Data entry- bom component qty in decimals

Hi, We need to enter bom component qty with 4 decimal places like 9.0001 mm etc. as the table field structure is set as 3 for decimal places, it is not allowing to enter. Also tried with su01 as well as cuni settings. Please advise is there any way to set the bom component qty in more than 3 decimal places?

Hi
System will allow only upto 3 places after decimal.check in CUNI
can u plz tell me wat is the relevance of 9.0001 mm if your planning is in Metres.it doesnt matter after 3 places of decimal.as per business process.even simple mathematics round off it to 9.0 mm
check and revert
Regards
Anupam Sharma
Edited by: anupam sharma on Nov 18, 2009 5:48 PM

Similar Messages

  • Bom Component qty & WIP Quantity differ at Trget cost calculation

    Dear gurus,
    i am facing the problem with WIP at target cost calculation in REM.
    My issue is
    BOM Component qantity is 9.524 TO  and price is 2000 then total cost is  9.521*2000=19048.
    but in WIP Report kkas in WIP explation it takes input qty 9.52 T0 and price 2000 then total price is 19040.
    Difference is 19048 - 19040 =8
    and also when i am issuing actual qty i.e 9.524 in BOM then my price is 19048.00 ant at time of variance calculaton then quantaty variance as   9.52.0-9.524.0=-0.04  then 0.004*2000 =-8 
    Please suggest solution for this.
    Any OSSS NOTE Required
    any Quires please revert back
    REGARDS
    Avinash.pegarlawar

    Hi
    Rounding differences between target and actual values and quantities are not unlikely to occur and cannot always be avoided but can be minimized.
    Small prices and price unit of 1 are likely to cause more of these rounding differences..
    The actual credit is simply calculated as price * quantity. The target credit however is calculated during the variance calculation
    and based on the sum of all items in the itemization/cost components of the cost estimate and therefore more accurate.
    To avoid this I suggest to store the material price with a larger price unit, i.e. 1000
    Std cost release stores price upto 2 decimals and target cost calculation goes upto 3 decimals...
    Please check also the note 1265918 for more information to this topic.
    Regards
    Ajay M

  • Full BOM component qty when follow-up material is effected.

    Dear Experts,
             How to ensure discontinuation / follow-up is implemented on FULL BOM's
             component qty, and not partial.
              Example : A requires 3B, and B is follow-up with C upon discontinuation.
                             Planned order of A should only contain 3B or 3C, not mixture eg. 1B
                             and 2C etc.
              How can the control be implemented ?

    Dear Pradeep, Rajesha & all,
          Assume BOM of "A" indicates component B qty 10 is follow-up with component C qty 10.
          Material B (say, balance 1 qty) is received into Store Y (MRP Relevant). Thus to exclude material B from MRP, we have to manually transfer stock to store X (Not MRP Relevant).
          This would mean, we have to perform manual tracking such that this store transfer is done, to force SAP to direct to material C, so that we either accept 10B or 10C in planned order and nothing else.
         Not forgetting, I could have another follow-up in another bom such that 1B = 1C. Thus, the material 1B I transfered to store X (Not MRP relevant) can actually be use in this case.
    <b>    Thus, from BOM explosion, is there a way to control discontontinuation to follow-up, based on full component qty specified in BOM ?</b>
    <u><b>My Setting as follows :</b></u>
    <b>(1)</b> Material Master of "B" : MRP4 specify (a) Discontinuation Indicator "1", (b) effective-out date, (c) Follow-up material "C"
    <b>(2)</b> In Bom of "A" (parent of "B") :
    - Item "B", indicate discontinuation group "A1"
    - Create item "C" and indicate follow-up group "A1" and qty to be follow-up upon B discontinuation.
    Thank you for your guidance !

  • BOM Component Qty.

    Hi
         In Casting Industries the consumption of rawmaterials for furnace is vary for every production.The Consumption is based on availablity of meatal scraps and also cost.How to Craete BOM for this Scenario.

