Datasource Creation for Informatica Source system in NW2004s
Hi,
We are upgrading BW 3.5 to SAP NW2004s. In NW2004s Create datasource
is new feature provided in BW 7.0.
I tried to create this datasource for Flat file and worked fine. We
are also using Informatica as source system (External System).
Whenever I tried to create datasource for External system such as
Informatica, it gives message
"Datasource ZTEST(INFPCPD):Object Type RSDS not supported in BAPI
Source System"
Is it a bug? or Creation of datasource is not supported incase of
Informatica or external system?
Thanks
Rupesh
Hi Rupesh,
The latest BI release in SAP NetWeaver 7.0 (2004s) includes a new type of DataSource for which staging BAPI has not yet been aligned.
Third party ETL tool vendors can therefore only implement their load processes using the original type of DataSource from BW 3.x. This DataSource is still provided in the new release without any changes. Upgrading to NetWeaver 7.0 (2004s) BI (BI 7.0) does not therefore endanger existing implementations based on BW 3.x and NetWeaver 2004 (BW 3.5).
It is also possible to migrate third party ETL implementations based on BW 3.x into the new data-flow concept of a NetWeaver 7.0 (2004s) BI environment using new DataSources, transformations (also new), and data transfer processes (DTP) (also new). This is possible because the system provides an emulated view for BW 3.x DataSources, which makes it possible to combine them with NetWeaver 7.0 (2004s) transformations and DTPs for regular batch load processing (this does not include direct access and real-time data acquisition (RDA)).
This allows the benefits of the new data loading concept to be made available in such third party ETL-based loading scenarios.
Regards,
Anil
Similar Messages
-
Message "Creation of DataSources for SAP source system is not permitted"
Hi,
I am in DW Workbench: Modeling and I need to copy a DataSource.
It's impossible, beacause I have this Message "Creation of DataSources for SAP source system is not permitted"!
What can I do?
ThksHii.
You can not copy the standard datasource to any other source system it will not allow you to do that.
But if you want to copy you can copy it to PC FILE source system.
It will allow you to copy there.
Right click in Datasource->Copy-> Give Target datasource name -
> intarget Source system tab -
>Give Source system for File.
Thanks
Mayank
Edited by: Mayank Chauhan on Sep 4, 2009 5:41 PM -
Creating DataSources for File Source Systems in csv format in sap bw 7.0
Hi,
Please explain how to Create DataSources for File Source Systems in csv format in sap bw 7.0. WITH SCREENSHOTS
Thanks
JINI
Edited by: Jini Jayan on Jun 11, 2008 11:36 AMStep 1. Select Source systems under Modelling in the left panel. In the right panel, right-click Source systems and select Createu2026.
Step 2. Select the FileSystem, manual meta data, data using file inte option, and then click to continue.
Step 3. Enter a name and a description for the source system, and then click to create the source system.
Now create an application component
Step 1. Select InfoSources under Modelling in the left panel. In the right panel, right-click InfoSources and select Create application componentu2026.
Step 2. Enter a name and a description for the application component, and then click to continue. (BW automatically adds a prefix of "Z" to the technical names of application components, unlike the naming system used for other BW objects.If u give the name as AC_DEMO it will be saved as ZAC_DEMO in the system.
Now create infosource
Step 1.Select InfoSources under Modelling in the left panel. Right-click the newly created Application Component , and then select Create InfoSourceu2026.
Step 2. Select the option Master data/texts/hierarchies, and then click to continue.
Step 3. Enter your infoobject name, and then click to continue.
Now you will be asked
Infosource(name) assigned to Appln component(name)?
Click continue
Now go back to workbench and see the Infoobject listed under the Application component name (under Infosource)
Right click the infoobject name and select Assign Datasource
Enter the Infoobject name as Infosource name and the source system name and continue
Now you ll get datasource assignment confirmations for Infosource_ATTR and Infosource_TEXT for master data and text.
Click yes and continue
Now you ll be taken to the Infosource(master data) change screen
Source system name will be given
Below that u need to give the datasource name u2026.._ATTR
Click Activate.
