Hi,
where can I customize the requirements plan number.
Thanks
Dede

In MD61 you can enter a reqmt. plan number as per your need, anything preventing you from entering the same?
or if the business need is something else, then can you let us know the same

Similar Messages

  • Table/Field for the requirements plan number.

    Hi,
    I need the Table for requirement plan number (that I display in MD61)
    Tablename and Fieldname.
    Thanks

    Pass the material and plant in PBIM and fetch the BDZEI- By using BDZEI and   date (PDATU-PBED), fetch the (PLMNG- PBED )as planned qty, UOM as ( MEINS-PBED) and date (PDATU-PBED) system.

  • Requirement plan number is to be populated in production order

    Hi all,
    Can anyone suggest how Requirement Plan Number given in MD61 can be populated in production order.
    This is urgent.
    Thanks
    KumaraGuru

    Hi Kumra,
    When we create the Requirement Plan number in MD61 it is updated at PBIM table. And after running the MRP, Requirement plan number (PBDNR) is updated in the PLAF  ( Planned Order Header ) Table.
    I am not sure about, it can be populated in production order.
    Le tus know your requirement so that we can help u further.
    Regards,
    R.Brahmankar

  • Requirements plan number

    Hi,
    At what point is the requirements plan number (field PBDNR) populated in SAP. I need to understand when this field first gets populated.
    Thank you

    Hi,
       If you want to give requirement to more than one material ( or a group of materials), through "Requirements Plan number" in the initial screen of MD61, you enter the list of materials.
      In MD62 and MD63, you can view the list of materials collectively by this plan number (PBDNR).
      In real time scenario, the client will use this field as unique to identify the monthly schedule of the respctive month.
       Check this...
    -Thaila Shree

  • How to Run MRP with requirement Plan Number

    Dear all,
    I am working for the process of MRP Run .But customer requirement is that "To Run the MRP with requirement Plan Number"
    If you are aware of this scenario ,please provide the solution.
    Thanksin Advance

    Go to MD61
    Select the Radio Button Rqt Plan Number
    Write the plan number eg. "test1"
    now you get the next screen
    Here you can enter the materials like
    first line Testmat1 -qty 100   150 ....
    2nd line Testmat2 -qty 150    100
    like that
    So the difference between MD61 with Material and Rqt Plan number is
    Material means we give requirement for only one material
    But for Requirment plan number , w.r.t one Rqt Plan number we can maintain requirement for multiple material
    same material with same period we can maintain requitement for Different Requirement Plan number
    This is reducing effort of client of data entry and for different sales Regions for the same material through "Rqt Plan No" they can differentiate the rqt
    MRP run run it for PLANT or multiple plant with Scope of Planning
    thanks
    Pl award points if useful
    K.Prabakaran

  • Requirements Plan Number - PLAF Table

    Hai PP Gurus,
    Requirement plan number not updating in the PLAF table.
    What would be the reason?
    Pls throw some light on this.
    Thanks & Regards,
    S.Ganeshraja

    Hi ganesh,
    Before using the fuction module use following table.
    PBHI.
    list out the all the data on particular date (PDATU).
    PBIM:
    Pass the all records with refernce to
    PBHI- BDZEI -> PBIM-BDZEI.
    Now u will get list of records for  material number and plant
    Now use fuction module  for planned order Number,
    i think MRP run  create one planned order for all req Plans for  a day.
    Plz tery and comer back & reward and clsoe teh thread.
    regards
    pardeep

  • Issue :PIR Demand release with internal requirement Plan number.

    Hi,
    I am facing Problem on demand release as a PIR with requirement plan number  from SCM to SAP R/3.
    when generating the requirement plan
    Requirement Plan number internally generating for each line items one plan number.
    Whenever releasing the demand from APO to R/3 , It should give only one requirement plan number for that batch , Not each line item seperate requirement plan number.
    Requirement type : VSF
    Version                : 05
    Example: I want 10 line items in planning table should create internally only one requirement plan number .
    If anyone know solution help me
    Regards,
    Sadasivam R K

    I hope you must have resolved your query at your end.

