Data Migration - Active contracts

Hi All,
As per the business rule of client, they post single invoice for the full amount at the start of contract, with four invoices on the same date but with varaying due dates on first of every quarter.
Ex: Start Date: 1\1\2010. End date: 31\12\2010. Amount 120000\- Posted on 1\1\2010. Invoices: 30,000\- four invoices with dates 1\1\2010. 1\4\2010 1\7\2010 and 1\10\2010.
Assuming that if i migrate the data on 1\8\2010. i marked cash flow date in sap as 1\1\2010 and first posting date 1\8\2010.
1. Now shall i need to create new line items using rerapp in the system or shall i allow the AR open items to move to the sub ledger with reference to cotract?
2. If i don't post entries using RERAPP in  the system, then at the time of termination how system reverse the full contract amount and post for the used period (which is standard behavior in case of termination) as there are no entries posted.
Can anybody throw some light on this.
Thanks,
Bala.

Hi Anil
How did you manage this? We also had the same problem in one of our contracts and what we did was that we copied the contracts from the legacy with the full value. That is suppose SAP went live on 1st April, 2009 and the contract was created on 1st January 2009 for a value of suppose 100 USD, with the first billing being done on 1st Jan for 33.33 USD for 4 months. We first created the contract with a validity from 1st Jan 2009 in the new system. We billed it with a billing type that we created that did not actually create new accounting entries as the accounting entries had already been created in the legacy system. In the new system then we recognised the revenue till the go live, so that the actual value remaining of the contract reduced. Then we started the billing plan of the contract from 1st of April 2009 for the remaining amount. So next invoice was created on 1st april for 33.33 USD. Can you share your solution.
Regards
Indranill

Similar Messages

  • How can we upload questionnaire to CRM 2007 during data migration activity?

    Hi all,
    I have an requirement where i have to upload questionnaires from an existing CRM system to SAP-CRM 2007 during data migration activity.
    i just go through what are questionnaires, how we can create them and how we can assign them to transactions.
    how can i upload during data migration activity ?
    Thanks & Regards
    Raman Khurana

    Hi,
    According to your post, my understanding is that the 'Upload.aspx' page was missing or corrupted from many document libraries after migration to 2010 from 2007. 
    Per my knowleadge, the upgrade process sets the SPWeb.CustomUploadPage property for upgraded sites to a custom upload page titled
    uploadex.aspx, as opposed to upload.aspx which is the default page for file uploads. And this custom upload page contains the “Destination Folder” field.
    To removes the custom upload page (uploadex.aspx) from SPWeb, and reverts back to the default upload page (upload.aspx), we can use PowerShell script to loop through all Web sites that are contained within the site collection, including the top-level site
    and its subsites, and checks to see if the SPWeb.CustomUploadPage property is not equal to blank. If true, then it sets the SPWeb.CustomUploadPage property to blank.
    Here is a great blog for your reference:
    Destination Folder field in site upgraded from MOSS 2007 to SharePoint Server 2010
    More information:
    What’s This Destination Folder Field On My File Upload Page?
    Best Regards,
    Linda Li
    Linda Li
    TechNet Community Support

  • Data Migration of Contracts with periodic billing and revenue recognition

    Hello Experts,
    I am trying to develop a legacy data migration plan for Contracts with periodic billing plan and revenue recognition.
    Example of the scenario is given below:
    Customer signed a contract for one year starting 01/01/2009.
    Customer is billed quartely, billed in advance.
    SAP going live on 04/01/2009
    Customer is billed for 3 months and also for initial set up fees.
    Revenue recognition is done monthly.
    We have to migrate this contract to SAP.
    Billing document posting may be necessay as it affects revenue recognition which spans across the total contract period.
    Any ideas how to do this?
    Thanks  A Lot
    Anil
    Edited by: Anil  Jose on Sep 17, 2008 9:38 PM

    Hi Anil
    How did you manage this? We also had the same problem in one of our contracts and what we did was that we copied the contracts from the legacy with the full value. That is suppose SAP went live on 1st April, 2009 and the contract was created on 1st January 2009 for a value of suppose 100 USD, with the first billing being done on 1st Jan for 33.33 USD for 4 months. We first created the contract with a validity from 1st Jan 2009 in the new system. We billed it with a billing type that we created that did not actually create new accounting entries as the accounting entries had already been created in the legacy system. In the new system then we recognised the revenue till the go live, so that the actual value remaining of the contract reduced. Then we started the billing plan of the contract from 1st of April 2009 for the remaining amount. So next invoice was created on 1st april for 33.33 USD. Can you share your solution.
    Regards
    Indranill

