Creation of Reservation for planned order

Hi Team,
Is it possible to create reservation for planned orders after MRP run?
My opinion was the reservation can only be created with reference to production order after MRP. The reservation can not be created with reference to planne dorders after MRP run because planned orders are intermident document which will not exist in the system always. The planned order details will not be available in the system once it get converted into production order.
How the reservation will be processed which was created with reference to planned order after converting the planned order to production order?
Kindly need ur guidance.
Thanks
psk

Dear PSK,
In a typical discrete manufacturing setup production orders are the promised receipt for which reservations gets generated as
soon a production order is created.But only if the order is released goods movements can be posted against the reservation
details through MIGO/MB1A for 261 movement.
It's not required to create any reservation at the planned order level or which may not help you in any means to your business.
But however in a REM scenario MF60 is used to create stock transfer reservations for 311 movement where planned orders
are used for production backflush.To explain in detail even without any planned orders you can do a stock transfer reservation
for a production quantity.
Check and revert back.
Regards
Mangalraj.S

Similar Messages

  • Automatic creation of Reservation for Service Order (Return and Repair)

    Hi, Looking for your valuable help on Creation of Automatic Reservation
    I am working on Return and Repair process at Plant.
    1) So far
    Service Notification > Repair Order > Return Delivery > Service order . has been done.
    now requirement is when i am saving the service order for the Object (Fisnished Goods), in which components  required for servicing of material are maintained, when i will save the order a Reservation for the same needs to be reaised to Warehouse automatically.
    2) In Repair order all operation and components are not reflecting when i am selecting the line item and going to EDIT > Display Range > All Items in VA02 for which i need to do DP90.(Resource Related Billing)
    Please hepl,
    Thanks
    SUDIP SINHA

    Thanks for giving valuable answer,
    what if in the service order i am replacing some spare parts along with services when FERT is not under warranty. How the cost will be transfered to invoice. In my case only one service is transfered.
    i waqnted to transfer cost of components as well..
    Thanks
    SUDIP SInha

  • Where we enter raw material reservation qnty for planned order in monthwise

    sir,
    as per client requirement in every month raw material reservation quantity fixed for planned order in monthwise.
    in sap Where we entere raw material reservation   for planned order in month wise nov, dec, jan and whre its show.
    is it possible after mrp run.can we check that raw material reserve stock in mmbe for planned order.
    pl guide me step by step

    Dear Prakash,
    1) in MMBE, you cannot see Reserved qty against plan order ( it is not a confirmed receipt )
    2) the reserved qty which is shown in MMBE is against production order
    3) only after converting plan order to production order ( Header material )
    4) dependent requirements will convert into reservations
    Regards
    kumar

  • Prevent creation of reservation for selected components on Production order

    Hello all,
    I am aware that the production order reservation creation is dependant on the order type, but is it possible to avoid the reservation creation for few components on the order ? Any techincal way? We want to issue our components to a different batch than the one reserved during the production order creation.
    Any help will be greatly apprciated.
    Thanks,
    Swetha

    Your material is get reserved for Production order as per the Order start date & Order release. What you can do is make the start date of the Production order & release it. If any other production order are already there & you can re set the ATP of that production order.
    Say there is one production order starting 2 days after & your all raw material is blocked for this production order. And the other production is having date after this now you want to give ATP from 1st order to 2nd order. For this 1st make the start date of 2nd prod order before 1st. Then Go to COMAC select both Prod Ord & GO ATP with check reset ATP. You see that ATP is passed from 1st Prd order tp 2nd.
    Regards
    Abhijit Gautam

  • Manual Reservation for Maintenance Order (Category 30)

    Hi,
    Can anyone suggest some procedure so that I can stop automatic reservation creation from Maintenance Order (type PM01, Category 30) and create manual reservation for the same.
    Presently Manual reservation is not allowed for Maintenance Order.
    Thanks
    Satadal