Now Click the tab transfer rules
Copy the communication str infoobject names to an excel sheet
For ex if your infoobj are IO_MATNUM and IO_MATNAME (material number and material name) copy and paste as
IO_MATNUM IO_MATNAME
MAT001 TEA
MAT002 COFFEE
MAT003 SUGAR
GIVE YOUR DATA IN THE EXCEL. AND CLICK File Save As CSV(comma delimited) and save to ur system. Give file name as something like infosourcename_ATTR.csv
Now back to the Infosourcechange screen
Source system name will be given
Below that u need to give the datasource name u2026.._TEXT
And activate
Now Click the tab transfer rules
Copy the communication str infoobject names to an excel sheet
GIVE YOUR DATA IN THE EXCEL. AND CLICK File Save As CSV(comma delimited) and save to ur system. Give file name as something like infosourcename_TEXT.csv
Now create Infoobject to load data
Go to Infosourceu2014Appln Componentu2014InfoObju2014SourceSystemu2014rightclick->create Infopackage
Step 2. Select the DataSource Material number (Master data), enter a description for the InfoPackage, and then click to continue.
Give infopackage description as Infopackage:InfoObj_ATTR
Now take care to select the first item in datasource and click continue
In the next screen click external data tab
Click client workstation
Datafileu2026.file name (browse to give the file u saved in ur system)
There will be an option to remove header data from file.remove 1 row.
File typeu2014csv file
Now click schedule tabu2014start dataload immediatelyu2014start.
In the same way
Go to Infosourceu2014Appln Componentu2014InfoObju2014SourceSystemu2014rightclick->create Infopackage
Step 2. Select the DataSource Material number (text)enter a description for the InfoPackage, and then click to continue.
Give infopackage description as Infopackage:InfoObj_TEXT
Now take care to select the second item in datasource and click continue
In the next screen click external data tab
Click client workstation
Datafileu2026.file name (browse to give the file u saved in ur system)
There will be an option to remove header data from file.remove 1 row.
File typeu2014csv file
Now click schedule tabu2014start dataload immediatelyu2014start.
Click the icon below admn workbench to go to monitor and check the load
Or you go back to Infosourceu2014Appln Componentu2014InfoObju2014right clickmaintain master data
Click execute
You can see the data load
Hope this helps!!! -
How to create DataSource for BI Source System in RSA1?
I have a BI Source System defined, however I can't figure out a way to create a new DataSource for it. I can create DataSource objects for all my other Source Systems, but I can't figure out how to do this for this BI system.
I select my BI Source System, right-click, choose "Display DataSource tree". When I right-click from the DataSource tree, I expect to get "Create Application Component" and "Create DataSource" options, but instead I only see "Replicate Tree Metadata" and "Replicate DataSources" options.
How can I create DataSource objects for my BI system?Hi,
I guess you want to create a custom developed source in BI itself. For that you need to create the data source in RSO2 and inside you need to give the specific aplication component under which you want this DS to be in. Generate a data souce and then go to BI My self Source system and then replicate that particular appl component o view your data source.
Hope this helps
Regards,
Srini -
Transfer Rules for two Source System in Production
Hi All,
I have a question.
I have source system ECDCLNT230 (ECC Devlopment) which is connected to BIDCLNT200(BID Devlopment) I have two production source system ECPCLNT410 (ECP Pre Production Client) & ECPCLNT400 (ECP Production Client) which i want to connect with BIPCLNT400. when i transport my content from ECDCLNT230 to ECPCLNT410 and ECPCLNT400 , it works fine. i created 2 source system in BIPCLNT400 and replicated data source in to BIPCLNT400 so all data source has replicated.
Now when i transport the request from BIDCLNT200 to BIPCLNT400, i need two transfer rules, two transformation one for each source system. for that what kind of settings are required.
Thanks is advance.
Regards,
Komik ShahHi,
If I understand correctly, in your BW Production system, you want to connect / load data from your ECC Pre Production and Production system.
In this case, to automate the transport needed for changes of transfer rules for both source system, you will need to have two tranfer rules in your BW Dev. You can either create two source system in Dev pointing to the same ECC Dev system, or one to ECC Dev and the second to ECC QA. Use different name for this two source system.
In BW Production, you then then maintain the source system conversion of both source system.
Thanks. -
Tcode for deleting source systems
Dear all,
is there any tcode for deleting source systems in BI 7.0? I tried RSAP_BIW_DISCONNECT and RSAR_LOGICAL_SYSTEM_DELETE, but these two didn't exist in BI 7.0. Please help. Thanks.
