Custom invoice blocked due to Quantity.

Hi All
This is regarding Intercompany India scenario.
Issue : Custom invoice  #5109581820 has been blocked for quantity. There are seven conditions ( JCDB,JCV1,JECV,J1CV,JEDB,JSDB,JADC) maintained for custom vendor and one condition (ZCCC ) for custom clearing charges vendor.
Hence there are total eight conditions for customs. And the above mentioned invoice has been block for Basic customs duty (JCDB)  and  Ecess on total duty (JEDB) conditions. Question : 1) Why the invoices for Basic customs duty (JCDB)  and  Ecess on total duty (JEDB) conditions are blocked.
2) Why only the invoices for Basic customs duty (JCDB)  and  Ecess on total duty (JEDB) conditions are blocked and not for other conditions ?
Details are as follows:
1)In PO#4700279549 total PO qty is 100.140kg
And delivery have been done in partial for qty 80.150kg and 19.990kg
2)PGI also done in partially for the same qty.
3)Now first custom invoice #5109538999 is for qty 80.150kg.has been posted on dated 16.10.2008
4)GR for qty 40.110 has been done on dated 31.10.2008
5)On dated 03.11.2008 GR posted for qty 20.040 but cancelled again on same date.
6)Now custom invoice #5109581820 posted for remaining qty 19.990 but still for invoice #5109538999 for remaining(80.150-40.110=40.040) qty  has not been received before second of custom invoice.
7)After 5.11.2008 GR posted for qty 20.00kg and on 06.11.2008 Gr posted for qty 20.040
That means total GR has been posted for custom invoice #5109538999.
Thanks and Regards..
Trupti

Hi Joan
Good question. First I tend to use this mail function, but then I decided to implement the workflow because
a) I was wondering how this works g and it is kind of sexy
b) I needed already a workflow for the Investment Management and wanted to stick on this technique
c) later we want to scan incoming invoices where we also will need to work with Workflows
d) the WF provides some functions like jumping directly to the invoice and order, delete blocking reasons or change the order
e) the WF could later be modified to cover more or other requirements
Of course the receipant of the Workitem also gets an eMail (via Internet) to let him know about an incoming workitem.
The most time I needed to find out how this works. Now it's just a piece of cake (as long as the SAP-standard WF for this is used without any modifications); would take not more than 15 Minutes to set it up again... no joke. But this depends also on the release you're on.
Of course you have to make a good end user documentation (but you have to anyways for the invoice verification) and about two good flow charts. This together with some trainings really needs the time.
Bye
Wolgang

Similar Messages

  • Workflow: invoice blocked due to quantity (BUS2081)

    Hi all
    First let me mention that I'm not a developer but a FI/CO consultant and new in this forum as well. So please excuse if this posting is in the wrong forum of if the question is stupid.
    We want to optimize the process of invoice verification. Therefore I implemented the Workflow WS20000397 which works great.
    But this workflow only deals with price-blocked invoices. What about the quantity-blocked ones?
    For this topic I found no information at all, only the Workflow WS00400026, but I'm not shure if this is still to be used with newer releases (4.7, Basis release 620).
    But anyway I tried to connect WS00400026 to BUS2081 in the function "event type linkages" with the event BLOCKEDQUANT where I entered WS00400026 as the receiver type.
    Now I'm not shure if this Workflow and the procedure is correct because a) I could not find any information about this and b) the "linkage activated" will automatic deactivated when posting an invoice.
    Could someone give me some hints how to deal with the quantity blocked invoices and workflow?
    Thank you and best regards
    Wolfgang

    Hi Joan
    Good question. First I tend to use this mail function, but then I decided to implement the workflow because
    a) I was wondering how this works g and it is kind of sexy
    b) I needed already a workflow for the Investment Management and wanted to stick on this technique
    c) later we want to scan incoming invoices where we also will need to work with Workflows
    d) the WF provides some functions like jumping directly to the invoice and order, delete blocking reasons or change the order
    e) the WF could later be modified to cover more or other requirements
    Of course the receipant of the Workitem also gets an eMail (via Internet) to let him know about an incoming workitem.
    The most time I needed to find out how this works. Now it's just a piece of cake (as long as the SAP-standard WF for this is used without any modifications); would take not more than 15 Minutes to set it up again... no joke. But this depends also on the release you're on.
    Of course you have to make a good end user documentation (but you have to anyways for the invoice verification) and about two good flow charts. This together with some trainings really needs the time.
    Bye
    Wolgang

