Data source failure in process chain.

Dear All,
Iam getting data from 2LIS_13_VDHDR today the process chain got failed the error is as follows:
There is no active delta initialization for this.
IS/QS/DATA source
This chain got failed from 2 days please as it is of high prority give ur valuable advices.
Regards
Amar.

Dear All,
Thanks for your quick replys.
I noticed the following things both in R/3 and BW.
1.There is no datsource exists in RSA7 Since the delta as been changed to INIT it has been delted from Delta queue.
2.The INIT request has been deleted in BW side.
3.There is No DSO to do Repair full request.
4.The cube is compresses so i cant delete selected requests in the cube.
5.I cant even do selection deletion and go for the full update since there is valid version.
Please help me step wise wat i need to do to get back the data for past 2 daya, can i Intalise from R/3 for 2 days and run the deltas as usual.
Regards
Amar.
Edited by: Amar on Dec 21, 2009 11:07 AM

Similar Messages

  • Need help in triggering the Data stream load  using process chain

    Hi Guru's
    is it possible to trigger a data stream load using process chain?
    Any help is highly appreciated.
    Thanks
    Indiran

    Hi Indiran and welcome aboard!
    Don't think this is possible. SAP BW & SAP SEM-BCS are rather independent systems. Though, BCS lives on top of BI-BW stack, it even may have master data different from those in BW.
    Process chains, AFAIK, is completely the BW's feature. Certainly, you may use PCc on BW side, loading ODS/DSO and cubes involved in BCS data model.
    The main con here is the lost transparency -- you don't control everything from the consolidation monitor.
    The pro side is also rather obvious for me. Since, very often there is a huge difference between data quality at the data source and in the BCS totals cube, I need to make a lot of data transformation. Not only some data calculations or cleaning, but also transformation of data model: key figure model -> account model. It's much more easier to do in BW, for me.
    I even call the ODS/cubes/routines involved in such transformation as intermediate layer, the layer between data source and SEM-BCS.
    And this layer lives rather independently from BCS.
    Hope this helps.

  • Data Load Requirement through Process Chain

    Hello All,
    I have implemented an area through a custom data source and following is my data load requirement through Process Chain. Request you to kindly help me for the same.
    1. The design is an InfoCube and updated using a Transformation through the custom data source.
    2. For the entire year 2008 I want a single request to be loaded. So it gets loaded into the PSA and then into the Infocube through a (Delta) DTP.
    3. Now, I have created an InfoPackage (Full Update) with year as 2009 in the selection. Tht is I want tht hencforth the data load should be for the year 2009.
    4. Hence, the Infopackage will run to bring the 2009 data into PSA and I run the (Delta) DTP to update the same in the Cube.
    5. Now, what i require is everyday the InfoPackage (Full Update) with 2009 should run and bring data into PSA. and the same should be updated in the InfoCube after deleting the 2009 request already present keeping 2008 request loaded previously intact.
    I hope the above is nt confusing.
    Please let me know if i can elaborate the same.
    Thank you.
    Regards,
    Kunal Gandhi

    Hi,
    Please go through the links.
    http://help.sap.com/saphelp_nw04/Helpdata/EN/21/15843b74f7be0fe10000000a114084/frameset.htm
    http://help.sap.com/saphelp_nw04/Helpdata/EN/f8/e5603801be792de10000009b38f842/frameset.htm
    http://help.sap.com/saphelp_nw04/Helpdata/EN/b0/078f3b0e8d4762e10000000a11402f/frameset.htm
    These may help you in designing the process chain as required.
    Regards,
    Sunil
    Edited by: sunil kumar on Apr 17, 2009 6:20 PM

  • How to find unassigned master data text objects in process chain in bi

    Hi
    Please let me know how to find the unassigned master data text objects in process chain.

    hi,
    actually if u want to find that , is ur Unassigned Infoobject in present in process chain or not, , that u can find out just by right
    click on your DTP (master data Txt datasource--> Master data text ), if this is present in Process chain, then on ryt click, the process chain option will be active. by clicking over that u can find the name in which this exists.
    thanks.

  • Including an Event Data Change in a Process Chain

    There is a step called "_Execution with Data Change in InfoProvider_" in the process of including event data change in a process chain.
    How do we carryout this? should this be done in Bex or in process chain itself?