    Dear,
           Consider the furnace capacity as base quqntity for the BOM. Then define the other components as per requirement in BOM. For the fix componenets and their qty mark that component as fixed quantity in item details. I think maximun variation will be in scrap and rement consumption. For different capacity of furnace you can define different production versions. If you are using REM then this process will work properly in casting production process. Let me know for further requirement.
    Thanks and Regards,
    Harriesh

  • EXPLODE BOM  COMPONENT QTY -REG

    Hi abapers,
            I am creating a report inwhich showing all BOM components for sale order 
            wise.
            I have used FM 'CS_BOM_EXPL_MAT_V2' to show all the BOM 
            components.
            Now  I want to display the component quantity also based on required  
            quantity as we do in CS11.
            Is there any tables or function modules to get those fields.
           Thanks in advance.
    Regards
    Rajaram

    Hi,
    please check out the following link it might help you
    Re: Function Module for Displaying BOM
    *****please reward points if the information is helpful to you***********

  • BOM component Qty is getting rounded to next value in Process Order and BOM

    We are in ECC 6.0, and maintaining BOM where Item quantities are decimal places e.g 0.3lb with respect to Hader qty. Now when we are craeting process order or exploding in CS11, we are seein that item quantities are getting rounded to next full integer e.g 1, 2 or 3.
    What could be the reason for this behaviour.

    In standard  "lb' doesn't have decimal point
    If you want decimal point
    go to CUNI
    select the mass
    you can find the lb
    maintain the decimal point  as 3, & decimal point rounding as as 3, system will show 3 decimal point in process order and in CS11

  • How can read BOM component date before save the production order??

    Hi Experts,
    In our company, we need to develop a program to read the BOM component data of the production order
    before we save the production order.
    That for example ,when we create and release a production order , before we save the production
    order,we want a porgram to read the BOM component data. If some component data can meet our
    requriement (may be if there is material requirement quantity>100 EA),then the system will pop up a
    small dialog box to remind us.
    There is user exit PPCO0007 and PPCO0007.But it seems they only can read the head data of the
    production order before we save the production order. And the BOM component data of the production
    order are saved in the RESB(Reservation Table).So if we do not save the production order,all the BOM
    component data are not saved in the RESB table.
    So how can slove the problem??
    How can read component date before save the production order??
    Are there any other user exit we can use???

    Hi Just wanted to check am I right that you are trying to check if you have enough Materials Available before you release or Save the order right ? if this is your business objective then when you create order you have material availability tab which checks and gives error if shortage is there. Please let me know if is this wht you asking for ?

  • How to get the Calculated Component Qty  of BOM in BI

    Hi Gurus,
    I am working on a requirement where I need to get the BOM Calculated Component Qty which we see in CS11.
    The way it is getting calculated in ECC is :- If a Component has an Assembly then We take the Base quantity of that material from STKO table and Take the Component qty of its component and multiply the Component qty of The component and the component qty of the Material for which the assembly exist and divide it by the base qty of the component  of the Assembly.
    We need to put the same logic in BI. can anyone please help me how i can accomplish this.
    Thanks!

    CLOSED

  • BOM Component Data

    i created a document(Document Maintenance) in sap to sent information to pas file , i have selected all option in Document Maintenance--> document option but when i check the pas file there is no information about BOM Component ,  is this information missed at all  when sap create the document ? what can i do to get this information in the pas file?

    Hi Vian,
    According to another thread there is no information about BOM components that hasn't been assembled into SFC.
    If you need to add this information to the pas file you'll need to develop a printing plugin customization using SAP ME SDK.
    Hope this helps
    Thanks
    Ivan

  • Po quantity and Component qty should be same Whildoing Subcontracting PO.

    Hello friends
    I need to do the following setting.
    While doing Subcontracting Purchase Order the Ordered Quantity  entered is to be reflect  Component Quantity.  ( Without entering component qty, automatically ordered qty should come in component qty). The reason is that user should not commit any mistake while doing po.
    Where can i control this. Is there any customization setting or Material Master setting.
    Please give me suggesition. Urgent.
    Thanks and Regards
    Sitaram

    Hi Sitaram,
    As you have maintained the BOM for that material/Plant.
    The finished material and components are maintained with the quantities,
    When you creating  the Subcontracting PO you enter the Material number in the item level
    in the material data tab you have 2 options Components and Explode BOM,
    If you click the Components the system will ask you to enter the components and their quantity.
    If you click the Explode BOM system will pick the components and their quantity from the BOM which is already maintained for that finishing material.
    So no need to maintain the quantity manually by Users, if you use explode BOM options.
    rgds
    Chidanand

  • BOM Component quantity vs Backflush Component quantity

    dear sirs,
    shall the 2 kinds of quantities be the same? when running backflush, component list exploded differs from that of BOM.
    what is in contact with them in between?
    thanks a lot!
    Mandy

    dear Venugopal,
    my question is, provided all master data maintained in place, when running some planned order to backflush, the quantity of component list doesnt match that by diploid in BOM.
    Say, material 1 stands 1kg in BOM (on condition of base qty 100kg of Assembly), when backflushing a planned order - 200kg, excluded scrap factor in BOM, the qty of material 1 in component list of backflush table doesnt equals 2kg.
    thanks so much for your prompt support!
    Mandy

