CS01 CS02 BOM Update

Hi,
In CS01, CS02 transactions,  i need to update de field STPO-DSPST. I tried to use BADI BOM_UPDATE, CEWB_BOM_UPDATE, exit PCSD0xxx and BTE CACS0000 but in all of them i didn´t get to modify the valeu of this field.
Can anyone help me?
Thanks!!!!!
Ricardo

Hi ,
      Please read the below help for Explosion type .
If the Explosion type is Phantom assembly off
You use the Phantom assembly off indicator, to determine how an assembly with the Phantom assembly special procurement key is exploded.
If the header material of an assembly has the special procurement key for a phantom assembly in its material master record, the standard SAP System:
Transfers dependent requirements for the superior assembly directly to the components of the phantom assembly
Generates planned orders or purchase requisitions for the components of the phantom assembly
If you set this indicator, dependent requirements are also generated for materials that have the Phantom assembly indicator.
So when you are using the badi or function check your material master record which a link to explosion type.
Please reward if useful.

Similar Messages

  • Assignment of BOM items to operations in CS01 / CS02

    Hello Sirs,
    How can we assign the BOM items to operations in  transaction codes CS01 / CS02 through path Extras --- Operations assignment.  Currently the option cannot be selected.  Please let me know the solution for it.

    Hi,
    Select the component
    Menu > Extras --Operation assignment
    Select the operation and save.
    This will assign the component to opeartion.
    Option 2.
    Ca02
    Here select the operation and click Compalloc in the menu.
    Now here also you can assign
    Regards,
    Vishal

  • Custom Field using screen exits CS01/CS02/CS03

    Dear Experts,
    I am using Screen exits to add some text description in CS01/CS02/CS03, my requirement is to add a field 'Product Appearance' with multiple lines for the material description. For this I have created customer field 'ZTEXT1' and appended it to STKO table. Now in screen painter(SE51) i need to add 3-4 lines of type stko-ztext1 because the product desc is of size 300-400 character.
    I am not able to create 3-4 lines of type stko-ztext1. Can u plz suggest how can i add 3-4 lines of  type stko-ztext1 in SE51.
    I am able to create a blank field in SE51 using Edit->Grouping->Step Loop->Define,  but while activating it is giving error as "Input/Outpt field STKO-ZTEXT1 and key word are not in the same screen".
    Plz suggest.
    Regards

    Hi Kurtt,
    Below are the available user exits :-
    PCSD0001  Applications development R/3 BOMS
    PCSD0002  BOMs: Customer fields in item
    PCSD0003  BOMs: Customer fields in header
    PCSD0004  BOM comparison
    PCSD0005  BOMs: component check for material items
    PCSD0006  Mass changes user exit
    PCSD0007  Check changes in STKO
    PCSD0008  WBS BOM: Customer-specific explosion for creating
    PCSD0009  Order/WBS BOM, determine URL page
    PCSD0010  Order/WBS BOM, determine explosion date
    PCSD0011  Knowledge-based order BOM, parallel update
    PCSD0012  Customer - Mat. number/mat. number during material exchange
    PCSD0013  Customer-specific processing of an explosion for BOM browser
    PCSD0014  Knowledge-based order BOM: Status
    Check which one suits your requirement.
    Regards
    Abhii

  • Modify Screen CS01 CS02 CS03

    Hi Experts,
    I would like to know if there's a way in modifying the screen 0152 for program SAPLCSDI of transaction CS01, CS02 and CS03. We would like to make the field RC29P-AUSCH - Component Scrap to be displayed as one of the columns in the item display after the column quantity.
    Is there a way in modifying the screen through any exits or BADIs?
    Thanks in advance for your help!
    Best Regards,
    Kurtt

    Hi Kurtt,
    Below are the available user exits :-
    PCSD0001  Applications development R/3 BOMS
    PCSD0002  BOMs: Customer fields in item
    PCSD0003  BOMs: Customer fields in header
    PCSD0004  BOM comparison
    PCSD0005  BOMs: component check for material items
    PCSD0006  Mass changes user exit
    PCSD0007  Check changes in STKO
    PCSD0008  WBS BOM: Customer-specific explosion for creating
    PCSD0009  Order/WBS BOM, determine URL page
    PCSD0010  Order/WBS BOM, determine explosion date
    PCSD0011  Knowledge-based order BOM, parallel update
    PCSD0012  Customer - Mat. number/mat. number during material exchange
    PCSD0013  Customer-specific processing of an explosion for BOM browser
    PCSD0014  Knowledge-based order BOM: Status
    Check which one suits your requirement.
    Regards
    Abhii

  • Inserting Record in a Z-Table during CS01 / CS02

    Dear Sir,
    We have a requirement that in Tcode CS01 / CS02 , for all new Records which are being created , we want that information like STLNR ,Itemcode and Quantity also must be posted in Z-Table .  We are maintaining the Z-Table for history purpose .
    Kindly guide us as what steps need to be followed to address this problem .
    With Thanks and Rgds
    Sonia Agarwal

    Hi Check whether the badi  'BOM_EXIT' or 'BOM_UPDATE' is useful. From here you can update your 'Z' table.