Jin Minghi,
chk the below link
How to delete source systems?
Ramesh -
DataSource Creation for flatfile in BI 7.0
I am new to BI 7.0. I have worked on BW 3.5. When i rightclick on Appl Comp for creating a datasource in 'Datasources' node, I am not able to find any option except 'Replicate MetaData'. Is there any setting to be made or shall I have to do it differently.
Please let me know.HI
first create flat file source system under file folder in source system tab
Go to datasource tab click , click on yellow icon and select ur source sytem
then u can create ur application component and datasource under that application component.
http://help.sap.com/saphelp_nw04s/helpdata/en/fc/1251421705be30e10000000a155106/content.htm
Regards
Kiran
Message was edited by:
ravi kiran naalla -
Prevent objects being transported for Sandpit source system
Hi there,
We have a 3-tier systems landscape for BI: DEV, QAS, PRD (we do not have a sandpit BI). In our R/3 development system we habe two clients which are both setup as source system for BI DEV. One of the clients in R/3 DEV serves as sandpit in that system and objects can't be transported from it. However, since this client is connected to BW, objects related to this source system can be transported from BI DEV. We want to prevent that, so only the objects in BW DEV for the real R/3 DEV development client are allowed.
Is there a way in BI to configure a source system in such a way (other than via security roles/profiles), that objects related to this source system can't be transported?
Cheers.Sander, you should post this in BASIS also. By posting in both the forums, you have a better chance.
In case BASIS folks say that they cannot stop this, try this work-around.
In BWQ, in RSA1, there is a Source System Mapping in one of the tools menu. There, your DEV is mapped to QAS, etc.
There, you may have your R/3 DEV mapped to R/3 QAS.
See if there is an entry for your R/3 Sandpit/Sandbox. If there is one, leave the mapping for it as Blank.
See, the only Objects that are related to Source System in BW are InfoSource-DataSources. If there is no mapping for SOurce System in BWQ, then the transport will fail.
This is just a thought.
Uday-Ram Chamarthy -
Transfer rules are missing for selected source system in BI content
Hi All!
The problem is: in BI content (Release 704, level 0003, SP SAPK-70403INBICONT) when I select needed source system (for example, A) only I can not find any transfer rules (0RPM area, 3.X transfer rules). When I select more than 1 source system (B, C..), I can see lot of different transfer rules for 0RPM area, but with assignment to another systems (B, C..). How can I get in Business Content transfer rules for data sources from needed source system (A)? Any help appreciated!
Regards, Iryna.Hi Rathy!
Thank you very much for your quick help! Usually I do the same. Now I faced with BI system, where data source were already activated in system A and replicated. I can see all needed active sata source un BI already. But I can not see transfer rules in content!
What you can advise?
Reagrds, Iryna. -
BI Content Activation going for wrong source system
Hi,
I am trying to activate business content for the Customer cube in BI 7. The problem is that although the source system selection shows client 200 selected, the content activation goes for client 500 (which is the BI client). That is, during the activation process the process diverts to client 200 for no apparent reason. I have tried selecting other source systems, but the system still goes for client 200. Any idea of what is going on?
Many thanks!
Regards,
Adeel HashmiHi Reddy,
I checked it already and it shows the T90CLNT090 - IDES ALE Central system (client 800) which is shown as "Self-def'd" and not R/3, infact i dont have any source system specified under R/3 option. How do i fix this, as mentioned earlier we have both ECC and BI in the same box, will this affect??? -
Problem in activating datasource after replication from source system
Hi Experts,
After replication of data sources from source system ,I get all data sources inactive. I tried to make it active manually but every time I get
Syntax error in GP_ERR_RSAPTD1, row 27 (-> long text)
Message no. RG102
Diagnosis
Field "/BIC/CCZVBAK2031" is unknown. It is neither in one of the
specified tables nor defi...
How do I go about solving this problem....Any advise please...Hello,
You do not mention your source system release but can you execute the check report
described in the SAP note 493422 , if this does not resolve the problem can you goto
RSA1, right click on the relevant "source system" and choose the "restore" option,
then please try and replicate and activate the datasource again.
If you have BW release 7.0 please check that the note 929751is applied in your system
or that you are on a higher support package level.
