Data Retention tool- help needed

hi gurus,
my client wants to extract all the used POs once every 4 months and store them on CD diskettes.I knew DART(Data Retention Tool) does this ,can any one suggest me if this is the right approach or Is ther any standard way of doing this in SAP.

Hi Cheris,
Yes, you are correct.DART tool is the right way to extract the PO's.
But before tha you have to onfigure DART according to your requirement and then go for extraction.
Reward if useful.
Thanks,
Dipti.

Similar Messages

  • SAP DART - Data Retention Tool

    Hi folks,
    Anyone has experience with DART – Data Retention Tool? This tool generates a flat file with an audit log result and I would like to know if is possible generate it in XML format? If not, which is the best option to convert this flat file in a XML?
    Thanks in advance,
    Ricardo.

    XML is not an option, however you can generate a view file in a format that contains meta data describing all field properties in the same file. That would be the best format to start with for XML conversion I think.

  • SAP Data Retention Tool and Batches

    Hi,
    does anyone know if there is a way to extract batch data with DART ?
    Regards,
    Volker

    volkes
    for the sap data rentention tool upgrade what are the steps required for the upgrading of the version2.1 to 2.5.
    can you please how the dart application is run.
    please me necessary documentation to [email protected]
    thanks in advance
    suman

  • Application Server Data Source settings help needed (10.1.2.0.2)

    Hi,
    Can someone tell me what maximum values can I set in the following properties under Connection Attributes when I define a DataSource on
    Application Server. I have almost 25+ web application deployed on my 10.1.2.0.2 server that all uses one data source I have defined. Now the issue is the number of requests
    are very high and every now and then I get timeout error when trying to get the database connection. At one particular instance at peak time I may get over 200+ requests that
    do some databse connections etc. Following are my current settings. But need to increase some more but wondering what are the maximum values I can have. I have only one server 10.1.2.0.2
    Connection Retry Interval (seconds) = 5
    Max Connection Attempts = 3
    Cached Connection Inactivity Timeout (seconds) = 30
    Maximum Open Connections = 60
    Minimum Open Connections = 10
    Wait For Free Connection Timeout (seconds) = 15
    What other properties can I have to make use of datasource effectively.
    Thanks

    Here is the copy of my datasources.xml.
    <?xml version = '1.0' standalone = 'yes'?>
    <!DOCTYPE data-sources PUBLIC "Orion data-sources" "http://xmlns.oracle.com/ias/dtds/data-sources-9_04.dtd">
    <data-sources>
      <!--
                An example/default DataSource that uses
                Oracle JDBC-driver to create the connections.
                This tag creates all the needed kinds
                of data-sources, transactional, pooled and EJB-aware sources.
                The source generally used in application code is the "EJB"
                one - it provides transactional safety and connection
                pooling. Oracle thin driver could be used as well,
                like below.
                url="jdbc:oracle:thin:@host:port:sid"
           -->
      <data-source class="com.evermind.sql.DriverManagerDataSource" name="OracleDS"
                   location="jdbc/OracleCoreDS" xa-location="jdbc/xa/OracleXADS"
                   ejb-location="jdbc/OracleDS"
                   connection-driver="oracle.jdbc.driver.OracleDriver"
                   username="scott" password="tiger"
                   url="jdbc:oracle:thin:@//localhost:1521/oracle.regress.rdbms.dev.us.oracle.com"
                   inactivity-timeout="30"/>
      <!-- For SQL Server -->
      <data-source location="jdbc/TestDS"
                   class="com.microsoft.jdbcx.sqlserver.SQLServerDataSource"
                   password="pwd" xa-location="jdbc/TestDS"
                   ejb-location="jdbc/TestDS"
                   connection-driver="com.microsoft.jdbc.sqlserver.SQLServerDriver"
                   username="usr"
                   url="jdbc:microsoft:sqlserver://someloc99:1433/DevelopmentAp"
                   inactivity-timeout="30" name="jdbc/TestDS"
                   connection-retry-interval="5" max-connections="50"
                   max-connect-attempts="3">
        <description>jdbc/TestDS</description>
        <property name="DatabaseName" value="DevelopmentAp"/>
        <property name="serverName" value="someloc99"/>
      </data-source>
    </data-sources>I also tried changing max-connections="0" it did helped but still after sometime I get timeout while connecting to the database. Don't know if it's with SQL Server that is not letting that many concurrent connections/sessions or something on the Application Server side.
    Thanks
    Message was edited by:
    WhiteSox
    Message was edited by:
    WhiteSox