  • Issue in data migration of PO contract (Updating table A215)

    Hi  All,
    I doing data migration for PO contract throught BDC, I wanted to update the table A215,
    I can't see the field of A215 on PO contract transaction screen (i.e. Transaction ME33K ).
    Can anybody tell me how to load the data in A215 thorugh BDC.
    Regards,
    Sagar

    How is this A215 table maintained manually? Thru ME33K  or a different transaction like MEK1?
    you are saying you do BDC, are yoou using a SAP given report or did you record the maintenance transaction yourself in SHDB?

  • New GL activated without data migration

    Hi all,
    we have some three projects lined up, one of it is new gl, due to some reasons we have postponed the go live of new gl but other two projects wants to go ahead with their go live, so we provided them an environment where new gl is active but doesnt have migrated data.
    What would be the risks when regression testing is done in such an environment, i have listed out few as below, can something else be expected?
    Cannot perform closing operations, as balances are not known and no previous data is available.
    Clearing and reconciliation functions cannot be performed.
    Cannot use the reporting function as there would be discrepancies in the output
    cannot check the balances
    Transactions referring to the previous data such as bill of exchange, down payments etc cannot be executed.
    if some one has gone thru such situation before, please provide information.
    thanks
    kumar

    Hi Kumar,
    Find below the answer to your question
    Cannot perform closing operations, as balances are not known and no previous data is available.
    - You can perform the closing operation without any problem. Its just that you will not have previos data which will get added to your existing data.
    Clearing and reconciliation functions cannot be performed.
    - You can perform reconcialiation function to the extent you have done the posting, not for the previous data.
    Cannot use the reporting function as there would be discrepancies in the output
    - You can take out reports but it will not give you correct picture as the previous data is missing. please keep in mind the Balance sheet GLs have cumulative balance.
    cannot check the balances
    - You can to the extent which you have done posting
    Transactions referring to the previous data such as bill of exchange, down payments etc cannot be executed..
    - Yes, to do so you need to migrate the previous data.
    Suggestion: Activating New GL without Data migration is an incomplet process, you should do the data migration at the earliest.
    Hope the above statements answer your questions.
    Regards
    Paul

  • SAP, Data Migration Contracts

    Good afternoon, I am seeking additional SAP resources with Data Nigration, MTO and ICWC experience. Please could someone advise a reliable source to find the available skills in the current contracting marketplace.

    Then my apologies and welcome as a "newbie" to our community.  Much information is to be gleaned concerning Data Migration in the website area called: <a href="https://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/developerareas/xi">XI</a>
    Also, note that community supports community and members ask questions and "reward" one another for good content.
    Generally we try to search or check the site as community members to see if our post has an existing answer.
    I was in the middle of this post, when Mark jumped to answer.
    Again, welcome and keep posting.
    Marilyn

  • What are  Pre Database Copy and Post data base copy activity list, Pre Migration and Post Migration activity list from SAP BW 7.0 to SAP BW 7.4 SPS6.

    BW on HANA :  Pre Database Copy and Post data base copy activity list, Pre Migration and Post Migration activity list from SAP BW 7.0 to SAP BW 7.4 SPS6.
    We are trying to copy database from SAP BW7.0 to SAP BW on HANA 7.4 SPS6 so we are in search for list of steps or activities during database copy both pre and post steps.
    Along with the above we are in search of Pre and post migration steps ones database is transferred successfully from oracle to HANA on 7.4 SPS6.
    Kindly help us in getting the exact course of action as requested.
    Thanks and Regards,
    Lavina Joshi

    Hi Lavina,
    try this link for starters: Upgrade and Migration - BW on HANA | SAP HANA
    Points to remember are:
    Preparation:
         -- Hardware Sizing
         -- Preparation of Data Centres
         -- HANA Hardware preparation
         -- System Landscape Readiness (upgrade software downloads, system readiness checks, etc)
         -- House Keeping activities on BW system (data clean up, etc)
    Post Installation:
         -- Sanity checks / Preparation and License checks
         -- JAVA Configurations
         -- Infoprovider conversions 
    Overall Stages are described below:
    # Environmental setup (HANA box)
         -- Initial system checks and Building Activities (system copy, Appln server setups, etc)
    # System readiness
                   - ZBW_HANA_COCKPIT Tool
                   - ZBW_HANA_CHECKLIST Tool
                   - ZBW_ABAP_ANALYZER Tool
                   - ZBW_TRANSFORM_FINDER Tool
                   - SIZING Report
                   - System Clean up Activities
                   - Impact of 7.4 on source system checks
                   - Java Upgrade for portal
    # DMO Stages
                   - Preparation & Pre Migration checks
                   - Execution / Migration
                   - Post Migration Activities
    # Testing Phase
                   - Source system checks/Activities
                   - System and Integration Testing
                   - End to End Testing
                   - Performance testing
                   - Reports
                   - BO reports / Interfaces
    Do let me know if you require any further information.
    Regards,
    Naren

