CUP Workflow issue

Hi guys,
First - this isn't my issue but an issue that my colleague is having. 
Their workflows have been setup and they've been working for sometime now.  I wasn't involved in their setup.  However last week, their BASIS team did some change (details aren't available to me as yet) and now, their CUP workflows are having a specific issue.
The path that I've examined is as follows:
Start > Manager > Role Owner > Security > Finish
The only custom approver is under Security.  The rest are as delivered in CUP.
What used to happen would be that the manager would get an email with a link that, upon clicking, would go directly into the request.  Now, that link takes them to a login box.  My colleague said that the tool hasn't been reconfigured by him and that the only major change has been some BASIS changes.
I'm not sure where to tell him to start looking, since everywhere I've looked seems to be ok.
Thanks,
Santosh

Hi Alpesh,
That's what I had also said, that perhaps the SSO config was broken.  However, my colleague insists that SSO wasn't enabled.  I have my doubts about this but I have no way to validate that it was working prior to this issue.
I know that when I look at the stages, the email templates for Approved, Rejected, etc., don't have any URL in the template, only the message.  As far as I know, this is how it should be.  Do you agree?
Thanks,
Santosh

Similar Messages

  • How to send the 3rd email in the MSMSP CUP workflow?

    Hello GRC community,
    at first thank you all for your great support during the last months. Four month ago I started the implementation of AC in our department without any GRC experience. But now, four months later we are just about to implement the AC 10.0. Thank you all.
    Now we are working on the following issue, where we need your help. Let me explain what the issue is:
    After the finishing the last step in CUP workflow (WS76300056) the workflow sends out 2 emails: (method CL_GRFN_MSMP_WF_TEMPLATE_BASE --> UPDATE_PATH_FINISHED sends out these 2 emails)
    1.to the USER
    2.to the REQUESTER
    But due to our presystem which is a part of the Access request workflow we want to send out a 3rd email to a 3rd recipient. Getting the 3rd recipient is not the issue. The issue is: where do we have to implement the sending of the notification? Our own Investigation comes up to an enhancement point which seems to be the right place to add ABAP code which sends out the 3rd email.
    Has anybody similar issue or the experience with the following enhancement and could help us? Or maybe there is an alternative solution? Any hints are welcome.
    Package: GRFN_MSMP_WORKFLOW
    Enhancement: GRFN_MSMP_END_OF_PATH_NOTIF
    Thanks, and best regards
    Sabrina

    The send mail function will send mail to the users and or alias in the workflow step where you invoke it. The IDOC script guide will help you with implementing these kinds of things.
    http://download.oracle.com/docs/cd/E10316_01/cs/cs_doc_10/sdk/idoc_script_reference/wwhelp/wwhimpl/js/html/wwhelp.htm
    IDOC script by usage / Workflow
    wfNotify is the one you want to look at specifically.
    Workflow
    The following Idoc Script variables and functions are related to workflows.
    Configuration Variables
    isRepromptLogin
    IsSavedWfCompanionFile
    PrimaryWorkQueueTimeout
    WorkflowDir
    WorkflowIntervalHours
    Global Functions
    getValueForSpecifiedUser
    Workflow Functions
    wfAddActionHistoryEvent
    wfAddUser
    wfComputeStepUserList
    wfCurrentGet
    wfCurrentSet
    wfCurrentStep
    wfDisplayCondition
    wfExit
    wfGet
    wfGetStepTypeLabel
    wfIsFinishedDocConversion
    wfIsNotifyingUsers
    wfIsReleasable
    wfLoadDesign
    wfNotify
    wfReleaseDocument
    wfSet
    wfSetIsNotifyingUsers
    wfUpdateMetaData
    Other Variables
    AllowReview
    dWfName
    dWfStepName
    entryCount
    IsEditRev
    IsWorkflow
    lastEntryTs
    SingleGroup
    wfAction
    wfAdditionalExitCondition
    wfJumpEntryNotifyOff
    wfJumpMessage
    wfJumpName
    wfJumpReturnStep
    wfJumpTargetStep
    wfMailSubject
    wfMessage
    wfParentList
    WfStart

