Customer function / badi to CHANGE AFVC-STEUS (Production Order)

Hi Gurus,
i'm looking for a customer function/badi to change field AFVC-STEUS when postin a Production Order.
The PPCO0... customer functions seems NO good because allow only to check but not to change data.
Any hint?

BBP_PD_PO_CHANGE <- that one
BBP_PD_PO_SAVE
COMMIT WORK.
The others to persist the change into the database

Similar Messages

  • Exit/Badi in the transaction of production order create or change (CO02)

    hi all,
    I need an exit/Badi in the transaction of production order create or change (preferably during SAVE).
    I want to change structure AFVGD-usr02,AFVGD-usr03 .
    <b>PPCO0007 Exit when saving production order</b>
    the exit is not applicable EXIT_SAPLCOZV_001 .

    Hi
    we around 200 exit for this tcode i found only three badi for this tcode.
    AFABD_CHANGE          Change Relationship
    CAUFVD_CHANGE        BAdI: Overall Network Scheduling with Selection Option
    SIDAT_UPDATE            Change date of price simulation.
    check with this goto se18 and F4 thn give the Package as CO.enter u get this three.
    reward pointd if use full

  • Change Component in Production Order

    Hi!
    I have to change materials in Production Order components before saving. Does anyone know a BADI or user-exit that i can use? I have tried so far BADI WORKORDER_UPDATE and user-exits PPCO0001 and PPCO0008 but none of them can be used for this.
    Regards,
    Zoltan

    Hi
    check the following exits related to production Order
                                                                                    CCOWB001            Customer exit for modifying menu entries                         
    COIB0001            Customer Exit for As-Built Assignment Tool                       
    COZF0001            Change purchase req. for externally processed operation          
    COZF0002            Change purchase req. for externally procured component           
    PPCO0001            Application development: PP orders                               
    PPCO0002            Check exit for setting delete mark / deletion indicator          
    PPCO0003            Check exit for order changes from sales order                    
    PPCO0004            Sort and processing exit: Mass processing orders                 
    PPCO0005            Storage location/backflushing when order is created              
    PPCO0006            Enhancement to specify defaults for fields in order header       
    PPCO0007            Exit when saving production order                                
    PPCO0008            Enhancement in the adding and changing of components             
    PPCO0009            Enhancement in goods movements for prod. process order           
    PPCO0010            Enhancement in make-to-order production - Unit of measure        
    PPCO0012            Production Order: Display/Change Order Header Data               
    PPCO0013            Change priorities of selection crit. for batch determination     
    PPCO0015            Additional check for document links from BOMs                    
    PPCO0016            Additional check for document links from master data             
    PPCO0017            Additional check for online processing of document links         
    PPCO0018            Check for changes to production order header                     
    PPCO0019            Checks for changes to order operations                           
    PPCO0021            Release Control for Automatic Batch Determination                
    PPCO0022            Determination of Production Memo                                 
    PPCO0023            Checks Changes to Order Components                               
    STATTEXT            Modification exit for formatting status text lines               
    Regards
    Anji

  • How to get change date in Production Order ?

    Dear Friends,
    I want to know it, how to get change date in Production Order "Administration-TAB".
    F1-Help, It is displayed with "Change date for Order Master". and Structure table "CAUFVD".
    But, CAUFVD is not Transp. Table.
    Which table should I read ?
    Thanks in advance
    Yamazaki-H

    Dear Friend
    Thank you for an answer.
    It was settled.
    Best regards.

  • Table of list status changes of the production orders

    Dear.
    In which table the system store the list status changes of every production order ?
    Thanks.

    Hi,
    First go to CAUFV table input the production order get the object number
    Input this object number in JEST table and get the system status
    Input the system status in TJ02T table ,u will get the production order status

  • Function modul for a material  throufh production order

    hi,
    Is there any function modul available in SAP for production order for a material
    ie passing input as production order to get the material no and production order date .

    Hi ..
       No ya these 4 func.modul is not in 4.6c can you pl send a right fun.mod. for 4.6 c ver.  so that i can use it.
    regards,
    Lakshman

  • User-Exits/Badis for T.Code Co01 Production Order

    Hi Friends,
    Please can any one give the User-Exits/ Badis For Co01 , I need to link the Material with Documents....
    Thanks,
    Ravi...........

    These are the available user exits..
    CCOWB001            Customer exit for modifying menu entries
    COIB0001            Customer Exit for As-Built Assignment Tool
    COZF0001            Change purchase req. for externally processed operation
    COZF0002            Change purchase req. for externally procured component
    PPCO0001            Application development: PP orders
    PPCO0002            Check exit for setting delete mark / deletion indicator
    PPCO0003            Check exit for order changes from sales order
    PPCO0004            Sort and processing exit: Mass processing orders
    PPCO0005            Storage location/backflushing when order is created
    PPCO0006            Enhancement to specify defaults for fields in order header
    PPCO0007            Exit when saving production order
    PPCO0008            Enhancement in the adding and changing of components
    PPCO0009            Enhancement in goods movements for prod. process order
    PPCO0010            Enhancement in make-to-order production - Unit of measure
    PPCO0012            Production Order: Display/Change Order Header Data
    PPCO0013            Change priorities of selection crit. for batch determination
    PPCO0015            Additional check for document links from BOMs
    PPCO0016            Additional check for document links from master data
    PPCO0017            Additional check for online processing of document links
    PPCO0018            Check for changes to production order header
    PPCO0019            Checks for changes to order operations
    PPCO0021            Release Control for Automatic Batch Determination
    PPCO0022            Determination of Production Memo
    PPCO0023            Checks Changes to Order Components
    STATTEXT            Modification exit for formatting status text lines