  • Invoice blocked due to price

    I have a framework po where there are invoiced blocked due to price.  The invoices took the total over the po price.  PO price was increased, but the payment block did not release when RM08RELEASE was run.  Now, when MRBR is run to manually release, these invoices do not show up, yet, on vendor account via FBL1N, they still show "R" block.  Can someone explain why this is happening?
    Thanks,
    Bill

    Charlie:
    I guess my question is that when the condition that caused the invoice to block, which was price, was corrected, why wasn't the invoice block removed when we ran RM08RELEASE with automatic release processing selected?

  • Invoice block due to tolerance limit

    Hello,
    I have created a PO for 600 DKK.
    I have created an invoice for 610 DKK and want to do the invoice verification in MIRO.
    The invoice gets blocked.
    Which tolerance limit is causing this?
    I have specified tolerance limits in transaction OMR6:
    1) PP (price variance): + 5% - 5% +15 DKK - 15 DKK
    2) KW (Var. from condition): +2% -2/ - -
    My 10 DKK difference between the PO & invoice lies between these tolerances.
    Are there any other tolerances to be fixed?
    Thank you for sharing your experience.
    Kind regards,
    Linda

    Hi,
    Stochastically blocked meaning that the invoice was blocked due to a payment block set at random in the document header. For each company code, we can define the degree of probability that an invoice will be stochastically blocked. In IMG setting, We mention Threshold value and the Percentage probability for our Company code.
    The degree of probability depends on the invoice value. If our Invoice value is the same or larger than the threshold value, the degree of probability is the same as the percentage probability maitained. If the invoice value is smaller, the degree of probability is calculated in proportion to the threshold value.
    Example
    Threshold value: 3000 percentage: 60
    Invoice value Degree of probability of a block
    3000 60 %
    5000 60 %
    1500 30 % (= 60 * 1500/3000)
    100 2 % (= 60 *  100/3000)

  • Invoice Block due to qty

    Hi All,
    I have a query on Invoice workflows . I'm trying to design an invoice workflow for Qty Block ( as there is no standard one ... although there is one for Priceblock). The event QuantBlock exists in the business object BUS2081 .but no method like ListBlockedPriceItemdata or BlockedPriceCheck which exist for Price variances .
    ....the requirement being to send a list of Invoice Lines Blocked  due to qty to the requisitioner , so that he can take some action . After that to recheck whether the invoice has any other qty variances ( this will be in a loop ).As the requisitioner can be different for every line item there can be multiple requisitioners for the invoice .
            Any ideas ?
    Regards,
    Radha Subramanian

    Well, this is sort of obvious....
    Create your own subtype and create your own methods using the SAP standard code as models for the implementation. Perhaps SAP implemented this for price blocks just to give customers an example of what is possible?
    As for the different requisitioners, that sounds like a candidate for dynamic parallell steps or subworkflows.
    When there is no standard functionality available (no function modules either like the ones for price blocks), then you don't have much choice. If you want it, you code it.

  • Custom invoice Block into MIRO

    Hi Gurus, I need to block an invoice based on the account assignment (internal order). The block should be a 'logistic invoice block' (displayable as a manual block into MRBR).
    Some can help me ?
    thanks in advance
    CIAO
    Alda

    AKPT,
    Thank you for your response.
    My purpose of blocking invoice is If the invoice date is before the PO creation date that invoice should be blocked and should show in MRBR as other invoice verification blocks. I am using BADI - MRM_PAYMENT_TERMS to set a ZLSPR(Payment Block Key) as a custom block, but this is going under Manual block in MRBR and not able to see Blocking reason in RSEG. Please guide me how to do in this scenario.
    Thank you in advance.
    regards,
    madhu

