Current Proccesor in normal correction activity
Dear all helpers.
Please, what is actual role for Current processor in activity normal correction? Is it developer? Or is it simple the one, who proccess the activity NOW, I this role is changing during life cycle of correction? My concern is, that there is possibility to choose developers and other roles at the sheet partners.
Thank you for explanation.
Many thanx
Petr
hi Petr,
there are indeed different way to interpret this. It can be a "current processor" whaterer the function behind or the "main processor", in this case this is fixed.
The fact that by default prompt to become the processor each time someone enters the document shows that SAP has chosen a moving value there.
In our company we have choosen a fixed value. This is the one doing the actual change. (customizing or development)
The other partner functions are well defined (like IT operator,...) and these partners are playing their role depending on the correction status.
Both approach are valid for me
best regards
Xavier
Similar Messages
-
Email when Current Processor Changed : Normal Correction
Hello Team,
I have a query,
In ChaRM ( Normal correction scenario ), if we change current processor field of change request ( even manually ) , then email should go to the processor. Can this be set up? if Yes , Please let me know the procedure?
Best Regards,
TusharDaniel,
I assume that you followed the steps of this blog: Pep Up Your ChaRM - Part 1: HowTo Create a Smart e-Mail Action
However, if you want to send an email when a processor is changed, then that would involve some development work. What we did here at our company was we leveraged off of OSS note 865619. We used the BADI that was documented in here to do partner comparison, if the current processor is different from the assigned processor, then a flag would be sent to be used later by the conditions.
Hope this helps.
Ryan -
Normal Correction/Development Activity
i am creating Development(Implementation) type change request, , after setting the status of the Change Request In Development and created the transport request. after creating TR its status automatically resets to "CREATED" again and again each time i create transport request??
Plus if we have imported a TR once in QAS and reset the status to "In DEvelopment" and created new transport request , by again "Import Transport Request (Background) it will transport the new TR only??
For normal correction/Development Activity we ahve to import transport request manually from task list???
ThanksHi
This should slove your problem
Note 919477 - Normal correction reset to status "created"
santosh -
Normal correction: how to assign developer or tester?
Hello,
I have implemented ChaRM. I have one concern infront of me regarding the process. My ChaRM is working fine. When I create a Normal Correction (NC) or UC, I can see the tab for Change Manager, IT Operator and Current Processor. I do want to know how the request will determine who is the developer or tester? Once I create a request, it is visible in the assinged person's queue. As I am not able to specify Developer and Tester in the request, how they will come to know about the CR?
In Partern Determination procedure, I can see SDHF0001 function is assigned for SDMJ and SDHF. I can only define 4 roles there. How can I add more?
Please help me ASAP.
Regards,
Rajeev
Edited by: Rajeev P on Jun 16, 2009 2:56 PMHi Rajeev,
did you have a look at the partner tab under "transaction data"? Is that what you are looking for?
It is just possible to display four entries under "fast entry", but you can assign lots of partners in the partner tab.
There are also several possibilities for the customization of the partner determination like access sequences, see IMG activity CRMC_PARTNER_AS.
Kind regards,
André -
CHARM: Developer and Tester same USER in normal correction
Hi Expert,
i'd like to know if in a normal correction it is possible that Developer and Tester are the same persone.
So the same user have to confirm development and confirm sucessful test.
Now if i try to use the same user i've an error.
Can you help me ??
thanks
FrancescaSPRO
search for Make Settings to Change Transaction Types, and select that activity.
Highlight SDMJ, select the Use Partner Functions folder on the left
in the table on the right:
The first column in the table is the status
The second column in the table is the partner function that the current business partner will be assigned to when save is clicked and the status becomes the first column.
The third column in the table is used for determining if partner functionsu2019 business partners are the same when the document is saved and the status becomes the first column. For example, the Tester (SDCD0002) equals the Developer (SDCD0001) when the status is Confirmed (E0009).
Delete the value in the third column to stop the comparison. -
Charms : Background job not scheduled (normal correction) ?
Hi,
I am trying to run a dry cycle for normal correction but when i go to task plan in any ticket to release a request. When i schedule this job " release a request" , i dont see any job running in background in SM37. I think job is not gettin sceduled properly.