  • How to get the Billing plan number for Contract Item?

    HI Friends
    I have been stuck up with the billing plan number to fetch perticular item in sales contract.
    When I go to the table FPLA, I can all the billing plan numbers for a contract or sales order and I am not able to locate for a perticular line item.
    Is there any way to fetch the exact billing plan number for a line item of a contract?
    Please help me
    Thanks
    Praveen

    U need to use the table vbfa or fololow thw link
    [http://www.erpgenie.com/sap-functional/sd/read-sales-document-flow-using-a-function-module]

  • Issue : PIR Internal Requirement Plan number generation

    Hi,
    I am facing Problem on demand release as a PIR with requirement plan number .
    Requirement Plan number internally generating for each line items one plan number.
    Requirement type : VSF
    Version                : 05
    Example: I want 10 line items in planning table should create internally only one requirement plan number .
    If you know solution help me out.
    Regards,
    Sadasivam R K

    Hi,
    Requirement Plan number internally generating I think it is not possible, as it is to  create and to identify one or more planned independent requirements.
    Only active version of PIR will be considered
    Regards,
    R.Brahmankar

  • Link between Contract line and the Billing Plan number

    Hi All,
    I have a requirement which needs a link between the Contract Line item and its Billing Plan Number. I basically have to find out the contracts which have a billing block. So a invoice would not have been created to that line item.
    Please let me know if such a link exists.
    Thanks in advance,
    jr.

    Hello
    In table <b>VBKD </b>(Sales Document: Business Data) you will find the link between the contract (VBELN) and the billing plan (FPLNR). If POSNR = '000000' then this is the billing plan of the contract header.
    The billing block can be found in VBAK-FAKSK.
    Finally, billing plan details can be found in table FPLA. If FPLA-RFPLN is filled then the item billing plan is linked to the header billing plan.
    Regards
      Uwe

  • How can I customize the hyperion planning workflow?

    As the title, Is there any body can tell me about the customization of the hyperion planning workflow?
    Anything about this topic is welcome.
    Thanks
    Regards
    Xiaolei Wu
    Edited by: piero wu on Jan 8, 2009 6:31 AM

    Unfortunately, you cannot change the dimensions that make up the "Planning Unit". (Scenario, Version & Entity)
    This enhancement has been requested from Hyperion many times. I can only imagine that the contents of the Planning Unit are very central to the inner workings of Hyperion Planning, and very difficult to change.
    This limitation has forced me to make some undesirable design changes in the past. For example, I have had to combine dimensions like Entity and Department (into a single dimension called Entity) so that I could get department into the workflow. That's about the only solution for your issue. Unfortunately, it can really muck up your dimensions.
    I wish there was a better solution.
    - Jake

  • Both the requirement & stock in single report

    Dear ,
    My client required one report which shows both the requirement(Planned order & Process Order ) and current stock for the material(Raw material ,SPM & PPM -which define in my BOM).
    Is there any report

    Hi,
    If you're asking for the functional spec of the report, i doubt anyone else can help in the forum, as it purely depends on the client & what info the need to see.
    But if you're looking for some documentation on the FM itself, i would suggest to sit with your abaper & test the FM in SE37 be entering the material number & plant details & execute. In another window open MD04 for the same mtl - plant combination. Now you should be able to co-relate the info from the 2 screens & then work based on that.
    Hope it clarifies.
    Regards,
    Vivek

  • How to find out the corresponding planning area for a given infosource?

