Creation Profile in Scheduling Agreement
Dear Experts,
Currently I'm working on Scheduling Agreement and Schedule Line.In standard SAP gives the provision of creation profile.I've gone through the SAP help documentation but I'm not clear on that.I've few doubts on creation profile.
1. I've created a profile say XXXX for 14 days JIT and 6 months Forecast.And I maintain the same on Scheduling Agreement additional data.
2.I'm creating delivery schedule respect ot Scheduling agrrement.
3. I maintain the aggregation horiozon in creation profile as 10 days daily aggregation for JIT and 120 days for monthly aggregation for forecast.
4.I run MRP for the header material and I maintain the necessary SA number in Source list.
5. After MRP run I'm not getting the respective schedule lines for JIT and Forecast.
6. What is the use of creation profile in Scheduling Agrrement and schedule line and is it determine ant schedule lines after MRP run.
Please clarify me on creaion profile.
Thanks in advance
PKB
Dear Experts,
I'm not getting any response regarding Creation profile which I posted last week.
Can anybody explain me the use of Creation profile in Schedule line?
From Standard SAP help documentation I'm not convince.
Best Regards
PKB
Similar Messages
-
Where is the field release creation profile in scheduling agreement?
Dear experts,
I need to maintain release creation profile in Scheduling Agreement.
please let me know where can I find this field in ME31L
Regards,
ShashidharFound in More functions - Item details
-
Creation Profile in Scheduling Agreement and Schedule LIne
Dear Experts,
Currently I'm working on Scheduling Agreement and Schedule Line.In standard SAP gives the provision of creation profile.I've gone through the SAP help documentation but I'm not clear on that.I've few doubts on creation profile.
1. I've created a profile say XXXX for 14 days JIT and 6 months Forecast.And I maintain the same on Scheduling Agreement additional data.
2.I'm creating delivery schedule respect ot Scheduling agrrement.
3. I maintain the aggregation horiozon in creation profile as 10 days daily aggregation for JIT and 120 days for monthly aggregation for forecast.
4.I run MRP for the header material and I maintain the necessary SA number in Source list.
5. After MRP run I'm not getting the respective schedule lines for JIT and Forecast.
6. What is the use of creation profile in Scheduling Agrrement and schedule line and is it determine ant schedule lines after MRP run.
Please clarify me on creaion profile.
Thanks in advance
PKBDear Experts,
I'm not getting any response regarding Creation profile which I posted last week.
Can anybody explain me the use of Creation profile in Schedule line?
From Standard SAP help documentation I'm not convince.
Best Regards
PKB -
Mandatory creation profile on scheduling agreements
Hello Gurus,
I need to put a value on creation profile field on schedulling agreements. I have to choices:
- Put the value on supplier data. It is a plant-dependant value i my client doesn't want to create this data.
- Made it mandatory. This possibility doesn't appear through Scheduling Agreement -> Define Screen Layout at Document Level as usual in fields on Purchase docs.
Anyone has an idea how made it mandatory (or de badi to change the value by code)
Best regards,
NachoDear Experts,
I'm not getting any response regarding Creation profile which I posted last week.
Can anybody explain me the use of Creation profile in Schedule line?
From Standard SAP help documentation I'm not convince.
Best Regards
PKB -
Creation profile based schedule lines
Dear all,
I release the Forcasting schedules based on the creation profile assign to the Scheduling agreement (Lpa)
In the creation profiel i have maintained the Aggegation horizon as 0-60 (days), 60-90(weeks) and 60-999 (months).
after release when i checked the schedules the aggegation is not properly.
how system caculated the the aggegation whether it consider the working day only or calender days
2. what is mean by creation indicator -R ( real time) B - mrp drivenHi,
It depends upon the Planning Calendar specified in Creation profile customization.
R- Realtime means using ME38
MRP driven is self explanatory and are created by MRP when the source is fixed in sourcelist and MRP indicator maintained.