If there is still a problem please le me know your BW Release and Support package level.
Best Regards,
Des -
Activating transfer rules for new source system
Hi
we are having 2 R/3 source system in BI. I had activated all the transfer rules with the first source system and now i have created a new source sytem connecting to a different R/3 client. I tried to change the transfer rules point to the new source system using the program RS_TRANSTRU_ACTIVATE_ALL giving the new source system and the infosource name. But i get the error "No Transfer Structure Selected" when i execute the prg.
how can i change the source system without creating the transfer rules for the new source but use the existing transfer rules and just change the source system assigned to it????
Regards
SujaiHi Sujai,
There are many cases when this program is used.
When the Trans rules get de-activated due to impact,we need to first replicate the data source and activate the TR using this program.This generally occurs during the data loads in prd.
It does not makes sense to transport it when there r no changes done to the TR.So simply,u can use this program to activate.
If the program does not work,then you are left with the transport option.
Thanks & Regards,
Suchitra.V -
Calendar configuration for peoplesoft source system
Hi All,Need one clarification.
we are using people soft as our source system.now we need to configure globalcalendar id parameter in dac.for that we ran below query in given source DB
SELECT SETID|| ‘~’|| CALENDAR_ID FROM
PS_CAL_DEFN_TBL.But for this no results were presenting in given database.So we thought of proceeding with default parameter 'SHARE~01'.Shell we proceed like that?will data load?otherwise any ware house generated calender we need to configure?.If yes what we need to configure.Please provide your valuable suggestions on this.
Thanks in advance.
Thanks,
AnushaIts better to check with functional guys from your project, they better know what they need for reporting as of your client.
-
Multiple Schema Creation with One Source system Via SLT
Hi all,
we have BW on HANA environment at our company premises, with SLT server installed
So, my Question is that is it possible to create more than one schema in HANA system with one Source system
As an example, lets say, ECC (Client 601) Source System has been connected to HANA via SLT and created Schema called SCHEMA_1 and again i want to create SCHEMA_2 by connecting same ECC (Client 601) source System.
please help me to short this out?
Thanks
MiranaHi Mirana,
Yes, it is possible to create more than one schema in HANA system with one Source system.
Please go through the Official SAP LT document for more details @ page number 13
http://www.saphana.com/servlet/JiveServlet/previewBody/1811-102-5-5419/SAP_LT_Replication_Server_for_SAP_HANA_SPS05_Over… -
Regarding master data loading for different source systems
Hi Friends,
I have an issue regarding master data loading.
we have two source systems one is 4.6c and another is ecc 6.0.
First i am loading the master data from 4.6c to bi7.0.
Now this 4.6c is upgraded to ecc6.0.
*In 4.6c and ecc6.0c master data is changing.
After some time there is no 4.6c, only ecc 6.0 is there.
Now if i load master data from ecc6.0 to bi7.0 what will happen.
Is it possible ?
Could you please tell me?
Regards,
ramnaresh.Hi ramnaresh porana,
Yes, its possible. You can load data from ECC.
Data will not change, may be you may get more fields in datasource at r/3 side, but BW/BI side no change in mappings structures are same. So data also same.
You need to take care of Delta's before and after upgrade.
Hope it Helps
Srini
Maybe you are looking for
-
Printed Documents crash in RH6
In RH 6 - opened a Printed Documentation layout. Set the settings to generate a Word document, create one book, retain hyperlinks, and use conditional text exclusions. RH crashed while compiling at the updating stage with a message of "RoboHelp HTML
-
i HAVE 5 DEVICES SET UP FOR FILING SHARING. HOW DO I FIND OUT WHAT THOSE DEVICES ARE?
-
FI-AA : Problem in Depreciation Run and Year end closing.
i am doing asset year end closing and new fiscal year open, i followed the steps as followings.. Step 1 Did depreciation run using T-code AFAB- no error step 2 checked depreciation run in AFAR was correct(no error) step 3.did actual run of new fiscal
-
How to uninstall trial to install purchased suite
Through college we were to install trial adobe creative design suite premium until our purchased software came in. My purchased adobe creative design suite premium software has arrived and I would like to make sure I perform the correct process to un
-
Why can I use my Epson scanner though Photoshop in CS3 and not in CS4?