  • Data Migration from Legacy System in CRM

    Hi All,
    We are going to Implement a new CRM project, I have a problem with LSMW(Legacy System Migration Workbench ), I have some Conversion Objects of CRM and I need to know whether Data Migration is possible or not, please tell me how to find these Objects and how to know Data Migration is possible or not.
    Objects are like.,
    1. Accounts
    2. Actuate Reports
    3. Active Campaigns/Campaign Content/Dispositions
    4. Contacts
    5. Contracts
    6. Opportunities
    7. Payment Arrangement History
    8. Payments
    9. Premises
    10. Rate Changes
    11. Security Deposits
    12. Business Partner Relationships
    13. Web self-service information
    14. Usage that has been used for quotes
    15. Tax history information, including AXCIS
    17. Service Requests
    18. Service Order History
    19. Security Deposits
    20. Reference Values
    21. Rate Changes
    Can anybody please tell any transaction code in CRM where can I find the Data migration for the above objects is possible or not.
    Thanks in Advance,
    Sai.

    Hello,
    for migration into CRM I would suggest the 'XIF-Interfaces'; these are interfaces provided in CRM for connection to external systems. I'm not sure if this will cover all objects mentioned above, but at least some of them should exist.
    Some information about existing interfaces can be found in the integration repository under http://ifr.sap.com/index.html; from the start screen first select 'Enter the repository' and then have a look under 'generic components' and 'SAP CRM'.
    Regards, Katja Ohliger

  • Data Migration from Legacy System in IS-U

    Hi All,
    We are going to Implement a new IS-U project,  I have a problem with LSMW(Legacy System Migration Workbench ),  I have some Conversion Objects of IS-U and I need to know whether Data Migration is possible or not, please tell me how to find these Objects and how to know Data Migration is possible or not.
    Objects are like.,
    1. Accounts
    2. Actuate Reports
    3. Business Partner Relationships
    4. Active Campaigns/Campaign Content/Dispositions
    5. Connection Object
    6. Contacts
    7. Contracts
    8. Opportunities
    9. Payment Arrangement History
    10. Payments
    11. Premises
    12. Rate Changes
    13. Security Deposits
    these are few and there are some more..,
    Thanks in Advance,
    Sai.

    Hi Ram,
    Use Transaction Code EMIGALL. It will ask for company code. By default Company Code is SAP. If you entered with the SAP you will get all the objects.Then goto menu IS-U Migration-->User Handbook. It will give you details Idea.
    Also Check the following Procedure
    You can find detailed documentation of EMIGALL in SAP itself. Use Transaction EQ81 to display it. It provides all the concepts and procedures to work with EMIGALL.
    Here are some points about EMIGALL :
    1. It Migrates data Business Object wise
    2. It uses Direct Input Technique
    3. It has more than 100 objects of IS-U
    and the steps for implementation goes like this:
    1)You have to create a user specially for migration which will have all the authorizations related to migration workbench, BASIS and IS-U
    2)You have to create your own company in EMIGALL. There is a default company called SAP.
    3)Company SAP contains all the Business Objects
    4)You have to figure out what business objects u need and then u have to copy those business objects to ur company from Standard Company SAP
    5)Each objects contains more than one structure and each structure can contain more than one fields. The relation goes like this
    Object ---> Structure ---> Field
    6)You have to define field rules for each required field of the object. You have to mark "Not required" for fields u don't need
    7)After field rules for a given object is set u have to generate load report i.e. actual Direct Input Program which will migrate data. This program is generated on basis of field rules set by u.
    8)After the load report is generated u have to prepare an input file (import File) for migration. The import file should be according to structure provided by SAP and must be in binary format. SAP Provides the structure of file according to your configurations. You have to write ur own Data conversion program(in any language) for this task.
    9)You take import file as input and migrate the data using generated load program
    10)Finally u can check the Migration Statistics and Error Log
    Thanks and Regards,
    Jyotishankar Dutta
    Message was edited by:
            Jyotishankar Dutta
    Message was edited by:
            Jyotishankar Dutta

