Deactivate the automatic determination of Requirement type

How can i deactivate the automatic determination of Requirement type for a particular transaction (eg.va01).
I know it is determined automatically based on one of the following
1.Strategy group assigned to the materiaL master.
2.MRP group in material master.
3.Material type
4.Item category and MRP type.
5.Item category.
I want this to be deactivated for a particular transaction. How do i do it?
Please help.
Madhu

Hi,
As soon as you save an order.VA01..the requriements of each line item are trasnferred to MM/PP depending on the planning strategy chosen for each material at the material master record. Therefore there is no chance of deactive the requriement type.
I'm not sure but try this exist,
V45S0003 MRP-relevance for incomplete configuration
V45S0004 Effectivity type in sales order.
Regards,
R.Brahmankar

Similar Messages

  • How can I add a new entry for determining a requirement type

    Dear Friends,
    How can I add a new entry for determining a requirement type
    via Item Category + MRP type,  I see no new entries selection.
    This is in  Avb Check & TOR-> TOR-> Determination of req type using transaction.
    Please help.
    Regards
    Ravi.

    Availability Check and Transfer of Requirements > Transfer of Requirements > Define Requirements Types ?
    Just one node above?
    Never mind, you need to add entry on item category:S

  • Is it recommendale to deactivate the automatic update of search plugins for a faster start of FF?

    I read that one can deactivate the automatic update for search engines in the settings because there are very seldom such updates (e.g. lastly in early 2010 for Google). This would provide a faster start of FF.
    I don't want to have overaged search plugins that might cause trouble, so my question is: Is it recommendable to do this?
    If you speak german, here is the URL where I found this:
    http://www.computerbild.de/fotos/Mozilla-Firefox-20-verstecke-Funktionen-6272370.html#18

    You can lock the related pref(s).
    lockPref("app.update.auto", false);
    lockPref("app.update.enabled", false);
    See:
    * http://kb.mozillazine.org/Locking_preferences

  • Can I stop the automatic underline when I type an email address in Pages?

    Can I remove the automatic underline when I type an email address? I know I can manually remove it, but am wondering if I can just stop it from happening?
    Thank

    I think you are probably referring to the email address being automatically converted to an active hyperlink. You can remove this by opening the Inspector, clicking the hyperlink icon (second from the right) and, in the Hyperlink tab, after selecting (highlighting) the address, uncheck the box next to
    "Enable as a hyperlink." Or, to disable all hyperlinks, click the box at the bottom of that Inspector window next to "Make all hyperlinks inactive."
    To avoid this in all documents, open Pages Preferences and, in the Auto-Correction Preferences, uncheck "Automatically detect email and web addresses."

  • Automatic determination of Condition type value

    Hi Friends,
    I have one requirement here as described below.
    In pricing procdure, I have defined 3 condition types for 3 types of taxes i.e. GST, HST and PST as per client requirement. The value of each condition type is fixed i.e. GST=5% of Gross, HST=7% of Gross, and PST=11% gross. These condition types are not applicable always in the PO. My requirement is when user selects any condition type, then system should calculate the condition type amount and value automatically.
    Ex. Suppose the purchase price of a material is 100 USD. In the PO, if user selects GST condition type, then 5% should be determined automaticall in the condition type amount and condition type should be calculated accordingly i.e. 5 USD. One important thing is  to note that these condition types will be selected by user as per their requirement and the corresponding % of the condition type should be determined automatically.
    Please advice.
    Thanks & regards
    Satya

    Hi Satya,
    You can achieve this using access sequence.
    1. Create one Access Seq or use Existing seq in your system
    transaction code OLME
    Purchasing --> condition --> Define Price determination proces --> Define Access Seq
    2. Transaction M/06 (Condition Type)
    Select your condition code (say ZGST) and click onthe detail view.
    Assign the Access Seq to this Condtion
    In the Manual Entries Field Assign 'C' for manual entry priority.
    save the entries.
    3. MEK1 - Create Condition Records
    Depending upon your access sequence priorties, define the condtion 'ZGST' with its rate applicable.
    similarly maintain the other condition code.
    After that create Purchase order. In condtion tab, whenever you enter either of these condition system will take the rate from condition records.
    Hope it solve ur issue.
    Regards,
    S Anand

  • Determination of requirement type

    hi,
    i am trying out all the posible search strategies to determine the requirement type.
    i am successful in determining the req type against the strategy group and the MRP group which i maintain in the material master.
    However, the next search strategy of Material Type is not successful. I need some help as to where is the assignment of req type against material type is done.
    Also, the next two search strategies are used ( Item cat  + MRP Type & Item Cat ). I know where the assignments are done for this & it has been done correctly. But, this also does not determine the req type.
    Kindly help me with the solution.

    Hi,
    As soon as you save an order.VA01..the requriements of each line item are trasnferred to MM/PP depending on the planning strategy chosen for each material at the material master record. Therefore there is no chance of deactive the requriement type.
    I'm not sure but try this exist,
    V45S0003 MRP-relevance for incomplete configuration
    V45S0004 Effectivity type in sales order.
    Regards,
    R.Brahmankar

  • How can i deactivate the automatic downloads of my media in the itunes store

    I just activated the automatic download on my imac, thinking just about music. No, my i mac started to download all movies, i have downloaded on my i-tv, which I don`t want. I so far failed to find a point in the menues to deactivate that automatic download function.
    Thank you for help!

    topsurgeon wrote:
    I just activated the automatic download on my imac, thinking just about music. No, my i mac started to download all movies, i have downloaded on my i-tv,
    What is i-tv?
    I so far failed to find a point in the menues to deactivate that automatic download function.
    Simply uncheck the same boxes you used to turn on Automatic downloads.
    iTunes prefs > Store.

