Cycle Run Group - Assesment

Hi People,
we have the follow situation:
We have many Assesment Cycle to execute at the same time by background for the transaction KSU5, but the system shows us: Cycle ABFEI01310 01.01.2010 cannot be started because run group 0000 is locked.
I already create a specific  "Cycle Run Group" = 0001
I thought that it will be possible to create only one Group and link it in all the "Assesment Cycle" , using the same Group but it didn't run. The problem of "lock"still.
The question is:
Do we have to create a "Cycle Run Group" for each "Assesment Cycle"?
We have 45 Cycles!!
Thanks,
Rosana.

Hi Rosana ,
Please review OSS Notes : Note 967372 - New GL or SL allocation: Explaining the lock concept
Review using the  " Using the cycle run groups " part . You must have some dependency .. which is causing the issue.
Also look into  Note 70094 - ALLOCATION: lock problem during background processing
Please revert back for any further clarifications.
Regards
Sarada

Similar Messages

  • Cycle Run Groups

    Hi people,
    We have many Assessment cycle (Profit Center) to execute and they are in a Job that is executed one by one. When the first is fineshed, the other one started, and so on..
    Each cycle has the same "Cycle Run Group" = 0000.
    It always work ok. But, since 2 months ago, an error is ocurring.
    When we start the job, the system stop in the first cycle for many time. The cycle is concluded.
    The next cycle is started and the system says us that the "cycle run group" is blocked, about the first cycle.
    But, when we see in the sm37, the first cycle was concluded, but we don´t know the reason that the "cycle run grouop" gets blocked for many time in the first cycle and when is started the second cycle, the system shows the messenger error.
    Could you help me please?
    Thanks.

    Hi,
    The best solution is use the instructions of notes 130350 and 70094. These notes explain that you should create the report given in note 70094 and afterwards create a batch job containing several steps including the created report.
    As described in the note, you can also work with variables in your variants, so you should only have to maintain once this construction of job steps.
    regards
    Waman

  • HDI unlock assessment cycle run group

    When I try to ru assessment cycle I am geting error mesage . How Do I unlock it so I can run it manualy? here do I lock it and unlock it.
    Message no. GA562
    Diagnosis
    You want to start cycle A00004 10/01/2004. However, cycle run group 0000 is locked by user . This can happen if user  is running a cycle from flow group 0000, or if the cycle is assigned to another flow group, but has dependencies with th flow group for cycle A00004.
    System Response
    Processing is stopped.
    Procedure
    Wait until cycle run group 0000 is no longer locked and start your cycle again.
    You can lock a cycle run group either by executing a different cycle or manually reposting a document during indirect activity allocation.

    Hi,
    Try this. go to KSU5 and extras-cycle-display cycle. then select the cycle. choose go then select the cycle group and select the overview button. here you can see the sub tree and see whether any dependency is there for the cycle. If so you have to run according to the sequence.
    Hope you go the answer.
    All the best.
    K Suresh Kumar

  • Cycle run performance is slow

    We have implemented cycle run group to enable parallel run for cycles which are under the same operating concern. But, the problem is it takes longer time to complete the cycle run. Any one knows how to solve this? ( We want to enable parallel run and at the same time keep the time spend to complete the cycle run). Thanks

    HI,
    search SAPNET, guess you will find for almost all mass process steps in SAP some relevant performance hints.
    Best regards, Christian

  • Product costing Cycle run for first time to complete backlog

    Dear sir,
    In my Company we went live in April 2011 and since then we never did settlement of Product costing as process was not stream line , but now (in Aug-2011) it is stream-line and we wanted to do Proper costing Cycle run & settlement too.
    Can you please let me know that how to proceed further, what precautions must be taken and whether we have to do settlement for April till July or directly we can go for settlement of last month July-2011.
    Please let me know detailed steps,
    Thanks & Regards,
    Ashutosh