    Dear Eshwari,
    1) To get the 'Execution on data change' option, you need to have aprocess chain with the 'Event data
    change' process type which contains 'the infoprovider' (The infoprovider, over which the query is created
    which you are trying to broadcast) in the process variant of it.
    2) Further more, additional authorization is also needed in order for the user to see such scheduling options in broadcaster.
    Please assign this authorization object to the affected users.
    BEx Broadcasting Authorization to Schedule  S_RS_BCS
         Activity                       *
         Event ID in Broadcasting Frame *
         Event Type in Broadcasting Fra <== Here you should select*
         ID of a BI Reporting Object in *
         Type of BI Reporting Object in *
    3) Please also ensure the user has not only the Busines Explorer role but also Business Intelligence role in Portal,
    Regards,
    Arvind

  • Steps for master data loading by using process chain

    Hi
    I want to load the Master data by using the process chain . Can anyone tell me the step-by-step method for loading the master data .
    I means what are the processes should i need to include in the process chain . Pls tell me in sequenece .
    i ll assing the points
    kumar

    Hi,
    The process os loading master data is similar to transaction data in terms of using the infopackages.
    First you have to load Attr followed by texts and hierarchy.For master data you have to include the process type called as Attribute change run.This can be included as a separate process type or using the AND process.
    Hope this helps.
    Assign points if useful.
    Regards,
    Venkat

  • Master data loading by using process chain

    hi
    I want to load the master data by using the process chain in BI7.0 . How can i do this one .
    Can anyone tell me the step-by-step method for loading the master data.
    kumar

    Hi Kumar,
    check this link to load the master data by using the process chain
    Re: Process Chain : Master Data
    cheers
    Sunil

  • Collection in source system ended-Process chain error

    Hi friends,
    I have  got a  PC which failed due to error : Collection in source system ended.
    My flow of PC is .
    start--
           --Load IP 1
          ---Load IP2
          _--load Ip 3
    Load IP4
          ---Load Ip 5.
    I got this error at IP2 and so my pc fail .
    can i manually upload this IP2  and  make the process chain OK?
    what are the steps involved in rectifying this?
    regards,
    siddartha

    First try to find out the reason for the load failure. Once you fix this, do a manual run of the infopackage and when successful you can continue with the rest of process chain.
    Sometimes, it doesn't help to just set a request to green status in order to run the process chain from that step on to the end.
    You need to set the failed request/step to green in the database as well as you need to raise the event that will force the process chain to run to the end from the next request/step on.
    Therefore you need to open the messages of a failed step by right clicking on it and selecting 'display messages'.
    In the opened popup click on the tab 'Chain'.
    In a parallel session goto transaction se16 for table rspcprocesslog and display the entries with the following selections:
    1. copy the variant from the popup to the variante of table rspcprocesslog
    2. copy the instance from the popup to the instance of table rspcprocesslog
    3. copy the start date from the popup to the batchdate of table rspcprocesslog
    Press F8 to display the entries of table rspcprocesslog.
    Now open another session and goto transaction se37. Enter RSPC_PROCESS_FINISH as the name of the function module and run the fm in test mode.
    Now copy the entries of table rspcprocesslog to the input parameters of the function module like described as follows:
    1. rspcprocesslog-log_id -> i_logid
    2. rspcprocesslog-type -> i_type
    3. rspcprocesslog-variante -> i_variant
    4. rspcprocesslog-instance -> i_instance
    5. enter 'G' for parameter i_state (sets the status to green).
    Now press F8 to run the fm.
    Now the actual process will be set to green and the following process in the chain will be started and the chain can run to the end.

  • How to change source system in process chain

    Hi All,
    In our Bw quality system, process chain is pointing to the Production system ,
    I want to keep the process variant name same as production but want to change the source system
    For example.. let us say currently process chains(All DTPs) are pointing to the Production server (PD001) ip (200.12.23.22)
    now i want to keep the Server name same but want to point it to the quality system..so after change Process chain will show same name but it should point out to quality system.(let us say bwq 200.12.23.232).
    Can you please help me on this

    Hi Pravender,
    In our BW system , we have same process chain in all the system (Dev, Quality and production)..and naming convention is also same ..(all process chain points to Production system only)..
    So when I want to load data from development i just need to change the source system ip adrress  to  the Development Server  (So names in process chain will indicate production but  it will point to the development server), .
    I want to know how can i change the source system mapping.
    Hope i am clear now

