DB LINK between XE and 11g instances

Hello ,
I am facing the following problem.
I have 3 databases instances on 3 servers on is Xe,the second is 10 R2 and
the third instance is 11g.
I have create db link between Xe and 10g and vice-versa (10g and Xe)
the db links in the two senses are working fine.
But i could not create db link between xe and 11g nor between 11g and Xe.
I will give some detail
On Xe dblink pointing to 11g , when accessed give the message :
"ORA-01017 : Invalid username/password;logon denied ORA-02063 preceding db11g"
i am sure that user name and password i give in db link creation are correct and tried it many times.
From the other side
On 11g dblink pointing to Xe instance when ,accessed give the folowing result :
i could access some table (select * from t1@dbxe)
but some times i got message : "Internal server Error" for the same select on the same table.
When i try to access fonction f1 on dbxe from 11g instace , i got the message
"ORA-04052 : Error when quering remote object f1@dbxe ORA-00604.."
Does any body have some idea about the issue ?
thanks in advance.

Is your 11g database configured to use case-sensitive passwords? If so, are you specifying a case-sensitive (quoted) password in the creation of your database link?
Joel

Similar Messages

  • How to join three tables and practical difference between 10g and 11g

    I want to know with example how to outer join three different tables in Oracle.
    Also if you have any website or reference for understand syntax or performance difference between 10g and 11g then please paste a link in.thanks!!

    Hi,
    897293 wrote:
    I want to know with example how to outer join three different tables in Oracle.The 3rd table comes into the result set the same way the 2nd one did:
    FROM           table_1  t1
    LEFT OUTER JOIN      table_2  t2  ON   ...
    LEFT OUTER JOIN      table_3  t3  ON   ...The join condition(s) for t3 can reference t1, or t2, or both.
    Also if you have any website or reference for understand syntax or performance difference between 10g and 11g then please paste a link in.thanks!!The main manuals all have "What's New" sections near the beginning. For example:
    http://download.oracle.com/docs/cd/B28359_01/server.111/b28286/wnsql.htm#sthref5
    Hoek,
    We've missed you. Welcome back!

  • Is there any difference between 10g and 11g M Views?

    Hi,
    I need to give a demo on and working examples of materialized views. The requirement is this: Master tables are in a 10g R2 DB, MV is in a 11g.
    I just create a DB Link in 11g to point to the 10g DB and then create the MV in 11g.
    Will there be any problems creating a 11g MV using 10 Master tables?
    My question is are there any significant differences between 10g and 11g MViews??
    Thanks & Regards,
    Channa.

    You have to be careful about your versions. 10g could be 10.1 or 10.2 11g could be 11.1 or 11.2
    I wouldn't have an 11.2 database with a database link against a 10.1 database.
    In fact, even with 10.2, I would try to ensure that I have a "high patchset" (10.2.0.4 or 10.2.0.5) although, in theory, 10.2.0.1 should also work.
    See Oracle Support article
    Client / Server / Interoperability Support Between Different Oracle Versions [ID 207303.1]
    Hemant K Chitale

  • Link  between LANDSCAPE AND R/3

    hi gurus i have doubt. that what is the difference between DEV,QUALITY AND PRODUCTION SERVERS AND DATABASE, APPLIACATION, PRESENTATION.
    initailly while we are in implementation we use DEV,QUALITY AND PRODUTION.
    after impllementation DATABASE, APPLICATION AND PRESENTATION comes into picture. so in landscape good configuration sits in production server. so for end user point of u PRODUCTION SERVER WILL BECOME DATABASE SERVER OR NOT. pls tell me the link between landscape and R/3.
    will reward