  • Purchase order workflow issue

    Hi All,
    A PO is created and rejected by a user in user decision step.The workflow will end.If the PO is changed(amount) again,the release strategy is triggered for the same user.But the workflow is not triggering.If the release strategy is for a different user,its triggering the workflow.I have used a fork inside which 1 parallel branch contains a wait for significantly changed event & another branch contains the user decision step,po release step & rejection reason scenario.
    Please refer the thread below.
    PO Release Strategy Issue
    Replies will be greatly appreciated.
    Edited by: Feddie on Jan 3, 2008 11:43 AM

    Hi,
    This is not workflow issue(work flow is different term)
    It seem problem of BADI (program written for creation of purchase order based on sales order)
    Take help of ABPer so he/she can solve this issue
    Kapil

  • Troubleshooting Approval workflow issues

    We are getting this message from time to time and are unsure how to troubleshoot it.
    It seems as though something is changing the document, what is the best way to figure out what?
    Approval on DOCUMENT NAME has ended because the item that the task process is running on was changed.

    Hi Daniel,
    1.What message do you get?
    2. Look in the Workflow History list, eg "http://sp2013/Lists/Workflow History". Do you find any errors in there?
    3. Is the user account starting the workflow correctly synchronized in the user profile database?
    4. Is the user account starting the workflow different from the Worflow Manager setup account? (more info at
    http://technet.microsoft.com/en-us/library/jj658588.aspx#section7)
    5. Are the User Profile Service and App Management Service started? See the green frames in the screenshot below, taken from Central Administration \ Manage Services on Server.
    6.Are the App Management Service Application and User Profile Service Application started? Their proxies should be started as well. See the green frames in the screenshot below, taken from
    Central Administration \ Manage Services on Server.
    For troubleshooting sharepoint workflow issues, you can have a look at the blog:
    https://technet.microsoft.com/en-in/library/cc298927%28v=office.14%29.aspx?f=255&MSPPError=-2147217396
    http://blogs.msdn.com/b/vincent_runge/archive/2014/01/07/troubleshooting-actions-for-sharepoint-2013-workflows.aspx
    http://ranaictiu-technicalblog.blogspot.com/2013/03/sharepoint-2013-workflow-debugdiagnosis.html
    https://infopathandsharepointdesigner.wordpress.com/2013/12/13/five-top-tips-for-troubleshooting-sharepoint-workflows/
    http://blogs.technet.com/b/victorbutuza/archive/2009/02/26/how-to-enable-workflow-tracing-debug.aspxBest
    Regards,
    Eric
    TechNet Community Support
    Please remember to mark the replies as answers if they help, and unmark the answers if they provide no help. If you have feedback for TechNet Support, contact
    [email protected]

  • Need help with a CUP workflow scenario

    Dear Experts,
    I'm sure it is not just me encountered this required scenario (or something similar).  I would like some pointers how to transcript it to a CUP workflow:
    Application admin logs a provisioning request.
    Security creates a user account and provisioning the roles on QA.
    Application admin ensures that the user undergoes training on QA.
    Upon passing the training, security replicates the user account and role assignment on PRD.
    The esoteric solution would be one request, two paths, two provisions. Is it somehow possible?
    Client doesn't use CUA.
    The security requirements are higher on PRD, where SoD handling will be required.
    Kind Regards,
    Vit Vesely
    Edited by: Vit Vesely on Apr 29, 2010 3:29 PM

    Hii Vit,
    If you want to have two paths for a single request than only possible solution will be to create role based initiator's.
    Role Based Initiatator's can be created by following Configuration -> Workflow-> Initiator-> create.
    Here Select the attibute as roles.
    For example create two Initiator
    Intiator1 -> having Role1 attribute -> Path1
    Intiator2 -> having Role2 attribute -> Path2
    Now in the request if u select Role 1 & Role 2, than request will follow the parallel path ( path1 & path 2)
    Else it is not possible to have parrallel workflow path for any other attribute.
    In Case you can have provisioning at end of the paths as well as end of the request.
    Kind Regards,
    Srinivasan

  • Workflow issue in HR Process and Forms

    Hi Experts,
    I am new to HR process and Forms.
    I am facing workflow issue in "change of position" process.
    The process is not going from manager to HR admin.
    Can anybody help me out on this.
    Thanks in advance
    Regards
    Rahul

    Hi Sahir,
    Thanks for your quick response.
    I checked in swi1  but it is showing "no entry exists"
    I have done all basic settings using PFTC and OOCU_RESP tcode but still it is not working.
    is there any other customizing that is needful??
    Regards
    Rahul