Please help me outHi,
All right. We need to dig this one
I guess you schedule the import by going the the tasklist
and you get a red flag for this activity in the calendar ? do you have any error message ?
If the messagein the task-list is not self-explanatory you can check the SLG1 log in SOLMAN. Which error message do you get there. (select the correct time frame, the log could be big)
My guess is that some S_RFC authorisation is still missing there
This authorisation is outside SAP_ALL and is often the cause of this kind of issue
Tell me the error message and we will hopefully fix this (I had the same kind of issue when I started last year)
best regards Xavier -
Reseting status of normal correction
Hello.
After update up to version ST 20 (SAPKITL430) one more error appear in system. After processing of any activity with normal correction and trying to save this document system resets status of correction to "Created". I have found coresponding SAP Note 919477, but it has't any correction instruction... Can you help me?
Edited by: Dmitry Udot on Sep 25, 2009 11:02 AMHehe... you are right.
First off I think it should be SDMI_ACTIONS not DMI_ACTIONS.
And yes, there should be some more instructions, hehe. Probably delete it (after making a screenshot).
The selected schedule condtion looks strange. Because as for what I can tell it says:
Set User Status to E0001 (new) when user status is not:
consolidated AND NOT productive AND new (consolidated and productive belong to SDMJ not SDMI, new fits to both)
OR
in developement (fits to SDMI and SDMJ)
So whenever you set (SDMI or SDMJ) to "in developement" it will be set back to E0001. Very strange.
Guess you may delete it or at least disable the action.
Regards -
Charm Normal Correction(Maintenance) not able to generate with SDMJ
Hi,
I have configured Servic Desk & CHARM newly. Urgnt correction is working fine.
But when i select the subject ' Normal Correction(Maintenance) ' in change request it creates a correction with Transaction type-SDMI
My requirement is SDMJ Normal Correction(Standard). why system is automatically taking SDMI insted SDMJ.
Regards
PKHi
Hav you activated the following BC Set
SOLMAN40_CHARM_TRANSTYPE_SDMJ
hope it solves
Regards
Prakhar -
Issue with normal correction.
Hello,
I am configuring ChaRM in SolMan system. I am able to perform the steps mentioned in the RKT. But currently I am facing 2 issues.
1. There is no action as "Create Change Request" in the support message. I can see only "Create Change Document". How can I get that action? What is the difference between a change request and chage document?
2. For normal correction (maintenance), once the message reaches the status "In developement", when I try to perform the action "Logon to the system", nothing is happening and I am getting successfull message saying "Action Logon to system performed immediately".
Please help me to solve these problems.
Thanks and Regards,
Rajeev.Hi,
1. There is no action as "Create Change Request" in the support message. I can see only "Create Change docuement" How can I get that action? What is the difference between a change request and chage document?
you are correct only action is there create change document because first a change document is created for Change manager approval and after his approval and concern he create a type of correction ithen only u get the next doc.
2. For normal correction (maintenance), once the message reaches the status "In developement", when I try to perform the action "Logon to the system", nothing is happening and I am getting successfull message saying "Action Logon to system performed immediately".
Check your authorization to logon to that satellite system
Regards
Prakhar -
Creation of New consistencycheck condition for Normal Correction
Hi,
We are using ChaRM normal correction to check the transport imported to production system we are using the check conditon 'PRODUCTION_IMPORT_OK' which is implemented in Class CL_SOCM_INSTANCE .
On similar base we wanted to create the condition of 'ZTEST_IMPORT_OK' for normal correction, but we are not able to find the Standard code written for condition PRODUCTION_IMPORT_OK.
If find this code we can make some adjustment in this code with BADI for consistency check to implement the new condition .
Is any one worked on this type of condition , your help will be appreciated.
Regards,
Amar KamatHI
Check if needed to assign any account key to this new condition type in your procedure if needed, then mantain the GL acc for the same.
If you are adding this condition type in your TAXINN procedure (assuming so) you need to create the condition type for the same by using trax FV11.
If you are adding your condition type in Pricing procedure then no ned to create the condition record.
Regards
Sujoy -
Process Flow for Normal Correction
Hi All
I am searching for a process flow for a normal correction. In specific I need to know who does what in terms of crating transports and releasing transports. I need to have a guide on the entire process as well as the status that the relevent parties change it to. For more info please let me know.
