DB02 ! Alert Monitor ! Profile Parameters ! Compatible value : 11.2.0

Hi,
My system is :
SAP ECC 6.0 EHP 5 last SP available.
Database Oracle 11G 11.2.0.2.0
In transaction DB02 , Alert Monitor ,  Profile Parameters,  there is a red alert in "compatible "
value : 11.2.0 <> 10.2.0
How can i corret this red alert ?
Also in DB02 , Space Management,  Segments , Mosta Allocate extents in any segments,  has red alert.
How can i fix it ?
Thanks.

Hello,
these checks are performed with settings as per DB17.
http://help.sap.com/saphelp_nw70/helpdata/EN/25/5215e970077e4fb366e5ce25629aac/frameset.htm
In transaction DB02 , Alert Monitor , Profile Parameters, there is a red alert in "compatible "
value : 11.2.0 10.2.0
How can i corret this red alert ?
If your DB is 11.2.0 10.2.0, please update check condition in DB17
Also in DB02 , Space Management, Segments , Mosta Allocate extents in any segments, has red alert.
Note 666061 - FAQ: Database objects, segments and extents
http://help.sap.com/saphelp_nw04s/helpdata/en/25/5215e970077e4fb366e5ce25629aac/content.htm
thanks
ashish

Similar Messages

  • No Values Updating in DB02 Alert Monitor

    Dear Experts,
    I have an issue with my ECC6 system that in DB02 Transaction > Alert Monitor > Performance . The values for IO,Cache ,CPU etc are not updating since 29.04.2011 . I have checked the OS Collector, Other Perf jobs, all are running fine.
    My OS is windows 2008 and DB is MS SQL 2008 .
    Can anyone shed some lights where to check and how to resolve it.
    Regards,
    NIbu Antony

    Hi Vivek,
    Thanks for the reply.
    OS07N is getting updated . I found the report RSDBMON0 , and run the same and it fetches the performance data.
    But the issue is , I have to run it manually, then only its getting updated daily. Does anyone know  the standard program for the same (report RSDBMON0)?  Once I run the report in SE38, the performance getting updated for that date.
    Also, I have another warning in DB02 > health  . I.e Linked Server Exist . Can anyone shed some light on the cause and resolution of this warning .
    Regards,
    Nibu Antony

  • Alert Monitor Threshold and Information, Warning and Alerts

    Hi,
    I defined a Forecast Alert Profile that is supposed to display the MAPE Alert in the Alert Monitor when the MAPE for the said selection is > x %. This x as I understand is maintained in the Diagnosis group of the Master Forecast Profile.
    I now try to make use of this Threshold Value Description "Variance is > %. and define  >(x-10) % but less than x % as information, x % as warning and >(x +20) as error but I am unable to make out how the alerts are determined and whether these values are indeed read (threshold >)
    Secondly my Alert may have been originally based on particular selection(s)- some in FG, some in BG. Some of these selections may not be assigned to the Alert Profile and the Planner may not remember at what level the forecast was carried out to begin with. So my query is at what level of selection is the Alert generated when there is no selection assigned to the Alert Profile ?
    Thanks
    Amit

    Hi,  I was hoping someone answers. It was not a profound question I believe
    I am also curious to know the same with respect SDP Macro based alerts. When a Macro Alert is triggered at Cell Val > y % and it is called a "warning" per the macro definition, of what good is the information, warning and alert threshold values in the Alert Monitor ?
    Does it mean the value 'Y' that I defined in macro step as 'threshold' for alert or process message can be more 'freely' defined in the alert monitor with three distinct values ? I tried testing but I am unable to conclude.
    Please help me understand
    Thanks
    Amit

  • Alert monitor PP/DS resource alert default priority error

    Hi Guys,
    I am seeing DP (Default Priority) column showing error lable in PP/DS alert profile against
    1. Overload on single activity resource
    2. Overload on Multi-activity resource
    3. Characteristics mismatch on resource
    Where can I set this right...cos this is leading me to non display of overload capacity though the resource is actually overloaded.
    Thanks In advance
    Regards
    Prasanna.