  • Workflow issue with interco transactions & general ledger entries in F-02

    Hello Experts,
    We are encountering a workflow issue when we are entering intercompany transactions with general ledger entries in F-02. Our workflow is set up with two release levels and the details are as follows:
    Amount below $2500 - single release level
    Amount above $2500 - two release levels
    The document type that we are using is SU and it is configured with intercompany postings and trading partner enabled in the control data.
    After parking a GL document that has interco amount entries below $2500 and general ledger amount entries above $2500 in F-02, the document is supposed to go to the two release levels in the workflow because the total amount is above $2500 (interco amount + general ledger amount > $2500). However, in the workflow, the document went to the single release level instead of the two release levels.
    Any idea why the subledger amount takes precedent over the general ledger amounts in determining the workflow release level?
    We would appreciate your help in solving this issue.

    You cannot change the design of the system.
    SAP may consider the change of design if all the users across the industries are reported. If a single user has a special requirement, it cannot be changed.
    You need to ask, whether this is a critical requirement for your business. Otherwise, please follow the standard way.

  • LR 3 Bug Report - file renaming error - significant workflow issue

    System configuration:
    MacPro Dual 2x2.66Ghz Dual Core Intel Xeon
    9GB RAM
    OSX 10.6.4
    Lightroom Application on System Drive
    Canon .CR2 files and Lightroom Catalog on internal software-based RAID drive
    Camera Raw Cache set to 50GB and resident on System drive
    Here is the issue:
    Once I finish the first round of editing a group of photos, I then rename them with the title of the event and a sequence number. I use LR's batch rename feature in the Library module. If I then delete 1 or more of these photos and attempt to rename them again(same event title + numerical sequence), the new names do not properly apply the numerical sequence after the filename. Either of the following can happen, and whcih one will happen is not dependednt on what I do.
    1. The files can be renamed, with the first image having a sequence number 1 number higher than the lowest number I typed into the sequence box in the batch rename dialog (if I type a number 1, the sequence starts at 2). There are also random gaps in the sequence numbering scheme. For example, the numbers will count to 15, then skip to 17, then count to 176, then skip to 178. The rest of the files might be renamed correctly, or there might be gaps. The gaps always skip a single number, and most of the time the numbers skipped are odd numbers, though numbers with a 16 are usually skipped (16, 116, 216)
    2. The files can be renamed as mentioned above, but with the addition of a -1 to the end of the sequence (example: filename-200-1 or filename-3-1). The addition of the -1 is also random, though it is more common with lower-numbered files than higher-numbered files.
    I have experienced this bug on groups as small as 50 photos or as large as several hundred.  I have tried remaning the files to a completely different text/sequence combination and then back to the one I want, and it does not help the issue. The sequence numbering is more likely to have more gaps the more virtual copies are present in the series of photos being renamed.
    This is a major workflow issue for me because the files I deliver have to be named sequentially, without gaps, following a specific text/numer naming convention. The bug is currently adding many extra hours to my post-production time. Any assitance would be greatly appreciated.
    Thank you

    Thanks for the detailed description.  I was able to repro this with your steps and have logged a bug for futher investigation.
    Becky

  • Provisioning roles in UME with CUP workflow

    Hello,
    to give our users permission to approve requests in CUP we assign them to LDAP groups. These LDAP groups have different UME roles.
    Is there any possibility to request permnissions for UME roles via a CUP-workflow in general?
    We are using GRC 5.3 SP 8.1
    Thanks
    Manuel Kunkel

    There are some pre-requisites - you need portal content on your AS Java, the "plain" AS Java install won't do.
    Here's a detailed guide on how to set this up:
    http://www.sdn.sap.com/irj/bpx/grc?rid=/library/uuid/502a14db-6261-2c10-22b5-95117ab0e5ed
    Frank.

  • Workflow issue after upgrade to ECC 6.0

    Hi,
    we are facing an workflow issue and thought if someone has faced similar issue and could help us.
    We've an approval workflow for purchase requisitions through release strategies. For some steps, if the approver is 'WF-BATCH' user, we are executing that step using a program. This program first set the workitem to completed status( this part is working), then it will close the purchase requisition to release status for a particular release code( this part is working) and then we are triggering the 'RELEASE' event for the business object providing the Object key which should take it to the next step( THIS IS NOT WORKING). The business object is custom. This was working perfectly in 4.7 version of SAP but this logic is not working in ECC6.0. we are using SAP_WAPI_CREATE_EVENT to trigger the event. But the workflow doesn't move on to next step.
    Have anyone of you have any idea as why this might be happening. Any information on this would be of great help.
    This is happening in ECC 6.0. USED TO WORK IN EARLIER VERSION.
    Regards,
    Sam K