  • BOM component and PGI

    Hi All,
    I'm trying to test how the system will react, by allowing me to PGI if I short confirm a BOM component. So if I confirm the mouse for 2 pieces instead of 3, would it allow me to PGI and invoice.
    eg. sales order for:
    Item 10 pc x 3
    Item 20 keyboard x 3
    Item 30 mouse x 3
    But confirm the delivery for:
    Item 10 pc x 3
    Item 20 keyboard x 3
    Item 30 mouse x 2
    Can anyone assist me in the process. We have Warehouse Management running so TO are part of the process.
    I'm not sure of the process exactly, so here goes:
    Create SO > Create Delivery doc > change Item 30 to quantity 3 in del'y doc. > create TO.
    Once the TO is completed ( pick & transfer) then PGI. If PGI is completed then create the invoice.
    Any assistance please?
    Rgds
    TV

    Hi Tony,
    If you want to do PGI for 2 pcs instead of 3 pcs for a BOM component, then the system will allow to do and will do PGI for that quanitity.
    If you have warehouse management then the process will follow as follow
    Normally Picking can be donw in two ways
    1. Manual Picking
    When you dont have warehouse management, then in changemode of delivery, you maintain quanitiy in Picking field, in Pick tab in delivery.
    And the picking quanity should not be greater than delivery qunaitity.
    2. Automatic Picking
    If you have warehouse management, then you cant do manual picking. You have to do pikcing using TO.
    Process is as follows
    1. Create Sales Order (VA01)
    2. Create Delivery (VL01N) or (in sales order change mode, goto Sales Document -> Deliver)
        Here the selection date should be req. delivery date of your sales order.
        If you can go in change mode of delivery and see the Pick tab, pick quanity will be grayed out. that means you cant give the pick qty manually for this you have to create TO.
    For BOM Material, Header component will not be reflected in the Delivery, Only sub components can be reflected in the delivery. As header component is not relevent of Picking. So, If you have only limited qunaity available for a req. del. date say 2 pces instead of 3 pcs, only that qty is picked in transfer Order.
    3. Create Tranfer Order (TO) (LT03 or goto change mode of Delivery, click on Subsequent Function -> Create T.O.)
    4. subsequently you can confirm the Transfer Order (LT03, goto Transfer Order -> click on Confirm -> Transfer Order)
    Now Pickng is done.
    5. Now do PGI, change mode of delivery (VL02N) click on Post Goods Issue.
    Now for your delivery PGI is done, and what ever the qty is picked in that delivery, that can be done for PGI.
    6. Create Invoice (VF01 or VF04)
    Hope this clear.
    Reward if helpful.
    Thanks,
    Praveen

  • Copy BOM Component Characteristic value in material PR created by MRP Run

    Dear Gurus,
    My requirement is I have materials like thread to maintain color characteristic i have create class - color- class type is 023 , now i want user should able to maintain characteristic value in BOM component (thread) of semifinish material.  FG , SFG  are not having any characteristic.
    Now in PR and PO we can maintain characteristic value in Material Data --->Configuration tab , Configuration tab will come only when there is tick in material is configurable at material basic data 2 view of thread and in CU41 I have to maintain material for class type 300 - Variant , then in class assignment i have select class type 300 and 023 both and maintain class , both are having same characteristic please make me correct if i am doing wrong process, if i am not maintaining class assignment 300 in CU41, in manual PO system not allowing to enter characteristic value in configuration tab . so i maintain both class assignment 300 and 023.
      Now for manual PR and PO system showing configuration tab and from PO configuration tab characteristic value is coming in MIGO automatically but when i am running MRP for finish material the auto PR generated by system for material thread is not showing configuration tab in Material Data of PR. I have maintain characteristic value in BOM --->Extra--->Batch Classification. Please guide me how to archive this.
    Thanks & Regards
    Akshay.