  • Invoice Block due to price variance

    Dear Friends,
    In invoice verification I have configured invoice block for price variance (PP).
    I have mentioned upper limit as 5%.
    PO---100
    GRN---100
    Invoice---120
    I have made this as warning message. I want this should not be open for payment before releasing in MRBR. After posting the document in MIRO it shows that invoice is blocked for payment. The payment bock indicator in payment tab in MIRO shows as "R"--Invoice verificatin.
    But system allows this document for payment to be done both in f-58 & f-53.
    So please tell me how to stop payment to be done before releasing it in MRBR.
    Regards
    R Panda

    Hi
    I think you may be missing some settings in FI, thats the reason it is allowing to pay the invoice whcih are blocked for payment.
    Please check with your FI consultant
    Thanks & Regards
    Kishore

  • Custom invoice blocking reason

    When posting an invoice, several checks are done to see whether invoice items should be blocked for payment. This is being done based on price and quantity. Right now we want to block payment for an incoming invoice item if that item does not have a corresponding PO item.
    To this end we want to (ab)use the blocking reason for quality. When posting an invoice, there will be a time in the code that blocking reasons will be checked, at least for price and quantity. At that point we would like to insert our own code to set the quality block field if required.
    Is there a way of customizing this process or creating an additional check without having to adjust standard SAP? Thanks in advance for the help!

    An update and a question on the issue. The badi eventually didn't work for us, the additional checks it performed made it very hard to work with. What we did was adjust standard SAP in the routine for quality check. If our check returned negative, we set the quality block and return the process to SAP. Luckily this isn't a coding beauty contest, but it works perfectly.
    Now we've been asked to implement the same process in another system. Newer system (SAP ECC 6.0), so once again we want to check whether there is a better way of solving the issue.
    We know we're able to define custom blocking reasons. However they all seem to be related to tolerance level checking, which is not what we want to do.
    Is there any way of creating a custom blocking reason on header or item level, which we can set with custom ABAP coding? Then we can program what we want to check and when to set the block.

  • Customer Invoice Block

    Hi,
    I want to block customer account manually for cheque bounce.No entry should be allowed to customer account.
    Thanks

    XD05?

  • Invoice blocking due to tolerance limit at header Invoice Value.

    Hi,
    Our client needs to have tolerance limit set for total Invoice value.The Invoice contains multiple line items.The tolerance may be % or $ value.The standard setting which I know is for each Invoice line item but not for cummulative.The issue is if we post exceed but within tolerance amount for each line item from the Invoice containing multiple line items,the total Invoice value exceeds considerably.
    Please let me know the how to deal with this issue?

    Hi Mandar,
    Set Tolerance Limits:
    In this step, you specify the tolerance limits for each tolerance key for each company code.
    When processing an invoice, the R/3 System checks each item for variances between the invoice and the purchase order or goods receipt. The different types of variances are defined in tolerance keys.
    As per your req ,it is not possible to compare PO Net header value with GR Total value and Toatl Invoice value because PO , GR and Invoice may contain the different line items.
    we are always doing Invoice verification at item level not on header level so SAP provides all the keys at item level only.
    Rewards if helpful...
    Regards
    Sanjay L

  • Invoice block removal due to quantity.

    Hi ,
    Is there a standard workflow to remove invoice that is blocked due to quantity mismatch.
    Or is there any other simple way to do that ?
    Regards
    Immanuel D

    I will assume that your title is correct: it is the invoice block you want to remove and not the invoice itself.
    There is a transaction which will remove blocks for which the blocking reason no longer exists. I just can't remember it now, and I don't have access to SAP here, but it is in the SAP menu close to the other LIV transaction. Find the transaction for releasing manually, it should be close to that.

  • Invoice Block problem in MIRO

    Hi Friends,
    I am facing a issue. Can some one help to overcome this issue please
    1. We have created PO with item value Rs 100  and  GR is not done yet.
    2. Then we created Invoice for value Rs 20. Invoice got blocked due to Quantity (because GR is not done)
    3. Now,I am creating subsequent debit for the same PO for the remaining value of Rs 80. But this subsequent document is not getting blocked . According to me this subsequent document should also get blocked. Can some one help me why this problem. Is it a standard SAP functionality that subsequent document will not get blocked?
    Deva

