CVC creation

hello SAP ppl
                     1)  Whats the another way to create CVC other then SAP easy acess like MC62 or DP- MD-Maintain Charcaterctic Com.
another way means creation of some 1000 CVC's.
                2) By infocube we load data to PA whats the another way i mean from where we get also data to PA.
3) we transfer demand forecast to R/3 and to which infostructure of R/3 we transfer our DP Data.
4) We transer data to R/3 by Plng job like creating Transfer Prfile and so on ,what could be the job name we give in realtime .
please find time for answering my queries.
Thankin u in advance
ronald

1) Whats the another way to create CVC other then SAP easy acess like MC62 or DP- MD-Maintain Charcaterctic Com.
another way means creation of some 1000 CVC's.
This is already answered by Virendra.
Have you checked the Load from Worklist option in /SAPAPO/MC62.
It allows loading data from multiple sources like a file, BW Infoprovider i.e. infocube etc.
2) By infocube we load data to PA whats the another way i mean from where we get also data to PA.
Users enter data to a planning area interactively always. You can also use BAPIs and use them in programs to write data to a planning area. Don't ask for such program code.
3) we transfer demand forecast to R/3 and to which infostructure of R/3 we transfer our DP Data.
Depends on R/3 infostructure design which will contain
4) We transer data to R/3 by Plng job like creating Transfer Prfile and so on ,what could be the job name we give in realtime
You can decide on the naming convention. There is no hard and fast rule
somnath

Similar Messages

  • Failure of CVC creation via /SAPAPO/TS_PLOB_MAINTAIN

    Hello,
    I want to generate CVC's via /SAPAPO/TS_PLOB_MAINTAIN and a variant.
    In my selection condition in this program I choose one product. The button 'Number of Hits' shows a quantity of 4 CVC's.
    After the execution of /SAPAPO/TS_PLOB_MAINTAIN I cannot find any CVC's on the Planning Object Structure with my specified product.
    What can be the reason for this failure?
    Thanks for answering and kind regards
    Heinz Becker

    Hi,
    thanks for your reply.
    The CVC creation run in background and finished successfully. There are no problems with numeric material code - I recognized the leading zeros.
    I do not know /sapapo/mc62 and I did not find it in the system (program which start via se38; transaction).
    Do you have any other explanations?
    Kind regards
    H.Becker

  • CVC creation - Strange issue with Master data table of 9AMATNR

    Hi Experts,
    We have encountered a strange issue with Master data table (/BI0/9APMATNR) of info object 9AMATNR.
    We have a BADI implemented for checking the valid Characteristic before creation of the CVC using transaction /SAPAPO/MC62. This BADI puts a select on master data tab of material /BI0/9APMATNR and returns no value. But the material actually exists in the table (checked through SE16).
    Now we go inside the info object 9AMATNR and go to the Master data Tab. There we go inside the master table
    /BI0/9APMATNR and activate that. After activating the table it is read by the select statement inside BADI (Strange) and allows the CVC to be created.
    Ideally it should not allow us to activate the SAP standard table /BI0/9APMATNR. I observed that in technical settings of this table it has single record buffering as switched on. (But as per my knowledge buffer gets refreshed every 2 to 4 mins and not in 2 days or something).
    Your expert comment is valuable to us. Thanks.
    Best Regards,
    Chandan Dubey

    Hi Chandan,
                 Try to use a WAIT statment with 5 seconds before your select statment.
    I'm not sure whether this will work. Anyway check it and let me know the result.
    Regards,
    Siva.

  • Issue in CVC Creation

    Hi Experts,
    I am trying to create CVCs but not able to do it. when I check in the log it gives 3 erors
    Characteristic value for characteristic XXXXXXX not filled
    Value AAAAAA  not contained in the master data table for XXXXXX
    No new characteristics combinations were loaded
    Please let me know what should I do to avoid this error, and how to create a CVC.
    Thanks
    Edited by: scmjrd on Jun 22, 2011 3:14 PM

    Hi ,
    this can be caused through a bug. Please check if note 1452746  is already implemented.
    Additionally have you flagged 'Check SCM master data' ? In this case system tries to check the values in SCM master data of target planning object structure.
    If you don't select 'check SCM master data' flag then there is no check on master data and system asks to maintain the values for characteristic XXXXXX in next screen manually.
    Hope this information will helps you.                           
    Regards,
    Tibor

  • CVC creation based on Info Cube

    Hi,
    I try to create CVC based on Info cube. But it is not reading data from infocube.
    I have correctly mentioned the date range.
    Does MPOS and Info cube structure required to be the identical? Or any other idea about it.
    Thanks
    Kr