  • Data Load scenario- help needed

    Hi gurus,
    Please help me with the below scenarios for the LO mechanism:
    Rec 1 entered in R3 between T1 and T2 (during R3 setup table population). When does Rec1 get into BW?
    Rec 2 entered in R3 between T2 and T3 (after setup table population but before initialization loads). When does Rec 2 get into BW?
    Rec 3 entered in R3 between T3 and T4 (during initial loads in BW). When does Rec 3 get into BW?
    Rec 4 entered in R3 after initialization is completed after T4. When does Rec 4 get into BW?
    Time
    T1                                          T2    T3                                                                               T4                             
    |--|---||--
           Rec 1                                Rec2                                   Rec 3                                                   Rec 4
    T1 – T2 – Setup Tables populated
    T3 – T4 – Initial Loads performed
    T4 onwards – Delta Loads performed

    Hi ,
    senario1;Rec 1 entered in R3 between T1 and T2 (during R3 setup table population). When does Rec1 get into BW?
    during the setup table filling ,v3 jobs will be descheduled
    you need to lock all the user's (no user can post documents)
    Rec 2 entered in R3 between T2 and T3 (after setup table population but before initialization loads). When does Rec 2 get into BW?
    here just setup table is filled,however init is not performed
    so still  v3 jobs will be in descheduled mode ,the posting which were/are happened  sits in application tables
    Rec 3 entered in R3 between T3 and T4 (during initial loads in BW). When does Rec 3 get into BW
    here init is running,it will be down time for R/3 due to heavy load processing to BW
    so still  v3 jobs will be in descheduled mode ,the posting which were/are happened still sits in application tables
    Rec 4 entered in R3 after initialization is completed after T4. When does Rec 4 get into BW?
    after init,now we need to schedule v3 jobs, so all the postings(which were posted earlier/which are posted for the moment) now will transfer from application tables to delta que depending on the update mode(direct/queued/un serialized)
    Hope this helps you!!!!!!!
    cheers,
    Swapna.G
    Message was edited by:
            swapna gollakota
    Message was edited by:
            swapna gollakota

  • ALE Data Transfer - Urgent help needed

    I am trying to set up an ALE interface from a SAP ECC 6 system to another SAP ECC 6 system using HRMD_A idocs.  The complication I have is in the receiving system, I need to generate a new PERNR for all employees transferred. 
    Can anybody advise how to go about doing this?
    Many thanks
    Jez

    Hi you can send the employees from sender system to reciever system.
    With the help of transaction pfal you can send the personnel number.
    You have to choose the ploan version 01
    object type will be p
    in object id write the employee number which will be transferred to the reciever system
    Then push the run button.
    But you have to configure HRMD_A in ALE implementation.

  • Slice tool help needed width expands and contracts

    I recently did a header for my website and srinks and expands
    with different screen sizes I need a bit of help to undstand how
    and why this happens.
    I built it on a 19" screen fits perfectly on the page. Then
    on the 15" I'm using now its very small leaving gaps along the
    sides
    here's the problem

    No, I don't mean that your header should be all one image.
    Currently, your header is a table with a number of images
    inside it. The width of the table is "absolute." It is set to a
    fixed number of pixels (800). It won't change. What you see as
    smaller and larger on your different monitors is a result of the
    different resolution that the two monitors have.
    The forum content, on the other hand, is in tables with
    widths that are "relative." They are are a percentage of the width
    of the browser window (81%). These tables will change size
    depending on the size of the browser window. For just one perfect
    setting, everything will line up. For all other widths, you have a
    mess.
    You need your header table and your forum tables to match.
    Either your header needs to be designed differently, so that it can
    expand and contract gracefully when a browser window is a different
    size (in pixels), or you need to edit your forum so that the
    various parts are all 800 pixels wide instead of varying
    percentages.
    As for monitors, it isn't the physical size that is important
    here, it's resolution. It isn't the number of inches, it's the
    number of pixels. You can have a 21" monitor that's set to 800x600
    pixels and you can have a 17" monitor set to 1600x1200 pixels. On a
    monitor with 800x600 pixel resolution, your header will be the full
    width of the screen and the forum content will be about 650 pixels,
    indented on both sides. On a monitor that is 1600x1200 pixel
    resolution, your header will be about half of the screen width and
    your forum content will be about 1300 pixels wide.