  • Data Manager Packeage and Process chain si not working

    Hi All,
    I executed a data manager package which contain a process chain to revaluate the one of my Account dimension meneber Say  "Revenue". I am working on BPC NW 7.0
    steps I followed:
    1. I created a script logic file and created a custom process chain.
        process chain steps:
      a) Start variant
      b) Modify dynamically
      c) Run Logic
      d) Or and Clear BPC tables
    2. This process chain was included in data manager package.
    3. Data manager package was modyfied to include parameters and scipt logic file name.
    4. executed data package
    The issue is " when I execute Data manager Package" I dont get any error but when I View status I dont see any pachage running or completed. If I see Process chain, It is failing at first step of Modify dynamically..no clue?
    Could you please let me know what could be a issue?
    Cheers,
    SAC

    I encounter this problem, Do this Steps:
    I. First,check if your process chain is existing in the Library.
    II.If yes,follow the steps below:
    1. Edata - organize Package - Modify your Package.
    2.Check if you had the correct process chain.
    3.IF yes, Click View package at its right side.
    4.Expand the Task Folder and take note of the Task Name (e.g. ZBPC_PROT_RUN_LOGIC)
    5.click Advance,Compare the task name that you noted in the syntax TASKS
    (e.g. TASK(ZBPC_PROT_CF_RUN_LOGIC,SUSER,%USER%)
    6. It should be the same.
    Running package but not appearing any status happens when the system cannot find your process chain.
    hope this helps,

  • HOW TO VIEW DATA IN LOG VIEW - PROCESS CHAIN?

    HAI FRIENDS,
    I SIMULTANEOUSLY LOADED DATA INTO ODS AND INFOCUBE....I USED THE PROCESS CHAIN TO LOAD DATA.. BUT AFTER ACTIVATING, I COULD N'T VIEW THE DATA IN THE LOG.AFTER THAT I FOUND OUT DATA IS NOT LOADED INTO THE ODS ..SO I ACTIVATED IT AGAIN.. DID THE PROCESS CHAIN ACTIVATE.. EVEN AFTER THAT I COULD NOT VIEW DATA IN LOG VIEW AND ALSO WHEN I CLICK ON LOAD DATA PROCESS(ODS) NO DATA IS FOUND.. PLS HELP OUT
    WITH REGARDS
    APPU

    Hi,
    Go to the manage screen for that ODS. See teh relevent request and find how many records were transferred and how many added.
    If it is zero added records, then check for any rules.
    Arun
    Assign pts if useful

  • How to pass date to program in process chain

    Hello,
    I have a program to extract the data of a query (using 'RRW3_GET_QUERY_VIEW_DATA' ) that I want to run in the process chain.
    This program is dynamic in that I pass the query name and the variables required by that query. As such, I need to pass the date dynamically because each time I use this program for a different query the dates required will differ. One query night require current month, another query might require current month -1, etc. and be dynamic so that I never have to change the settings of the process once created, i.e. it will automatically know which month it is extracting for each month.
    Is there a way to do this in the process chain?
    I made the program dynamic (by giving it parameters) rather than having to create a program hardcoded for each query.
    I have searched but cannot see anything relevent.
    I hope somone can help me!!!
    Thanks
    Richard

    In your ABAP program that calls 'RRW3_GET_QUERY_VIEW_DATA' you can define a select-option for the date, so that you can enter this information on the selection screen.
    Now create a variant (as mentioned before) for your query and your dates. Important to stress out here is that the dialog to save variants offers already in the standard multiple option to define dates or date ranges dynamically.
    So you can pick one of the standard dynamic variables to have the variant always pick e.g. the current date or the previous month.
    Have a look in the SAP help for "Using Variables for Date Calculations"
    http://help.sap.com/saphelp_nw04/helpdata/en/c0/98039be58611d194cc00a0c94260a5/frameset.htm
    The screens look old and grey, but this still works fine and can be used to avoid hard-coding or storing values in Z-tables.
    Best,
    Ralf

  • Can I delete 'Initialization Options for Source System' in Process Chain?

    Hi All,
    Can I automate the process of deleting the 'Initialization Options for Source System' for Delta Init package? I need to include this step in a process chain, rather than deleting the init request manually.
    Thanks,
    Naveen.