    HI Prasanna,
    Threshold limits for resource overload alerts are specified in the Alert Monitor profile for PPDS and not in the resource master. In resource master you define the bucket capacity for the resource.
    In the Alert Monitor profile, you specify 3 threshold values, namely, information, warning and error. Suggest you take the below steps to see if the Alert profile is really working:
    1. Identify a test resource
    2. Define the block capacity as per your requirement.
    3. Create orders on the test resource such that it becomes overloaded.
    4. In the Alert Monitor profile, define a new PPDS alert Profile keeping the below points in mind:
                  a) Select "Resource Utilization in Bucket(PPDS)"
                  b) Define the threshhold values for the above three types of alerts
                  c) Fill the selection of resources tab with the test reosurce and test location
                  d) DO NOT MAKE ANY OTHER SELECTION
                  e) Save the profile
                  f) Redertmine the alerts
    It should display all the Alerts, if any on the above test resource. One point to note here is that, if in DP column, the alert type is ERROR (ie red) then only the values which are above the Threshold value for ERROR shall be populated.
    Kindly take note of the planning version in which you are testing the scenario and it should be same in the Alert monitor profile as well.
    Please revert if you are still not able to see the alerts.
    Regards,
    Binod

  • Raising event when value for a parameter in alert monitor changes

    Hi All,
    We are using Redwood Cronacle version 7 and have connected it to SAP solution Manager System to get the central monitoring data. Now we want to raise a particular event whenever value for a specific parameter in alert monitor gets changed.
    I had a look of already present functions in JCS_MON package, but was not able to find any pre-existing function.
    Any pointers on how to achieve this...
    Thanks a lot.
    Best regards,
    Vithalprasad

    Hi Anton,
    Thanks for your reply. We want the event to be raised on one of the parameters which is coming from SAP solution Manager. This event is required to be raised every time the value of that parameter gets changed from its current value. So it is not possible to define some severity where value can be defined.
    One way can be to store the previous value in one custom table in repository and keep on checking with the present value. Once the difference is found then raise the even & replace the current value with the new value. But just want to know if there is some better solution for this.
    Thanks a lot.
    Best regards,
    Vithalprasad

  • In Alert Monitor - Is it possible to add Price or Cost as Column Value?

    Hey Folks
    I am trying to define a methodology to manage and work on the exceptions in the Alert Monitor,
    and I would like to carry on the ABC analysis based on Price or Cost?
    The alert monitor was defined prior to my time on this latest project.
    Would it be simple to add or difficult to link the price from values from whatever table they come from,
    to show as column fields? so they ABC analysis can use that column as the Ratio one?
    If anyone think this is feasible let me know.
    thanks for your feedback
    JD Loera

    Hello!
    Awesome, thanks for the response, I will put that in my project list and will link with the Basis/ABAP team.
    Cheers!
    Business Procees note to all out there in *APO DP Business Processes and Planning.*
    If you use the alert monitor, as you know you can define there macro generated alerts and analyise through the variances from Target and Actual Values.
    Also, you can still use the ABC analysis there, to identify A B C of the results that you get ( in the example above, % of variance )
    However, from a Business Process bang for your buck and time. By adding the Material Cost or Price, the Demand Planner or SNP Planner can also do the ABC analysis based on the price as well, and really then identify the items with higher value to work with,as those are important to always keep in check. (ABC from the fiancial point of view so to speak)
    Cheers all, worth to think about for your own Alert Monitor processes.
    JD Loera

  • How set up alert Monitor with available to promise profile?!

