Cross docking - planning not possible

I have set the customizing settings (maintain warehouse level settings ; defince cross-docking relevancy for movement type 101 and 350 ; maintain number rangers) for cross docking but I am still not able to link an inbound TR to a outound TR (same quantity / material).
The error messages "No matching inbound documents found" occurs when I try to "Plan the cross-docking".
Scenario
outbound TR for KANBAN WM replenishement (mvt 350)
inbound TR for goods receipt posting (mvt 101)
Thank you in advance!

Hello,
Can anyone reply this?
I don´t have a solution yet.
Thanks a lot,
Jesus

Similar Messages

  • Inbound deliveries not appearing Cross dock plan

    Hi,
    I am setting up Cross docking. However, inbound deliveries do not show up in the Cross dock planning screen. They only appear when I create a PGI for the inbound delivery.
    Message I get is :
    No inbound documents have been selected for planning
    Message no. LXDCK003
    What do I need to do in order to have the Inbound deliveries appear?
    Thanks

    Had you find a solution?? I have the same problem, I can´t see the inbound delivery in the cross docking monitor. RG, Daniel

  • Cross-Docking Planning (TR x Delivery)

    Hello,
    I'm working with Cross-Docking in the ECC 6.0... And I had sucess with the matching between a Inbound TR and Outbound TR (The same category)!!!
    But, I can't to do the matching between a Inbound TR and Outbound Delivery...
    Could anyone tell me if this combination possible?
    Thanks in advance.
    Regards
    Diego

    Hello,
    Can anyone reply this?
    I don´t have a solution yet.
    Thanks a lot,
    Jesus

  • BI Integrated Planning: Not possible to enter „new rows“ in Webtemplate

    Hello Experts,
    we are trying to use the BI integrated planning, in particular we want to use the manual planning functionality with „new rows“, that means we want to create new rows for combinations of characteristics for which no data has been entered / loaded yet.
    To test this functionality, we´ve built a very simple example consting of
    -     a real time info cube with 4 characteristics, 1 key figure and one time characteristic
    -     an aggregation level which contains the 4+1 characteristics
    -     an input-ready query
    -     a web-template with an analysis grid, sth. to select the characteristics, eg. drop-down-boxes or a navigation pane and a button to save the entered data
    But now it is not possible for us to create new rows to enter data. The error message that is displayed in the top of the screen reads „No new row / column inserted, since not all characteristics have a lead column“.
    The strange (?) thing is, that if we use the navigation pane, it is possible to draw the time characteristic as the only element to the „rows“ – and then we can enter the time characteristic, but not the key figure !
    We´ve succeeded in entering data for „new rows“ using BexAnalyzer, but we really need this functionality within a web template.
    Btw, I think we´ve done the necessary adjustements for the web template (e.g. for the analysis grid „number of new rows“ and so on)
    According to our SAP Basis Administration, the OSS-Note No 984601 has already been installed.
    What do we have to do if we want to enter data in new rows ? We would already be happy with a simple example / how to to know what we have do to do to build a very simple web application !
    Many thanks for any help !
    Frank

    Okay, it has been solved (answered by SAP-Support) ! It´s so easy: the only thing you have to do is to display only keys, no text, in the query !

  • BI Integrated Planning: Not possible to enter u0084new rowsu0093 in Webtemplate

    Hello Experts,
    we are trying to use the BI integrated planning, in particular we want to use the manual planning functionality with „new rows“, that means we want to create new rows for combinations of characteristics for which no data has been entered / loaded yet.
    To test this functionality, we´ve built a very simple example consting of
    - a real time info cube with 4 characteristics, 1 key figure and one time characteristic
    - an aggregation level which contains the 4+1 characteristics
    - an input-ready query
    - a web-template with an analysis grid, sth. to select the characteristics, eg. drop-down-boxes or a navigation pane and a button to save the entered data
    But now it is not possible for us to create new rows to enter data. The error message that is displayed in the top of the screen reads „No new row / column inserted, since not all characteristics have a lead column“.
    The strange (?) thing is, that if we use the navigation pane, it is possible to draw the time characteristic as the only element to the „rows“ – and then we can enter the time characteristic, but not the key figure !
    We´ve succeeded in entering data for „new rows“ using BexAnalyzer, but we really need this functionality within a web template.
    Btw, I think we´ve done the necessary adjustements for the web template (e.g. for the analysis grid „number of new rows“ and so on)
    According to our SAP Basis Administration, the OSS-Note No 984601 has already been installed.
    What do we have to do if we want to enter data in new rows ? We would already be happy with a simple example / how to to know what we have do to do to build a very simple web application !
    Many thanks for any help !
    Frank

    Hi Frank,
    please check the following as noted in the online documentation:
    "You can enter plan data irrespective of whether data has been posted.
    If no data is available in the analysis grid, you use input help to restrict the free characteristics to a single value or drag and drop the free characteristics into the rows. You cannot use characteristics in the columns and can use one structure only."
    http://help.sap.com/saphelp_nw04s/helpdata/en/43/f234619e3c4c5de10000000a155369/frameset.htm
    If it does not work anyway, open a customer message.
    Regards,
    Marc
    SAP NetWeaver RIG