    Hello Satadal
    nobody's answered you because it's not possible to create a manual reserve for logistic orders as Network/PP orders or PM orders.
    If you want inhibit the automatic reserve creation :
    - customizing (transaction OIOE) : set "Never" in field "Reservation Relevance/Generation of Purchase Requisition". The reserves will be created but they will be not relevant for MRP.
    - Hide the field AUDISP "Reservation Relevance/Generation of Purchase Requisition"  at component level (OICMPD) and operation level (OIOPD)
    Good luck
    silvia

  • Reservation against planned order

    Hi...
    I have one issue with reservation against planned order.
    We have REM & after MRP run generates planned order with order type PE.When i check planned order in table PLAF.
    I found reservation no. & same has been passed to RESB , I got the reservation details but it is not allowed for goods movement XWAOK field in RESB. So no question of goods movement through MB1B with movement type 311.
    My question is that is there any customization related to above scenario so that reservation is allowed for goods movement?
    Regards
    Tushar

    Dear ,
    In REM , you will recieve reservation against planned order .But GI always happens during GR or after GR along with back flashing .I do not think so you can issue material against reservation as like normal PP Order reseravation  in the production order .
    1.Goto -SPRO->production-> Rep Manufacturing->Define Rem MAnufaturing profile(OSP2) --->Control data, in the Control data 1 tab select the "GI back flush at GR posting".
    2.Check in  the REM profile assigned in MRP view of material Master (MM03)
    Based on this above set up , you can make Goods Issue for Planned order in REM .If you deselect that option execute material staging transaction code is MF60 and then go for REM backflush. In materil staging the components issue is carried out for the planned order.After that you can execute the REM backflush in MFBF
    In rem scenarion components placed on the production lines anonomously (without ref to planned order)...you cannot issue materials like in production orders scenario. if you want to have track on the good issues before the GR then use the pull list concept...there will be no movement type but you will have track on quantities issued to header parts/production lines not to planned orders.
    Hope this clarifies your doubt .
    Regards
    JH

  • Stock reserver for sales order

    Dear All
    1. MMBE-Check the stock with batch no 6000000340 with 200 qty
    2. Sale Order Created-
    3. MB1B - Used Movement type 412 E with Inputs such as Sales Order,[warning message: sales order is not provided for this goods movement] after pressing the document is posted
    4. In MMBE When i check the stock under batch no 6000000340  with 150 qty in unrestricted stock and Sales order Stock  i can see the 50 quantity stock
    Query is
    1. Why the 50 quantity stock which is reserved for Sales order stock is seen under unrestricted stock and not under  Reserved tab
    2. When i create delivery  with the same material and  batch no, the stock is reduced from unrestricted stock[150 -10delivery qty] = its showing 140 qty, but stock should be reduced from 50 quantity which i have reserved for Sales order.
    Please guide
    Regards
    Sandeep Bhowmick

    Hi Sandeep
    Visualize this scenario
    Material is pen in MMBE unrestricted stocks is 100
    Sales order created with item cat TAN with special stock indicator E not marked and the order no is say 55 for 10 qty
    Now you are reserving stocks in t code MB1B with movement type 412 E inputting the order no xx and saving it
    Now in MMBE put the material as pen and input plant and storage location etc press F8
    unrestricted stocks will be 90
    Sales order stocks will be 10
    If you click on the details of this sales order stocks you will see the order no xx and qty will be 10
    (read your first post exactly the same of this)
    now are delivering the sales order and doing the pgi
    Now in MMBE
    unrestricted stocks will be 80
    Sales order stocks will be 10 (this exactly is your problem)
    that means the system having a reservation in MMBE for a particular sales order xx not utilizing those stocks and still takes the stocks from the unrestricted and this is wrong
    This is happening because the item cat TAN is not marked with special stock indicator E during order creation of xx
    Now mark the item cat TAN with special stock indicator E and create a fresh cycle say order no yy
    When you do PGI for order no yy the unrestricted will be 90 and there wont be any sales order stocks as the stocks are already PGIed
    That means the system picks up the correct stocks for delivery
    The system behaves very perfectly When there is sales order stocks in MMBE i dont  understand ,what is the reservation you are talking about
    Regards
    Raja