    Hi Krishna,
    I think you are trying to mix 2 questions.
    Well you can frame the questions like this:
    1) Difference between Development, Quality and Production Servers
    2) Database, application and presentation layer.
    Well the point1) refers to Landscape. What happens is when are working for any end to end implemetation or support project we need certain instances so we can have instances like Development, Quality and Production. we have got different instances because we need to test whether the changes made are working as per the requirements.
    Point 2)  refers to R/3 technology.
    SAP R/3 is based on a three tier client/server technology. Typically, it is made up of three functionally distinct layers namely: the user interface, business logic and database.
    The user interface, which is otherwise known as the presentation server displays the interface for users' communication with the SAP system. It is often referred to as the SAP GUI. As a matter of fact, it is a program called sapgui.exe. The application server is where the business logic and data manipulation takes place. Data processing, SAP administration tasks and client request/feedback management are handled within the business layer. The database layer is synonymous to the database server and it typically acts as a data repository for tables and other database objects and structures.
    Ideally, an R/3 system is composed of one database server, one or more application servers and one or more presentation servers.
    Hope this helps you.
    Do award points if you found them useful.
    Regards,
    Rakesh

  • Broken Link between Base and Target document in 'Copy To' option

    Hi Folks,
    One of our client has been facing a peculiar issue. When the 'Copy To'  function is used to Copy document from Sales Order to Delivery and recently one instance of 'Copy To' from Delivery to A/R Invoice ,the base document got copied to the target document in each case but there was no trace of any Base Ref. left in the Target document( either in row level or Remarks), thereby the link between the Base and Target document got broken.The Base document remains with status as open.The same base document when tried again to 'Copy To', it creates the link between Base and new Target document.
    This instance had occurred recently 3- 4 times in a span of 3 months or so. In normal circumstance this never happens. The client is pretty sure they have used 'Copy To' option to copy the document from Base to Target.
    Any hints or possible reasons if one can highlight would be appreciable.
    The current version used is SAP B1 8.82 PL11 and it was upgraded more than a year back.
    Regards,
    Bharath

    Hi,
    All the data in Sales Order and Delivery are matching one to one in terms of row details,
    and Document header level.
    The missing data was Base Ref. data and Del.Date didn't get copied from base to target as shown in screen shot.
    Also i have checked it earlier regarding change of target document row details like changing item, but this will only remove the link of that particular row and remaining row link remains intact, but in this case there are many items and it doesn't seem user will have changed in all the rows.
    Regards,
    Bharath

  • Link between Delivery and Sales Order Schedule Line

    Hi Gurus,
    I have a requirement in which i need to display quantity and amount at schedule line level and also the delivery and delivery item for each schedule line.
    For example, if there is a sales order O1 and item 10 for which we have 3 schedule lines and 3 deliveries as well say D1, D2 and D3.
    Report should be something like this
    Sales Order    Item   Schedule Line    Delivery    Del Item   Confirmed Order Qty
    O1                 10      1                       D1           10            5
    O1                 10       2                      D2            10            5
    O1                 10       3                      D3            10            4
    How can i determine that a particular delivery corresponds to which schedule line of that saler order-item?
    We have the link between delivery and sales order but is there any way that we can get the link of delivery at schedule line level?
    Please help.
    Regards,
    Gaurav

    Hi,
    I suppose you must check with SD functional consultant and the post should also be in the logistics SD forum and not BI. But I suppose there is know specific link between the schedule line of SO to the Delivery. It is more like a bucket flow for ex.
    Sale order   Item    Schedule line  qty
    SO1            Item1     Sch1            10
    SO2            Item1      Sch2           10
    Delivery Item QTy
    DO1       IT1   15
    DO2       IT1    5
    In this case qty 15 is distributed over both SO1 and SO2, and SO2 ITem1 Sch2 has link to both the DOs
    So I am not sure if you can establish a one to one link, please check with your SD consultants.
    Regards,
    Ashwin G

  • Link between sd and pp

    hi all,
      i have a problem regarding relation or link between sales and production order. i have to fetch production order number related to sales order number. i have checked in the table AFPO that is production order item table , there is field AFPO-KDAUF and AFPO-KDPOS ie, sales order and sales item. but when i see these two fields there is no data into the field so how can i get data into the table related to production order.can anyone help me on this issue.