  • Books & Tools: Help needed for Begining Java....

    Hi,
    I am a Computer science Graduate & working. I am new to Java but not Programming. I have some knowledge on OOPS concepts, .Net, Java, C# & web development.
    I need Help To pick the Best Book/Books that can make me comfortable in programming Java & Understanding whole Java concept.
    I followed many books but found they are not following the Right approach.
    I would appreciate if someone can suggest me a Complete Book/Books, which you think have helped.
    Thanks.

    This is the starter set:
    Sun's basic Java tutorial
    Sun's New To Java Center. Includes an overview of what Java is, instructions for setting up Java, an intro to programming (that includes links to the above tutorial or to parts of it), quizzes, a list of resources, and info on certification and courses.
    http://javaalmanac.com . A couple dozen code examples that supplement The Java Developers Almanac.
    jGuru. A general Java resource site. Includes FAQs, forums, courses, more.
    JavaRanch. To quote the tagline on their homepage: "a friendly place for Java greenhorns." FAQs, forums (moderated, I believe), sample code, all kinds of goodies for newbies. From what I've heard, they live up to the "friendly" claim.
    Bruce Eckel's Thinking in Java (Available online.)
    Joshua Bloch's Effective Java
    Bert Bates and Kathy Sierra's Head First Java.
    James Gosling's The Java Programming Language. Gosling is
    the creator of Java. It doesn't get much more authoritative than this.

  • Warp Tool Help Needed ?!

    I want to warp a specific selection of a portion of a layer, but everytime I do this the warp tool cuts off the edges. Is there a way to prevent the warp tool from doing this ?
    -Thank you in advance

    Some quick ideas:
    Try the Liquify tool instead.
    Or Warp the entire image without making a selection first.
    Or make a new layer and warp more than you need, then blend it with what's left from below.
    -Noel

  • Unix Application monitor tool : Help needed

    Hi All,
    I am planning to develop an Application monitor tool for internal use.
    In a Nutshell this tool will monitor set of services (user applications), which or running on HP UNIX box from a windows terminal. Just to know whether they are running OK or not (red green amber!). In other words executing small command on unix and sending the result back to client.
    I am wondering is there any open source tools for this type purpose from which I can take some help.
    Thanks in advance

    A few simple Google searches will probably pull up what you are looking for on HP Unix. For starters
    http://www.google.com/search?sourceid=navclient&ie=UTF-8&rls=GGLD,GGLD:2004-08,GGLD:en&q=open+source+monitoring+tools+HP+unix

  • How to improve speed of data acquisition? Help needed urgently.

    I want to convert analog signals to digital signals and simultaneously perform some search on the data acquired and this whole process has to be done continuously for few hours.
    So I tried writing two programs in Matlab, one acquires the analog data and converts it to digital and saves the data in small chunks on hard disk (like file1, file2, file3,...) continuously. The other program performs the search operation in those chunks of data continuously. I run both the programs at a time by opening two mat lab windows.
    But the problem Iam facing is that the data acquisition is slow. As a result I get an error message in the second program saying that
    "??? Error using ==> load
    Unable to read file file4.mat: No such file or directory."
    Iam unable to synchronize the two programs. I cannot use timers in search program because I cannot add any delays.
    Iam using a NI PCI-6036E ,16 Bit Resolution ,200 KS/s Sampling Rate A/D board.
    Should I switch to some other series such as M series having sampling rate of the order MS/s?
    Can anyone please tell me how to improve the speed of data acquisition?
    Thanks.