  • Data Migration of FI-CA Cleared Items

    Hi,
    Currently I am working on a Data Migration project to migrate data from our FI-CA  module on ERP 4.7 to ECC 6.0.
    THere has been a request from the business to migrate historical data (e.g. Cleared items).
    Is there a SAP recommended approach or tools to load this data into the target environment?
    Currently all documentation around SAP data migrations talks about stategies for open item data migration however I have seen nothing arouund migrating historical financial data.
    Is this because it is not recommended or technically impossible?
    Regards
    Adam Gunn

    That BAPI is used typically for straight out vanilla GL, AR, AP postings, however you still have to create the other side of the entry and then clear it.
    I need to be able to migrate full history, which means from an FI-CA  viewpoint:
    1. Migrate FI-CA posting of liability against BP/contract account.
    2. Migrate associated payments.
    3. And then clearing documents.
    Basically the requirement is to represent the historical data in the new system as if it was posted and matched off.
    Is there a technical way to do this?
    OR,
    Do you migrate the FI-CA liabilties, then the associated payments and then run clearing on the target system?
    I suspect this is almost an impossible data migration requirement as development of the extraction and load process would be extremely complex and testing would take months to cover all posting scenarios in FI-CA. However, I would be interested if anyone has attempted to do this before.
    Adam

  • Data  Migration from 4.7 to ECC 6.0

    Dear Friends,
    We are doing upgration from sap4.7 to ECC6.0.
    We have activated new gl. We have configured all ecc6.0 functionality.
    But we stuck on data migration from classic gl to new gl.
    We want to activate the migration cockpit but system is asking license key.
    My question is, which license key it is?
    From where we will get this?
    Kindly don't send me any links and any documents related to ecc6 functionality.
    Please guide us on this.
    Thanks & Regards,
    Reva Naik

    Hi,
    following link may give you some hints:
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/2e/9e4638a28b2763e10000009b38f8cf/frameset.htm
    Regards
    Bernd

  • T-code for ending the active contract in RE-Fx

    Hi Experts,
    Is there any separate transaction to end a RE contract.
    Currently I'm terminating the contract, by manually entering the valid to date in the genral data tab page of the t-code RECN.
    Is there any other way available to end an active contract?
    Kindly assist.
    Thanks & Regards
    Shantanu

    Shantanu,
    Terminating Contracts is a Business scenario and usually a Business process is defined for such scenario. What I mean is if you wish to terminate a Contract you may have to execute series of steps in SAP related to your contract, example terminating Objects, taking care of outstanding payments/receivables etc.
    I could not find a Valid to date on Contracts General Tab which you quoted. But if you are talking about Contract end date on Terms tab then that is the expiration date of the term or the Contract. Contract will expire on that date, but you can certainly renew the Contract.
    If you wish to terminate a Contract, I would suggest to execute Notice on Contract and populate NOTICE PER date. Depending on your requirement you can choose to give notice on Objects too. This will mark this Contract as Canceled. This is an event and you can use it to control subsequent tasks in your business process. For this process you can set up Notification and reminders too.
    There is a Notice Tool which you can use for mass termination too.
    Thanks,
    Jag

  • Configuration Manager 2012 SP1 Prerequisite Checker returns "Migration active source hierarchy" error