    Hi,
    Settlement will be done on period basis in you're case June month is closed and now open periods are July and august.
    so the production orders can be settled collectively in CO88 for July month.
    and for costing run i.e standard cost estimate you need correct BOM and Routing.
    after doing settlement of production orders do costing run.
    it's not mandatory that settlement should be done. even you can run the costing with out settlement.
    costing run will consider the raw material prices ,activity prices sub-contracting price etc..
    after considering the above prices after releasing the costing run it will update the actual price in the material master of the header material.
    for indual material=CK11N and CK24
    Collectively=CK40N
    For the materials with Price indicator V(header materials) settlement is important here no cost estimate.
    settlement of production order will leads to change the price in the material master. so here no Standard cost estimate..only settlement.
    revert me if any issue
    Regards,
    Ravi

  • Result Analysis(WIP) not posted after 4 cycle run

    Hi,
    Every month value is posted in Result Analysis GL account for WIP. But we found in period 10 and period 11 value is not posted Result Analysis GL account after running 4 cycle run (Overhead calculation, WIP calculation, Variance calculation and Settlement). What may be reason ??
    Regards,
    Samrat

    Hi Christian ,
    One question related to Cut-Off period regarding WIP calculation which myself and Ajay were discussing 15 days  back..
    Is it required to change the cut-off everymonth when we calculate WIP . In my client.. then donot do that .. but still we calculate the WIP..
    Is the significance of cut-off period is to tell the system the first period to calculate WIP .. during implementation .. My client never changes that and its in a MTS ( Process Order Senario )... but calculates WIP every month.
    Regards
    Sarada

  • Is it possible to post the depreciation once the depreciation cycle run?

    HI  ALL
         Is it possible to post the depreciation once the depreciation cycle run?
    IF YES   WHY
    IF NO WHY
    PLZ EXPLAIN ME
    Regards
    raju

    yes we can go for repeat run.But it is possible to repeat the posting run within the period last posted.Normally the repeat run is carried out at the end of the fiscal year, if completing postings are necessary because of corrections to manual depreciation or depreciation terms
    assign points if useful

  • How to run group solve with the batch manager

    I'd like to know if it is possible (and how) to run group solve defined in OFA with the batch manager.
    Thank you
    Luigi Polverini
    Synesis s.r.l.

    OFA uses its Task Processor rather than Batch Manager to run tasks in batch. Group solves can be scheduled this way by submitting the group solve task to the TP, and then rescheduling it in the Task Queue window.
    null

  • COPA Assessment cycle run KEU5

    What all  can be as a Reciever in COPA Assessment cycle.Why is COPA Assessment cycle run KEU5.

    Hi,
    What all can be as a Reciever in COPA Assessment cycle.
    ..this is [documented|http://help.sap.com/saphelp_erp60_sp/helpdata/en/7a/4c48c64a0111d1894c0000e829fbbd/frameset.htm] in help.sap.com. As per [rules of engagement |/thread/931177 [original link is broken];pls. search before posting
    Why is COPA Assessment cycle run KEU5.
    ...no idea what you mean. Pls. explain.
    Regards
    Karl

  • [SOLVED] sudo: unable to set runas group vector: Invalid argument

    I recently made the (idiotic) mistake of overwriting my /etc/passwd and /etc/group files, although I managed to restore them from a backup.  Since restarting the machine I'm having the same issue every time I invoke sudo:
    sudo: unable to set runas group vector: Invalid argument
    I can't find any info on this error. Any ideas on where to start?
    Thanks,
    -- C. M.
    EDIT: I should also note that this is a headless machine that I'm accessing via SSH.
    Last edited by C. M. Harlequin (2014-06-15 10:35:33)

    Thanks for the reply, Amish.
    It's my understanding that the 'group vector' is a term that refers to the specific set of groups to which a user has membership, rather than a specific group named 'vector'.  Although, I could be mistaken.
    From the sudo manpage:
    The -P (preserve group vector) option causes sudo to preserve the user's group vector unaltered. By default, sudo will initialize the group vector to the list of groups the target user is in. The real and effective group IDs, however, are still set to match the target user.
    Similarly, from the sudoers manpage:
    By default, sudo will initialize the group vector to the list of groups the target user is in. When preserve_groups is set, the user's existing group vector is left unaltered. The real and effective group IDs, however, are still set to match the target user. This flag is off by default.
    But the manpages don't offer me much, I'm still clueless as to why I'm getting the error.
    EDIT: although using the -P flag seems to allow sudo to run without error
    Last edited by C. M. Harlequin (2014-06-14 18:42:39)