    Gayathri wrote:
    I want to convert analog signals to digital signals and simultaneously perform some search on the data acquired and this whole process has to be done continuously for few hours.
    So I tried writing two programs in Matlab, one acquires the analog data and converts it to digital and saves the data in small chunks on hard disk (like file1, file2, file3,...) continuously. The other program performs the search operation in those chunks of data continuously. I run both the programs at a time by opening two mat lab windows.
    But the problem Iam facing is that the data acquisition is slow. As a result I get an error message in the second program saying that
    "??? Error using ==> load
    Unable to read file file4.mat: No such file or directory."
    Iam unable to synchronize the two programs. I cannot use timers in search program because I cannot add any delays.
    Iam using a NI PCI-6036E ,16 Bit Resolution ,200 KS/s Sampling Rate A/D board.
    Should I switch to some other series such as M series having sampling rate of the order MS/s?
    Can anyone please tell me how to improve the speed of data acquisition?
    Thanks.
    Hi gayathri,
    well my email is [email protected]
    if ur from india mail me back.
    Regards
    labview boy

  • SAP tools help needed ASAP

    Does naybody have any details ont he following:
    1. Global Technical Support tool using SAP..
    2. Environmental Health Care Services tool using SAP.
    Thanks,
    Bhaskar

    VBRK
    VBRP
    VRPMA
    VBUK
    VBUP
    VBFA
    VBAK
    VBAP
    VBPA
    MKPF
    MSEG
    ISEG
    BKPF
    BSEG
    UKPF
    USEG
    MARC
    MARD
    MBEW
    MEAN
    MARM
    MAKT
    WLK1
    WLK2MVKE
    MLAN
    MAW1
    EKKO
    EKPO
    LIKP
    LIPS
    are also some of them...

  • Date difference calculation help needed

    Hi,
    I have a form with a date field and one text field which is hidden..in case the date field value is less than the current date minus 3 years then the text field should display else not. Please advice what logic/code can be used.
    Any suggestions would be highly appreciated !!
    Thanks
    Kapil

    In the mean time, a couple of stylisitc suggestions:
    if(start.getTime().before(end.getTime()) == true)
    // == true is redundant and cluttersome
    if(start.getTime().before(end.getTime()))
    Long L = new Long(diff);
    return L.intValue();I'd suggest returning a long, rather than an int. If you insist on returning an int, because you're sure that the number of days will never be more than Integer.MAX_VALUE, then add an assertion that its not.
    assert diff <= Integer.MAX_VALUE : diff + " too big";The Long is overkill. If you do have a small enough value, just do return (int)diff;

  • Data-guard conceptual help needed

    Hello Experts,
    We have 2-node RAC Physical standby DG. I got the following doubts in my mind just to clear my concept:-
    1. Can we perform Hang analyze on the DG site, when it is on managed recovery and of-course in read-only mode? if not then Q2?
    2. If both of my DG nodes (in a 2-node RAC DG) are in a hung state while the managed recovery was active, can I do sqlplus sql> set _prelim on and enable oradebug hanganalyze or do I have any other option apart from restarting the DB
    3. IF the Primary RAC (2-node) hangs then if we take systemstate dump / Hanganalyze from the DG site
    I guess, we will not get meaningful results as Hanganalyze will use Kernel system calls of the Server on the DG site and systemstatsdump will dump the SGA of the secondary site instance's SGA
    4. I am using a non-RAC primary and Secondary site and non-ASM disk
    I have my Primary mount -points as /Oradata/Prim1 = 1 TB and Physical standby DG - real time apply mount-point as /Oradata/Seco1 =.8 TB & /Oradata/Seco2 = .2TB and my Primary DB is now on size expansion from .79 TB to .95 TB overnight. I am not intending not to take any down-time nor am I able to extend the disks on the Primary for any reason. what can be done wisely to keep the DR site in close sync?
    Regards,
    Syvalli
    Edited by: user4566776 on Dec 12, 2012 6:04 AM

