CUA linked with SRM - USERS_GEN

Hi all,
We will implement a new SRM 7 system that is linked to an existing CUA.
Users will be brought from CUA to SRM's SU01.
But afterwards we'll still have to execute the USERS_GEN transaction in the SRM system I presume since the CUA doesn't hold the organisational unit or position of the transfered user. Or is there a way to let CUA provide the necassary data without we having to do the manual USERS_GEN in SRM?
Thanks for your feedback.
Regards,
Patrik

Yes. Saravanan is correct.
you must integrate the user in to the SRM Organisation level.
then only User can perform any function like create sc, po , contract etc..via WEB ..
till the user integrate into org it is like dummy user ..

Similar Messages

  • Linking of ECC vendor with SRM ROS supplier in EBP

    Hello,
    How can we link manualy created ECC vendor with SRM ROS supplier in EBP, I dont have PI system.
    Thnks,
    Raju

    Raju the link is established basically (if i talk purely technical) in table VENMAP.
    it has 3 fields...
    partner guid| logical_system| vendor number(in logical system)
    so here
    partner_guid is the guid of the supplier in BUT000
    log_sys is the logical system to which you want it to connect it to(in this case ECC logical system)
    and vendor is the vendor number in that connecting logical system(means ecc vendor number)
    so this creates the link.
    but which version of SRM and SUS are you using?

  • MDM catalog integration with SRM 7.0

    Hi all,
    We will be upgrading from SRM 5.0 to SRM 7.0
    We currently have CCM .....Few questins on catalog enablement for us with SRM 7:
    1.With SRM 7,0,can we use CCM oor MDM is the only option???
    2.Is it better to have MDM as a seperate server and enable SRM MDM catalog content?
    3.We have 2 punch out catalogs for 2 vendors.How to enable the punch out catalog links in SRM 7.0???What is the path for IMG config??
    4. We have around 20 internal supplier catalogs .Now should we upload few of the supplier catalogs and then upload rest or can we upload all the suuplier catalogs at once through IMPORT MANAGER in MDM ???What are therestrictions in terms of the no of catalogs or catalog data that can be improted and mapped ???
    5.What are additional features in SRM MDM 3.0 catalog  in contrast to CCM??
    6.The backend master data such as Supplier/Porg etc.....how is that synchronised from SRM to SRM MDM catalog???Is it through some scheduled programs???
    7.What is the use of PI/XI in enabling SRM MDM catalog??Why is it mandatory??
    8. What are the allowed file types for cataog data upload in MDM???Like it was CSV in CCM...
    9. Where can I find some sample catalog files for test upload?
    10.What are the lastest SP for MDM available for integration with SRM 7.0??
    11. after price changes from supplier(thru negotiation),are these price changes to be updated manually for indiavidual items/products through MDM data manager or is there any way to automate this delta update for price in MDM???
    12.Also maintaining catalog data in MDM for SRM procurement will be a seprate actibity just like maintaing catalog in CCM??
    I have gone through the help links but wud like ansers to above ques based on experiences of the forum members...Please provide inputs to my above queries if anybody has worked on MDM catalog integration with SRM 7.0....
    Thanks for your time.

    HI,
    1.With SRM 7,0,can we use CCM oor MDM is the only option???
       You can use any catalogs which support SAP OCI interface.
    2.Is it better to have MDM as a seperate server and enable SRM MDM catalog content?
       MDM Server(contents) and AS Java(for UI) are required. Please check the installation guide.
    3.We have 2 punch out catalogs for 2 vendors.How to enable the punch out catalog links in SRM 7.0???What is the path for IMG config??
       Same as SRM 5.0. Define External Web Services.
    4. We have around 20 internal supplier catalogs .Now should we upload few of the supplier catalogs and then upload rest or can we upload all the suuplier catalogs at once through IMPORT MANAGER in MDM ???What are therestrictions in terms of the no of catalogs or catalog data that can be improted and mapped ???
      Yes. You can use Import Manager. No issues.
    6.The backend master data such as Supplier/Porg etc.....how is that synchronised from SRM to SRM MDM catalog???Is it through some scheduled programs???
      MDM Extractor is available.
    7.What is the use of PI/XI in enabling SRM MDM catalog??Why is it mandatory??
      Mainly for contents mapping.
    8. What are the allowed file types for cataog data upload in MDM???Like it was CSV in CCM...
      Any. Even for DB interface is also supported. You see all options when you run import manager.  
    9. Where can I find some sample catalog files for test upload?
      Sample repository definition is delivered. You can manually create 1 entry by Data Manager.
    10.What are the lastest SP for MDM available for integration with SRM 7.0??
      You can find it SAP Service Marketplace. http://service.sap.com/swdc
    11. after price changes from supplier(thru negotiation),are these price changes to be updated manually for indiavidual items/products through MDM data manager or is there any way to automate this delta update for price in MDM???
      You can use contract and contract items are transfered to Catalog.
    12.Also maintaining catalog data in MDM for SRM procurement will be a seprate actibity just like maintaing catalog in CCM??
      Yes. Catalog is just Catalog.
    Regards,
    Masa

