Credit Check with Third Party Process

Hi Gurz,
I know about third party process but my problem is with credit check of the customers.
If customer has not got enough credit limit to process the order in normal senario credit controller has to manually release the order as system blocks it. In third party process system will give you warning message when saving sales order about customer credit limit but allows you to save sales order. Once saving sales order it authomatically creates Purchase Requisition. From PR purchasing creates P.O. with out knowing about customer credit limit issue. and so on. In other words goods supplied to customer even though credit limit has exceeded. This user don't know untill raising the invoice to the customer which is too late.
Can we stop creating Purchase requisition or block purchase requistion for credit check ? or there are better way of handling the process for credit check?
Thanks in advance

Hi,
Try to implement OSS note -738171 - Delivery block does not influence purchase requisition.
Following is the details of the note;
Summary
Symptom
The delivery block in a sales order does not prevent the generattion of the purchase requisition in a third-party or individual purchase order item. Regardless of the Customizing settings in the delivery block, the system confirms the TAB or TAS item and generates the purchase requisition.
More Terms
Order, purchase requisition, PReq, TAB, individual purchase order, individual purchase order item, TAS, third-party, third-party item, SD order, delivery block, VBAK-LIFSK, VBEP-LIFSP
Cause and Prerequisites
Solution
Create a user-specific user requirement (for example, 902: BEDINGUNG_PRUEFEN_902 in Include LV07A902) as a copy of standard user requirement 102 and assign it to requirement 'Preq' by using Transaction OVB5.
In the source code of the user-requirement, program a check for the delivery block which, if necessary, triggers an ERROR_EXCEPTION which prevents the generation of the purchase requisition.
You can use the existing check for the credit block as a template.
Regards,

Similar Messages

  • Availablity Check with Third Party Orders

    We have inventory on hand (from returns- customers refused order or canceled order at the last minute) and would like to do a check on inventory before the purchase req is created. Is there any automated way of doing this? I know that I could change the item cat on the material master, but this is difficult because there are many third party products that we sell. Any insight will be greatly appreciated.

    Hi,
            first u maintain item category determination for both TAN,TAS.during sales order creation if system does not confirm the required quantity after carrying out availability check then u change the item category to TAS system automatically creates purchase requisition, any how we have to change the item category in the sales order when ur treateing a material as both normal item and some times third party item.
    withregads,
    kirankumar vemula

  • Third party process with Valuated sales order stock

    Hi All,
    We have third party sales order process with valuated sales order stock. The problem is that in the theird party PR which is triggered directly from the sales order it determines a stock account which is assigned to the BSX key in OBYC.
    But since this is third party processing as per my understanding a consumption account assigned to key GBB-VAX (since account assignmnt category is X) should get determined, so that when the GR is done against the PO a consumption posting is done in the background.
    I am not able to understand if the system is determining the stock account due to the fact that it is valuated sales order stock and if so, what should happen after GR. Should we have a stock created for the material which is physically directly delivered to the customer?
    Regards,
    V S

    Hi,
    Check GBB-VKA which is defined in OME9 for your ''E'' Account Assignment Category that SAP will debit upon GR posting
    Also check "X" GBB-VAX and the G/L account assignment in OBYC
    The posting on GR should be debit KBS -Credit GR-IR
    Thanks
    Diwakar

  • Third party process - error

    Dear all,
    In the third party process, have we to create outbound delivery?
    I have created PO from PR of  a third party sales order. And now, i don't understand to delivery to customer.
    Pls tell me solution.
    If we have to create outbound delivery from that sales order, i get errors:
    Item category TAS is not defined and Item category TAS is not defined, so item 000010 will be disregarded. I also checked in VOV4, VOV6, VOV7.
    Thank you,