    We have 2-node RAC Physical standby DG. I got the following doubts in my mind just to clear my concept:-
    1. Can we perform Hang analyze on the DG site, when it is on managed recovery and of-course in read-only mode? if not then Q2?
    2. If both of my DG nodes (in a 2-node RAC DG) are in a hung state while the managed recovery was active, can I do sqlplus sql> set _prelim on and enable oradebug hanganalyze or do I have any other option apart from restarting the DBYes you can perform hang analyze and even you can generate active session history report if DR is on read-only mode.
    SQL> select database_role from v$database;
    DATABASE_ROLE
    PHYSICAL STANDBY
    SQL>
    SQL> oradebug setmypid;
    Statement processed.
    SQL> oradebug unlimit;
    Statement processed.
    SQL>
    SQL> oradebug hanganalyze 3;
    Hang Analysis in /u02/app/oracle/diag/rdbms/CKPT_un/CKPT/trace/CKPT_ora_5113.trc
    SQL>
    SQL> oradebug dump systemstate 266;
    Statement processed.
    SQL>
    [oracle@oracle-stby ~]$ tail -10 /u02/app/oracle/diag/rdbms/CKPT_un/CKPT/trace/CKPT_ora_5113.trc
      Holder:
      SO: 0x8ca2c8b8, type: 83, owner: 0x6000c478, flag: INIT/-/-/0x00 if: 0x3 c: 0x3
       proc=0x90488f50, name=circuit holder, file=kmc.h LINE:2615, pg=0
      (circuit holder) disp = 0x8ca2c830 (0, 1), proc = (0x90488f50, 1)
    END DISPATCHER DUMPS
    END OF SYSTEM STATE
    *** 2012-12-12 20:03:44.100
    Oradebug command 'dump systemstate 266' console output: <none>
    [oracle@oracle-stby ~]$
    3. IF the Primary RAC (2-node) hangs then if we take systemstate dump / Hanganalyze from the DG site
    I guess, we will not get meaningful results as Hanganalyze will use Kernel system calls of the Server on the DG site and systemstatsdump will dump the SGA of the secondary site instance's SGAYes, the hang analysis we should perform from the instance where you have problem. you can use OS level trace if database not accessible by using How to interpret OS system traces [ID 1429678.1]
    4. I am using a non-RAC primary and Secondary site and non-ASM disk
    I have my Primary mount -points as /Oradata/Prim1 = 1 TB and Physical standby DG - real time apply mount-point as /Oradata/Seco1 =.8 TB & /Oradata/Seco2 = .2TB and my Primary DB is now on size expansion from .79 TB to .95 TB overnight. I am not intending not to take any down-time nor am I able to extend the disks on the Primary for any reason. what can be done wisely to keep the DR site in close sync?Can you tell me one thing? After size expanded in primary from .79 TB to .95 TB does your standby is out of SYNC?
    If you do not have space, then you should add some space to the disk to avoid any interruption to production. Or check whether you can adjust HWM on primary database using below method. http://www.oracle-ckpt.com/how-to-shrink-datafiles-adjusting-hwm/
    Hope this helps

  • Hello, okay? since then, was robbed today, and my find my    iphone this down, please tell me if he has a way to locate the computer, I need the iphone again, it has many important data it please help me

    hello, okay? since then, was robbed today, and my find my
      iphone this down, please tell me if he has a way to locate the computer, I need the iphone again, it has many important data it please help me

    It's gone and you most likely are not getting it back.
    If you had important info on it, you should have made backups so you would not lose the data.

Maybe you are looking for

  • Error Message when creating Purchase Requisition

    Hello, We are on SRM 4 version in classic scenario. We are creating a limit shopping but when he has been approved we got an error from the backend system : Shopping Cart XXXXX3 (Purch. Requisition XXXXX): ME020 Item category X not allowed with docum

  • Presets settings

    I am a bit frustrated with Presets. I have created a Preset named " Identity and copyright". I want to use this Preset during importing all images.  However, I'm having some confusion in the Metadata section while in the Library module on the Right P

  • How COPA datasource is loaded with data?

    Hi all, I'm very new to COPA extraction. I tried to extract data from COPA. So I created Costing based COPA datasource. Do we need to do anything to fill the data? Or Is there any initialization step as in LO? How the COPA tables are filled with data

  • Syntax for search help

    What is the syntax to link a search help to a parameter?

  • Using LabVIEW 7.0 Evaluation version

    Hi all I Installed the LabVIEW Evaluation version in "Evaluation Mode".But I've just open and created a new Vi once.When I open it again,I get an error message that it is expire.I think it just expire after 30 day.Can you help me about this problem.