  • Cross-Dock: No inbound docs have been selected for planning

    Hi everybody here,
    I am testing cross-docking function on our DEV environment. I set the warehouse 001 as one-step crossdocking and no opportunistic cross-docking allowed, not consider FIFO. The time ref. is delivery date & time, time window is set to 72H, release time is 2H and latest relase time is 1H.
    Then I set movement type 501 and 201 as cross-docking relevancy.
    I created 2 TRs with movement 501 and 201 with same material and same quantities. The 501 TR's planning time is 12:00, Aug 17 and The 201 TR is 23:00 Aug 17. However, when i run LXDCK to plan a cross docking with these 2 TRs, system prompts an error message "No inbound docs have been selected for planning".
    If you guys have implementation experience of cross-docking, please give me some advice, many thanks!
    Leon Xiao

    Hi,
    I am facing a similar problem, were you able to find out the reason for the problem?
    Any help is appreciated
    Thanks in advance,
    Mike

  • Customizing-IMG-structure cross docking not visible

    The customizing-IMG-structure "cross docking" is not visible / available within SAP ECC 6.0-system altough WM-module is used. It is visible via SIMGH but can not be used / displayed via SPRO.
    Could you please tell me what is the reason for this?
    In addition the cross-docking transactions can not be executed (e.g. lxdck ; "You are not authorized to monitor XDOCK").

    Hi
    Please check the following thread.
    Cross-Docking functionality in ECC 6.0
    Thanks
    Anandha

  • Cross Docking Pick TO cancellation

    Hi Experts
    I am trying to Configure the Cross docking scenario
    I have configured the following
    1. Cross-dock Warehouse level customization in SPRO-LE-WM-Cross Docking-Maintain Warehouse level Settings
    2. Cross dock relevancy for movement types in SPRO-LE-WM-Cross Docking-Define Cross docking relevancy for movement types
    3. There is no Pre-allocated stock check for both movement types 101 and 601
    4. Stock placement and stock removal confirmation required for storage types 902 and 916.
    Transaction Steps:
    1.Outbound delivery, TO created
    2.Inbound delivery created, GR done, while creating Putaway TO system is moving the stock from 902 storage type to 916 storage type
    But the pick TO created against the Outbound delivery is not cancelled and the Outbound delivery is not updated with the Putaway TO.
    Which step or config i am missing?
    Regards
    Venkat

    Hi, you have two options to configure cross-docking. Take a look at these documents for detailed explanation.
    1) Planned Cross-Docking
    Planned Cross-Docking - Cross-Docking (LE-WM-DCK) - SAP Library
    2) Opportunistic Cross-Docking
    Opportunistic Cross-Docking - Cross-Docking (LE-WM-DCK) - SAP Library
    I figure you are using opportunistic xDck based on your question.
    Could you just go through all the steps on the document I linked?
    Just go through all of the requirements, carefully inspecting if any
    of those doesn't match the process.
    First you have the settings required. Make sure they are OK.
    Then check the process flow and your documents you are testing
    with.

  • Cross Docking Configuration Issue

    Hi Experts.
    I'm trying to configurate CD following configuration guide indicated as follow:
    IMG->LE->Warehouse Management->Cross Docking->General Setting->Mantain Warehouse Level Settings.
    Problem is that Cross docking  menu not appear in my IMG Menu below Warehouse Management.
    I have the following sytem EHP4 FOR SAP ERP 6.0 / NW7.01.
    Please help.
    Thanks.

    Refer below link
    http://help.sap.com/bp_bblibrary/600/HTML/W71_BB_EN_US.htm

  • Opportunistic cross-docking not working

    Hi All,
    We are trying to implement opportunistic cross-docking process. My understanding is that during the creation of the goods receipt TO the system looks for any open picking TO and accordingly directly moves material from 902 to 916 storage type. The following configuration is done
    1. For the warehouse opportunistic cross-docking has been activating by selecting option 4.
    2. Cross-docking relevancy has been defined for movement type 101
    3. For movement type 101, the 'Consider pre-allocated' check box is not ticked
    4. In the respective movement types 1 & 2 for 'TO creation' are entered as screen control in movement types 101 and 601
    5. No automatic confirmation for TO is set up
    The following transactions are now done
    1. Create a sales order with outbound delivery and TO created (not confirmed)
    2. PO with MIGO (we are not using HU and hence no inbound delivery)
    3. Now during the creation of the TO for the goods receipt, the expectation is that the system will look for the open picking TO and will cancel the same and then create the putaway TO directly from 902 to 916. But this does not happen.
    Not sure if I am missing some setting or some transaction needs to be done differently. I went through SAP help but it does not give more details on what setting might be missing.
    Regards,
    Ketan

    Hi Jurgen,
    Thanks for the link. But I had already gone through it and configured the system accordngly. The surprising part is that corss-docking is working for outboud documents i.e. if i create a TO for inbound first and then for outbound then while creating the TO for outbound it automatically takes the source as 902 and cancels the put away TO. However for other way round where the outbound TO is first created and then the inbound, the expectation is that reverse should happen i.e. the destination in the TO should be taken as 916 and original picking TO should be cancelled. However it is not happening.
    In the link it talks about points 5 & 6 which are only for HU environment and since we do not have the same I have not configured those. But my question now would be is it that opportunistic inbound cross-docking can only be possible with HU but not required for outbound. Else I do not see any other reason why this might be happening.