    Gurus,
    I read a lot of notes about alert profile but I ´ve been in doubt.
    I set the monitor alert in /sapapo/amon1:
    - Selected alert type
    - Selected some products and my allocation
    - Assigned alert profile - defined the bucket
    Check instruction:
    - Activated "ATP Alert Act."
    I vent seen any place to assign my alert profile in /sapapo/bop. Is it possible or necessary?
    When I redetermine the alerts for my profile in /sapapo/amon1 any alerts are showed.
    I don´t want to use macros to create alert.
    I created a scenary to see an alert:
    My scenary
    Availability: 100
    Order confirmed: 100
    I changed my orders to 50.
    Availability: 50
    Order confirmed: 100
    Execute alert monitor
    Result: No warning
    I´m glad for your attention...
    Best Regards!

    Thiago,
    http://help.sap.com/bp_scmv250/BBLibrary/HTML/S21_EN_DE.htm
    Best Regards,
    DB49

  • Short dump while running Alert Monitor

    Hi,
    I am getting a short dump while determining alert in Alert Monitor through T. Code /SAPAPO/AMON1. The error says as below:
    Runtime Errors         BCD_NO_SIGN
    Short text : A packed number contains no sign.
    What happened? : Error in the ABAP Application Program, The current ABAP program "SAPLKKBL" had to be terminated because it has come across a statement that unfortunately cannot be executed.       
    Information on where terminated : Termination occurred in the ABAP program "SAPLKKBL" - in "FB_OUTTAB_SORT2".

    Hi Axon Generic,
    Please checkon the following
    1) In the overall profile of alert monitor, check the relative
    time interval whether specified correctly
    2) Under the alert profile in Overall profile, check the
    threshold values are defined correctly
    3) Check the SAP Note 151709 , 189061
    Please confirm your findings.
    Regards
    R. Senthil Mareeswaran.

  • Alert Monitor Issue

    Hi APO Experts,
    I have a Planning Book/Data View which has 4 macros generating standard status alerts for the same book/view under different situations. Now when i create an  over profile and an sdp profile for this book/dv and do the redetermine alerts after ruuning those macros in bg. Am not able to see all the alerts listed in the alert monitor even though scenario calls for the alerts to generated.
    PB/DV --XX
    Macro 1-- for KF1
    Macro 2 -- for KF2
    Macro 3--for KF3
    Macro 4--for KF4.
    After running the macros in the bg, when i load the selection in the pb, even though i see that for all the kf values populated in the pb should have created the alerts. i am not able to see those in the alert monitor. Please help me , where i am missing the link in setting up the alerts for the same planning book/dv having multiple macros generating the alerts.
    Kindly help me, as we r in the testing phase and am not able to find  a fix for this.
    Kind Regards,
    Sanjeev

    Hi,
    First of all , Assign the SDP profile in the interactive planning book by the dropdown menu and check by running the macro in interactive planning book that whether the alerts are generated in interactive view.
    If the alert are generated in interactive view , then the issue could be due to default macros not included in your backgtround running step. Include the default macros in the background job as the first step.
    If the alerts are not generated in the interactive view itself, then check for below points:
    a) If the KF values fits into condition defined in alert macro ?
    b) Are the KF , alert condition and planning book / data view defined inside the alert step same as required. Sometimes if you copy the alert macro from other planning book / DV macro then inside the alert step , the pb/dv remains old.
    c) Are the PB/DV defind in alert profile same as required ? Is there any threshold maintained for alert ? Is the selection profile correctly maintained inside alert profile ?
    I hope it should resolve your issue.
    Let me know if it helps.
    Regards
    Gaurav

  • Which R3-Profil-Parameters are Reported ?!?