SantoshHi friend,
This is answer to all your queries concerned.*need S-user for this
https://websmp106.sap-ag.de/~sapidb/011000358700000086572008E.sim
Pls assign pts and can close the thread. -
Import Error in Normal correction of CHARM
Hi All,
In Normal Correction, when i try to import to Quality system, by executing the import transport request in the Task plan.
Iam facing some error in the TMS RFC.
Pls find below the error description.
TMS communication error with TMSSUP RFC
Message no. XT153
Diagnosis
There was an error during communication with the RFC destination
TMSSUP @ XXX.DOMAIN_XXX
System Response
The exact error message of the system is:
Name or password is incorrect (repeat logon)
Procedure
The function terminates.
Procedure for System Administration
Check your TMS configuration with the transaction STMS.
When I check the Import alert monitor i donot find any entriesHi Venkat,
TMSSUP RFC and TMSADM are auto generated from STMS, mostly distribution did not happen correctly or completely.
if you need TMSADM as modifiable, use addition in TMSCROUTE Table on Oracle level.
but first double check all three RFCs in SMSY for the system, then re-distribute the TMS config.
Also pls check the CONTROLLER RFC , for user and passwrd before distributing.
Regards,
Kaustubh.
Edited by: Kaustubh Krishna on Jun 7, 2011 9:09 PM -
Normal corrections "SDMJ" are not visible under tcode "DSWP"
Hi!
I have the following problem by working with ChaRM and normal corrections.
There are two types of normal corrections:
1) Normal Correction (type:SDMI)
2) Normal Correction (type: SDMJ)
Problem
Since a few days it is not possible to see all the SDMJ normal corrections within tcode
DSWP --> Change Management --> Drop Down "Not Completed".
Only the SDMI normal corrections are visible there.
Questions:
how can this issue be customized in order to see the normal corrections of type: SDMJ in tcode DSWP?
Thank you very much!
regardsWe implement SAP Work Center
-
Normal Correction flow & Transport of copies
Hi,
I am performing following steps for Normal Correction. But when I first time schedule the imoprt job, nothing is moved to Quality system.
u2022 Action u2018Set to In developmentu2019. Status changes to u2018In Developmentu2019.
u2022 Perform action u2018Create Transport Requestu2019. Transport Request (ID6K900342) created.
u2022 Change the Maintenance Cycle phase to u2018Development with Releaseu2019
u2022 Developer completes the work & releases the Task in satellite system
u2022 Action: u2018Test Transportu2019. Creates Transport of copies (ID6K900344)
u2022 Schedule the import job. ( But after executing also nothing will be moved to Quality)
u2022 Action: u2018Complete Developmentu2019. System creates another new Transport of copies (ID6K900347) for Original Request.
u2022 Schedule the Import job. ( But after executing also nothing will be moved to Quality)
What could be the reason. both the TP copies are in queue only, nothing is moved to quality.
Regards
PKHi PK,
Let me try to explain:
NC => 80000001
1. Create TR
XXXK0001 (Original TR)
2. "Test Transport" or "Complete Development"
XXXK0001 (Original TR) -> still not released
XXXK0002 (ToC- copy of XXXK0001)-> is created in DEV
3. Import TRs to QAS (from task list)
XXXK0001 (Original TR) -> still not released
XXXK0002 (ToC) -> is moved to QAS
4. Now the changes are in QAS, but is not placed in the PRD import queue. So, you can test it with no risk.
5. If you have problem, go back to 'In development'
Correct the problem in XXXK0001
and go to step 2 again.
6. If the changes are OK in QAS
- Select 'successful tested'
XXXK0001 (Original TR) -> is released
7. Import to QAS
XXXK0001 imported in QAS and automatically placed in PRD import queue.
8. Import to PRD
The ToC is used to avoid import an inconsistent TR into PRD system, because once it has been imported in QAS, the same will be available to import into PRD, without any test.
BR
Fernando -
11.2.0.3 RAC ASM Pri with Normal FileSys Active Standby Post Failover
The architecture consist of two node rac asm primary and one normal filesystem active standby all on Oracle 11gR2 11.2.0.3. With basic Broker Configuration.
