Cross-docking with external WM system

Hello Gurus,
We are trying to implement cross docking but we donu2019t have wm on the SAP ERP. We would like to know if this is possible. And this is possible, how can we manage this scenario for example: A delivery from PLANT A to a client that uses PLANT B as cross-docking plant. When the shipment leaves PLANT A what movement we need to do. When the materials of the delivery are received on PLANT B what movement should we do. When the shipment leaves PLANT B we make the goods issue?
Is this correct? If this is correct you have to change the plant of the sales order and delivery from PLANT A to PLANT B.
Best regards,
Tiago Magalhães

Managed by process not by any configuration.

Similar Messages

  • How to integrate iPayment module with external Payment System

    Hi,
    I have a requirement where I need to integrate Oracle iPayments in Release 11i with external payment system which is different than standard payment system given by Oracle,so can anybody please guide me on the steps which need to be performed to integrate Oracle iPayment with external payment system for credit card transaction processing.
    I want to implement both the models gateway payment model and payment processor model.
    It will be really helpful if anybody can provide me some sample code for the servlet to be written and the configuration steps asap.
    Thanks in advance.
    Thanks,
    Devendra
    Edited by: Devendra Pratap Singh on Mar 23, 2009 12:02 PM
    Edited by: Devendra Pratap Singh on Mar 24, 2009 4:03 PM
    Edited by: Devendra Pratap Singh on Mar 24, 2009 9:05 PM

    Devendra,
    Review the following notes:
    Note: 333676.1 - Oracle iPayment White Paper
    https://metalink2.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=333676.1
    Note: 135745.1 - iPayment API and Interface FAQ
    https://metalink2.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=135745.1
    Regards,
    Hussein

  • CUP Future Integration with External Training System

    Are there any plans to allow CUP to integrate with external training systems. We have a need for CUP to integrate with an external training system to obtain course completion information which would then be used in the approval process for requests associated with adding or updating roles. Thanks in advance.

    I don't know of any specific enhancements for that requirement but I would raise this directly with SAP to check!
    I'm sure you could use a work around by using qualification records to trigger the CUP webservices of a certain request type and  generate a workflow path for that specific approval mechanism.
    Cheers, Simon

  • COMMUNICATION ERROR WITH EXTERNAL TAXATION SYSTEM - VERTEX_MS0018

    When  I copied US company code 3000 to my org using USD as currency code with a  a view to simulate US  scenarios it threw an error as under.
    The error occurred when I  was trying to fill in the address tab after copying the  company code.
    <b>
    COMMUNICATION ERROR WITH EXTERNAL TAXATION SYSTEM - VERTEX_MS0018</b>.
    Thank you and regards,
    Ram

    Hi Ram Shiva,
    Deactivate External tax
    Path:SPRO>Financial Accounting>Financial Accounting Global Settings>Tax on Sales/Purchases>Basic Settings>External Tax Calculation>Activate External Tax Calculation
    Hope this will solve
    Best Regards
    Ashish Jain

  • Cross Docking with GATP

    I am considering ECC WM and / or EWM.  One of my requirements is an opportunistic cross dock that will assign goods at GR to an open sales order line item.  EWM opportunistic CD is synonomous with PFGR.  Does ECC WM provide any benefits over EWM in terms of cross docking with GATP?
    Many thanks.
    Michael

    Have you received any feedback from SAP or from third party consultants that the WM to EWM connection is feasilble? The benefits of EWM to GATP vs. ECC WM to GATP are very big, however , I am not even sure that WM to GATP is a real option. That is why I ask.

  • Cross Docking with LE-WM - or - Reactivating Back Orders upon Goods Receipt

    I have been reviewing the documentation for Opportunistic and Planned Cross Docking in LE-WM. The requirement is to release Back Orders upon receipt of a shipment to avoid putting them away and picking them right away from the bin. We want to release the Back Orders for picking in the GR area at the time of receipt.
    So far it appears that Opportunistic Cross Docking depends on a Transfer Order already existing. The system then cancels the existing TO and replaces it with a TO to pick from the receipt Storage Type.
    Planned Cross Docking appears to require an existing Outbound Delivery to the expected Inbound Delivery.
    In the case of a Back Order, no Outbound Delivery or Transfer Order exist since there is no stock to release until the goods are received.
    Is there a way to release Back Orders to be picked directly from Goods Receipt?
    Thanks;
    Jim

