Creation of SNP PDS using planned delivery time

Dear Experts,
How do i control creation of PDS because of operaion generated from planned delivery time,although planed delivery ime is zero.
the scenario is as follows:
Material :XXXXX
Planned Delivery time
Procurement Type:E
Plant:XXXX
in transaction /sapapo/curto_simu: there are two PDS displayed with PDS usage as PDS for Supply Network Planning(SNP)
the first one is because of operation generated fromm planned delivery time,output qty is the same a s that maintained as base qty in BOM and mode is blank,activity field is even blank.
the other PDS is created because of the valid production version in R/3.
Thanks in advance
Amrish

Hi Dutta,
Thanx for a quick revert.
Yes we are using reciepe and we have a valid PDS being generated because of Production Version.
The problem lies with the creation of other PDS from planned delivery time whereinplanned delivery time is zero.I want a resolution so as the system doesnot create thses PDS which are invalid in nature.
These invalid PDS are hamperring result out of SNp optimizer for the reason these are considered in the input log of optimizer.
Regards,
Amrish

Similar Messages

  • Schedule Agreement - Planned delivery time

    Can you still use planned delivery time when using Scheduling Agreements?  Or does this field need to be set to 0 for the delivery lines to get created properly when using JIT/FRC schedules?  If we cannot use Planned delivery time, is there another field that can be used to hold the Vendors lead time.  We want to take this into consideration when determining the end date of the Scheduling Agreement.

    Hi,
    the planned delivery time field on the material master is designed to be used when it cannot find the correct data from the info record. It should always contain the planned delivery time that should be applied if the vendor is not specified.
    the same field on the info record should contain the planned delivery period for the appropriate vendor.
    This field does not have to be 0 if you are using JIT etc.
    Steve B

  • MRP - Planned Delivery Time as 'Number of workdays' - How ?

    Hi All,
    We want to use 'Planned Delivery Time'(PDT) as 'Number of workdays' rather than 'Number of calendar days' while running MRP (Single item, multi level) from MD02 AND eventually that would be reflected in 'Availability date' in MD04. Can we achieve this by config or we need to search a proper user exit / BADI / enhancement spot for this ? Any suggestion on this is most welcome.
    Note - Factory Calendar ID has been maintained properly with Mon - Fri as working days.
    Thanks,
    Ashok

    Hi Csaba,
    Thanks for your input. The link you have provided does give information on how to assign the factory calender at plant level. However it doesn't answer to my question of how to use 'Planned Delivery Time' as 'Number of workdays'  rather than 'Number of Calender days' .
    My concern is 'Is it possible achieving this ? If YES, How ? By using config OR by any enhancement spots / User exits ?'
    Any suggestion is welcome.
    Thanks,
    Ashok

  • MRP - Auto creation of del schedule lines based on planned delivery time

    Hi,
    We have activated MRP (type PD) where Purchase requiesition is auto created by system for requirement quantity. We require to optimize delivery schedule in such a way that entire PR quantity is broken into various delivery schedule based on planned delivery time and requirement.  Scenario can be further explained with following example.
    Material Requirement for a month is say 1,25,000 units
    Closing Stock say 25,000 units
    PR Generated by system for 1,00,000 units. The entire quantity is schdulled with only one delivery schedule line as per planned delivery time. 
    The requirement is to generate multiple delivery schedule lines automatically in Purchase requisition based on planned delivery time so that Purchase orders can be placed with system generated delivery schedule lines.
    How can it be achieved ?
    Regards,
    Nirav Kinkhabwala

    Nirav,
    This subject has been discussed repeatedly in this and other forums.  I must assume that you overlooked the rules of engagement, which state that you should first search the forums and other public sites, before posting questions here.
    Standard SAP MRP cannot be made to generate multiple items in a Purchase requisition.  The functionality you seek is usually achieved when converting purchase reqs to Purchase orders, where many single purchase reqs can be adopted into a single Purchase order.
    You also might want to investigate use of Vendor Scheduling agreements.
    Best Regards,
    DB49

  • How planned delivery time effects delivery creation?

    Dear All,
    Some time before, while placing order thro' CRM, we came across a typical error (hard error).
    "date (11/12/2011) lies afterthe end of validity calendar". 
    we could not place order in CRM but in SAP we could create save the order despite of same error but soft. However system didn't allow to create delivery for same order & same error message populated"
    Later it was found that it is because for material  " Planned Deliv. Time  maintained for say "X "days in material master MRP2 view" & was corrected.
    How planned delivery time effects delivery creation?
    For material even though planned delivery time was maintained as say for 500 days, sales order requested delivery date & delivery date in order schedule line got determined as order date (Considering avaliability of funds & material).
    i.e order date/req. delivery date/delivery date in schedule line are same as date on which order is placed.
    Regards
    Suhas W

    Hi,
    Extended your factory calender in SCA3.
    Regards,

  • Planned delivery time field in sale order

    Dear All,
    During creation of  STO at item level under delivery TAB "planned delivery time" field is showing with edit mode, I want to activate this field for sale order creation / change also. Plz advice how I can do this.
    regards,
    sps.