  • Shall i restrict CS01, CS02 by Material type wise

    Dear all Gurus,
    Please help me out to restrict the CS01 & CS02 by material type wise.
    Thanks in Advance
    pabale

    Dear Mr. Devendra,
    Please let me know the configuration in details becoz i want to restrict the user for not to change the HALB TYPE BOM in CS02 but in case of FERT type he can change.
    e.g.
    BOM Creation user has to rights to create / change the BOM of material type FERT.
    BOM Creation user has to rights to create / but no change authority the BOM of material type HALB.Change rights we have to assign to authority.
    Hope from you positive feed back and thanks for immediate respond to both.
    Regards,
    Pabale

  • Automatic Costing Run after BOM updates

    Hi All,
             My client requirement is that is there any possiblity of Automatic costing Run after BOM updates?
    or any message can be triggered to Finance dept from SAP after BOM updates.
    Thanks,
    dev

    Dear Dev,
    In standard SAP it is not possible.
    In case if you are using ECM - Change numbers for BOM creation/change then we can trigger a message.But in order to trigger
    a report has to be developed,but in my understanding it is good to take only costing run for a period and the made BOM
    changes will get reflected in the next costing run for the next period.
    Incase if in the same period a new cost estimate has to be carried out means first CKR1 has to be executed.
    Check and revert back.
    Regards
    Mangalraj.S

  • BADI in tcode CS02 for BoM updation ..pls very urgent

    hi friends,
    I need the name of badi which is called after every change in bills of material for material.
    i,e In the TCODE CS02, after changing the quantity and given save, i need to send mail to concerned users intimating them about the change.
    I tried using the badi... BOM_UPDATE with the method...Change_at_save, but this method is called before the data is saved into database.
    ls help me in solving this.
    thank u in advance.....

    instead of BADI try user exit which might help u...
    List of user exits which are there are..
    PCSD0001
    PCSD0002
    PCSD0003
    PCSD0004
    PCSD0005
    PCSD0006
    PCSD0007
    PCSD0008
    PCSD0009
    PCSD0010
    PCSD0011
    PCSD0012
    PCSD0013

  • BOM Update using a function module - 'CSAP_MAT_BOM_MAINTAIN'

    Hi,
    I have problem in updating the item status for a BOM using a function module - 'CSAP_MAT_BOM_MAINTAIN'.
    My goal is reset the Checkbox for 'Indicator: item relevant to production'. When i pass the value ' '[Space] to the structure field 'T_STPO-REL_PROD' it doen't work.
    Do let me know if you come across such problem & what needs to passed as input to reste the checkbox in the BOM.
    Thanks & Regards,
    Bhargava

    PLM wants to manipulate the Indicators u2013 u201CBulk Materialu201D & u201CCost Relevancyu201D in BOM.
    Note: The 2 indicators [u201CBulk Materialu201D & u201CCost Relevancyu201D] are interlinked with each other for a business functionlity given by SAP. So, if we try to set both indicators we get the below SAP standard error.
    E 29127 Bulk material not allowed for items relevant to costing
    SAP Field Name                             RFC Tag       SAP values    PLM values  Meaning for SAP field
    Indicator: bulk material                   BULK_MAT   Space             !                   No
    Indicator: bulk material                   BULK_MAT    X                   X                  Yes
    Indicator: item relevant to costing  REL_COST    Space            !                    Not relevant to costing
    Indicator: item relevant to costing  REL_COST     1                   1                   Not relevant to costing
    Indicator: item relevant to costing  REL_COST     2                   2                   Packaging operation
    Indicator: item relevant to costing  REL_COST     3                   3                   Packaging material
    Indicator: item relevant to costing  REL_COST     X                   X                  Relevant to costing
    To achieve the clear/reset/set value for 2 indicators [u201CBulk Materialu201D & u201CCost Relevancyu201D] from PLM, only eitheir of indicators status needs to sent [i.e 1 indicator status @ a time].

