HCM but I don't have any knowledge about Cost center.
    So please guide me how to create Cost Center? and with whom it should be assigned?
    Because at the time of hiring employee cost center is required in IT0001.
    Regards
    Rohit

    Hi Rohit,
    Create cost center via KS01.
    Assigning cost center to org unit or position is your company's decision.
    We are assigning cost centers to positions since our org units and cost centers are not totally in -line.
    Regards,
    Dilek

  • Creation of new vendor master record

    When I assign Account Group, getting following error "Acc. group uses internal no. assignments, leave blank".
    if leave blank; asking to enter account group. Can anyone suggest how to select external number assignment while creating a new account group?
    Edited by: Kushal Pal on Jun 11, 2011 5:46 PM

    Hi Atif,
    I have solved the problem myself. we assign external numbers in the customization through SPRO u2013 SAP reference IMG u2013 Finance Accounting u2013 Accounts Receivable and Accounts Payable u2013 Vendor Accounts u2013 Master Data u2013 Preparation for Creating Vendor Master Data u2013   Create Number Ranges for Vendor Accounts ans selecting Ext check box as first step.
    In the second step, by selecting "Assign Number Ranges to Vendor Account Groups" in the same customization.
    Your suggestion was helpful but I had already worked out. XKN1 is the correct Trans. to look into assigned ranges.
    Thanks.
    Edited by: Kushal Pal on Jun 13, 2011 4:55 AM

Maybe you are looking for

  • Two separate Apple accounts for iPhone but one iPad - can we get apps from both accounts to iPad?

    My wife and I have our own apple accounts (for our iphones) but share (or fight really!) over the only iPad. Is it possible to download Apps from both our accounts onto the Ipad, or would this violate the T&C and so not possible? Any thoughts most we

  • Mapping problems

    Hi, I posted this thread in Designer section but I think this place is more appropriate. I have a mapping problem. In my process I have two forms with the same xml schema binding to this forms. The first form is prefill with his informations (name, d

  • Select, Copy and Paste text - the iPhone can't do that either???

    Select, Copy and Paste text - the iPhone can't do that either??? OK, this is pretty lame...the iPhone does not allow you to select, copy or paste text in SMS, Notes, Safari or Mail. Is this just a oversight on the part of Apple?

  • WTK 2.5.2 Emulator always asks about file access

    Is there a way to suppress the question that the emulator asks about accessing a file using a Fileconnection? It asks it on EVERY SINGLE ACCESS and seriously interferes with debugging. (On the real device, I can give permission once and be done with

  • Reorder columns in JTable

    Hi. I want to reorder the columns in a JTable. I want the user to be free to resize and reorder the columns just as he wants, save it, and reuse these settings the next time. I have no problems getting the current configuration. But I cannot handle r