    I have a Sap Solution Manager (SSM) with Enhancement Package1 which gets data for the EWA (Early Watch Alerts) once a week (on sundays) from the connected SAP Systems. The data is then saved in a set of tables named "DSWPBI_*", i.e.
    DSWPBI_Server
    DSWPBI_Sysdata
    DSWPBI_System
    For Auditing Issues i am specially interested in the R3-profil-parameters which are stored in the table DSWPBI_Server. My question regarding the values for these parameters is:
    Which value will be stored (and reported later) when a profil parameter is changed dynamically (means the parameter will be activated without restarting the system). For example the dynamically changeable parameter xyz may be set to the value "1" in the instance profil but is dynamically changed to "2" during operations. Which of these values will be found (and reported) in the table DSWPBI_Server ?
    Is it the value "2" because it is the momentarily active one or is it "1" because it is the value saved in the profile file (and will be active after the next reboot) ???
    Thanks you for your help,
    Christoph

    will assign points to any suggestion

  • Profile Parameters for Logon and Password (Login Parameters)

    I've upgraded SM3.2 to SM4.0 and now users can create password with 40 characters. I want to return to max 8 letters in password and to big letters in password. I' haven't found appropriate parameter. Does parameter login/password_downwards_compatibility provide me compatybility to old login parameters?

    Hi,
    Also follow the following
    /people/sap.user72/blog/2005/10/19/attention-security-administrators-new-password-rules-are-on-their-way
    After SAP NetWeaver 6.40, the password hash algorithm is changed from MD5 to SHA-1. This means that more secure hash values, which are not backward-compatible, and which make reverse engineering attacks difficult, can be generated. By default, new systems generate two hash values: a backward-compatible value and a new value. However, you can configure the system so that only the new hash value, which is not backward-compatible, is generated. You can set the degree of backward compatibility with the profile parameter login/password_downwards_compatibility.
    The system can determine the type (new or old) of the current user password at any time. During logon, the system calculates the password hash based on the entered data and in accordance with the information from the user master record (see the hash procedure used) and compares the hash values. The system decides itself which part of the entered password is evaluated.
    · If the user master record shows that the user’s password was encrypted with the old password hash algorithm, the system only evaluates the first eight characters and converts these to upper-case
    · If the user master record shows that the user’s password is encrypted with the new password hash algorithm, the system evaluates all characters as they were entered (up to 40 characters, with no conversion to upper-case).
    The new functions do not initially have any consequences after the upgrade; the operation of the system and password queries continue to run as usual. The passwords of the new type gradually replace the passwords of the old type.
    Do reward with points.
    REgards.

  • Questions on Alert monitor

    Hi,
           I have few questions on alert monitor.
    1. If we create an alert and have it as default macro, does it display in interactive planning book without a alert profile assignment? or should we assign an alert profile to see alerts in planning book. I remember that we just need alert profile if we need to check the alerts in a separate screen for our convenience.
    2. Is alert profile assignment specific to a user? If that's so, then how we assign different profiles to different users? any transaction? or are they specific to a selection or planning book or version?
    3. In Application specific alert profile, in SDP tab, under "SDP - Database Macro Alerts", I see few alerts types apart from standard ones. These were actually our previous alert macros. How did they get created like a alert type?
    4. I created a simple macro with change color of cell to red if a condition is satisfied. Also raise an alert for that and assigned it to default. When I go back to the SDP94 screen and run the macro, my cells are highlighted as red whenever the condition is satisfied but when I click on the alerts icons, I get a blue information message "No alerts exist for your selection". When I click on the icon, it gives me a window saying " Internal error analyzing SDP alert".
    Can somebody help me understand what's going wrong?
    Thanks.

    I think you can select that standard type.
    However since it was SAP delivered, we chose not to, and instead created more line items in SPRO with text such as "Alert Message 1" etc. We created numbers ranging from 9001 to 9010. While defining the custom alert, under alert type, it showed up these numbers that were setup in SPRO. I would assume that just like you pick up 9001, you should be able to pick up 4100 or 4101 (alert type numbers) which is the standard status alert. If you run out of the numbers, you would definitely need to add more in SPRO settings. Remember the alert text is picked from SPRO, where you can change and make it more meaningful so that users can do sorting on those alerts.