    Hii Kr,
    Characteristics in cube should match with characteristics in MPOS.
    Cube should have all the characteristics which are exist in MPOS.
    Even if one of them is missing it will not allow to create CVCs using Cube data.
    Hope this will help
    Thanks
    Satish Waghmare

  • How to add Navigation attributes values via ABAP while creation of CVC

    Hi,
    I have a requirement like, I have to add navigational attributes to the cvc record while CVC creation ( /sapapo/mc62 transaction).
    There were two scenarios: 1. Usually when they load master data from BW side those navigation attributes available and when we do CVC creation it's automatically picks those values. If NOT then i have to bring Market segment and Business unit navigational attributes values from ECC via RFC function module by passing MPN and End customer division as a input.
    I am facing problem when BW side if business unit and Market segment were blank.
    Do we have any Function modules available to add navigational attributes data and should update corresponding master data tables.
    Please help me step by step process on this.
    Thanks
    Ravi
    Edited by: REDDY KALLURI on Jan 22, 2011 10:30 PM

    Michael,
    Are you intending this as a commercial solution or a work around?
    To take an existing equivalent, one would build a view in the database tailored for each grid in an Oracle Forms application. Or a separate query layered over tables for each form/grid in a Delphi or Access application? Even if it is ninety nine percent the same over half a dozen forms/grids?
    And now you've added a whole slew of "slightly different" rowSetInfos to maintain.
    So if you wanted to add a column that needs to appear everywhere... you've just increased the workload multi-fold?
    That would be a management nightmare, wouldn't it? Not to mention yet more performance cost and a slower system?
    Hmmmm..... I'm not sure I like where this is headed... someone needs to do some convincing...
    null

  • Error when generating program when creating CVC using infoprovider

    We are receiving the message "Error when generating program" when
    creating CVC using infoprovider.
    This may have something to do with the fact that we added an attribute
    to the infoObject 9ALOCNO. We are getting an information message if we
    run a consistency check in the POS.
    We had this same issue in our development system. Here, I deactivated
    and then reactivated the CVCs and this resolved the problem. However,
    this is not a good solution since this is also a problem in our
    production system and we do not want to deactivate the POS.
    is there another option to fix this problem?
    Thank you,
    Rumi

    Hi Rumi,
    i would try these:
    1. Make sure the cube is active and every thing ok there
    2. Run programs /SAPAPO/TS_PSTRU_CONS_CHECK on POS and /SAPAPO/TS_LCM_CONS_CHECK on planning area respectively.
    3. Check the CVC creation log in transaction /n/sapapo/mc62 for more details.

  • How to configure CVC automation process using SNP master data and BI customer master data

    Hi Gurus,
    How to configure CVC automation in MPOS structure technically, using SNP master data in CVC creation such as Product and location details
    and in parallel extract date from ECC to BI customer master data in DP. Where-in a APO BI cube should have only new combinations which are to be validated with ECC and existing combinations in the MPOS structure before creation of CVC in different regions of MPOS.
    Second the automation should also check certain validations of product, location and are part of SNP-ECC master data and are these new combinations.
    Could someone guide us in this process.
    Thanks
    Kumar

    Praveen,
    The short answer is to move the data into infoproviders or flat files for all of the 'characteristic-type' source data; and then copy CVCs from the infoproviders into the Planning area, probably using one or more Process Chains (program /SAPAPO/TS_PLOB_MAINTAIN).
    The long answer is that this is not a trivial undertaking; this could end up being a pretty involved solution.  If you do not have enough BW/DP expertise available locally to create this solution for you, then I recommend you consider engaging external resources to assist you.  I personally wouldn't even consider starting to work on such a solution without first knowing a lot more about the detailed business requirements, and about any existing solutions that may already in place.  An SCN forum is not really suitable for such an answer.  In my opinion, the BBP doc alone would be 20+ pages, assuming no enhancements..
    Best Regards,
    DB49

  • Create CVC using Standard Function /SAPAPO/TS_PLOB_CREATE

    Hello All,
    please can you explain me in detail how the Function /SAPAPO/TS_PLOB_CREATE work to create the CVC.
    we have a custom program that use this function to create the CVC for Italy Project, we have copied this program to use it for a roll out project in brasile, my client is asked me for the new project brasile should we create new tables?
    my interest is to now if this function need a custom table to work? or we can use it in various program without needing different
    tables?
    if we use this function on the same system to create CVC for different area Italy/brasile will we have some problem on the data?
    for our brasile project we have created new custom master data  tables.
    thanks for All
    Bilal