    Hi,
    Is WF-BATCH having proper auth. ?
    Or, if you are using the FM SAP_WAPI_CREATE_EVENT in some program and is scheduled as a batch job, then that user under which this batch job is runnign should have proper auth. to raise the event. Please check those.
    Also, what the error (if any) says in SWEL ?
    venu

  • Workflow issue-Agent not maintained

    Hi All,
    I have a workflow issue. For a PR, the workflow is throwing up the error as :
    "Agent not maintained for plant XXXX planner group XXXX release code.
    Please maintain an agent for the above key in the Agent AssignmentTable,and forward the workitem with text "Release requisition XYZ" in your Workflow inbox to an appropriate Approver."
    Please help me out on this one.
    Thanks,
    Swati.

    HI
    Check 'Agent Assignment' in not green..
    Then push the button 'Agent.Assign for TASK' in front of 'Agent Assignment'.
    Next, You can go the maintain screen.
    Push 'F8' or 'Attributes...' and check 'General Task'.
    and try again..
    Good luck

  • Content Workflow Issue using Cineform/PPro/AE

    Hello, I have a potential workflow issue that I need some advice on. I'm currently editing a project in Premiere Pro CS3 using the Cineform intermediate codec (the video was shot in HDV--Canon HV30--imported using AspectHD). Everything is working fine.
    However, I'd like to export some of the video of this project off to a portable hard drive to physically hand over to someone who will be importing it into After Effects CS3 (on a completely different hardware system) to spice things up for me--i.e. they are going to make a flashy intro/title for this project.
    Lastly, I would like to re-import her finished video back into Premiere. She does not have the Cineform codec so exporting it as a cineform.avi file is out (I would think--or am I incorrect here?). My question is mainly--what is the best file format to hand over to my AE person AND what is the best file format for my AE person to give back to me to re-import into Premiere and keep it all in HD/HDV 16:9?
    I have no idea if this is a really easy thing, or really challenging. Any thoughts or suggestions are greatly appreciated.
    Bill

    Hi Bill
    well the best person to answer that question is the lady who is doing the afterv fx work for you. only she knows what her system can handle. I would recommend first and foremost uncompressed avi if she is on windows or uncompressed .mov if she is on a mac. otherwise if she cannot handle uncompressed because the file is too big you could give her a quicktime animation. i think the file is a little smaller than uncompressed but i could be wrong. but qt animation is still a big file. you could also render out the video as an image sequence I recommend a TIFF sequence suing LZW compression to keep the file sizes down. give her the image sequence she can add the fx and then she can render out the final product as an image sequence again which you can match up with the audio track on your pc. she can also give you an uncompressed file which you can then render out to cineform.
    angus

  • OIM 11.1.1.5 Approval Workflow Issue

    Hi,
    I have installed OIM 11.1.1.5. While self-registration of a user, the request is created and by default assigned to xelsysadm as the request level approver.
    However, when the approver logs in, assigns the organization to the user and approves the request, it is shown that the approval task is completed.
    But the request status doesn't change and remains "Obtaining Request Approval" and thus the user is not created in OIM.
    In SOA server, on checking the logs (soa_server1-diagnostic.log) we found the following error -
    [soa_server1] [ERROR] [] [oracle.soa.bpel.engine.dispatch] [tid: orabpel.engine.pool-5.thread-4] [userId: weblogic] [ecid: ee9b8be672bf5ad0:-72f1c18e:1399f6dc058:-8000-0000000000000108,0:1:100000006] [APP: soa-infra] failed to handle message[[
    java.lang.NoSuchMethodError: oracle.wsm.policy.model.IPolicySet.getStatus()Loracle/wsm/policy/model/IPolicySet$POLICYSET_STATUS;
    We are unable to resolve the issue, we've tried using a custom approval workflow instead of the default approval workflow.
    Kindly help.
    Edited by: 957679 on Sep 7, 2012 6:17 AM
    Edited by: 957679 on Sep 7, 2012 6:19 AM

    Hi ,
    I actually faced the same issue some time back .., it took me almost a week to resolve it ..
    This is happening basically due to incompatible version of wsm-policy-core.jar on your server . Please check all the FMW s/f installed on your server . One of them is incompatible with OIM 11.1.1.5.0 .
    Are you using BIP 11.1.1.6 by any chance .
    Thanks
    Suren