  • Navigation attribute in the Alert Monitor

    Hi All,
    In the alert monitor in SAP APO the display table contains only characteristics and not the navigational attribute.
    Is there any way through which we can display the navigational attribute also?
    Thanks,
    Diana

    Diana ,
    This is how we handled it when we had a situation similar to yours. Since the navigational attribute was also a BW info object , we pulled the value for the navigational attribute to APO-BW  . We then put custom logic in the BAdI to pull data for the navigational attribute and display the same in the alert monitor.
    Your ABAP team should be able to help you in putting the custom logic in the BAdI . To save the value to the info object you need to have an idea about APO-BW.
    Thanks
    Saradha

  • Photoshop CS5 still chooses wrong monitor profile in dual monitor case?

    The folk lore has it that if you go to EDIT/COLOR SETTINGS and open the Working Spaces RGB drop down, then what it says near the top on the "Monitor RGB" line is the monitor profile that photoshop is actually using.
    If that is true, then I would expect that if I run photoshop on my monitor 1 it would show the profile of monitor 1, and if I run PS on monitor 2 it would show the profile of monitor 2. But in fact, it always shows the profile of monitor 1. Naturally, this creates anxiety that PS is using the wrong profile to display my images, since I normally run with the image on monitor 2.
    My setup: Windows 7 64-bit, PS 12.0.1 x64. Matrox M9120 graphics card driving two monitors. Windows CONTROL PANEL/COLOR MANAGEMENT shows a different profile active on each monitor.
    (By running photoshop on a particular monitor, I mean I run photoshop, drag it in non-full screen mode to the desired monitor, and close it. Then I run it again and it starts on that monitor (including the splash screen).)

    PeterFacey wrote:
    Emil, Sorry, I disagree. It relates entirely to how Photoshop handles profiles, not how the operating system does.
    Windows operating system doesn't handle color profiles at all, but it provides all programs that do with the same way to handle them. If you have the color profiles of your monitors installed properly in the system, they will be equally available to all programs. If a program can use properly one color profile for one monitor it will do the same with more.
    PeterFacey wrote:
    I also have CorelDraw which is a colour managed application. If I set that straddling two monitors, do you think it will use the appropriate monitor profile for each half? I don't know, ...
    I don't have CorelDraw and don't know if it is color managed, but if it is and if the color management on your system is working properly it should give you the same result as Photoshop. Just go ahead and check it - open the same image in Photoshop and in CorelDraw and make a screen capture then measure the RGB values in Photoshop or any program that displays the RGB numbers of colors. But have in mind that a screen capture from multiple monitors that share the desktop will capture the entire shared desktop on one image (if monitors are different sizes it will leave blank areas around the smaller one depending on the alignment), but the same colors will be the same on the entire screen capture using the effect from the color profile only of your main monitor. So if you want to measure how the other monitor displays the RGB color values of the same color, you have to change it  to your main monitor in your system in order to have the screen capture with the effect of that monitor's color profile.
    On my computer using Windows 7, all color managed programs show the same colors on one or more monitors. Along with the color managed programs from Adobe like Photoshop, Illustrator, InDesign, and AfterEffects, the other color managed programs like Windows Explorer, Windows Media Player, Firefox, QuickTime, etc also show the same RGB values of a color from each program on a certain monitor.
    Basically, if the color management is working properly, the same color displayed from all color managed programs should look the same or as close as possible on each monitor, but when you capture the screen and measure the RGB values they should be different on each monitor unless the monitors are physically identical which is unreal.