    Hi Bilal ,
    Function /SAPAPO/TS_PLOB_CREATE - Create Single characteristic combination, is nothing but a program  called internally in standard TCode: /sapapo/mc62 for CVC creation. This function is used specifically when you want to create single CVC based on the individually/interactively entered characteristics combination.
    Whereas there is a similar function /SAPAPO/TS_PLOB_MAINTAIN-Create Characteristic combinations (again a part of standard TCode/SAPAPO/MC62 called internally) which is used for multiple CVC creation based on the characteristic data either from MPOS, Info provider, external file or BAdI.
    As understand from your requirement that you want to roll out the CVC creation process based on the table entries, we have similar setup in which we have following process which is working very fine u2026
    -We have created a Z Table where the new characteristic combinations are entered globally -for all four regions
    -Based on entries in that Z table as a data source we have built a Info provider(Cube) and then
    -This Info provider is used in function /SAPAPO/TS_PLOB_MAINTAIN (as a part of scheduled jobs running with some frequency) to create multiple CVC combinations across regions.
    Hope this helps youu2026
    Regards,
    Digambar

  • Use of function module to update Realignment data: Demand Planning

    Hi,
    Can anyone explain how the function module /SAPAPO/TS_RLG_STEP_CREATE works? I need to use it to update Realignment table(of CVC creation in Demand Planning).
    Thanks !

    I also need information about this bapi /SAPAPO/TS_RLG_STEP_CREATE
    Thanks

  • Leading zeros in the Product allocation characteristic combinations.

    Hi All,
    I am copying Characteristic combination from planning area to product allocation group, after i complete the transaction system is automatically preceding the zeroes to the product number.
    I have one the following activities before copying CVC of planning area to product allocation group.
    against all the Product allocation settings.
    2.Created the MPOS with product (characteristic length of Product is 18), Customer and Allocation object.
    3.Created planning area and planning book.
    4.Copied cvc combination from planning are to product allocation group and also copied planning area values in to Product allocation group.
    5.Tried to check in the ATP simulation mode, while I was doing system has given no characteristic combination found, when I checked Product is preceding zeros as per the filed MATNR length 40 and this MATNR is selected from the Product allocation field catalog, But when I add zeros to product system is performing Product allocations in simulation mode.
    6.Tried triggering gATP Product allocations by creating Order in ECC, here also it has given same error No characteristic combination exists.
    When I did initial R&D on this. I found that material number in the product allocation characteristic combination is leading by zeros for ex:- 000000000000000002200325.
    Could any one please suggest me what to do on this.
    Thanks and Regards,
    T.Muthyalappa

    Hi Muthyalappa ,
    If i have understood your question properly , then my guess is you should be facing this problem only for numeric material codes. Try out the following things
    1. Execute the same test condition for a non numeric material. I believe it will work perfectly .
    2. For numeric material codes it is not working because of the difference in MATNR length between ECC and APO. In ECC the maximum possible MATNR length is 18 char whereas it is 40 chars in APO. So as per std SAP functionality the numeric materials get concatenated with leading zeros when you try to transfer it (or carry out any kind of processing ) from ECC to APO.
    ex consider material 12345. In ECC it will be stored internally as 13 leading zero's followed by12345 . But in APO it will be stored as 35 leading zero's followed by 12345.  Your issue is the system does not recognize the CVC that has this material as characteristic. At the time of cvc creation / change make sure your material characteristic ( especially for numeric material codes) totally has 40 chars . Pack it with leading zeros and make the material length 40.
    Try this out and update me .
    Thanks
    Saradha

  • DP process implemented as process chain or jobs

    Hello sapiers:
    I would like to get some examples of how to define PC for DP process like CVC creation, Forecast calculation, snp release.
    I know these are new functionalities but dont know if incopatible with ver 3.5 (that I am using) or the difference (adv/disadv) to define them simply as jobs
    please if possible email me  to [email protected]
    tia
    KCA

    Hi,
    What is the scheduling option that you have selected in the start variant of your process chain? If the chain has been successfully scheduled then you can see that in t-code SM37 under your id, the job for process chain should show as scheduled. If you cannot see anything there then please maintain the start variant properly and rechedule the process chain.
    Regards,
    Arminder singh

  • Multiple users uploading data to Live cache

    Sorry posted in wrong thread. Please find this thread in Master data and general.
    Closing this one
    Hello ,
    Does APO has the capability to handle flat file uploads simultaneously to live cache  by 5 different users or does it throw out a message asking other users to wait until one upload is finished.
    We have a situation where users upload the flat files and based on these files the CVC creation process kicks off (If there are any new combinations). But every time more than one user tries to upload the file the system would nt allow other users to upload.
    Any help or input is highly appreciated.
    Thank you,
    Sai
    Edited by: st.sapscm on Jan 11, 2012 12:01 PM

    Thanks a lot of the prompt reply.
    Let me be more specific. The users upload sales data to APO (APO Info cube) in Work week versions. So the planners usually don't upload same CVCs but sometime they do upload all at once, say once every week or month.
    So when you say "Object" say the object in my case is APO BW infocube. The second part of your response compliments the idea that it might not be possible to do a simultaneous upload. Correct me if i am wrong. I am a little confused with the very first statement  ("Yes it is possible..." and the second part of you response about the locking.
    Can you please explain what would happen in each case when the recipient is 1. Info cube 2. Planning area
    Thanks a lot.
    Sai

  • Monthly sales forecast file upload new combinations not getting loaded.