  • WorkFlow Issues: Appending (not replace) Attendee Field in Calendar List and Email Variables (including .ICS file link)

    Kind of new to attempting any custom development in SharePoint.  Working with 2013 and have the 2013 Workflow Farm setup/working.  I am trying to have a calendar that users can register to appointments via custom list.  I
    have the list that pulls the title into its  own "Event" field as a lookup.  Also have a workflow on the calendar that adds the current user as an attendee and made that field "not required".  I'm trying to accomplish this:
    1) Have the Custom List update the Calendar list attendee field with the username. Currently it wipes out what is there and replaces with the "Created By" name. Tried to set a variable that would put the current attendees in a string
    and just add the current user, then use that variable to update the attendee field.  No luck.  Ultimately if I can understand this enough and get fancy enough, I'd setup a workflow  that can have someone delete their own registration item in
    the custom list and remove only their own name from Attendees...
    2)  Have a workflow kick off an email that sends the registrant the calendar details. Have tried to pipe in variables to get the ICS file (some variation of this )
     If I put the List ID in brackets I get an error about having that and variables in the same code for an email workflow.  In any event I can't really get the email workflow to give any kind of nice piped in values the best looked like this and had
    the wrong date: You registered for  {"results":[{"Id":22,"Value":"Test Event 8"}]} on 1/1/0001 12:00:00 AM

    Hi Jason,
    seems your requirement a bit complex, we forum team may have limited resource regarding this issue.
    you may consider to use infopath for example from this 3rd party article:
    http://www.bizsupportonline.net/infopath2007/programmatically-add-item-sharepoint-calendar-infopath.htm
    or for general example:
    http://office.microsoft.com/en-001/infopath-help/customize-a-sharepoint-list-form-HA101821257.aspx
    the article is to add an item to your calendar list, so then you may need to do wipe or other procedures, by infopath you may add the data as
    you need.
    if should infopath feature may not be possible to use in your environment, i may need to suggest you to open an advisory case to us, by contacting our representative,
    https://support.microsoft.com/
    Regards,
    Aries
    Microsoft Online Community Support
    Please remember to click “Mark as Answer” on the post that helps you, and to click “Unmark as Answer” if a marked post does not actually answer your question. This can be beneficial to other community members reading the thread.

  • SRM Process Controlled Workflow Issue - Process Level Agent not shown up

    System: SRM 7.0 (SP09)
    Implemented BADI to determine agents at process level - BADI Definition /SAPSRM/BD_WF_PROCESS_CONFIG
    Configuration: 1 Process Level (Seq 100, Lvl Type A, Resp. Resolver Name: Z_XXXXXX, Task ID 40007954, Decision Type 1)
    When creating the Shopping cart based on the cart value, the agents are determined correctly and process level GUID is created with Agent ID associated.
    something like
    GUID1 - APPR1
    GUID2 - APPR2
    GUID3 - APPR3
    GUID4 - APPR4
    Before "Order" when we do preview of Approval Process, it shows all the approvers in the sequence as expected. As soon as the cart is ordered, the first process level GUID lost its agent thus throwing error saying "Strategy Z_XXXXXX did not determine any approver"
    But when we look at the table /SAPSRM/D_WF_016, the corresponding entires of GUID1 has the agent ID as APPR1.
    The task 40007954 has been GENERALIZED so as the master workflow template 40000014. The same is working in our Dev system but throwing error "Strategy Z_XXXXXX did not determine any approver" in QA system.
    Any input is highly appreciated.

    See the thing is the agents were picked up & saved in the table /SAPSRM/D_WF_016 in the process level BADI. The first process level guid doesn't get processed in the RESP_RESOLVER BADI. I put the break point and can see the agents were picked up & saved in Process Level BADI.
    The funny part is it is working just fine in the Dev system. Secondly, when we do BOB for the same user (requester), it picks up the first level approver without the error.
    Meaning, If USER1 shops for himself (Creator & Requester are same), we encounter this error. If USER2 shops for USER1, then the corresponding approvers were picked up correctly without the error. USER1 & USER2 have same authorizations in SU01D (USER2 is copy of USER1, so no authorization issues). Approvers determination is based on the requester.
    Somewhere, we miss the settings. Don't know where though.