  • ALERT MONITOR

    Hello
    I have configured the Alert Monitor, Alert is triggered, the message comes on the external mail.
    But I have 2 questions related to the Alert Monitor.
    1) Explain what the appointment of the following fields in the t-code ALRTCATDEF:
    alrtcatdef -> Properties -> Max. No. of Dels
    alrtcatdef -> Properties -> Expiry Time in Min.
    If I understand correctly, these two parameters make it possible to limit the number sent to external e-mail messages to one Alert category for a specified period of time?
    If so, I have this option does not work, it is ignored.
    That is, point out in t-code ALRTCATDEF: 3 posts in 5 minutes. 10 generating error messages. I get 10 messages per mailbox.
    (Error is generated by running a report, calling class PROXY, which obviously causes an error).
    How to limit the number of outgoing messages to external mail Alert for one category for a specified period of time?
    2) When an error occurs in the JDBC adapter (eg: "ORA-01400: cannot insert NULL into (" PI "." MY_TABLE "." FIELD_1 ")") can not get data from the container (t-code ALRTCATDEF):
    SXMS_TO_ADAPTER_ERRTXT (Data Type - CHAR70)
    SXMS_TO_ADAPTER_ERRLINES (Data Type - ALPF_STRING_TAB)
    However, other containers, normally return their contents.
    In t-code: alrtcatdef -> Long and Short Text -> Long Text (E-Mail, Fax) wrote the following:
    Error in Adapter Engine: &SXMS_TO_ADAPTER_ERRTXT&.
    Full text errors in Adapter Engine: &SXMS_TO_ADAPTER_ERRLINES []&.
    How can I put in an error message JDBC adapter?
    Software Component Version:
    SAP_ABA: Release - 710, Level - 0007, Highest Support Package - SAPKA71007, Short Description - Cross-Application Component.
    SAP_BASIS: Release - 710, Level - 0007, Highest Support Package - SAPKB71007, Short Description - SAP Basis Component.
    ST-PI: Release - 2005_1_710, Level - 0003, Highest Support Package - SAPKITLQJ3, Short Description - SAP Solution Tools Plug-In.
    PI_BASIS: Release - 2006_1_710, Level - 0007, Highest Support Package - SAPKIPYN07, Short Description - PI_BASIS 2006_1_710.
    SAP_BW: Release - 710, Level - 0007, Highest Support Package - SAPKW71007, Short Description - SAP NetWeaver BI 7.1.

    abhishek salvi wrote:>
    >
    How to limit the number of outgoing messages to external mail Alert for one category for a specified period of time?
    > RWB --> Alert Rule Definition --> Suppress Multiple Alerts of this Rule
    I know and use, but it has many disadvantages.
    >
    How can I put in an error message JDBC adapter?
    > could not get your question....
    >the second alert container that you defined will contain more alert details (number of characters).
    The fact that SXMS_TO_ADAPTER_ERRLINES reflects more complete information about the error, I know. But I did not receive any information from SXMS_TO_ADAPTER_ERRTXT, and SXMS_TO_ADAPTER_ERRLINES.
    Containers returns NULL, while the RWB in Message Monitoring error is displayed.

Maybe you are looking for

  • Printing a year planner from ical

    is it possable to print a sasco style calander from ical within lion .it apears to be able to print a silly colourd yellow to red chart showing how many events on a day but no descriptions i would love it to print it out in a month by month in a year

  • Firefox opens with I access Dashboard on Mac OSX 10.6.4, why?

    Every time I open my dashboard screen on my Mac, Firefox starts up and opens two windows, it appears to be trying to open a link automatically. How do I get this to stop? I suspect it might have something to do with the webclip feature on Safari but

  • Why does my AdobeBridge keep shutting down?

    I have a PC and when I use the camera raw option it tells me that "Adobe Bridge CS6 has stopped working and needs to close". I just recently downloaded windows 8.1 upgrade, does that have anything to do with it? Any suggestions? It's really annoying

  • How to identify the meta chain in which the Process Chain is used

    Hi,    I had a Process Chain which is designed to Load Transaction Data.    This process chain is scheduled to start as a part of Meta Chain...    How can i locate that META chain in which this Process Chain is used Thanks

  • Location services off in Find My Friends

    I've gone to every location in iOS 8.1 where location services can be turn on and it's on everywhere. But when I go into Find My Friends itself the "Me" line has in red "Location Services off. If I touch "Me" (ok, let's not be juvenile) it takes me t