    Please have a look for details
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/a8/b99725452b11d189430000e829fbbd/content.htm
    Subsequent Debits/Credits are used in cases where the quantity is in the original invoice is to remain the same. For eg.
    PO  10 - $10
    Gr   10 - $10
    LIV 10 - $11 (Logistics Invoice Verification)
    The vendor invoice is more than that in the Purchase Order. In order to correct, the Vendor may send in another invoice for
    the Increased amount or a credit memo for the increased amount.
    If you approve of the price increase, post the subsequent invoice received as a Subsequent Debit/Credit Invoice.
    If it is a credit memo that has been received, then post the credit memo as Subsequent Debit/Credit.
    This would retain the quantity but reduce the amount.
    Subsequent Debit/Credit is for the case when the credit is not for the full amount eg. if the Vendor decided to credit
    only the $1 overcharged.
    Credit memo is for the credit of the full amount and value.
    Edited by: Sridhar Jayavarapu on Feb 12, 2009 2:34 PM

  • Payment block due to quality reasons

    Hi Gurus,
    My client would like to have a the payment blocked when the material is in quality inspection upon GR. Using a QM control key 0007 in material master, we can set invoice block due to quality reasons.
    However, I would like to have the payment blocked when the received material is in QI stock. The manual payment block works in MIRO, but how can the payment be blocked automatically?
    Thanks for your inputs on the same.
    Regards,
    Aroop

    HI,
    There is a Quality Block (Block.reason: quality) check Box active in the MIRO,untill we have cleared the Stock from quality inspection.
    So we have to write in the Exit below
    EXIT_SAPLMRMP_010-ZXM08U16-----MIRO
    if this indicator SPGRC is "X" Configure an error message that material is in Quality inspection.
    Hope so it helps
    Regards
    Anjanna.

  • Customer invoices are blocked for dunning automatically when we run F150

    HI All
    when we are running the dunning (T.Code F150) for one of the customer invoice items are blocking for dunning automatically.
    the customer master setting for dunning block fields is empty and there is no changes for this field.
    These invoices are created recently and could please help to find a solution for not happened the same in hte next dunning runs?
    thanks in advance
    Best regards
    Venu

    Hi,
    Customer automatically gets blocked if the Customer has NO Line Items which can be considered for Dunning.
    Before running the Dunning check weather the customer master us updated with DUNNING Variant and also check for the weather the  Line items are over due and if so check the Dunning Procedure for Dunning INTERVAL and also the Arrear Days for each Internal.
    Hope this will Help you .
    Thanks
    Goutam

  • Report to show order blocked due to customer credit limit

    Hi,
    We can set customer credit limit and if the orders exceed the limit, the order will be blocked. I need to know is there any standard SAP report showing the orders blocked (due to credit limit) and unblocked?

    Hi Paul Hawk,
    There are no standard SAP report showing the orders blocked (due to credit limit) and unblocked. But there are reports which needs some customization.
    Please see the reports
                        RVKRED06 credit check for blocked SD documents,
                        RVEXSLIB   List of all blocked partners / documents
    Regards,
    Lakshmi

Maybe you are looking for

  • Glossary appearing behind text

    Hi i am using a glossary interaction. Ive added it to my first slide and it works ok. I have a button on my master slide that makes this pop-up. When i click this button on th esecond slide or any other... the glossary appears behind the the and smar

  • Pictures from PC to Mac brings up a thumbs.db file!

    I put pictures (from my PC) on a flash drive.  When I open the drive, it only brings up a thumbs.db file.  I can't open the pictures to save them on my mac.  When I put the flash drive back in the PC, the pictures are there.  Help!  I know that thumb

  • Database mailbox grow quickly Exchange 2010 SP3

    Hello. Since we migrated from Exchange 2003 to 2010, the growth of our databse mailbox is excessive. We have a total mailbox size hovering around 75 GB and the size of the database is 120 Gb. Mailbox quotas are very limited and 90% of users move emai

  • Connecting iPod mini through Firewire port

    I usually connect my iPod through my USB 2.0 ports, but I would like to try connecting it through my firewire port. When I plug in my iPod with the included firewire cable, my computer doesnt recognized the mini is plugged in (the mini is charging so

  • Can I hide tree disclose button basing on node.attr?

    Hi OTN, I have an af:treeTable with dynamic node levels. It is not determined how many levels there are, but basing on node attribute I can find out weather the node is a leaf. So I would like to hide disclose triangle button for those nodes that hav