    Hi,
    We are in the process of implementing BW-APO in our project.
    We have got couple of standard BI infosources and now the task is to identify the corresponding planning area for a given infosource..
    Let' say for 0APO_DP_ORDERANALYTICS_1
    what is the planning area?
    Any help is appreciatable!!!
    Regards,
    Swapna.G

    Hi Swapna.
    You are at risk of putting the cart before the horse here. As Sujay asks, it is important to understand whether you are using the standard provided planning areas. Even then there are a number of different planning areas that may be deployed depending upon the required planning functionality. There then may be the case where standard planning areas are not being used (this is very often the case) which means that your InfoSources might only be good as a template.
    All this makes your question virtually impossible to answer.
    Maybe if you gave some background as to the status of your project we could help more.
    From your question it looks as if you are working on APO-BW outbound (i.e., reporting after the planning has taken place) which would suggest that the design and build of APO-BW inbound and the planning functionality has taken place. Is this the case?
    If so, then you need to touch base with your APO technical guys to understand the design of the planning areas and whether your standard 0APO_* InfoSources are suitable.
    If not, I suggest you are working back to front and you should be focussing on the APO-BW inbound required to support the planning requirements.
    Regards, Mark.

  • Materials Required Planning

    Hi all,
        I have already maintained MRP field and forecast field for materials. Pls can anyone tell me the steps to perform MRP activities on the material.. The MRP type i use is forecast-based planning .

    Dear ,
    I am doing this Forcast Base Planning in our busniess .
    Few Question : Are you keeping all the material which will be FBP in one MRP Controller or one MRP Area or One Storage Location ? How are you planning to Excute MRP in MD01?
    Here what we did is I have create  scope of planning where I include different storage location ,plant , MRP area so that various material can be planned through MRP.In your case u can run MRP on plant /sl/mrp area based on requirement  in MD01.But not all the material will be under FBP.In this case I have created an User Exit in MD01 where it will plan only those Material which are having MRP Type-Fore Cast Base MRP irrespective of MRP Controller ,SL ,MRP Area ,Plant
    How to execute Forecast :-
    1.If you are looking for Individual Forecast for any material , u have to go though MM02 , select the Forcasting View  hit on the Execute Forecast  and save.It will based on the Consumption Histroy , Forecasting Model , Smmothing factor , Initialization Factors, Period forecast  .It will calcualte the  forcasting for the stipulated period and safety stock will be calculated based on service level percenrage in MRP3 view .In case of total forecast , you can do it through MP38 :
    1.Enter Plant Code
    2.Copy the material which one u want to execute forcast in case if you want to  shorten ur time .
    3.Period Indicator -M
    4.Forecast Execution : A
    3.Tick on the SAVE/Log Record and execute .
    It will show you how many materials forcasted with quanty , safety stock and forcast realted parametrs in each n every material .How many are failed due to no cunsumption valus with red alarm.
    2.Copy Forcast to Planning Table : MD70 .Enter Plant , Material ,Period To/From  for copying the monthly forecast ,Requirement Type : VFB -check in your case , Version :00  .Give a Requirement plan Number .Tick on Req active ,History ,No Data Base Change , Detail List  .Finally execute .
    3.check the same in MD62 -Change Planning Table with that Req Plan Number not by material /product group.
    4.Run MRP on MD01 based on your requirement as I have shared with u above.
    Regards
    JH
    After that

  • Deleting a Requirement Plan

    Hello All,
    I have a issue regarding PIR -> Requirement Plan.
    We have uploaded a Requirement Plan through a BADI which read Excel File with TCode ZMD61 which has the Prodn Plan for Jan2010, plan named as JAN10.
    Requirement Qty of this plan is getting updated in table MDPB.
    Now i want to Delete this requirement plan, how can i do that !?
    I tried to delete the requirements through MD62, was able to delete all, but the table (MDPB) still shows the Requirement plan JAN10 still existing at the table level. Becuase of which the reports which are linked to MDPB table are giving values of the Plan which i have deleted.
    How can i remove  / edit these values at table level.
    Thanks in advance,
    Harris

    Dear All,
    Thank you so much for your inputs and valuable comments.
    But the Issue got resolved in rather orthodox manner.
    Issue: Plan not existing, but the table was displaying the
    1. I uploaded the Materials which were being displayed in the table MDPB through MD61.
    2. Put any Qty as a Requirement.
    3. Saved the Plan
    4. Deleted the plan.
    Result: The entries got cleared from the Table.
    Thanks and regards,
    Harris