  • Function module for BOM Update all line items at a time

    Hi,
    Please enlightenn us, which FM is do the update for BOM item datas. ( current FM is updated line item one item then come out and log in again updating another line item , thus cause more error are facing.)
    we want a FM to update one time all the line time and come out from the screen.
    Thx
    Sathiya

    HI,
    As suggested above use CEWB or if you want to manage it via a Z program then use:
    CSAP_MAT_BOM_MAINTAIN
    or
    CSAP_MAT_BOM_OPEN
    CSAP_BOM_ITEM_MAINTAIN (Use these 3 in sequence, refer to the help file on the FM)
    CSAP_MAT_BOM_CLOSE
    Hope it answers your query.
    Regards,
    Vivek

  • BOM updation in REM

    This is related to REM scenario.I have run MRP based on certain demand.Now some of my BOM components get changed.How can i update these new BOM to my existing planned order.
       Whether i need to delete the planned order for updating the new BOM.  Please clarify.
    Regard's
    Guruprasad

    Hi,
    Re-run MRP again (MD02) with below parameters
    Planning Mode = 2 (Re-explode BOM and Routing)
    Regards,
    Sankaran

  • How to create material bom through CS01 if bom created by using ppe

    Hi experts,
    I have created a material bom through PPE of material A. Now i want to create bom through CS01for same material A.
    system shows error "A breakdown (PVS/VA) already exists in iPPE for material".
    So how can create bom through CS01?
    Suggest me.
    Regards,
    Nitin Nerkar

    Hi,
    Please check and implement the below note,
    [1311089|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=1311089]
    Thanks
    Hrishi

  • CS01, BADI/EXIT Update on save

    Hi experts,
    i would like to change the bom status when i save in cs01/02.
    I tried serveral badi's, BTE but it doesn't work.
    How can i do that?
    Thx
    Cheers
    Hannes

    Hi,
    unfortunately not. In this exit there are only importing parameters where i can put a message as output.
    Cheers
    Hannes

  • BOM update BDC

    Hi all,
    I want to populate a field for each component of the BOM using CS02. For example I have two components for a particular BOM.
    I am selecting each component and going into the details of each component.Here I want to populate the field.
    After populating this field, I am selecting the second component and repeating the process.
    I want to write a BDC program for this.Can anyone tell me how to use the concept of table controls in this case with an example.
    Here I don't have two separate files i.e., one for header and the other for items.
    thanks
    Sandeep

    Dear Sandeep,
    Please go through the link:
    http://www.sap-img.com/abap/program-loads-the-bill-of-material.htm
    Regards,
    Abir
    Don't forget to award Points *

  • BOM updation in production order

    Dear All
    I have created production order against one specific BOm
    Then i changed the BOM line items & again i have created one more production order but new BOm items are not updaetd in the new production order
    pl help
    regards
    Kiran

    Kiran,
    I would suggest you to check the Valid from Date of specific component you are taking about, probably you would have added with effectivity date 10.01.2008. Now when order is exploded it is looking for valid components as on 03.01.2008, this may be the problem.
    A simple suggestion here is that you execute Read PP Master data for this order in the change mode(CO02), from the menu bar Functions--->Read PP Master Data. You would get a Pop-up screen Read PP Master data.. here in the screen "Cont." button. One more screen pops up, here in the BOM explosion date you give it as 10.01.2008. Hope you will get the new component also in your production order now.
    Regards,
    Prasobh

Maybe you are looking for

  • Safari issue: Multiple browser pages from the past are resident!

    Having an issue with safari. When i open up the app, there are 7 previous pages that were accessed in the past that are open. I have tried to delete cookies, history, hard reset, etc. I can close out all of the previous open pages but the next time t

  • Download file (*.jpg or *.pdf ) from Unix to Local PC.

    Please let me know how we can down load (*.jpg or *.pdf ) from Unix to local machine. How to handle these files in Opendata set ---> Graphics (not text mode.....) thanks a lot in advance ..:)

  • MSN Unexpectedly quits

    I didn't know where else to put this topic. sorry if there is a better place for it. I've had this issue for a while, and it just happened out of no where one time. Don't know what happened at all. I've reinstalled MSN messenger 3 times and it still

  • Photoshop CS6 (mac release version) is FREAKING OUT on external screen

    Is it just me having this problem? When I use Photoshop CS6 (released version) on my brand new MBP17 everything is just fine. Then I pull it to my connected Cinema Display and everything FREAKS OUT. Every pixel inside the imagewindow is distorted, is

  • Buffer problems

    I am reading in three signals from a DAC and storing them in memory whilst doing FFTs etc. If I make the buffer large (32000 samples per channel)I can get it to work for about a minute before I get an error message. Reducing the buffer size makes it