    Hello, 
    I am getting "Migration active source hierarchy" error in the SCCM 2012 SP1 prerequisite checker on the CM 2012 primary site. The error says "There is an active hierarchy configuration for the migration. Please stop data gathering for each
    source site in the source hierarchy." However, actually there is no migration source hierarchy configured and there are no migration jobs displayed in CM 2012 console. We used to configure this feature to migrate CM 2007 to current CM 2012 without service
    pack two years ago and we have deleted these configurations. 
    In migmctrl.log, the following record is being generated every 60 minutes. 
    ======================================================
    Connection string = Data Source=xxxxx;Initial Catalog=xxxxx;Integrated Security=True;Persist Security Info=False;MultipleActiveResultSets=True;Encrypt=True;TrustServerCertificate=False;Application Name="Migration Manager".~~  $$<SMS_MIGRATION_MANAGER><04-07-2014
    01:01:53.710+300><thread=6992 (0x1B50)>
    Created new sqlConnection to xxxxx~~  $$<SMS_MIGRATION_MANAGER><04-07-2014 01:01:53.741+300><thread=6992 (0x1B50)>
                                                                    [Worker]: Start two step scheduling
    for MIG_Job~~  $$<SMS_MIGRATION_MANAGER><04-07-2014 01:01:53.741+300><thread=6992 (0x1B50)>
                                                                    [Worker]:        
    Step 1. Query the schedule items that was running or requested to start immediately ...~~  $$<SMS_MIGRATION_MANAGER><04-07-2014 01:01:53.741+300><thread=6992 (0x1B50)>
                                                                    [Worker]:        
    Step 2. Query the first item in order of DateNextRun ...~~  $$<SMS_MIGRATION_MANAGER><04-07-2014 01:01:53.819+300><thread=6992 (0x1B50)>
                                                                    [Worker]:        
            No item found. Sleep until the next event.~~  $$<SMS_MIGRATION_MANAGER><04-07-2014 01:01:53.882+300><thread=6992 (0x1B50)>
                                                                    [Worker]: End two step scheduling
    for MIG_Job~~  $$<SMS_MIGRATION_MANAGER><04-07-2014 01:01:53.882+300><thread=6992 (0x1B50)>
    [MigMCtrl]: the workitem queue is full!~  $$<SMS_MIGRATION_MANAGER><04-07-2014 01:01:53.882+300><thread=6992 (0x1B50)>
    [MigMCtrl]: WAIT 3 event(s) for 60 minute(s) and 0 second(s).~  $$<SMS_MIGRATION_MANAGER><04-07-2014 01:01:53.882+300><thread=6992 (0x1B50)>
    ======================================================
    I am not really sure where to look into in this case. I would appreciate any advice. 

    Hi,
    Could you please upload the full migmctrl.log?
    How about specifying a source hierarchy with the same name and password of the hierarchy before in the console, then click Clean Up Migration Data?
    Best Regards,
    Joyce Li
    We
    are trying to better understand customer views on social support experience, so your participation in this
    interview project would be greatly appreciated if you have time.
    Thanks for helping make community forums a great place.

  • Data migration for re-organization

    hello,
    I have to delimit the existing org structure in SAP system.
    the steps are as follows:
    1) create new org structure
    2) create new org structure to cost center mapping
    3) delimit the old org  and positions
    4) assign new org to positions
    5) assign cost center to some positions
    Please can some one tell me which is the easiest transaction to do data migration for the step 3.
    Regards
    Meghana

    hi,
    You can delimit the positions llike,
    Plan Version    HI Plan version
    Object Type     S  Position
    Object ID       50018201     Director - Enterprise Bus
    Object abbr.    S 50018201
    Infotype        1001 Relationships
    Subtype
    Planning status 1    Active
    Validity        06/11/2008  to     12/31/9999
    Data sample
    Then  there is option called Delimit (shift+F1) where you can demilit the dates.
    Try this.
    Reward me if helps,
    Thanks,
    Vasu.
    Edited by: VASU MALYAVANTHAM on Jun 12, 2008 1:05 AM

  • Migration of contracts

    Hello Experts,
    I am trying to develop a legacy data migration plan for Contracts with periodic billing plan and revenue recognition.
    Example of the scenario is given below:
    Customer signed a contract for one year starting 01/01/xxxx.
    Customer is billed quartely, billed in advance.
    SAP going live on 04/01/xxxx
    Customer is billed for 3 months and also for initial set up fees.
    Revenue recognition is done monthly.
    We have to migrate this contract to SAP.
    Billing document posting may be necessay as it affects revenue recognition which spans across the total contract period.
    Any ideas how to do this?
    Thanks A Lot
    Kiran

    Hi Anil
    How did you manage this? We also had the same problem in one of our contracts and what we did was that we copied the contracts from the legacy with the full value. That is suppose SAP went live on 1st April, 2009 and the contract was created on 1st January 2009 for a value of suppose 100 USD, with the first billing being done on 1st Jan for 33.33 USD for 4 months. We first created the contract with a validity from 1st Jan 2009 in the new system. We billed it with a billing type that we created that did not actually create new accounting entries as the accounting entries had already been created in the legacy system. In the new system then we recognised the revenue till the go live, so that the actual value remaining of the contract reduced. Then we started the billing plan of the contract from 1st of April 2009 for the remaining amount. So next invoice was created on 1st april for 33.33 USD. Can you share your solution.
    Regards
    Indranill