    Please refer to the below links -
    https://forums.sdn.sap.com/post!reply.jspa?threadID=309885
    Integration points with MM/IM and PP are some of the following -
    When a Production order is created and released a reservation gets created for the materials in BOM
    When the reservation is created and materials are posted against the reservation with mvt type 311 these are transferred to the respective location.
    When a GR is posted with mvt type 101, the Finished or Semifinished goods are posted to the respective storage location and inventorized.
    When a consumption is posted with mvt type 261 then stock will get reduced in resepective storage location.
    When a batch determination is done in a production order basing on the batch search strategy and sort rule material, quantity and batch are selected.
    If WM is configured an associated internal movement for all the above movement types will be posted.
    During MRP, BOM which is a master data for PP is used to calculate the dependent requirements of materials.
    During availabilty check of a production order basing on the availability check configured materials will be selected and checked.
    Hope the above may help you.

  • 'Is there a link between OLM and iProcurement'

    I have been asked 'Is there a link between OLM and iProcurement'? The person posing the question is wanting to create trainers as suppliers and I know that the supplier information is shared between OLM and the A/P, A/R and G/L modules and I presume that the link to iProcurement will be via one of these modules however is there a more direct vanilla link between OLM and iprocurement?
    Any help would be great
    Thanks
    DM

    I am afraid there is no link between the iProc and OLM.
    The closest that apps can offer you is that your learner/delegates can be of type external i.e. being an Organization or a Customer. Hence there exists a link for your delegate to be a customer(hz_parties).
    However this might be a future integration i.e. Trainers being suppliers. I am saying so because in 11.5.10 there is a table named OTA_VENDOR_SUPPLIES that has reference to vendor_id. Currently this table is not being used by OLM.
    You may look into the code of packages OTA_VSP_API, OTA_TEA_BUS & OTA_PLE_BUS and see if Oracle's future functionality will converge towards your business requirement.
    Thanks,
    Anil Passi
    http://oracle.anilpassi.com

  • Link between Project and Sales Order

    Apart from sales order can we have a link between project and customer master ??
    I know that WBS element assignment can be made in sales order but i want to have link between
    customer master and project. I don't want any user field or text field in sales order.
    Any idea ?
    Regards
    Ashish

    Yes Mr Ashish!
    As far as iam concern there is no link between Project & Customer Master, you have to link it with SALES order, I had check in XD03,XD01, the complete customer master, i didnt find any field in customer master which links with Project.
    I'll let you know if i find any links.
    Regards,
    ANSAR

  • Link between Item and delivery

    Hi ,
    I want to know the link between item and deliveyr. Like for example, an sales order item ( no. 10) containing 10 quantities can be delviered 5 times( each containing 2 quantities) and line item ( no. 20) can contain one single delivery. I am working on a report where i have to link all the line item to its delivery number. I am trying to achieve this through GENIl but i am not able to indetify as to how to differentiate the different deliveyr numbers. In other words, can some one help me as to how to link the delivery number to its corresponding items?

    Document flow is stored in the table VBFA in ECC.
    VBELV fied is the sales order number and in POSNV specify the line item number and speicfy VBTYP_N = J (Delivery).
    Regards,
    Bhanu

  • Link between GTM and FSCM (sales or purchase order hedging)

    Hi all,
    I am trying for a few days to have SAP GTM working (I am in an IDES ECC6 system, and as far as I know in EhP4 version). The main goal in fact is to test the currency hedging, and therefore to the link GTM and FSCM, either single-sided purchase or sales order, or two-sided . The flow I want is the following :
    -     I buy or sell a product, in GTM, through a trading contract which generates a purchase or sales order.
    -     Automatically a currency hedge is generated to cover the risk, in FSCM, I guess in exposure management.
    -     And then the financial products (derivatives) are generated as well.
    No problem to create the trading contract, no problem to generate the sales or purchase order. But in spite of the (very little) customizing I found in u201CSAP GTM => currency hedgesu201D, and some in FSCM, in u201Ctreasury and risk managementu201D, no way to have this link between GTM and FSCM, no additional document is generated like a Forward Exchange Transaction (I guess I should have this, and then a risk exposure in FSCM).
    Would you have an idea ? Is this customizing, or an additional Business Functions or Extension Set not activated ? SAP says : u201Cit worksu201D, but canu2019t find the way.
    Thank you very much for your help, I am quite looking for this link for a few days now u2026
    Best regards
    Patrick