    The problem is that all the information I found so far about it is over the process of external goods coming and sending they out without the need of storing in the warehouse. They go directly to the picking area (one step) or in two step process  going first from 902 (Good receive from external) to Cross docking Sorage type.and another movement  from Cross Docking Storage type to 916 Good issue Storage type.
    I need to know if it is possible to implement a solution of Cross Docking for certain number of products having a factory and a warehouse. If so, would you give me a brief process flow?.
    Thank You very much.
    Al
    Edited by: agmogena on Aug 22, 2011 12:01 PM

  • Workflow integration with external DMS system

    Hi,
    What integration/control transfer possibilities exist between SAP Workflow and an external document management system (e.g. Hummingbird)? Would some sort of interface be necessary for the integration and what would the level of effort be more or less?
    This is quite urgent and I would greatly appreciate your input.
    Regards
    Liza-Marie

    Hi Liza-Marie,
    you can work at different levels:
    1) Integration of documents use in the SAP workflow can be stored in external DMS and linked to SAP transactions through SAP Archivelink; you'll probably need a Hummingbird interface certified archivelink
    2) If you want to integrate your SAP workflow with the workflow of the DMS (if any), you can practice as follows:
    a) From you DMS, you can raise events in the SAP system on which your SAP workflow would react (to start or resume) by making use of standard RFCs such as SWE_EVENT_CREATE; eventually you can expose it as web service, which will simplify the call
    b) From SAP worfklow, you can send mails, call external system commands (more rarely used) or call web services that would allow you external DMS to be triggered on
    Details on all these techniques would be too huge to be described in a post, but this gives you an overview on how SAP Workflow can interact with external solutions.
    In summary to your question:
    1) Interface required YES - ARCHIVELINK CERTIFIED in case you want to store documents in external DSM that need to be connected to your SAP transactions
    2) Level of effort is depending on your scenario
    Rgds,
    Karim

  • 4th gen Nano - only 1 channel plays when docked with external speakers

    * bought 4th gen Nano direct from Apple
    * Boynq iCube - music only comes out of right channel (iPod Video works fine though)
    * Jensen JiMS-185 - music barely audible from left channel (iPod Video works fine on this as well)
    * Insten cradle / supplied iPod cable - both channels work fine
    * headphones work fine
    Are there any known incompatibilities between 4th gen Nanos and some external speakers, or is does this sound more like a wonky refurb'd unit? Both problematic speaker systems were purchased new. If it was just one I'd think it was the speaker system. But given that similar issues are spanning 2 different speaker systems I'm not sure what the problem is now.

    Sounds like you have an issue with the pins on the dock connector of your Nano. There is a left and right outputs on two of the pins on the dock connector. It could very well be that one pin is bent and on one radio no connection at all while on the other barely touch causing bad sound.
    Alternatively it might be dirt, grime, oil, or other debris caught in the pins as well that simply need to be cleaned out.
    Get a good magnifying glass, eye loupe, etc. and inspect the dock connector on the nano for debris and for damaged pins.
    Patrick

  • Interface with external email system

    Currently, Oracle Customer Relationship Management Release 3i can only allow internet messaging. I have 2 queries:
    1. How does internet messaging works? Where do you configure it?
    2. Is it possible to link the messaging system to Lotus Notes?
    null

    Hi,
    The entire architecture of messaging in Oracle is built on Oracle Worklfow.
    The messages are not only internet enabled messaging but also integrate with any MAPI compliant messaging system, UNIX Send Mail and Oracle Mail. Thus Oracle Worklfow can be integrated with Lotus Notes also to provide the notifications which are generated in Oracle.
    As far as integrating Lotus Notes with Oracle WOrkflow is concerned , suggest u get in touch with Mr Kirit Goyal at [email protected] who has worked in this area.
    null