Performed a managed broker switchover and not the Normal Filesystem has the primary role and the standby consist of the two node asm rac. I want to switchback, i.e., Former Primary -> Primary Role and Former Standby -> Standby Role.
However my broker contains the following:
DGMGRL> show configuration verbose;
Configuration - DG_PRI_CFG
Protection Mode: MaxPerformance
Databases:
STANDBY - Primary database
Warning: ORA-16829: fast-start failover configuration is lagging
KEMETRAC - (*) Physical standby database
Error: ORA-16810: multiple errors or warnings detected for the database
(*) Fast-Start Failover target
Properties:
FastStartFailoverThreshold = '95'
OperationTimeout = '30'
FastStartFailoverLagLimit = '95'
CommunicationTimeout = '180'
FastStartFailoverAutoReinstate = 'TRUE'
FastStartFailoverPmyShutdown = 'TRUE'
BystandersFollowRoleChange = 'ALL'
Fast-Start Failover: ENABLED
Threshold: 95 seconds
Target: KEMETRAC
Observer: emcc.respecti.com
Lag Limit: 95 seconds
Shutdown Primary: TRUE
Auto-reinstate: TRUE
Configuration Status:
ERROR
I've found a recommendation to increase the value of FastStartFailoverThreshold='90';
Though I continue to encounter the above configuration error.
Recommendations are appreciated!
Edited by: 783527 on Mar 12, 2012 7:41 PM03/13/2012 13:13:22
Data Guard Broker Status Summary:
Type Name Severity Status
Configuration DG_PRI_CFG Warning ORA-16607
Primary Database STANDBY Warning ORA-16829
Physical Standby Database KEMETRAC Error ORA-16810
03/13/2012 13:14:22
Data Guard Broker Status Summary:
Type Name Severity Status
Configuration DG_PRI_CFG Warning ORA-16607
Primary Database STANDBY Warning ORA-16829
Physical Standby Database KEMETRAC Error ORA-16810
03/13/2012 13:15:22
Data Guard Broker Status Summary:
Type Name Severity Status
Configuration DG_PRI_CFG Warning ORA-16607
Primary Database STANDBY Warning ORA-16829
Physical Standby Database KEMETRAC Error ORA-16810
03/13/2012 13:16:22
Data Guard Broker Status Summary:
Type Name Severity Status
Configuration DG_PRI_CFG Warning ORA-16607
Primary Database STANDBY Warning ORA-16829
Physical Standby Database KEMETRAC Error ORA-16810
03/13/2012 13:17:22
Data Guard Broker Status Summary:
Type Name Severity Status
Configuration DG_PRI_CFG Warning ORA-16607
Primary Database STANDBY Warning ORA-16829
Physical Standby Database KEMETRAC Error ORA-16810
03/13/2012 13:18:22
Maybe you are looking for
-
Wireless very slow and/or unstable after Kernel update to 3.13
I have a "fresh" install from 2 weeks ago. It was installed with Kernel 3.12. I have a rtl8192cu, it was dreadful, so as recommended I installed dkms-8192cu and everything was perfect. After the upgrade to Kernel 3.13, both with the standard driver a
-
Identify Spry Tab as Active?
How do you identify a Spry tab in a Spry Tabbed Panel as the active one in a series of them? By default they're all grey. The obvious solution would be to have the active tab be a different color from the other tabs. Can this be done? Thanks.
-
Got 09 Imovie...Its been a drag ever since...yep Im angry....heres the challenge. I made a movie using my imac camera last night. A short clip that would be 10m in the old Imovie ended up being 500....and even when I converted it to mv4, it was still
-
Soemone please help. I've been at this for a very long time. When I install the trial version of the Master Collection CS5.5 on my pc nothing will open because of errors. I get error 131:4 on some and Error 5 on the others. I have reinstalled this th
-
Local Process chain getting failed
Hi All, My local process chain is getting failed due to the following error. "Job started Step 001 started (program RSPROCESS, variant &0000000068733, user ID ALEREMOTE) Start process CHAIN EC_EW_M_COMPLAIN_ZMTCOCR1 in run 1HN75DVW2PG2WFU98WGFIXOGV o