    Naveen,
    As far as I know, nope. And it's logical, considering the Initialization is a "one time" process and not a repetitive one (unless you have to reinitialize, of course...)
    Regards,
    Luis

  • Flat file data loading error using process chain

    Hi SAP Experts,
    I am having a problem loading the flat file data to the cube using process chain. The issue is that when i run the process chain it fails giving the message " Date format error, please enter the date in the format  _.yyyy" . I am using " 0calmonth in the datasource" . Strange is that when i manually execute the infopackage, i dont get any errors and am able to load the same file successfully to the dso and the cube. Is there any special setting for the process chain that i am missing?
    The date format in the flat file is mm/yyyy. I have tried all the options i could including recreating the datasource and invain dont see any success so far. please help me solving this problem as we r in the middle of testing cycle.
    Thanking you all for your quick response and support all the time.
    Kind Regards,
    Sanjeev

    Hi Sanjeev,
    I believe you are opening the .csv file again after saving it. In this case the initial 0 in single digit month (say 02/2010) is getting changed to 2/2010 and the resulting file is not readable to the system. Just do not open the file after you have entered data in the .csv file and saved and closed it. If required, open the file in notepad, but not in excel in case you want to re-check the data.
    Hope this helps.
    regards,
    biplab

  • BPC:: Master data load from BI Process chain

    Hi,
    we are trying to automatize the master data load from BI.
    Now we are using a package with:
    PROMPT(INFILES,,"Import file:",)
    PROMPT(TRANSFORMATION,%TRANSFORMATION%,"Transformation file:",,,Import.xls)
    PROMPT(DIMENSIONNAME,%DIMNAME%,"Dimension name:",,,%DIMS%)
    PROMPT(RADIOBUTTON,%WRITEMODE%,"Write Mode",2,{"Overwirte","Update"},{"1","2"})
    INFO(%TEMPNO1%,%INCREASENO%)
    INFO(%TEMPNO2%,%INCREASENO%)
    TASK(/CPMB/MASTER_CONVERT,OUTPUTNO,%TEMPNO1%)
    TASK(/CPMB/MASTER_CONVERT,FORMULA_FILE_NO,%TEMPNO2%)
    TASK(/CPMB/MASTER_CONVERT,TRANSFORMATIONFILEPATH,%TRANSFORMATION%)
    TASK(/CPMB/MASTER_CONVERT,SUSER,%USER%)
    TASK(/CPMB/MASTER_CONVERT,SAPPSET,%APPSET%)
    TASK(/CPMB/MASTER_CONVERT,SAPP,%APP%)
    TASK(/CPMB/MASTER_CONVERT,FILE,%FILE%)
    TASK(/CPMB/MASTER_CONVERT,DIMNAME,%DIMNAME%)
    TASK(/CPMB/MASTER_LOAD,INPUTNO,%TEMPNO1%)
    TASK(/CPMB/MASTER_LOAD,FORMULA_FILE_NO,%TEMPNO2%)
    TASK(/CPMB/MASTER_LOAD,DIMNAME,%DIMNAME%)
    TASK(/CPMB/MASTER_LOAD,WRITEMODE,%WRITEMODE%)
    But we need to include these tasks into a BI process chain.
    How can we add the INFO statement into a process chain?
    And how can we declare the variables?
    Regards,
    EZ.

    Hi,
    i have followed your recomendation, but when i try to use the process /CPMB/MASTER_CONVERT, with the parameter TRANSFORMATIONFILEPATH and the root of the transformation file as value, i have a new problem. The value only have 60 char, and my root is longer:
    \ROOT\WEBFOLDERS\APPXX\PLANNING\DATAMANAGER\TRANSFORMATIONFILES\trans.xls
    How can we put this root???
    Regards,
    EZ.

Maybe you are looking for

  • Setting up excel services on Sharepoint 2010

    I am using sharepoint 2010 enterprise version, and needs some advice with setting up excel services. When installing sharepoint 2010 enterprise, is the service application for excel services already installed. I see it listed so i assume it is, but i

  • Perform - syntax

    Hi ,     Iam trying to write an extractor for open and closed items ie form BSAD and BSID . So i have written the logic .when i tryed to modularise the code .the function module is not acteping the perform statment Ie when i tryed to put the logic in

  • OJ syntax for multi-table left outer join with MS Oracle Driver

    I have a multi-table left outer join that works fine in SQL Server ODBC Driver, Oracle ODBC driver 8.01.07.00, but not with Microsoft ODBC Driver for Oracle 2.573.7326.0 SELECT * from { oj A LEFT OUTER JOIN B ON A.col1 = B.col1 LEFT OUTER JOIN C ON A

  • New 4S does not show waiting voice mails? How do I fix?

    New 4S does not show waiting voice mails? How do I fix?

  • DI: Error importing Journal entries

    does anyone know what this error is refering to? Add Journal: -5011[JDT1.Account][line 1], 'Row in Transaction with Account No.' //Code vJournal.ReferenceDate = CDate(refDate) vJournal.TaxDate = CDate(refDate) vJournal.Reference = "Import" vJournal.L