  • Report of List of all status changes for various production orders at a tim

    Hi,
    Can I have a standard report which shows the dates of each and every status (user & system) of a production order.
    I need to have a report for a list of productio orders at a time.
    If we go to CO03, header menu, status changes option is there, but it only caters for single production order.
    Table JCDS is available to know the dates but I need a standard one rather than a Z development.
    Or you can guide me any function module.
    Thanks,
    Kumar

    Hello,
    You will get the details of status in following table.
    JEST - for object status
    JSTO - Status Profile
    TJ02T - to Decode the status Number
    as the status data you will get from JEST is in very typical form you have to use TJ02T to find the exact status
    AM

  • Function Module / BAPI for reprinting a production order

    Does anyone know a Function Module to do a production order re-print?   Not an original, just a copy.
    Thanks,
    --Amy Smith
    --Haworth

    Thanks Kevin,
    Been there.  Couldn't find anything.  Doing a BDC for testing. 
    Looks like you have to do a Production Order change.    So maybe is a BAPI for that.
    I'll post what we find in this thread...
    --Amy Smith
    --Haworth

  • User exit or functional module for multiple GR of Production order.

    Hi All,
           I have done a enhancement in CO11N so that batches can get created in production order  confirmation.
    Now When I go to MIGO to do GR I have option to enter the nulitple batches against the production order.
    But what I am looking for is there any exit or functional module which reads the production order and fecth batches which were created from CO11N.
    Regards.

    Hi,
    A few options:
    1. User Exit - MBCF0002
    2. BADi - MB_MIGO_BADI, MB_DOCUMENT_BADI
    3. A Z program by calling BAPI_GOODSMVT_CREATE
    Regards,
    Vivek

  • Batch processing function to read PP data for production orders

    Hi,
      As we know, If BOMs changed we can use T-code: CO02, then follow the menu "Function --> read PP master data" to get up-to-date BOM. But If there're many production orders need to be read PP master data again, I have to do it one by one.
       My question is, If I have a list of production orders, could I do it in batches? and What's the transaction for it?
    Please kindly Advise.
    Best Regards.

    Hi,
      As we know, If BOMs changed we can use T-code: CO02, then follow the menu "Function --> read PP master data" to get up-to-date BOM. But If there're many production orders need to be read PP master data again, I have to do it one by one.
       My question is, If I have a list of production orders, could I do it in batches? and What's the transaction for it?
    Please kindly Advise.
    Best Regards.

  • Change BOM and Production Order

    Hello Expert,
    I have recuuring problem, hope you can lean help to me. Can you explain to me why this happen?
    we have change a component BOM in CS02, first we create change number in CC01. with effective date for 30.09.2008.
    In BOM 6083, there exist a component 10020379. we want this component to be deleted on 30.09.2008 and be replace with a new component material 10060530 effective on the date 30.09.2008. that was the new set up of the BOM of material 6083 (at this date august).
    Today (27.08.2008) we create a production order for material 6083, relesed it and when we will look at the PO Component Overview of our created PO both BOM component material 10020379 and 10060530 was present both backflushed was tick. but 10060530 component has zero req. qty compared to 10020379 it has a value on req. qty.
    why that even we create the PO in August replacement material 10060530 was exploded and included in PO since this material will be effective on 30.09.2008?
    and when we confirmed the PO via CO11N, we have a COGI error for the replacement material 10060530 "Enter Storage Location"?
    How all this happen Guru?.
    Thanks and more Power

    Hi,
    in this scenario, you can control the BOM explosion better with Revision Levels.
    say you have created the Revision Level with CC11, using the same change master which is effective from 30.08.2008.
    Every time, when you create an Order, system will pick the latest/relevant Revision level.
    If you create an Order on 01.01.2009, suppose there is a chanege again to your BOM, still at the time of confirmation/backflush system will explode the BOM as on 30.08.2008.
    Hope this helps..
    Regards,
    Siva

  • Is there any function for the Batch assignment of production order

    There is one function in the CO02(Production Order) which named "BATCH ASSIGNMENT".
    CO02 -> Components -> Batch assignment
    But the function only can assign one material one time.
    This is very boring.
    So we are planning to create a new program for it.
    But I can't find any function moudle or BAPI can be used.
    Could anybody give me some function moudle or BAPI for it?
    Tks

    Hello~~~Is there any body here?

  • Function module name for routing fom production orders

    Function module name for routing fom production orders

    Hi
    There are lot of fun modules related to routing
    like
    BAPI_ROUTING_CREATE
    BAPI_ROUTING_EXISTENCE_CHECK
    goto SE37 Tcode
    enter routing press F4
    you will get a lot out of that use the required one
    Reward points for useful Answers
    Regards
    Anji

  • Program RCCLTRAN is locking the changes of the Production Orders

    Hello,
    I am encountering an issue, the standard program RCCLTRAN which read production order and create idocs are locking the changes made in APO. The message specifies: "Changes to Order 1XXXX are not transferred".
    May I know if there is a User Exit that could be implemented that will not affect the planning activities of the planners when the program is running simultaneously?
    Thanks for your support!
    Nap

    Hi Nap,
    I am not familiar with the program that you mentioned.
    However I think it should still be possible to give some guidance if you can share the following information:
    1) Using RCCLTRAN, where do you send the Idocs to?
    2) The error that you mentioned - Is it appearing in APO or is it appearing in R/3 when this program RCCLTRAN is running in R/3, and some planners are sending planned orders from APO?
    PS: In standard SAP, it's not possible that 2 users make changes simultaneously to the same document, and this is not advisable also. So I hope you are not requesting for this.
    Regards - Pawan

Maybe you are looking for