    Hi
    In third party scenario the material is delivered to your customer thro out side vendor
    You are billing your customer
    Vendor is billing you for the material he has delivered to your customer
    Here we dont make any delivery
    Process Flow for 3rd Party Sales
    Customize the third party sales in summary:
    1. Create Vendor XK01
    2. Create Material u2013 Material Type as "Trading Goods". Item category group as "BANS".
    3. Assign Item Category TAS to Order type that you are going to use.
    4. A sale order is created and when saved a PR is generated at the background 
    5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
    6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO 
    7. Goods receipt MIGO 
    8. Goods issue
    9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the configuration and,   therefore, there is no delivery process attached in the whole process of Third party sales.
    10. Billing
    SD -  3rd party sales order Create Sales Order
    VA01
          Order Type
          Sales org, distribution channel, div
          Enter
          Sold to
          PO #
          Material
          Quantity
          Enter
          Save
    SD -  3rd party sales order View the PR that is created with a third party sales order
    VA01
          Order Number
          Go to Item Overview
          Item ->Schedule Item
    SD -  3rd party sales order View the PR that is created
    ME52N
          Key in the PR number
          Save
    SD -  3rd party sales order Assign the PR to the vendor and create PO
    ME57
          Key in the PR number
          Toggle the "Assigned Purchase Requisition"
          Execute
          Check the box next to the material
          Assign Automatically button
          Click on "Assignments" button
          Click on "Process assignment"
          The "Process Assignment Create PO" box , enter
          Drag the PR and drop in the shopping basket
          Save
    SD -  3rd party sales order Receive Goods
    MIGO_GR
          PO Number
          DN Number
          Batch tab , click on classification
          Serial Numbers tab
          Date of Production
          Flag Item OK
          Check, just in case
          Post
          Save
    SD -  3rd party sales order Create Invoice
    MIRO
          Invoice Date
          Look for the PO , state the vendor and the Material
          Check the box
          Click on "Copy"
          Purchase Order Number (bottom half of the screen)
          Amount
          State the baseline date
          Simulate & Post
          Invoice Number
          *Invoice blocked due to date variance
    SD -  3rd party sales order Create a delivery order
    VL01N
          In the order screen , go to the menu Sales Document , select "Deliver"
          Go to "picking" tab
          State the qty and save
    SD -  3rd party sales order Create a billing document
    VF01
          Ensure that the delivery document is correct in the
          Enter
          Go to edit -> Log
          Save
    Hope the process is very clear to you now
    Regards
    Raja
    Edited by: ramanathan raja on Sep 18, 2008 3:06 PM

  • How to handle the cost in third party process

    Hi experts,
    As the request, my client has some trading goods. the customer buy them from my client. but there is no stock in my client. for this transaction, my client send PO to the vendor and the vendor delivers the products to the customer directly. After my client recieve the shipping notification, they create the invoice to end customer. So i want to use the Third-Party Function.
    But i have a confuse. How dose sap process the cost of trading goods(HAWA) in standard? you know, there is no stock for the trading goods, how to get the condition value of cost(VPRS)? Is there any special setting for the trading goods master data or some parameters in other place?
    can anyone give some supports? Thank you very much.

    Hi Dave,
    You can capture vendor price in billing document as a cost.
    Check the following settings.
    1) select the determine cost field in third party item category.
    2)  Billing relevance F
    3) check the VPRS condition type in pricing procedure. It will come after total amount.
    VPRS   statistical
    Subtotal = B
    Requirement = 4
    Now create a sales order with third party material and maintain price E.g  500 USD
    system will take VPRS value from material master in sales order level. E.g 300 USD. ( In billing level only system copies vendor price as a cost )
    Do the following transactions after sales order.
    Create a purchase order ME21N  with reference to PR( take the PR number from Sales order)
    In purchase order maintain price in item conditions tab E.g 320 USD.
    Goods receipt   MIGO
    Vendor invoice  MIRO
    Now create a Billing document with reference to sales order number.
    Here system takes VPRS cost 320 USD(PO price) instead of 300 USD which we maintained in Material master.
    Regards,
    Chandra

  • Intercompany invoice not getting created in third party processing

    Dear Gurus !
    I am facing a problem in creating the intercompany invoice in case of third party order processing.
    In our organisation , for any type of sale two billing documents are creared :
    1) Commercial Invoice under the co. code for which sales org. is maintained at the sales order bookin level .
    2) Intercompany Invoice under the co. code in which plant is maintained which is used at the sales order level as delivering plant.
    So, as per the configuration req. for third party processing  , i have created Sales order ( with automatic Purchase requistion generated ) , Purchase order creation with reference to the Purchase requisition , goods reciept ( MIGO ) and invoice reciept ( MIRO ) , then billing doc. or commercial invoice ( VF01 ) with the generation of accounting document and finally the intercompany invoice ( VF01 ) .
    But i am facing the problem in final stage , that is , intercompany invoice creation .
    Error Message : No open billing quantity has been determined .
    I have checked the copy control for sales order to intercompany invoice and still not able to resolve it .
    Please reply which setting needs to be done for this .   
    Awaiting your response , that what copy control settings is required .
    Thanks .....