  • Create Run group under an existing run group in storage vi

    Hello,
    I am using the LabVIEW storage vi's for creating tdm files.
    Is there a way to create Run groups under existing run groups
    Example
    Run Group 1

    Duplicate thread! Please refer to this existing thread.
    - Philip Courtois, Thinkbot Solutions

  • Issue in Running the Assesement Cycle after upgrade.

    Hi
    We have a  Z Transaction Code for running actual assessment. We have migrated to ECC 6.0 from 4.6C. In the standard T Code KSU5, system was giving the message GA 627
    "For the execution of assessments, distributions, periodic repostings or indirect activity allocations in the CO-OM application, groups have to be defined in the current client which summarize all actual or planned transactions. In the current client, these groups are either not available or do not have the latest status."
    I have run the report RK811XST and now I am able to run KSU5 in the system. However, for ZKSU5, the same issue persists. Please advise
    Regards
    Sanil K Bhandari

    Hi Sanil
    Try to run the report RK811XUP as well.
    What happens us when you run the report, it creates some basic sets like 0HC0_VRG*
    I dont know which sets are called for in your Z transaction... But, I guess whatever error message it gives in case of ZKSU5, it should also be giving you the program that needs to be run... Did you try executing that and still it gives you error msg?
    Ajay M

  • No IT and RT data in off-cycle run

    Hi Experts,
    we configured bonus off-cycle by using IT0267, but after off cycle payroll run, no data in IT and RT table, checked
    P0267  CN17      GEN  NOAB   Import additional off-cycle payments
    CN17 Supplementary payments (Copy from X011)
            AMT= BETRG Set
            NUM= ANZHL Set
            VAKEYZEINH Time unit in v.key
                VWTCL 47   Processing class
                    OPIND      Operation indicator
                    ADDWT *    OT   Output table
                  A
                    OPIND      Operation indicator
                    ADDWT *    OT   Output table
                  Q
                    ELIMI *    Elim.time period ID
                    ADDWTE*    RT   Results table
                    ADDWT&MY10 VAR  Variable table
    My IT0267 wage type's PC47 is left as blank, so it will be read to IT/OT table. but after this funtion, no data in IT output...
    could you plesae give me some suggestions for this? Thanks very much.
    Regards.   Xiaoli

    Hi Sameer,
    thanks for the suggestion, yes, they are the same, 0002 special payment...
    anything else i need to check?
    thanks very much.
    Regards.  Xiaoli

  • Assessment Cycle run

    Hi,
    While I run assessment cycle i get error message:
    No account is specified in item 0000000001
    Message no. F5670
    Diagnosis
    No account was specified for account type "S" in item "0000000001" of the FI/CO document.
    System Response
    The Financial Accounting program cannot process the document.
    Procedure
    A system error has probably occurred in the application you called up. Check the data transferred to item "0000000001" of the FI/CO document.
    It runs in test mode but it gives above error in real posting mode. I checked some of the OSS notes but none were helpful.
    Thanks,
    kenny

    Hi,
    for reconciliation posting
    In transaction ok17 u need to specify P/L account for exp posting.
    and in transaction OBYA u need to maintain baalnce sheet account for clearing between co codes.
    and intransaction OBXN u need to maintain balance sheet account for clearing between bus areas.
    Points if info useful.
    Rajesh