    Dear SP
    This field is laready there in the MRP-2 of the material master. This is used to calculate the no. of days to procure a material/service externally. Why do you want to activate this in sales order.
    Thanks
    Shuktiz

  • Planned delivery time issue

    Hello Experts,
    We have below requirement.
    Created sales order for a particular material. Planned delivery time is picked from info record for that material and PR has been created.
    We are converting PR into PO and the planned delivery time is fine. Now we are updating the ASN from vendor with some prior dates. In MD04, the same got updated. However the sales order still shows the old planned delivery time only. How to get the new planned delivery time  in the sales order based on the ASN updated in PO.
    Example:
    Material: A
    Planned delivery time is 10 in info record
    Created sales order. Planned delivery time in the sales order is 10. PR created with fixed vendor and planned delivery time is 10 days from the date of creation.
    Converted PO.
    Now we received the ASN from Vendor that the vendor will deliver this material in five days. So accordingly we are updating the ASN in PO with delivery date.
    In MD04, we could the new planned delivery time based on the ASN. However sales order delivery still shows the previouls delivery date only.
    How to get the new delivery date in the sales order based on the ASN update?
    Regards
    Bala

    This is not standard SAP logic. Required delivery date on the original line item stays as it was when you issued the order. Then you create a confirmation (ASN) that is relevant to MRP with the updated delivery date. Planning sees the new date and acts accordingly, and also in the order you can see both "old" and "new" (in the confirmation tab).

  • Planned delivery time

    Hi,
    I have created a sale order on 1/7/2009 with a material which has planned delivery time of 4 days.
    Now when I go to the schedule lines screen I see that the delivery date corresponding to the confirmed quantity is 1/8/2009.
    Why is not SAP taking the 4 days into considerations while determining the delivery date?
    Please see below the screen shots:
    Scheduling configuration in material master:
    [http://i40.tinypic.com/14b2fyc.jpg]
    Schedule lines screen shot:
    [http://i44.tinypic.com/9pxkzc.jpg]
    Sincerely.
    Ketan

    Hi,
    You seems confused with planned delivery time in MRP 2 view of material master to Sales order delivery date.
    Material master Planned delivery time is for the material which is procured externally  through PR -- PO process.
    In Sales order the delivery date is with respect the ATP--Avalible to Promise.
    If the stock is avalible in the storage location on the date of Sales order creation, then system will consider the delivery date an the basis of confirmed qty in the sales order. You can check in CO09 for confirmed qty.
    rgds
    gsc

  • Overruling of planned delivery time in inforecord

    Dear Experts,
    for certain materials we have defined planned delivery Times within the respective material info records.
    This is working as expected.
    However, in certain cases the real delivery time for a material could differ from the one stored in the inforecord (be shorter).
    Is it possible, that the end-user can overrule this planned delivery time during the PO creation, or do we have
    to maintain the info-record for this (keeping in mind, that only as an exception the delivery time should be overruled).
    Thanks for your Support on this and best regards.
    Jan

    Of-course they can change the planned delivery time at the time of PO creation.
    System will fetch the default planned delivery time and delivery date as per defined material master.
    But when you change the planned delivery time (in delivery tab), then system will calculate the delivery date automatically.
    If this will happen very exceptional, then no need to maintain in info record or material master. Just change the planned delivery time at the time PO creation, system will change the delivery date accordingly automatically.

  • Value of planned delivery time in days not updating

    Hello Experts,
    i have created a material using BAPI_MATERIAL_SAVEDATA.
    IN Mrp2 VIEW
    PLANNED DELIVERY TIME IN DAys is not updating
    i have passed
    la_plantdata-plnd_delry =  P_PLND_DELRY.
    la_plantdatax-plnd_delry =  'x'.
    i have commited the work too but the field is not updated
    Please help.
    Thanks & Regards,
    Naresh

    Hi,
    This question is not related to APO, i would suggest you to post the thread in ABAP forum.
    However can you check
    can you check whether la_plantdatax-plnd_delry field is 3 charcter or one character field.
    Generally it will be like below.
    la_plantdata-plnd_delry = 100
    la_plantdatax-plnd_delry = 'X
    Regards,
    Srini

  • Planned Delivery Time and Transportation duration- Tlane and Means of Transportation