  • DMS object links to SRM

    Hi,
    You can used this method to create object links between DMS different ECC objects (See below) Is there anybody who can tell me if you can use the same method to create object links between DMS and SRM objects? It should be very helpful for me.
    Thanks in advance
    //Håkan
    Adding Other Objects
    Purpose
    You can also link documents with SAP objects for which no linking is supported in the standard
    SAP System.
    Prerequisites
    In Customizing for the Do
    cument Management ,SAP objects that you want to link to document info records, by choosing Control Data ® Maintain key fields.
    Process
    Program two screens for the following module pools for the SAP object that is to be linked additionally:
    u2013 SAPLCV00
    u2013 SAPLCVIN
    The process logic must be according to that of screen 0204 in program SAPLCV00 and must not be changed.
    Create the function moduleOBJECT_CHECK_XXXX (XXXX = name of the SAP object).
    If this object can be classified, this function module already exists in the standard system. Otherwise, copy the existing function module OBJECT_CHECK_EQUI (linking of equipment) and change it to suit the new object.
    Result
    After you have completed the above, documents can be linked with the SAP object that you have added. You define the settings for this in Customizing for the Document Management System (see:
    Object Links).

    Hey Manghes,
    The business scenarie is that poeple working in only SRM not in ECC system at all and they want easyly reach or link some document in DMS to SRM objects by using object links.
    BR
    //Håkan

  • OpenText integration with SRM

    Hi gurus, I am new here.
    I have studied VIM (vendor invoice management) by Opentext by my own during a month, and I am going to start to implement it in a project but I need to integrate VIM with SRM.
    I have searched for information but I haven't succeed.
    Could you recommend me some web page or tutorial?
    Thanks!

    Hello,
    Purchase Orders exist in ECC backend (as their SRM Confirmations being Goods Receipt in ECC).
    Invoice is based on ECC data, that's why i say, for me, there is no link/integration between VIM and SRM: documents used by VIM are the ECC ones.
    Regards.
    Laurent.

  • DMS Object Link for SRM

    Dear All,
    Can you please provide me the object link for SRM( Inbound Delivery).
    Our team requirenment we should need to integrate with SRM through DMS (object link)
    So provide me the solution?
    Thanks
    Edited by: RS on Aug 26, 2010 1:14 PM

    Hi RS,
    Kindly follow following steps. Add the new object in DMS object link and DMS screen on new object screen with help of Abap'r.
    This can be achived with help of Abap'r and following steps:
    Purpose
    You can also link documents with SAP objects for which no linking is supported in the standard SAP System.
    Prerequisites
    In Customizing for the Do cument Management , you must maintain the key fields for the SAP objects that you want to link to document info records, by choosing Control Data  Maintain key fields.
    Process
    1. Program two screens for the following module pools for the SAP object that is to be linked additionally:
    u2013 SAPLCV00
    u2013 SAPLCVIN
    The process logic must be according to that of screen 0204 in program SAPLCV00 and must not be changed.
    2. Create the function module OBJECT_CHECK_XXXX (XXXX = name of the SAP object).
    If this object can be classified, this function module already exists in the standard system. Otherwise, copy the existing function module OBJECT_CHECK_EQUI (linking of equipment) and change it to suit the new object.
    Result
    After you have completed the above, documents can be linked with the SAP object that you have added. You define the settings for this in Customizing for the Document Management System (see: Object Links).
    Regards,
    Ravindra

  • Do not use Portal with SRM 7 ?