    For one of our planning areas, I get sales forecast as spread sheet and upload this to the infocube.
    We run CIF daily and monthly also to include all new material.
    When I upload the file when I checked the log everything went fine with 3 warnings for 3 products with message "contents of the infocube not contained in BasicPlobStruc.
    Now these material are already in APO by Sold to party is new and there is no combination to this Sold to party and hence the the data did not get loaded.
    Now my Client wants to change whatever required so that all new combinations data are included in when month end sales forecast is loaded.
    Can you advice what needs to be done as ther are large number of products I wont which are new combinations and as far as my knowledge is concerned , since there is no history CVC's are not automatically created.
    Can anyone advice.

    Hi Siva,
                   To b frank I did not completely understand what you are talking about as you are all over.
    As I understand you are getting excel file for sales forecast and you upload the flat file to cube and generate CVCs based on this cube. You are not able to generate the CVCs for all combinations in the cube.
    "Sold to party is new"-- where is this new? in the cube data?
    "contents of the infocube not contained in BasicPlobStruc." - You get this warning if you have lets say 4 characteristics in your cube and only 3 of them in the planning object structure. This is ok. The rule of thumb is that "Your planning object structure has to be subset of your infocube". Which means that you cannot have 3 characteristics in cube and have all those 3 +1 additional in POS.
    This still does not stop the system from creating all combinations int he cube as CVCs.
    The possible reasons why the combinations(CVCs) are not generated from cube:
    1. If there are empty values in a record like below
    Plant--Materialsales org.-customer---qty.
    P1--M1SO1____----10
    P2--M2SO2C2--
    17
    The system only creates the combination P2M2SO2C2 but leaves out the first combination..Why? you have an empty value and system cannot take it so it leaves it out.
    2. If you are checking the flag "Check SCM master data" in MC62 while CVC creation. The system checks the master data for products, locations and if the product or location does not exist the system doesnot create the corresponding combination.
    Please correct me if I misunderstood you and also do not hesitate to ask more questions for clarity.

  • Creation of CVC

    Hello All,
    I am struck in creation of CVC.
    I have suucessfully loaded the data from file and I am able to see the data in info cube by selection of "display data in info cue"
    But I am not able to create CVC in MPOS. I get message "No new characteristics combinations were loaded"
    Please tell me what shall I do ?
    I am able to create single CVC.
    Thanks a lot in advance
    Prabhat

    Dear Prabhat,
    please check the date for the data in the cube. This date has to be included in the horizon of the variant you use for generation of CVC's. 
    You can do it as follows:                                                                               
    1.) Enter txn /n/sapapo/mc62                                          
    2.) choose MPOS
    3.) click "create characteristic combinations"                        
    4.) click "generate in background"                                    
    5.) Load from infoprovider and choose the cube                     
    6.)Make sure that date in cube is included in the horizon         
        -> Double check if CVC's are selected by clicking "Number of hits"
    7.) fire                                                              
    I hope this will help.
    Regards,
    Tibor

Maybe you are looking for

  • Firefox 3.6 just installed but won't open

    SUBJECT: FIREFOX WON'T OPEN. I have used Firefox for years, but upon reinstalling my Vista Home Premium OS, I also had to reinstall all my software. The only problem I had was with Firefox, which appeared to download and install successfully, but ref

  • Setting for issue subcontract material with ME2O

    Hi, In our system presently we are issueing all the material to subcontract with MB1B movement type 541,  I wan tto knowthe settings and process of issue the material with ME2O, what settings are needed this is to control some that we can see the iss

  • RX600XT and TV-out

    Hello, I can connect my TV to my computer, and I can see my Desktopscreen on the TV screen. When I play a DVD movie with WinDVD or PowerDVD, the program opens, and the movie plays on my computerscreen, but not on the TV. I can see the active window o

  • PR after MRP run

    Hi, After MRP run we want the valuation type system should pick up automatic in generated Purchase requisition. Can you please confirm how it is possible ?

  • 10.6.3 Update and iMovie 6 Crashes halfway through Startup

    I just added the 10.6.3 Update. Restart, Repaired Disc Perm.. Now every time I start iMovie HD 6, it crashes halfway during the startup process? The application trys to start by loading the last used project, btw. Help? TIA