Hope this helps. -
Significance of release creation profile
Hi all,
Can anyone explain with example the use and significance of release creation profiles in outline aggrement
Thnks
GanHi,
Release Creation Profile
Use: -
The creation profile determines:
- Which event triggers the creation of a scheduling agreement release (changes involving the lines of the overall schedule and/or the reaching of the next transmission date)
- How the delivery dates are shown (aggregation and release horizon)
- Whether
Backlogs and Immediate Requirements are determined and shown in the scheduling agreement (SA) release Whether a tolerance check is carried out for SA releases that are created due to changes to the overall delivery schedule in the system
Note: -
The tolerance check is only carried out if lines of the overall schedule for an item have been changed and if you create SA releases using the release creation program (via Scheduling agreement ® Create SA release).
Features: -
A creation profile is defined on a plant-dependent basis and consists of the following areas:
General parameters: -
- Whether - and, if so, under what conditions - an SA release is generated (creation strategy).
- Whether backlogs and immediate requirements are to be determined for the SA release type.
- Whether or not the tolerance check is to be deactivated in the case of change documents created for SA releases with backlogs.
Aggregation horizons: -
- The Release Horizon for which released quantities are shown, and
- The periods for which quantities may be aggregated.
If your creation profile provides for aggregation, quantities and delivery dates set out in the lines of the overall delivery schedule stored in the system for a scheduling agreement are aggregated to form release schedule lines.
If you use a creation profile without aggregation, or work without a creation profile, the schedule lines of the SA release correspond to the schedule lines of the overall delivery schedule for the scheduling agreement for the relevant period.
Creation periodicity: -
- Whether SA releases are to be created on a periodic basis (and, if so, at which frequency).
Each time a scheduling agreement release is created, the system calculates the next creation date. Weekly and monthly releases are always created on a Monday (first workday of the period). The system takes the factory calendar as the basis for calculating the due dates for release creation.
If you wish to create SA releases on a periodic basis, you should choose a creation strategy that includes Next date.
Tolerance profile: -
- Whether tolerances are are to be checked for scheduling agreement releases created as a result of changes to the overall delivery schedule. This allows you to specify that SA releases are only to be created following major changes to the overall delivery schedule.
In the case of SA releases containing backlogs or immediate requirements, the system never checks tolerances.
Activities: -
You process creation profiles in Customizing for Purchasing under Scheduling Agreement ® Maintain Release Creation Profile for Scheduling Agreement with Release Documentation.
You assign a creation profile to a scheduling agreement item in the Additional data. -
How to create Creation Profile
Hello all Gurus,
Can someone please tell me how to create "Creation Profile" and use them in MM scheduling agreement? I have an issue, where the user wants 2 separate creation profiles to be created so that the demands should be sent to suppliers on Thursdays and Fridays only. I maintained the creation profiles in SPRO -- MM -- Purchasing -- Scheduling Agreement -- Maintain Creation Profile for Scheduling agreement with rel. doc. But these creation profiles doesn't seems to work. What are the extra steps that we need to carry out once the creation profiles are created and then maintained in MM scheduling agreement?
If you have any knowledge on creation of CREATION PROFILES please share it with me. It will be very much helpful for me.
Thanks and Regards,
Umakanthhi,
Go to SPRO > MM > Purchasing > Scheduling Agreement > Maint. Rel. Creation Profile for Sched. Agmt. w. Rel. Docu.
Maint. Rel. Creation Profile for Sched. Agmt. w. Rel. Docu.
In this step, you can define the release creation profile.
The latter is an instrument for determining which criteria are used to generate releases against a scheduling agreement and transmit them to the vendor.
You assign the creation profile to the scheduling agreement item in the additional data.
The creation profile controls the creation periodicity of the releases and - starting from the current date of release creation - the way in which the quantities are aggregated.
In the release creation profile, you can define
o General Parameters
- Which creation strategy is the basis for JIT delivery schedules and scheduling agreements.
- How backlog and immediate requirements are taken into account during release creation.
o Aggregation and release horizon
- If and how schedule lines should be aggregated during release creation.
o Release creation periodicity
- With which periodicity scheduling agreement releases are created
o Tolerance profile
- That for releases created as a result of changed schedule lines, the system performs a tolerance check
o Internet release
- Whether an Internet release is created during release creation -
Creation profile with required parameters
Please can anyone tell me how to create the new creation profile with the following parameters: Delivery on Thursday and creation on Wednesday.