  • QTP crashes after long cycle runs

    Product name: QuickTest Professional
     Product version: 11.00
     Product ID: QTPRPID11.00/01
     Product build: 1018
     Operating system: Microsoft Windows 7 Service Pack 1 (Build 7601)
     Internet Explorer version: 9.0.8112.16421
    Addins Used
      .NET 
     Web 
    Problem Statement
    QTP Crashes after running successfully for 180 Hours (36 Cycles)
    Script Started Time - 2014-05-05 04:33:20
    QTP Started to Hang Time- 2014-05-11 17:12:04
    We need your Expert Advice for Improving the Performance of the QTP,
    Suspect –(Possible Causes)
    We would like to know , if the below mentioned setting would affect the performance of the QTP scripts in any way?
    We are currently having the 2 major vbs files in QTP Scripts. Each vbs File has around 17000 lines of Code with around 160 functions. And these are loaded at the Beginning of the Automation scriptrun (Not Run Time)
    And we load shared Repositories at the start of the QTP run which is about 20MB.
    Will this below Corrective action Help?
    if we implement the below changes,  will be any considerable improvement in the Performance ?  
    By  reducing  the No. of lines in the VBS file by splitting the 17000lines VBS File into smaller Files
     by loading the Functions and the Repositories in the Run Time Dynamically.

    Create a new profile as a test to check if your current profile is causing the problem.
    See "Creating a profile":
    *https://support.mozilla.org/kb/profile-manager-create-and-remove-firefox-profiles
    *http://kb.mozillazine.org/Standard_diagnostic_-_Firefox#Profile_issues
    If the new profile works then you can transfer files from a previously used profile to the new profile, but be cautious not to copy corrupted files to avoid carrying over the problem
    *http://kb.mozillazine.org/Transferring_data_to_a_new_profile_-_Firefox
    Boot the computer in Windows Safe Mode with network support (press F8 on the boot screen) as a test.
    *http://www.bleepingcomputer.com/tutorials/how-to-start-windows-in-safe-mode/
    Do a malware check with several malware scanning programs on the Windows computer.<br>
    Please scan with all programs because each program detects different malware.<br>
    All these programs have free versions.
    Make sure that you update each program to get the latest version of their databases before doing a scan.
    *Malwarebytes' Anti-Malware:<br>http://www.malwarebytes.org/mbam.php
    *AdwCleaner:<br>http://www.bleepingcomputer.com/download/adwcleaner/<br>http://www.softpedia.com/get/Antivirus/Removal-Tools/AdwCleaner.shtml
    *SuperAntispyware:<br>http://www.superantispyware.com/
    *Microsoft Safety Scanner:<br>http://www.microsoft.com/security/scanner/en-us/default.aspx
    *Windows Defender:<br>http://windows.microsoft.com/en-us/windows/using-defender
    *Spybot Search & Destroy:<br>http://www.safer-networking.org/en/index.html
    *Kasperky Free Security Scan:<br>http://www.kaspersky.com/security-scan
    You can also do a check for a rootkit infection with TDSSKiller.
    *Anti-rootkit utility TDSSKiller:<br>http://support.kaspersky.com/5350?el=88446
    See also:
    *"Spyware on Windows": http://kb.mozillazine.org/Popups_not_blocked

Maybe you are looking for

  • Not sure if its possibl

    I have a sb wireless music. I want to know if i can pass use one of the bundled programs, passing in filenames via the command line interface, playing/en-queuing them in the current play list. Any help would be great.

  • Problem in softwere update

    I clic on my softwere update icon, after show new version for my N8, but i try to instal new version, its 30 MB new version to improov my N8, But its only show in my softwere update, how can i instal new vesion,

  • SWT Runs in Eclipse - Not after export (NOT executable JAR)

    I have been working on my first SWT application. It will run when using the Eclipse run command. However, when I export the project to a JAR file I can't get the module to run. I am NOT trying to run this as an executable JAR. I will eventually get t

  • Canon iR3220 for mac OS X 10.5.8

    hi im having difficulty connecting the office copier iR 3220n to my macbook on OS X 10.5.8! someone help =/ i have zero clue about copiers and computers.

  • Safari does not retain Full Screen state

    Yosemite: version 10.10 (14A389) Safari: version 8.0 (10600.1.25) Safari does not retain Full Screen state when opening, or re-opening, quitting and restarting Safari, or rebooting the computer, even when the last state was in Full Screen. Under Lion