  • WM: opportunistic cross-docking

    Hi all,
    According to my understanding of the help.sap.com online documentation, we are NOT supposed to use the Cross-docking Monitor while trying to achieve an opportunistic cross-docking stock transfer between an inbound delivery and an outbound delivery. Once we appropriately complete the Customizing, the system is supposed to generates BY ITSELF a cross-docking decision during the process of TO creation (after the arrival of the incoming stock or release of the outgoing document).
    Am I right ? Up to now, I can't achieve it...
    I've checked my Customizing several times against this documentation these last days. According to it, there are two points of view regarding the creation of the opportunistic cross-docking decision:
    - either the system does it by itself (= killing the Outbound delivery TO, modifying the destination of the Inbound delivery TO and updating related documents);
    - or involved Inbound and Outbound deliveries must be manually designated for cross-docking throught the use of the monitor (like it is necessary to create Planned cross-docking decisions).
    So, my questions are:
    1. Do we need to manually designate Inbound and Outbound deliveries candidates for cross-docking using the monitor in order to create an opportunistic cross-docking decision?
    2. If so, how can we automate the creation of the candidate designation?
    Thx in advance for valuable inputs!
    Edited by: al7sap on Oct 22, 2008 5:23 PM

    Hello,
    For Oppertunistic Cross dock..
    You need to create either Putaway TO/Pick TO and then system checks the cross doc and cancel the TO and create a new TO from 902 to 916. and also updates in the document flow. This  you can do with out Cross dock monitor. With out planning the cross dock you can do the cross docking by following the config in help.sap.com.
    for more information about the complete config you need to see the sap link below. sure it will help you.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/c6/f85c504afa11d182b90000e829fbfe/frameset.htm
    thanks.
    tkreddy

  • Cross-Dock: No inbound docs have been selected for planning

    Hi everybody here,
    I am testing cross-docking function on our DEV environment. I set the warehouse 001 as one-step crossdocking and no opportunistic cross-docking allowed, not consider FIFO. The time ref. is delivery date & time, time window is set to 72H, release time is 2H and latest relase time is 1H.
    Then I set movement type 501 and 201 as cross-docking relevancy.
    I created 2 TRs with movement 501 and 201 with same material and same quantities. The 501 TR's planning time is 12:00, Aug 17 and The 201 TR is 23:00 Aug 17. However, when i run LXDCK to plan a cross docking with these 2 TRs, system prompts an error message "No inbound docs have been selected for planning".
    If you guys have implementation experience of cross-docking, please give me some advice, many thanks!
    Leon Xiao

    Hi,
    I am facing a similar problem, were you able to find out the reason for the problem?
    Any help is appreciated
    Thanks in advance,
    Mike

  • Cross-Docking Config.

    I am working on Cross-docking scenario in ECC system and I am stuck at "Generating a Cross-Docking" Decision. This is the 6th step as per Best Practice GZ6.
    What are config settings that should be maintained to generate a decision?
    I have maintained General Settings of Cross-docking at WAMS and got stucked at Monitoring settings.
    Kindly help.
    Thanks!
    Abdul Saleem

    W71 is a BPP for executing Opprotunistic Cross Docking and, quite frankly, I found it makes no sense at all. It has a step to create an Outbound Delivery using MB1A - VL10B is usually used to ccreate and Outbound Delivery. MB1A just creates a Goods Issiue. The same applies the the step for creating an Inbound Delivery - MB1C??? That creates a Goods Receipt - not a Delivery.
    The best I've found for actually setting up Cross Docking is:
    http://help.sap.com/erp2005_ehp_02/helpdata/en/3e/49503e30a9d549e10000000a114084/content.htm
    http://help.sap.com/saphelp_rc10/helpdata/en/6f/dadd4424b711409384ce2382728f57/content.htm
    Even still, I have run into a problem allowing the Goods Receipt of an Inbounde Delivery prior to confirming the WM Transfer Order. The steps in the config doc show where it should be set, but it is in the Handling Units section of the IMG. The documentation implies this should work for non-HU receipts as well. I keep getting the error that the GR cannot be completed because the WM TO is not complete.
    I'm still looking for an answer to this.
    Jim

  • WM cross docking and yard management

    Dear Gurus,
                        Any body here could explain me step by step configaration of WM--Cross docking and Yard Management.
    Any help will be rewarded.
    Regards,
    SAP.