    Dear Experts ,
    I have question regarding lead time calculation my SNP
    I have
    Start Location : A
    Destination location: B
    I maintained Planned delivery time in ECC- material master as 10 days  and cifed to Tlane Product procurement as 10 days
    and leave empty in the transportation duration empty so the total lead time is 10 days from start location A to destination location  B
    now
    I maintain 24 hours in Means of transport as transportation duration by truck
    now the lead time is 11 days from start location A to destination location B
    Now
    i leave empty planned delivery time empty and maintain Means of transport duration as 48 hours
    so the lead time is 2 days from A to B
    does my understanding is correct or not advise please
    Regards
    Raj

    Hi Raj,
    Take a look of these notes. Specially SAP note 379006. This note explains how the system sets the times in ECC and APO. Basically, It recommends a BAdI in order to match the delivery date in ECC and APO (transit time). What I recommend is to set delivery time equal to 0 if this is possible in your company.. This is not an SAP recommendation, because the delivery date is a key master data in the purchasing process and making it equal to 0 could not be allowed.. Now, if its possible in your case, it is the easiest way to ensure consistency...
    These are the notes:
    379006
    - Transport duration and planned delivery time in APO and R/3
    441622
    - Supplying-plant-dependent planned del. time/trans. time
    624982
    - Incorrect dates for RBA controlled stock transfer
    Kind Regards,
    Mariano

  • Udating material master with changed planned delivery time in contract

    Hi experts ,
    My question is while we are changing the planned delivery time in the contract we need to udate the same in the material master table . so how to update the material master table with new planned delivery time. Is there any FM exits to udate it and if it is then how to use it.
    thanks
    Anshuman

    Hi Madhu ,
    You are right we can use BAPI_MATERIAL_SAVEDATA but if we use it then we have to use BAPI_COMMIT also to make sure that all the changes are saved completly and if we do BAPI_COMMIT then it maye commit all the task which is in queue and it need to update later. So it is again a issue .
    Thanks
    Anshuman

  • Planned delivery time as workdays

    Hello,
    Do you know if there is any way to get the planned delivery time (MRP2 / MARC-PLIFZ) to workdays ?
    For us, goods do not travel over week-end, that's why it does not work well for us.
    It seems, that the standard version does not allow to calculate delivery time in working day. Do you know which user-exit I could use to change that ?
    We create PR with MDBT, MD03 and MD01.
    Thanks,
    Regards,
    PYR

    Hello,
    Thank you for your replies.
    Could you tell me where I could define a calendar for my vendors ?
    You say that delivery time depends upon the working of the vendor, but I didn't manage to define the working days of the vendors in SAP.
    Thanks

  • Planned delivery time in material master

    Is planned delivery time in material master considering holidays ? I mean when I say 7 days, is it one week and 2 days or only one week ?

    Dear Balaji,
    If you push F1 when your mouse is set on that field you will see that help says that PDT is defined as calendar days. However, you can carry out some changes:
    http://www.sap-img.com/materials/planned-delivery-time-as-workdays.htm
    About meaning of PDT:
    http://www.sap-img.com/production/calculation-to-determine-the-delivery-date-and-release-date.htm
    In addition to that link, you can use safety time as well (with this setting you can pull back in time the requested availabilty date during MRP run). You can also use PDT in info records if you have several source of supple for one material.
    BR
    Csaba

  • How can consider Planned delivery time for subcontracting dependent of qty

    Dear guru ,
    How can mrp schedule delivery date of a subcontracting purchase requisition in order to consider planned delivery time and quantity to purchase.
    Thanks

    dear guru ,
    I want to create a self-defined info structure similar to S013.
    I want to add field purchasing group from EKKO-EKGRP. The other fields are similar to S013 with the same rules.
    What do you suggest i can do consider note 397864 :
    You are not permitted :a) to use info structure S013 as a template for self-defined info structures (This is prevented as of Release 4.5 due to a termination message).b) to create any update rules for S013 with a self-defined update group.c) to include the enhanced update rules that are used for S013 during the definition of key figure updating into the definition of the update of a self-defined info structure (compute...).
    Thanks

Maybe you are looking for

  • I have adobe photoshop starter edition...  It won't open!

    I have adobe photoshop starter edition....  It won't open!

  • Help building image swap in flash cs4?

    Hello all, I've been trying to research 'flash cs4 image swap' but most everything I find is related to dreamweaver, so I appreciate anyone's help to point me in the right direction. I have a project in which I have an opening scene of a main image a

  • Importing 3gp files

    Hi, I've shot a short clip with my mobile phone which generates 3gp files. I can't import it in fcp because a message appears saying "access denied, 1 file unknown". How can I do to get it into fcp project ? Thanx for answering. Steve

  • How to Load Progressive-Download Video just when I press Play?

    I have set the Progressive-Download video instead of Streaming-Video (because my webserver provider "aruba.it" doesn't offer streaming videos), in Flash CS4 Professional, and exported to Dreamweaver CS4. I have also inserted the HTML code in Dreamwea

  • Dos command from java

    hi all how do i run dos commands from java??????????