Hi,
Settings for the Creation Profile
You make the following settings in Customizing for Purchasing under Scheduling Agreement ® Maintain Release Creation Profile for Scheduling Agreement with Release Documentation.
General Parameters
For JIT delivery schedules, you select Changed or next date. For forecast (FRC) delivery schedules, you select Next date only.
For JIT schedules, you specify that backlogs and immediate requirements are determined.
Aggregation Horizons
For JIT schedules, you specify daily aggregation and enter 10 workdays as End. For FRC schedules, you choose monthly aggregation and enter 180 workdays as End.
This has the effect that JIT delivery schedules show the daily quantities for the next 10 workdays and FRC schedules the monthly quantities for the next 180 workdays (9 months à 20 workdays).
Creation Periodicity
You specify weekly creation for JIT schedules and monthly creation for FRC schedules.
Tolerance Profile
You specify 10 days as the checking period for JIT schedules, since this corresponds to the release horizon. You enter 5% as upper and lower tolerance limits and choose Overall check.
In your case JIT SCHEDULE IS VALID. I hope this will clear your issue. -
Creation profile with weekly aggregation
Hello amigos!!
I created a creation profile for foreign suppliers by doing weekly aggregations.
I have the following problem... for de deliveries from today to the future the print layout show the aggregation weekly (weekly format), that is fine.
But the deliveries in the past the print layout show them with day format. And is also required in Week format.
what I missed? what I need to do to fix it=Hi,
Settings for the Creation Profile
You make the following settings in Customizing for Purchasing under Scheduling Agreement ® Maintain Release Creation Profile for Scheduling Agreement with Release Documentation.
General Parameters
For JIT delivery schedules, you select Changed or next date. For forecast (FRC) delivery schedules, you select Next date only.
For JIT schedules, you specify that backlogs and immediate requirements are determined.
Aggregation Horizons
For JIT schedules, you specify daily aggregation and enter 10 workdays as End. For FRC schedules, you choose monthly aggregation and enter 180 workdays as End.
This has the effect that JIT delivery schedules show the daily quantities for the next 10 workdays and FRC schedules the monthly quantities for the next 180 workdays (9 months à 20 workdays).
Creation Periodicity
You specify weekly creation for JIT schedules and monthly creation for FRC schedules.
Tolerance Profile
You specify 10 days as the checking period for JIT schedules, since this corresponds to the release horizon. You enter 5% as upper and lower tolerance limits and choose Overall check.
In your case JIT SCHEDULE IS VALID. I hope this will clear your issue. -
All,
1.Can anyone pls tell me the path for doing creation profile for schedule agreement in SPRO?
2.Also pls explain abt creation profile?
ThanksPath
SPRO- Material Management---Purchasing -SCheduling Agreement----Maintain Creation profile ..
Definition: release creation profile
An instrument used to determine the period in which releases (types of delivery schedule) are generated against a scheduling agreement and transmitted to the vendor.
The creation profile controls the creation periodicity of the releases, the aggregation of scheduled quantities starting from the day after release creation, and the implementation of a tolerance check to ensure that releases are only created in the case of major changes to the overall delivery schedule in the system.
Example
A release creation profile for a scheduling agreement for which delivery schedule lines have been entered over several years specifies that releases are transmitted weekly from 01.01 to 12.31 of the first year. The release quantities are to be aggregated as follows:
For a period of 10 days starting from the current date of release creation: no aggregation. From the tenth to the thirtieth day: on a daily basis. From the thirtieth day to the sixtieth day: on a monthly basis.
Reward if helpful -
Schedule agreement-JIT and creation profile (are necessary to maintain)
Hi Friends ,
I am doing schedule line agreement in this way.
1) Create SA agrement -ME31L
2) Maintain schedule lines -ME38
3) MIGO-
4)MIRO
That is working.