  • Reservation for Sales Order

    Hi All,
    We have a scenario with reservations in make to order:
    I have a
    Sale order1 for material A: 100 Kgs (Confirmed Qty)
    Sale order2 for material A: 200 Kgs (Confirmed Qty)
    I have created delivery document number 50kgs for sale order 1 and saved. Now when I'm trying to transfer post stock using 413 E movement type from "Sales order 1" to "Sales order 2" system is giving me an error that reservation already exists for 100Kgs. Please clarify on this:
    1. How to reduce the reservation quantity so that I can transfer stock from one sale order to another?
    2. Where can i see the list of reservation created for a sale order?
    3. Can we stop system from creating reservations for sales order? If so what will be the effect of it?
    Regards
    Ayyallas

    Hi,
    Please 1.use MBBS report to get the reservations for sales order. 2.In OVZ9  for availability check don't include SO requirements, to avoid reservation creation for SO. 3.To reduce the stock don't create reservation against movement type(231). To reduce the quantity for sales order, its better to delete the reservation for that sales order and issue the material. For the rest of the quantity recreate the reservation for SO, if needed. If you stop reservation creation for SO, the material might not available if any immediate demand arrises. Thanking you.

  • Correlation of reservation with Planned order in APO.

    Hi,
    In R/3 in COGI we see reservations. my issue is I want to know for which planned orders in APO these reservations are.
    In the product view in APO we can see some reservations (PRDRES(W) - correct me if I am wrong). How to correlate these reservations with planned orders. I am looking in PP/DS module of APO.
    Thanks a lot in advance,
    Prabhat

    Hi Prashant,
                      You are correct and if product is showing the reservation then it is mean for all order in product view.
    You can check the Production Planning Table inside PPDS for wider view of reservation and orders.
    /n/sapapo/ppt1
    Check the SAP Note: SAP note 439596
    SAP Link is also useful:
    http://help.sap.com/saphelp_scm50/helpdata/en/64/dca63be2bc331be10000000a114084/content.htm
    http://help.sap.com/saphelp_scm50/helpdata/en/c1/147a375f0dbc7fe10000009b38f8cf/frameset.htm
    Let me know if it is sufficient.
    Regards,
    Vishal

  • User exit/ badi needed for planned order create/change,collective ATP check

    Dear All,
    I'm looking for a user exit/ badi which can be used for planned orders at the stage of
    mass collective availability check (COMAC tcode) update; or at some other relevant stages of mass update of planned orders.
    I need after collective availability check to perform the following:
    1) to copy date from "total comitment" field on header tab of planned order and paste it (replace old date) to order finish date on header screen
    then
    2) to start a scheduling.
    Very appreciate your help.
    Best Regards,
    Andrey
    Edited by: Andrey Kruglov on Apr 15, 2010 3:06 PM
    Edited by: Andrey Kruglov on Apr 15, 2010 3:07 PM

    Dear,
    Use the BAPI : BAPI_PLANNEDORDER_CHANGE
    Or use the function module MD_SET_ACTION_PLAF for Schedule planned order.
    and the transaction MDAC Execute action for planned order
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    Delete planned order
    Assign the key for the respective action control to the materials in the material master (MRP 4 view).
    Please refer this thread,
    Re: MDVP for collective orders
    Regards,
    R.Brahmankar

  • Query about Manual Reservation for Maintenance Order Category 30

    Hi,
    I have a problem. Generally from Maintenance Order type PM01 under Order Category 30, when we give some materials requirement, SAP automatically generate reservation for those materials and take the GL as Consumable Item.
    But in my case, that GL has to be changed depending on what perpose we are using the material. But Manual reservation is not allowed for the order category 30 and no GL can be changed for automatic reservation.
    Can anybody suggest any way-out so that we can give our desired GL No. for the reservation for Maintenance order (say Order type PM01 under category 30 which is SAP internal).
    Thanks in advance,
    Satadal