  • Hi! I went to the new Apple new shop and I was looking for a dock station/ speakers for ipod. Why is not possible to listen the models not in exhibition?! How can I decide?! Just the design?! It's stupid!

    Hi! I went to the new Apple new shop and I was looking for a dock station/ speakers for ipod. Why is not possible to listen the models not in exhibition?! How can I decide?! Just the design?! It's stupid!

    Hi! I went to the new Apple new shop and I was looking for a dock station/ speakers for ipod. Why is not possible to listen the models not in exhibition?! How can I decide?! Just the design?! It's stupid!

  • Settlement of planned deliv. costs not possible if GR-related data entered

    Hi gurus,
            While doing T-code MRRL if i am entering the GR posting date and ticking the good + delivery check box an error message is trigerd 'Settlement of planned deliv. costs not possible if GR-related data entered'.PLZ reply the reson for this error.

    I Have the same problem them I realise  that :
    This message just appear if i am using doc. selection = 4 .
    tks
    Teresinha

  • Not able to link inbound to outbound in cross dock

    Hi,
    we have a warehouse managment setup in our project we are using cross dock process linking of my inboun delivery to outbound delivery. In my inbound delivery consits of 2 materials amd my outbound also consists of the same materials while i am going to connect this inbound delivery to outbound delivery. The inbound is giving all the materials and while the outbound is showing only one item cross dock monitor but the second item is present in outbound delivery but it is not displaying in the monitor tool.
    Can any one let me know.
    sunil

    Can you give me some more inputs on this? I need to know exactly what is the role of ware house there? What exactly you are doing in cross docking? Are you shipping the material received through inbound process by just putting in another truck? What mvt types are used here both for inbound and out bound?

  • Capacity planning is not possible for this info structure

    Hi Gurus,
    When I create Rough cut planning profile, I am getting error message ""Capacity planning is not possible for this info structure""
    I am using info structure S994 copied copied from standard info structure.
    Please suggest to oversome this error.
    thanks  and regards
    Murugesan

    Hi,
    Make sure the capacity planning relevant field is maintained for the Infostructure config setttings in MC7F.
    regards
    Ratan
    Edited by: Ratan on Aug 10, 2009 7:49 PM

  • Cross Docking for stock category Q (inspection stock)

    Hello everyone,
    My client uses cross docking in 4.7 release and recently a requirement came up where they wanna be able to cross dock stock received from production while the User Decision from QM is still pending.
    I have tried to walkthrough the code behind planned/opp cross docking and realised that only available stock is taken into consideration.
    I d be really grateful if anyone could suggest how to best approach and tackle this issue? Please consider that the quant should not lose the inspection lot number so that once UD is given, the stock category changes automatically.
    Thank you
    Kind Regards

    Yes it is possible. In the IM/WM interface tables, in the second table, you can vary the process according to stock status. See the third column.
    LogisticsExecution \ Warehouse Management \ Interfaces \ Inventory Management \ Define Movement Type
    Following is the config. help text for the field
    Special Stock Indicators for Whse Mgmt
    Use
    In the Materials Management system you can post different transactions using one movement type.  For example, posting goods receipt to unallocated stock or goods receipt to
    stock in quality inspection.
    These transactions are treated differently by the system on the basis of this indicator.  Together with other indicators of a movement type in the Materials Management system, this indicator is used to correctly allocate a movement type in the Warehouse Management system so that the transaction can be posted accordingly.
    Regards,
    Nick

Maybe you are looking for

  • Which memory modules to use for upgrade 8 core Mac Pro

    I am planning to upgrade the memory in my new 8 core Mac Pro, I use it for graphics and video editing (FCS2), I am wondering what would be the advantages and differences between getting the 8GB upgrade in 2-pair of 4GB module or 4-pair of 2GB module,

  • I keep getting Kernel Panic when I try to install Panther

    Hello! I bought a used iMac from eBay. It's a 500mhz Indigo model with CDRW. It has Jaguar and OS9 installed on it and I want to install Panther. When I try to do the install the computer reboots and I get the Kernel Panic. I just want to wipe out wh

  • Missing pages in PDF export

    In Indesign CS4, when I export a 48 page document to PDF the last few pages are always missing. I've trying anything but I can't make it print the whole document.

  • Load balancer + preserving IPs

    I seem to have encountered a rather severe limitation of the mod_loadbalancer, and I'm hoping there is a workaround. I have a SJSAS 8.1EE cluster fronted by Apache (also tried SJS WS6.1 too) with SJSAS's loadbalancer plugin. It seems that the appserv

  • Using airport disc as a music server, and playing music over airtunes

    I know that I can put my itunes library on an external hard drive, and that I could access this external hard drive wirelessly if I attached it to an airport extreme. However, if i did this would I still be able to play music over airtunes. It seems