    Hi experts
    We use SRM 7.0 with SAP Entreprise Portal. We are in Support Package 5, we want to not use any more the Portal with SRM 7.
    How to be able to not use Portal and only use SRM web client?
    Thank you.
    Regards,
    Peggy.

    Hi ,
    Try to check this link hope it will be use full .
    http://forums.sdn.sap.com/thread.jspa?threadID=2122248&messageID=11016445#11016445
    Thanks & Regards
    Pradeep Kumar Dondeti

  • ESW: No link for SRM / EU5 in the  ES Workplace Homepage?

    Hello ,
    I have registered into ES Worplace some time back and accesssed the SRM 7.0 then.
    I have re-registered today and find that access information to EU5 is not provided and also the access link to SRM backend is not in home page.
    Is the SRM access from ES workplace removed? Kindly advice.
    Regards
    Prasuna

    Hi,
    > So if I have imported the implemention into the ERP, do I need to map those implementations to the service definitions in ESR
    Not really, ESR is just definition and if your services are available in ERP then it is enough to use them.
    >Could you recommend me a way to consume/test the service?
    You can goto transaction "SPROXY" on ERP and search for your service then execute it from there, read documentation for field information and type of data supplied, as it could be very frustating to understand GDT.
    >in a way of proxy and PI combination
    If you are on ABAP system then you can call this service internally as you can call any class. See the underlying implementation class of this service in SPROXY.
    PI is useful for A2A communication, if you have third party program and want to communicate with ERP services (sepcially async) then you can create mappings in PI and allow thirdparty to communicate with ERP.
    Typical usage scenario is: Legacy->PI->Proxy(ERP)
    PI will play role of translator (if your legacy application send message in different style) and postman (to transfer message from one location to another).
    Async services are useful when there is bulk transaction and NO realtime response required.
    Regards,
    Gourav.

  • Movilizer platform (Shopping cart mobile approval) integration with SRM 7

    Dear All,
    I am in need of integrating the Movilizer platform with SRM 7 for shopping cart mobile approval. The details about Movilizer can be found here. - Movilizer - The Movilizer for SAP Workflow
    Could you please share me your experiences/pain points which need to taken care upon the time of implementation. Thanks in advance for your help.
    Best Regards,
    Bharathi

    Dear All,
    I have a development over here where the prerequisite of integrating the Movilizer platform with SRM 7 for shopping cart mobile approval is to check the function module on Remote-Enabled.
    As of SAP enhancement package 2 for SAP Supplier Relationship Management 7.0 (SAP SRM 7.0), Changes have been made to some standard function modules so that they are no longer RFC-enabled.
    Please refer the below link for your reference.
    consolut - Changes to Standard RFC-Enabled Function Modules ( RELNSRM_702_RFC )
    If the same function module is used by Movilizer and they are no longer RFC-enabled, please do check on that. I will keep you updated on our resolution.
    Best Regards,
    Bharathi

  • Central contract details & link with operational contract

    Hi guys,
    I want to get all the detail of CENTRAL contarct and the In need to get the corresponding operational contract also...
    Please let me know whether there is any F.M. or Class or table where I can get these details.
    regards,
    Prabhu

    Please rephrase your questions
    The Contracts are distributed to backend system and Linkages are made betwwen SRM and Backend contracts. once distributed contracts are reached later clean jobs build a linkages between backend business Object contract with SRM contract
    see
    Linkages division in BBP_PD
    header as well as item
    Header Links:
    and item links

  • How do I add URI web link with custom tooltip like "CLICK HERE TO UPDATE" instead of URI web link in tooltip.

    How do I add URI web link with custom tooltip like "CLICK HERE TO UPDATE" instead of URI web link in tooltip.

    You've probably found an answer to this by now, but I think this has been addressed in another forum -- The link below suggested using a button and adding the tooltip to the button. 
    https://forums.adobe.com/thread/304974?start=0&tstart=0
    Sounds like it would work but I haven't actually tried it. 
    Good luck~!