    Hi Buddi / Mahesh / Kiran ,
    It ' s good to see all of your opinion . But my problem has not been resolved .
    I am implementing third party processing in my organisation , where the customer is an export customer ( outside India ) . Hence , this is a merchant export .
    All the configurations / Customisations have been done for this process .
    The process is running fine till commercial invoice , but the problem is in intercompany billing doc. creation.
    I am again repeating - Error message : No open billing quantity has been determined.
    Explanation of the process :
    1) The order has been booked with item category TAS alongwith the item cat. group as BANS for the material used in the order .
    2) The sales area is 1020 / 30 / 35 . Here , 1020 is sales org . under company code 0079 , 30 is export's distribution channel and 35 is the division for components .
    3) The delivering plant used in the sales order is 1009 which is under co. code 0077. The price / condition record maintained for this material is in USD / EUR as it is a case of merchant export .
    4) The purchase requisition is generated automatically when the order is saved . It can be seen at VA02 - > Item details - > Schedule Lines .
    5) With the help of this PR no. , i have created a purchase order for vendor which is maintained under co. code 0077 asking for material in plant 1009 which we need to export / supply to the customer.
    6) The value of material per piece in the P.O. is coming from the material master record -> Accounting 1 view - > Moving av. Price .
    7) Now, the Purchase order is saved . With the help of this P.O. no. , goods reciept ( MIGO )is done .
    8) After MIGO , Invoice reciept or MIRO is done under company code 0077.
    9) After MIRO , customer ' s invoice is created through VF01 .
    Remember : This is an order relevant billing , no delivery or PGI will happen here because the material is not coming into the plant 1009 .
    10)The billing document ( order - related billing doc.) is created and the accounting document is also created under co. code 0079 in USD .
    Till this stage , everything is running successfully as per business requirement , but i am facing the problem in the final stage , that is creation of intercompany invoice under co. code 0077 which is in INR .
    In all other sales document types used in our industry , the process is same , that is : a) Sales order creation b) Delivery and PGI c) Billing doc. creation with accounting doc. under co. code 0079 and finally d) Intercompany invoice with accounting doc. under co. code 0077 and excise invoice creation with reference to intercompany invoice.
    In the above, problem is not there becuase orde is delivery relevant , hence copy control is maintained for interco. billing to delivery type.
    But in the new process , that is , third party processing , sales order relevant billing is done . so i suppose there will be a copy control for intercompany billing and sales doc. type , but i am not able to resolve it .
    Hence , please understand the process before suggesting .
    Thanks and awaits reply........

  • About third party process

    hi friends,
    in third party order processing what is the need of creating purchase requisition, cant we create purchase order with out refrence to puchase requisition?
    Thanks and regards
    sudhakar