    To the best of my knowledge this is possible. To the best of my knowledge G/L account determination for every material happens after a series of checks are done internally by SAP. By checks I mean the sequence of steps as customized by the consultant in the configuration. Now at the end of the sequence if SAP has not succeeded in identifying a G/L account it will open up a tab in which u can manually enter the G/L account. For non-stock item you can anyway enter it.
    I would suggest that you post this query in the MM forum also.
    thanks
    Bala

  • How to connect MAPL and PLPO to derive work center for planned order

    Hi,
    Anybody know how to derive work center using MAPL and PLPO for planned order (PLAF). Is there any connecting table between MAPL and PLPO.
    Please help asap.
    Regards,
    Mitali

    I guess u r trying to view the detail scheduling info (tab in MD13) for a planned order . In that case -
    1. Go to PLAF and enter the planned order number. (PLAF-PLNUM) and get the ID of the capacity requirements record (PLAF-BEDID).
    2. With this PLAF-BEDID go to KBED. pass the value here. KBED-BEDID. The KBED-ARBID values are your work center ID.
    3. To get the work center texts ( the way is appears in the screen) - Pass this value to CRHD . CRHD-OBJTY = 'A' ( i.e Type work center) and CRHD-OBJID = KBED-ARBID.
    Hope it solves ur prob.
    Cheers
    SKC

  • Exclude stock reserved for production order from availability check

    Hi Experts,
    We have a problem in the availability check.
    There is a material used as selling product and components in the same time.
    When the material has been reserved completely for a production order, the new sales order still get confirmed despite there is no physical stock at all!
    Please advise how to exclude the stock reserved for production order from the availability check in sales order? Many thanks!
    Regards,
    Qiang

    Go to MM02 and check what availability check is maintained for that material.  Next go to OVZ9, select that available check with the combination "A" and maintain "X"  or  "F"  in the field  "Incl.production orders".
    thanks
    G. Lakshmipathi

  • Extractor for Planned order

    Hi Experts,
    I am looking for the stabdard extractor for the Planned order, Basically I need the fields from the table PLAF.
    Please let me know any standard extractor available or any extractor need to enhance.
    Thanks
    sai

    Hi Sai,
    Take a look at 2LIS_04_P_MATNR and see if it is usefull:
    http://help.sap.com/saphelp_nw70/helpdata/en/88/7fc73c0c52085be10000000a114084/frameset.htm
    Else it seems that you should create a generic extractor directly on the table according to this thread:
    Re: Extractors for Planned orders and Proces Orders
    Hope this helps.
    BR
    Stefan

  • Table For Planned Order Details From PP Module

    In our organisation we are taking Plan Vs Acheivement from Production. So, intialy we taken Plan details from "PLAF" Table and Acheivement details from "S225" Table. But After running MRP at month end. Previous month plan get deleted and new order create.
    how to get history data for Planned order.
    Please help us.
    Regards
    Naga

    I don't think that there is any history in regard to planned orders.  PLAF will get rebuilt according to your MRP parameters and I don't believe that the data is stored.
    Regards,
    Rich Heilman

Maybe you are looking for

  • Trouble showing .orf files in Bridge CS3

    Having moved to a new mac I just installed my old CS3 package. Everything seems to work fine but I can no longer see my photos from my Olympus E-3, raw .orf files. I have tried to upgrade Bridge but with no results in that regard. I also added the DN

  • Help with CASE MANAGEMENT

    Hi Experts, I am working with Case Management, and I have to create Cases with all its specifications automatically. Anybody knows how I can create it? or Anybody have any suggestion or documentation to start with this. Thanks in advance. Regards, Be

  • Problem in Reducing the root file system space

    Hi All , The root file system is reached 86%. We have cleared 1 GB data in /var file system. But the root file system still showing 86%. Please note that the /var file is not seprate file system. I have furnished the df -h output for your reference.

  • Files and/or folders becoming locked on Mac Server 10.3.9

    Files and folders cannot be reopened on the respective server share when the creator or inclusive user tries to reopen a folder or file, they see the file / folder as being locked. The server is set to inherit permissions. All of our students go to a

  • How do i switch from prepaid to more everything?

    i currently have a prepaid verizon cell phone but i want to switch to a more everything single line plan