    Yes Mr Ashish!
    As far as iam concern there is no link between Project & Customer Master, you have to link it with SALES order, I had check in XD03,XD01, the complete customer master, i didnt find any field in customer master which links with Project.
    I'll let you know if i find any links.
    Regards,
    ANSAR

  • What is the link between PO and Requisition in database side

    hello friends,
    please can any one tell me that what is the link between PO and Requisition in database side. means after creating the requisition we will go for create the PO based on that requisition.
    want to know that what is the link between both in database side.
    Thanks in advance
    krish.

    Hi,
    The link is at distribution level, between:
    PO_DISTRIBUTIONS_ALL.REQ_DISTRIBUTION_ID
    and
    PO_REQ_DISTRIBUTIONS_ALL.DISTRIBUTION_ID
    Hope it helps.

  • Link Between AP_INVOICE_PAYMENTS_ALL and AP_PAYMENT_SCHEDULES_ALL

    Guys,
    I am new to Oracle Financials, can you please let me know if my understanding of link between AP_INVOICE_PAYMENTS_ALL and AP_PAYMENT_SCHEDULES_ALL is correct or not?
    SELECT ai.invoice_id
    , ai.invoice_num
    , aps.due_date
    , aip.accounting_date
    , aip.amount, aip.payment_num
    FROM ap_invoices_all ai
    , ap_invoice_payments_all aip
    , ap_payment_schedules_all aps
    WHERE aps.invoice_id = ai.invoice_id
    AND aip.invoice_id = aps.invoice_id
    AND aip.payment_num = aps.payment_num

    plz look at seeded view AP_DOCUMENTS_PAYABLE
    FROM
    ap_invoices_all ai,
            ap_invoice_payments_all aip,
            ap_payment_schedules_all aps,
    WHERE
    AND aip.invoice_id = ai.invoice_id
    AND ai.invoice_id = aps.invoice_id
          AND aps.payment_num = aip.payment_num
    ...your code a bit different by
    AND aip.invoice_id = aps.invoice_idbut it's ok
    >
    AND aip.payment_num = aps.payment_num
    Is this correct?
    >
    yes

  • Link between PR and RFQ

    Hi all,
    I looking for a table where I got a link between e PR and the RFQ which refeer to that PR. We can see in ME53N in the Status tab the RFQ number. I want to fine a table where is that link between PR and RFQ.
    We can see the link in EKPO with the PO number  only if a PO is done from the RFQ (field BANFN).
    If I look in EKPO with the RFQ number, the field BANFN (PR number) is empty.
    I don't find a table with a link between the PR and the RFQ if the PO is not done (nothing interesting in EBAN)
    May someone help me ?
    Thanks all
    Regards
    Mathieu PAINEAU

    Hi all,
    I found by myself ! This link is done in the Table EKET.
    Regards
    Mathieu PAINEAU

  • Linking between PP and SD tables

    Hai friends,
    I want one link between PP and SD tables. My requirement is i have planned order PLAF table. i want to link Sales table. Please guide me.
    Thanks and Regards
    visvanath

    Hi
    You can simply link the Sales order No and ITEM
    VBAP-VBELN and VBAP-POSNR with the PP order item table
    AFPO-KDAUF and AFPO-KDPOS and get the Pp related info
    or in Sales tables there is a field called AUFNR in VBAP
    use that for PP order number
    SD tables
    http://www.erpgenie.com/abap/tables_sd.htm
    PP tables
    http://www.erpgenie.com/abap/tables_pp.htm
    Regards
    Kiran Sure

Maybe you are looking for