    Hi,
    hum, this is a bit huge to reply.
    Yard is working as cross-docking with a single WM.
    Cross-dock needs :
    A WM configured
    WM movement types to be dedicated
    More tricky, it needs to have the Goods receipt sequence to be modified. The goods receipt must be setup to be done before the TO gets created
    Yard is more straight forward.
    Yard site related to WM
    Define the Yard map: The doors, parking spaces... (nota: Maintain the yard doors from the WM customizing. It is a WM location before all.)
    some vehicles (Material group, ...)
    Some master data. The trucks, the trailers...
    To keep in mind:
    a truck is an handling unit.
    The relation between a delivery and a truck is done with handling units.
    The relation between CD and Yard: At CD Decision time, a Yard scheduling activity will be created. Therefore a WM door will booked.
    Hope this provides a starting point to you
    BR
    Alain

  • Re: WM cross docking and yard management

    Is there a way to stop automatic scheduling in Yard Management.
    Can someone explain how you can schedule a vehicle without first check-in in Yard management.

    Hi,
    hum, this is a bit huge to reply.
    Yard is working as cross-docking with a single WM.
    Cross-dock needs :
    A WM configured
    WM movement types to be dedicated
    More tricky, it needs to have the Goods receipt sequence to be modified. The goods receipt must be setup to be done before the TO gets created
    Yard is more straight forward.
    Yard site related to WM
    Define the Yard map: The doors, parking spaces... (nota: Maintain the yard doors from the WM customizing. It is a WM location before all.)
    some vehicles (Material group, ...)
    Some master data. The trucks, the trailers...
    To keep in mind:
    a truck is an handling unit.
    The relation between a delivery and a truck is done with handling units.
    The relation between CD and Yard: At CD Decision time, a Yard scheduling activity will be created. Therefore a WM door will booked.
    Hope this provides a starting point to you
    BR
    Alain

  • Getting Communication error with the external tax system(VERTEX_MS0018)

    Hi All,
    I am a new SAP HCM self learner. I am practicing it on company's sandbox system. When I am trying to create a company and saving the address, it is returning Communication error with the external tax system(VERTEX_MS0018). I have already tried to solve is issue by going thru previous related to same issue like
    Communication error with the external tax system (VERTEX_MS0018) ...Urgent
    but coudn't solve the issue.
    Please help. Is this issue coming as I am using a training environment? any alternate approach?

    Hi Ravi,
    To disable the connection to Vertex:
    Goto tcode  SPRO > Cross Application Components > Transaction Tax Engine >
    Technical Settings> Define External Tax System
    Here an RFC would be defined. Remove it and try again.
    Also in SPRO > Cross Application Components > Tax Determination based on Jurisdiction Codes > External Tax Jurisdiction > Activate External Tax Jurisdiction.
    Remove the entry 'V' here.
    Regards,
    Srikishan

Maybe you are looking for

  • Problem installing itunes on xp x64

    I need help, I've tried to install itunes 3 or 4 times and everytime it tells me that i should use the 64 bit installer, which i tried and then was told that its only for windows vista 64. but after i stick with the 32 bit installer it comes with an

  • Query Tuning Assistance - part 4

    636 - access("TC"."TRANSACTION_NBR"="FIN_AGING_INVOICE_VIEW"."MAX_TRANSACTION_NBR") 649 - access("A"."PAYMENT_NBR"="TA"."PAYMENT_NBR") 650 - filter("TA"."REVERSED_TRANSACTION_NBR" IS NOT NULL AND "TA"."PAYMENT_NBR" IS NOT NULL AND "TA"."INVOICE_NBR"

  • Synchronous messages through Soap Adapter

    Hi XI Guru's In my scenario I am sending a synchronous soap message over soap adapter. Message flow is  like 3rd Party Application --> XI --> SAP R/3. My message do get processed in SAP R/3 and I do get response in SXMB_MONI as well as in Message Mon

  • Subject in Email is always "Report sent from Report Builder"

    We run Forms 6.08 in C/S - architecture. Forms calls reports: ADD_PARAMETER(pl_id, 'SUBJECT',TEXT_PARAMETER, 'Please read appending pdf' ); add_Parameter(pl_id,'DESTYPE',TEXT_PARAMETER, 'Mail'); Run_Product(reports, 'MY_Report', SYNCHRONOUS, BATCH, F

  • Dell 1750 Windows 7 Will Not Load Past Splash Screen.

    I have a dell 1750 laptop that I just replaced the hard drive with a new exact same hard drive that was in there I went to reinstall windows from the recovery disk and it never gets past the 7 logo I never even get to the option of installing the OS.