    hi
    Yes, wat you said is correct we can create PO with Reference to PR.
    In some situation we need to show this information to the auditing people ( Internal Process ) for that they need to show the reference doct, beacause of this order only we are created PO..
    And also one more scenario
    One customer is palcing material for 100 item but we have only 80 in that case we need to deliver the good the customer from our third party vendor in this sitution also we need some refrence document which is linked to Our Order..
    Because we need to create PR
    Ihope it is clear, Rewards if it is Usefule
    Regards
    Durga Prasad
    Third Party Process
    Customize the third party sales in summary:
    1. Create Vendor XK01
    2. Create Material – Material Type as "Trading Goods". Item category group as "BANS".
    3. Assign Item Category TAS to Order type that you are going to use.
    4. A sale order is created and when saved a PR is generated at the background
    5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
    6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
    7. Goods receipt MIGO
    8. Goods issue
    9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
    10. Billing
    SD - 3rd party sales order Create Sales Order
    VA01
    Order Type
    Sales org, distr chnl, div
    Enter
    Sold to
    PO #
    Material
    Quantity
    Enter
    Save
    SD - 3rd party sales order View the PR that is created with a third party sales order
    VA01
    Order Number
    Goto Item Overview
    Item ->Schedule Item
    SD - 3rd party sales order View the PR that is created
    ME52N
    Key in the PR number
    Save
    SD - 3rd party sales order Assign the PR to the vendor and create PO
    ME57
    Key in the PR number
    Toggle the "Assigned Purchase Requisition"
    Execute
    Check the box next to the material
    Assign Automatically button
    Click on "Assignments" button
    Click on "Process assignment"
    The "Process Assignment Create PO" box , enter
    Drag the PR and drop in the shopping basket
    Save
    SD - 3rd party sales order Receive Goods
    MIGO_GR
    PO Number
    DN Number
    Batch tab , click on classification
    Serial Numbers tab
    Date of Production
    Flag Item OK
    Check, just in case
    Post
    Save
    SD - 3rd party sales order Create Invoice
    MIRO
    Invoice Date
    Look for the PO , state the vendor and the Material
    Check the box
    Clilck on "Copy"
    Purchase Order Number (bottom half of the screen)
    Amount
    State the baseline date
    Simulate & Post
    Invoice Number
    *Invoice blocked due to date variance
    SD - 3rd party sales order Create a delivery order
    VL01N
    In the order screen , go to the menu Sales Document , select "Deliver"
    Go to "picking" tab
    State the qty and save
    SD - 3rd party sales order Create a billing document
    VF01
    Ensure that the delivery document is correct in the
    Enter
    Go to edit -> Log
    Save

  • Subcontracting & Third party process

    All,
    I am combining the subcontracting and third party process so that once a sales order is created, a subcontracting PO gets generated. At this point, we can either deliver goods from our inventory, or deliver from an external supplier. Finally the subcontractor sends goods to our customers.
    I have some questions for this process:
    1. I want to tell the subcontractors to send finished goods to our customers. There is a field in the PO - 'customer number' which will tell the subcontractor where to deliver to. However this field is only active for 'third party POs' (item category S). I have a subcontractor PO (item category L), so this field is inactive. How do I activate this?
    2. Finished goods are sent to the customer, so I assume I should be creating a statistical goods receipt. However my GR is an actual posting. How do I make it statistical?
    3. Delivering goods from an external supplier involves creating another PO and filling in the 'SC vendor field'. How do I tie this PO to the subcontract PO?
    I hope the questions are not too confusing. Thanks in advance,

    pistols123 wrote:
    > 1. I want to tell the subcontractors to send finished goods to our customers. There is a field in the PO - 'customer number' which will tell the subcontractor where to deliver to. However this field is only active for 'third party POs' (item category S). I have a subcontractor PO (item category L), so this field is inactive. How do I activate this?
    >
    > 2. Finished goods are sent to the customer, so I assume I should be creating a statistical goods receipt. However my GR is an actual posting. How do I make it statistical?
    >
    > 3. Delivering goods from an external supplier involves creating another PO and filling in the 'SC vendor field'. How do I tie this PO to the subcontract PO?
    Hi,
    For point 1. You can try with screen transaction variant for ME21n in T.code: SDH0 and check, you may have to include some logic, so discuss with ABAPER.
    For Point 2. I think For goods receipt from subcontractor should not be statistical GR, Since we are sending goods (Raw Material) which has a value so it will have an implication on the inventory value while sending the goods and while receiving the goods.
    For point 3. You need to go for ABAP enhancement.
    Hope this helps.
    Regards,
    sharan

  • Doubt about third party process

    Hello SD Consultants.
    Recently i joined in a company...so here we implement third party process.. My colleague has implemented third party process.
    here he has done...va01...me21n...migo...miro and vfo1......but when i take coaching they dint say about migo in third party...so
    friends please help me..what is the relevance of migo here...we are not receiving any goods from  vendor...so whats the use...
    Thanking you