A ) But then why it is necessary to maintain in material master under purchasing tab- JIT
and
B) in vendor master -Creation profile
Please can u explain me A and B
Regards,
Mahesh.Hi Mahesh,
Maintaining JIT in material master is necessary only if you wish to Use JIT scheduling agreement schedule lines, if you are fine with only FRC schedule line, then you don't need to update this field. This is a control on the material level, like you know if a certain material can't be managed on a JIT level then you will not use it, so JIT agreements can't be created for it.
I don't feel Creation Profile is mandatory for vendor master, because you can opt to enter the creation profile in the Scheduling agreement additional data. Creation profile basically has a lot of control function, here isthe abstract from SAP Help
The creation profile determines:
Which event triggers the creation of a scheduling agreement release (changes involving the lines of the overall schedule and/or the reaching of the next transmission date)
How the delivery dates are shown (aggregation and release horizon)
Whether Backlogs and Immediate Requirements are determined and shown in the scheduling agreement (SA) release
Whether a tolerance check is carried out for SA releases that are created due to changes to the overall delivery schedule in the system
Regards
Chandra Shekhar -
GRN vs Schedule Agreement validity Date
Dear All,
We got very severe issue, we have created the Scheduling Agreements(document type -LP) between the two plants (Cross Company Codes) with the vendor code created under the Account Group : 0007.
During the creation of the Scheduling Agreements , we have not assigned the Plant code in Vendor Master (In Purchasing organisation data-> Extras-> plant Assignment).
So the shipping data did not get determined per material in scheduling agreement and scheduling agreements created as the normal Scheduling agreements (NOT as Stock transfer scheduling agreements)
and plants started doing the transaction(In Production server) as Normal Purchase Sale (by creating sale order and GRN via Scheduling Agreement) .
But now , it is required to change the process via Sale -Purchase to Stock Transfer , so we have changed the Vendor master and assign the Plant to the vendors.
But the transaction has been going on already created scheduling agreements. So how Delete/Close the existing scheduling agreements. and we need to create new scheduling agreements(Stock transfer scheduling agreements).
I have tried out with Validity period (by shortning the Validity Period) , so that existing SA should NOT be invalid for GRN, but GRN date has no control with Validity period of SA.
Please suggest how to go about it.
Regards
NitiinHi,
Try This
Do not maintain Delievry Schedule in Me38 or you can try with setting Block vendor in Source List or you can change validity period in source list.
Regards,
Vikas -
Hi
Please explain the function of the Time dependent indicator in the Schedule agreement doc. type.
What is the effect of having and removing it for the Schedule agreement.
regards
arvindHi,
I would suggest you to check the note 456691.
Check the Customizing for the document type of the scheduling agreement
(Transaction OMED).A price determination only occurs during the creation
of the scheduling agreement if the 'time-dependent conditions' indicator
is NOT set.
Conditions in the info record and contract are master conditions.The
difference between quotations and scheduling agreements is made by the
document type (indicator 'time-dependent conditions').Master conditions
are limited to a certain validity period, have master data status and
are rather valid on a long-term basis.
Master conditions, which refer to more general price agreements such as
vendor, material type, ... (general conditions, Transactions MEK*), can
also be represented.
Generally conditions in purchase orders are document conditions.They are
only valid for this document.Document conditions are also available for
quotations and scheduling agreements if this is set in Customizing.
Regards,
Edit -
Scheduling Agreement not going to srm
Hi,
Wwhile transfering the SA thru a msg type , we are not able to post it to SRM wen we use the doc type xxx, but if we use the doc type yyy it gets posted .
Please let me know wat setting needs to be changed to send the SA to SRM using doc type xxx thru the msg.