    Akshay kukde,
    Still i am unable to understand the reason for maintaining a characterstic value for a batch through BOM, I hope you are not changing BOM for every purchase order ?
    can you explain what you expect by maintaing this one value for batch characterstic?
    you can have many other simple option like
    1) Create a material with colour included in it ex, Thread_red, Thread _green etc and use them in BOM
    2) Use text in BOM to hold this discription for colour
    3) Use batch management, class 023 in material master classification , defalut value for colour, purchase order will be created and while doing GR you can change in colur if its different then default you set earlier.
    Akshay kukde wrote:
    if i am creating PR Manually -ME51N , system showing configuration tab , where i can maintain characteristic value , which then reflecting in PO and from PO to MIGO
    The above scenario I have tried by maintaining class type 023 and same characteristic in material Master. but result is same for auto generate PR by MRP- configuration tab is missing.
    My requirement in this case is characteristic value should flow from BOM to PR generated by MRP.
    when you manualy create PR you Thread material is consider to be a configurable material and thats why you are able to input configuration value, otherwise as soon as you put this configurable material inside a BOM of normal materila it loost its configuration feature, if you want you can create your parent material also as configurable material, assign same class to it and create configuration profile and take MRP run this time you will get PR with configuration tab as your thread get configuration derived from parent.
    Hope above details may help you.
    Check and reply, also mark replies helpful if it helps you.
    Thanks
    Ritesh

  • Validity Date at BOM componet

    Dear all,
    I'm strugling on changing the valid-to date for a BOM component.
    Let me explain in detail what the scenario is and what I've done so far.
    I have a BOM header "Z" with 5 different components, Y, X, W, V and U. Validity dates should be as follows:
    - Y --> 02.04.2010 to 31.12.9999
    - X --> 02.04.2010 to 31.12.9999
    - W --> 02.04.2010 to 31.12.9999
    - V --> 02.04.2010 to 20.02.2012
    - U --> 21.02.2012 to 31.12.9999
    I have created a change number with validity date 21.02.2012, but when trying to change BOM components validity dates fields will be grey and won't allow me to do the necessary changes.
    Could you please guide me with the necessary steps that I need to follow or where my issue would be? - I have already been checking the forum and followed some of your tips(checked config and so on, and everything seems to be ok).
    Thanks a lot in advance for your help on this one as it's quite urgent to solve this so we can test it, as we need to provide with some explamples on how material variances report will be affected to client ASAP.
    Kind regards,
    Mario

    Hi Mariete ,
    you just need to create a change number with the valid date you want for component , example if you create a change number valid from 01.01.2010 and if you use it for changing BOM , all the changes you made will have this validity date.
    its not possible to input validity dates, so all the times it will be greyed out , you can control it as discribe above.
    in you case you need to create 2 change numbers , 1 with valid from date in 02.04.2010 and use it for component Y X W and V
    and others with validity date 21.02.2012 and use it for component U.
    another thing please keep in mind if you BOM is created in todays date or date which is greater then 02.04.2010 will be a problem , so suggestion is while creating BOM , use a change number which is valid from 02.04.2010 and cause of it all 4 components will be automitacily hace valid date 02.04.2010.
    and after creating this BOM with 4 component  use a second change number and add component U.
    please check i hope it wil help you.
    Thanks
    Ritesh

  • JTable as a data entry screen

    I am trying to use JTable for data entry. I assign few columns to contain
    Integer class type and others with Float. Now, the problem that arise is
    that Objects of Integer and Float are sub-classes class Number and JTable
    has by default a Cell Editor defined to handle this Class type. The problem
    arises only when a float type is handled. Floats which i use carry either a 3
    decimals or 2 (basically quantity is represented in 3 decimals and amounts in
    2 decimals). But for eg if i have a float 3456.78 i want that to displayed as
    3456.780 and if 987.6 then 987.60. I can manipulate them in the required form
    as a String but not as Number. (then its not right aligned). I have no clues how to do this and its very much important that i finish this asap.
    Gurus out here please pour all the help you can .
    Thanks in advance
    Shomal

    You talked about editors, but it seems like you are able to edit just fine. It seems that displaying a previously edited Float is your real problem. If that is the case, you just need to add a specialized cell renderer for displaying your Float objects.
    First create an implementation of TableCellRenderer (it's easy, there is only one method) that returns your Float object rendered correctly.
    Then just add the following code:
    TableCellRenderer renderer = new MyFloatRenderer().
    table.setDefaultRenderer(Float.class, renderer);
    From now on Integers will use the regular Number Cell Renderer and Floats will use your custom renderer.
    If you have a problem with the editor also, the steps are similar.
    Implement TableCellEditor (only one method again) then add the following code:
    TableCellEditor editor = new MyFloatEditor();
    table.setDefaultEditor(Float.class, editor);
    Offer duke dollars next time, you'll probably get a more timely response.

Maybe you are looking for