    Dear K. Ram
    MIGO - goods recipt, MIRO - invoice verification.
    Third party process sales order > PR > P.O  > MIRO > Invoice (delivery done by vendor to customer)
    Individual purchase order (IPO)   sales order > PR > P.O  > MIGO >  MIRO > Invoice (delivery done by vendor to company n then to customer).
    You are right concept wise. Ask ur friend or team leader and try to have a discussion on business process.
    Also check the Item category group  is BANS (Material master), Item category  TAS (Sales order)  for third party .
    If it is showing BANC, TAB. It is IPO as mentioned above and u have been disguised with business process explanation from your friend/ seniors or they din't understand the process.
    You can discuss n debate , also raise a point of reducing the master data by eliminating migo transaction in third party.
    This is what been taught to us too.
    Regards
    Pavan Kumar

  • Requirement to bill customer before vendor invoice in third party processing

    We have a requirement to bill a customer before the vendor invoice in third party processing. The reason behind this is because the vendor send invoices only once in a month and the customer cannot wait for so long to to receive their invoice from the business.
    I saw some discussions that the third party processing with shipment notification can be used however when I check the business flow in that case I see the following.
    A Third-Party Sales Order is created and a purchase requisition is generated automatically 
    A list of purchase requisitions to be assigned is displayed 
    The assigned purchase requisitions are converted into purchase orders 
    The purchase orders are approved 
    A statistical goods receipt is posted 
    The vendor invoice is verified and posted 
    The billing is created
    It clearly says that the customer billing document is only possible after entering the invoice from the vendor. Which would be the best way to fullfill this requirement?

    Do you mean the goods issue done by the vendor to the customer in the vendor system? And this quantity will be copied into our ( where the third party order is created) system?
    No, MIGO done by in our company system only. May be you might have misunderstood because of  my sentence.instead of company i mentioned as Vendor.
    For Vendor this process will become as standard sales and he will do PGI. However in our system we do MIGO .
    Suppose the customer ordered 10 Qty. Vendor delivered 2 Qty wouldn't the above equation Order qty- MIGO qty= Invoice qty be 10-2= 8? but we should be really billing the customer only for 2 right?
    No you have mistaken my idea, it was not a formula just i was giving example.
    Billing qty is nothing but it is qty copies from source document to target document.
    E
    Goods receipt quantity less invoiced quantity
    for example order qty is =10 and vendor delivered first time 2 qty to the customer and he billed our company for 2qty and we billed the customer for 2 qty.
    And next time let us assume again Vendor delivered 4 more qty and billed us 4qty.And this time when you are billing the customer in VF01 system will propose the 4qty only( total goods receipt qty 6 - already invoiced qty 2).
    Hope now you understood the meaning of E(goods receipt qty less invoices qty).
    And did you try your requirement as mentioned in my first reply?
    thanks,
    Srinu.

  • Need connectivity of SAP Oracle with Third Party tool with dsn

    Hi Friends,
    We need to access SAP's Oracle database with third party tool with the help of dsn creation. For that we need to create 2 staging tables and need a new segment for these tables. Our data will move from SAP transactions to these 2 tables and we want to fetch this data via dsn into another third party S/W.
    I am unaware of such kind of working, can you please help me how to create new segment and how to create dsn for accessing tables in this segment.
    Our requirement is as follow.
    The staging tables are required in the SAP database with user name and password. The user should have all access to the staging table only.
    Requesting your kind help on this issue. Please suggest for further processing of activity.
    Rgds, Krishan Raheja.

    Hi,
    Common way to integrate SAP (database) with third party Application is to use and implement SAP Connector (Java or .Net).
    Using this, you can fetch the data from SAP database to use it in Third party application.
    As per my understanding the method you mentioned, will void the SAP database license term.
    So Please check before doing such configuraiton. Also that method is NOT recommended..
    Regards.
    Rajesh Narkhede

  • Free of charge third party process.