Regards,
ManuHi
<b>Please go through the links below -></b>
http://help.sap.com/saphelp_srm50/helpdata/en/17/303f412124de2be10000000a1550b0/frameset.htm
Re: BADI for Backend Scheduling Agreement
try to transfer scheduling agreement in sus
http://help.sap.com/saphelp_srm50/helpdata/en/da/151241c738f423e10000000a155106/frameset.htm
http://help.sap.com/saphelp_srm50/helpdata/en/42/f9a830c2673ee2e10000000a1553f6/frameset.htm
http://help.sap.com/saphelp_srm50/helpdata/en/42/f9a572c2673ee2e10000000a1553f6/frameset.htm
http://help.sap.com/saphelp_srm50/helpdata/en/7d/0a093f7c392e5ae10000000a114084/frameset.htm
Scheduling agreement in SRM 5
http://help.sap.com/saphelp_srm50/helpdata/en/38/4cc5376848616ae10000009b38f889/frameset.htm
http://help.sap.com/saphelp_srm50/helpdata/en/fa/8a0d41f0faef23e10000000a155106/frameset.htm
http://help.sap.com/saphelp_srm50/helpdata/en/15/c9df3b6ac34b44e10000000a114084/frameset.htm
Re: Benefits SRM contracts compared to MM contracts
Re: Transfer contracts form backend R/3 to EBP
Error in Backend Scheduling agreement Creation
SRM -ECC: Scheduling Agreement Failing
Regards
- Atul -
Scheduling agreement from backend to srm
Hi SRM Gurus,
Can I have the stepup step procedure for a backend scheduling agreement transfer to SRM.
Means we have a scheduling agreement in backend but the further process we have to do in SRM like schedule lines generation.
I suppose we need to have PDP.
Can anyone suggest?
Reg.,
Sridhar.Hi
<b>Please go through the links below -></b>
http://help.sap.com/saphelp_srm50/helpdata/en/17/303f412124de2be10000000a1550b0/frameset.htm
Re: BADI for Backend Scheduling Agreement
try to transfer scheduling agreement in sus
http://help.sap.com/saphelp_srm50/helpdata/en/da/151241c738f423e10000000a155106/frameset.htm
http://help.sap.com/saphelp_srm50/helpdata/en/42/f9a830c2673ee2e10000000a1553f6/frameset.htm
http://help.sap.com/saphelp_srm50/helpdata/en/42/f9a572c2673ee2e10000000a1553f6/frameset.htm
http://help.sap.com/saphelp_srm50/helpdata/en/7d/0a093f7c392e5ae10000000a114084/frameset.htm
Scheduling agreement in SRM 5
http://help.sap.com/saphelp_srm50/helpdata/en/38/4cc5376848616ae10000009b38f889/frameset.htm
http://help.sap.com/saphelp_srm50/helpdata/en/fa/8a0d41f0faef23e10000000a155106/frameset.htm
http://help.sap.com/saphelp_srm50/helpdata/en/15/c9df3b6ac34b44e10000000a114084/frameset.htm
Re: Benefits SRM contracts compared to MM contracts
Re: Transfer contracts form backend R/3 to EBP
Error in Backend Scheduling agreement Creation
SRM -ECC: Scheduling Agreement Failing
Regards
- Atul
Maybe you are looking for
-
My wife and I have iPhone 4S's but are currently sharing the same iCloud account. I would like to set her up with her own account but I would like to share contacts and photos on the iCloud. Is there a way to share this across 2 iCloud accounts? Th
-
Mapping activity step in BPM and related complex functions/conversions
Hello Experts, a) I am trying to find out the complex conversions used in BPM process modelling activities such as mapping activity. What are the different complex conversions/functions which are very widely used/required in BPM projects? I am talkin
-
Hello, Would some one please help me? I have a loop which continuously aquire images from a camera and saves it to a video . I would like to crop a region of this video by passing the co-ordinates of a rectangle.After I have the cropped video, I woul
-
PHP Form Sending E-mail without inputs in Safari
Hi everyone. I'm having a problem and can't seem to find what the problem is. My form works fine in chrome and firefox but not safari. Below is my code. Please let me know if you can help. HTML Code <form id="form_280313" class="appnitro" method="pos
-
Changing sampling time for logging data in DSC
currently I created lots of shared variables by Modbus server. I'm wondering when I active logging data to Citadel, there is any option for change sampling time for logging data or not. I only saw option for changing base on percentage of value diffe