  • How to I get a link with a "Mail to" address to open up a Compose window in my Yahoo mail, rather than in the Mail progrom on my Mac. I do not use the Mac Mail program.

    How to I get a link with a "Mail to" address to open up a Compose window in my Yahoo mail, rather than in the Mail progrom on my Mac. I do not use the Mac Mail program.
    == This happened ==
    Not sure how often
    == always

    Thank you, "the-edmeister" -- You render a great service, one that lifts my spirits.
    Your answer also taught me to be a little more persistent, as I had started looking at Preferences, and just didn't notice the icons (including Applications) at the top of that window that would have led me to my answer.
    Dave

  • PO Service not link with AP invoice service

    Currently usiing SBO 2007A, SP-00, PL 49.
    I have 1 PO service. Base on this PO service, I create AP Invoice service.
    The account no. use in PO service is different from account no. use in AP Invoice service. Since account no. have been overwrite in AP Invoice.
    PO service is missing link with AP Invoice.
    When we open again the PO we couldn't find target document.
    Also same when we open AP Invoice, we couldn't find base document, which is actually the PO.
    Only in AP Invoice's remark we can find the PO no.
    Also in the database, in AP Invoice table base document no. is blank.
    Also it cause the PO not automatically close.
    Previous PL, this error not exist.
    Any one can help.
    Thanks in advance,
    Surya

    Hi,
    Please check Note No. : [ 1334491|https://websmp130.sap-ag.de/sap(bD1odSZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=1334491] which explains the reported issue.
    Kind Regards,
    Jitin
    SAP Business One Forum Team

  • Can I Select from table skipping extents linked with lost datafiles?

    Hi~,
    I need your help to recover my database.
    I'm using oracle 9.2.0.8 at Fedora 3 with no-archive mode.
    and I don't have any backup.
    Last night, I experenced hard disk failure.
    I tried OS-level recovery, but I lost some datafiles of tablespace.
    anyway, I wanted to recover my database without data of lost datafiles.
    so, I issued "alter database datafile offline drop" and
    start oracle instance.
    But, datafiles were not removed from dba_data_files view and
    extents linked with lost datafiles were not removed from dba_extents view!
    Selecting query of some table containing extents linked with lost data files,
    I got "ORA-00376: file xxx cannot be read at this time" message.
    So, my question is that..
    HOW CAN I SELECT FROM THAT TABLE WITHOUT SCANNING EXTENTS LINKED WITH LOST DATA FILES?
    Thanks.

    Hi,
    Without being in archivelog and without backup, one can't do any sort of recovery. That's why backups and archivelog are so so important.
    The offline data file command never does actually drop the datafile. It merely indicates to the control file that now the said tablespace will also be dropped. This won't update any view that the files are not supposed to be used or shown to you anymore.
    This is what documentation says about the recovery of the database in the NoARch mode,
    http://download.oracle.com/docs/cd/B19306_01/backup.102/b14191/osrecov.htm#i1007937
    You do need a backup in order to get those tables being read. Oracle doesn't have any feature which can offline/skip the missing extents for you and let you read the data without them.
    HTH
    Aman....

  • Creating a link with the Link Tool

    I used the Link Tool to create a Link in my pdf file.  The link is set to open a website file.  I created 2, one with just a little text and the other was a picture that was 200 X 300 px.  When I follow the links, each is opening a full web page.  I expected that with the Text link because I put the text on an html page but the picture I sized to the 200X300 but that opened a full web page also.  When setting up the link to the Web File I did not see an additional settings as far as how to open the web page such as _parent or _child etc.  I believe it is normally the Target.
    Does anyone know how I would either do this with the link tool or know of a better way to do it overall?
    Thanks
    Bob

    Hi,
    You may be confusing HTML markup for links with PDF links.
    In PDF, HTML markup is not applicable.
    So "target_xxxx" or any other HTML 'stuff' cannot be used.
    For the graphic file (JPG, PNG, whatever), make a web page file that is configured to display the graphic file in a manner you desire.
    The web link you set in the PDF, with Acrobat, will result in this web page file opening.
    This is the file that will control how the graphic is rendered.
    If needed, a resource for HTML "how to" is W3 Schools.
    Be well...

Maybe you are looking for