    Dear Gurus,
    I want to create a sales order with a third party material with zero price, create a PO and invoice the PO with zero value.
    Could you please tell me how this can be achieved and what are the necessary settings in config to be changed?
    Thank You
    Kumar

    Hi Kumar,
    the third party process is as follows:
    1.Customer will order the material from the Company X.
    2.Company X will not have stock of the material.
    3.Company will raise a PO for the material to the Vendor & asks the Vendor to deliver the material to the customer.
    4.Vendor will directly deliver the material to the customer & will send the invoice to the Company X.
    5. Company X will then raise a invoice to the Customer wrt on the Sales order.
    Create a Sales order with item category TAS, Schedule line category CS(standard).Once the SO is saved, go to the change mode of the SO, go to Schedule lines tab, & note down the PR number.
    With reference to the PR, create the PO & then MIGO and MIRO.
    Then create the invoice wrt the SO.
    Let me know if you hav any problems.
    Regards,
    MP

  • Third Party Process and Inventory

    We are using the SAP function "Third-Party Processing". We are using the function in it's standard (SAP R/3 4.7).
    The auditor now has the following issue: Shipping the goods starts after paying the goods. Out of this, while shipping the goods, we are the owner of them. In this circumstance the ship is our warehouse.
    SAP does not allow an Inventory Management within Third-Party Processing:
    "Since a third-party order involves a movement from the vendor direct to the customer, Inventory Management is not in any way affected. If you wish to document the movement in the system, however, you can create a goods receipt for the third-party order."
    With the SAP functions in this scenario it is correct that the warehouse stock is not being impacted. This is a conflict with the opinion of the auditor.
    Let me explain in detail what is wrong out of the view of our auditor:
    For example we initiated the order of a customer in June and we have paid the goods in June. The shipment starts in June and the goods will arive in July. Due to the fact, that we are the owner of the goods on the ship, we have to increase the stock. This is the opinion of our auditor.
    Does any body know, how to solve the issue? How do you manage Third Party Processing & Inventory?

    Some auditors just dont understand the SAP process. Instead of talking to weak users, they should talk to SAP directly.
    What about shipments from standard sales orders that are shipped end of June and do arrive at the customer in July?
    When do you bill your customer? when the goods arrives there, or earlier? Depending on the Incoterms you may still be the owner until the truck is unloaded.
    If you change your process and post goods receipt to your warehouse, then you show inventory where no physical inventory is, you posted a goods receipt without a physical receipt. I am sure the next auditor will not allow such therotical process.
    Get together, IT consultants of FI and MM and SD, strong business people for the same modules and the auditor, and discuss and find an optimal solution.And let the auidor sign the decision paper!!! Very important, I recently had to convice German auditors because they had different opinion than the Australian and US auditors of the same auditing company (and the issue had nothing to do with local legal requirements).

  • Third Party Process ASN

    We have configured a third party process for specific sales orders.  We receive an inbound ASN with shipment information and then we create the outbound invoice, directly from the sales order, after we post the inbound invoice.  Is it possible, and how, to create an outbound ASN, from our system to the end consumer, based on the information in the inbound ASN?  We would prefer not to create an outbound delivery document in our system and would like to generate the outbound ASN off the outbound invoice or the original sales order.
    Thanks for the help.
    Chris

    We have configured a third party process for specific sales orders.  We receive an inbound ASN with shipment information and then we create the outbound invoice, directly from the sales order, after we post the inbound invoice.  Is it possible, and how, to create an outbound ASN, from our system to the end consumer, based on the information in the inbound ASN?  We would prefer not to create an outbound delivery document in our system and would like to generate the outbound ASN off the outbound invoice or the original sales order.
    Thanks for the help.
    Chris

  • Third Party Process Issue

    Hello Friends,
    Need Your Inputs for below issue"
    in third party process: SO is created with 2 line items, -->PR-->PO--> Vendor delivers only 1 item and MIRO is done for it,
    But
    During Creation of Customer invoice Both Line items are considered in the Invoice(F2)
    1st line item with the Value of X Rs,  and 2nd Line item with zero value ( as there is no delivery done to customer and hence no invoice via MIRO)
    Requirement is:
    The 2nd Line item should not be considered at all during Customer invoice creation.
    Item cate used is TAS with billing relevance F (i,e standard config)
    Kinldy help
    regards

    hello srinu..
    SO is created with 2 line items, PR is auto created. 1 PO is created (with 2 line items)
    MIRO is done w.r.t PO line item 10 only,
    then when i create customer invoice from SO i get 2 line items, for 1st line item there is value populated. 2nd line item has zero value,
    The requirement is that if there is no Processing of SO for line item 2 ,, then it should not be populated in the customer invoice.
    Regards

Maybe you are looking for