  • Automatic determination of Delivery type and Billing type in a sales order

    Hi,
    I want to know that in a sales order cycle, how does automatic assignment of delivery type and billing type takes place after we create a sales order?
    For example,when I create an outbound delivery for a sales order of type normal (OR) then in that case how does the system knows that it has to create an outbound delivery of type LF.How does the system propses it automatically and same is the case of billing document.

    Hi
    In customising the sales document type (Tcode VOV8) -
    specify the default Delivery type in the field DELIVERY TYPE in the 'Shipping' area of the sales document type customisation.
    Similarly you can specify the billing type in the BILLING area for both Delivery related billing and Order related billing.
    Thanks,
    Ravi

  • Deactivate the automatic Creation of Delivery after Sales Order is Posted

    SD gurus,
    When I am creating a Sales Order, after posting it I want to create the delivery for the same manually.
    But the configuraion is so made that the delivery is automatically generated.
    How do i go for it ?
    Kindly help

    Hi Mohanty,
    I think the Immediate Delivery under Shipping for that order type may have value A or X, Clear that value.
    1) Goto VOV8 tansaction.
    2) Select the Sales order type (For eg: OR for standard order) and double click on that
    3) Under Shipping tab, Set Immediate Delivery with Blank value
    Plz reward points if it is helpful
    Thanks,
    Vinay

  • Deactivate the automatic interpolation of data in DIAdem

    Bonjour!
    Nous sommes intéressés à désactiver l'interpolation que DIAdem fait automatiquement des données manquantes d'une base de données MySQL. En fait nous voudrions fixer une valeur de plage manquante à partir de laquelle l'interpolation des données ne se ferait  plus.  Par exemple: si les données sont absentes sur moins de 30 minutes, interpoler, si les données sont absentes sur plus de 30 minutes, ne pas interpoler. Est-ce possible de donner ce paramètre à DIAdem? Merci!

    Hi frpic76,
    Let me repeat back to you in English what I think you're asking and then give you a few thoughts-- unfortunately my ability to write French is even worse than my ability to read it.  It sounds like you want to apply interpolation to your aquired data only when the region of missing data is within a certain minimum amount, but if you have data missing for much longer intervals (say, between tests run in different months) you do not want any interpolation.  This sounds reasonable enough.  You also mention that you are storing the data in a MySQL data base, so I'm surprised that you can not query out only the data you want (which presumably all falls into the category of needing interpolation).
    I'm also unclear what you mean by interpolation.  Normally I would understand that to mean imposing an expected timebase on data that was acquired at larger time intervals or at irregular time intervals, wherby you determine the interpolated Y values based on weighted linear extrapolation from the closest adjacent acquired values.  But DIAdem does not do this automatically, as you seem to suggest.  What DIAdem does do is plot all isolated XY cartesian pairs on a VIEW or REPORT graph, but here DIAdem just connects each individual graphed data point to the next data point with a straight line-- the intervening values are neither calculated nor regular.  Still, if this is what you mean, then there are two easy solutions.  First, you can insert a NoValue after the end of the values from the first data set and before the values of the second data set-- graphs in VIEW and REPORT will not plot a line to a NoValue.  Alternatively, you could change your SQL query to only read into DIAdem the data from one measurement at a time.
    Feel free to ask follow-up questions in English or French,
    Brad Turpin
    DIAdem Product Support Engineer
    National Instruments

  • How does the MRP Group determine the Requirement Type

    Hello,
    I find in help that the MRP Group or the Strategy Group in the MRP view of the material master record determines what Requirement Type is used.
    Could you please tell me in which table / transaction can I find the assignment of Requirement Type to MRP Group? I mean it in case when the Strategy Group has not been maintained.
    I will appreciate your help very much.
    Best regards,
    Robert

    Dear,
    System will pick the requirement type from strategy group maintained in MRP 3 view of material master, If the strategy group is not maintained, then only system will check the MRP group In MRP1 view and check the strategy group maintained in OPPR
    Based on strategy Group- you can find the requirement type In IMG>production> Production Planning >Demand management> Planned Independent requirement -->Planning strategy -->Define strategy , From here you can find the requirement type and requirement class
    and then go to OVZG
    if the requirement class have a setting for costing - order costing and costing details, while saving the sale order system will update the cost of goods sold in condition EK02

  • How the system determines the Requirement type  for one sales order

    Hi,
    SAP-SD Gurus,
    Please tell me how the system determines the Requirement type  for one sales order?
    Thanks & Regards,
    Sreenivas.P

    Hi,
    System follows some search criterial to determine the requirement type
    1. First, an attempt is made to find a requirements type using the strategy group in the material master.
    2. If the strategy group has not been maintained, the system will determine it using the MRP group.
    3. If the MRP group has not been defined, the system uses the material type instead of the MRP group when accessing the corresponding control tables.
    4. If no requirements type is found here, the system assumes a special rule and attempts to find a requirements type with the aid of the item category and the MRP type.
    5. If this is not possible, a last attempt is made to find a requirements type with the item category only.
    6. If the last attempt fails, the system declares the transaction as not relevant for the availability check or transfer of requirements.
    Please check the path
    SPRO->SALES & DISTRIBUTIONS->BASIC FUNCTIONS>AVAILABILITY CHECK AND TOR->TRANSFER OF REQUIREMENTS--->DETERMINATION OF REQUIREMENT TYPE USING TRANSACTION.
    Hope it will clarify
    regards,
    santosh

  • LE-TRA : automatic determination of the route for MM module

    Hi guys,
    for the automatic determination of the route for MM module is it mandatory to fill the storage location?
    Thanks in advance,
    Dom.

    Dominique,
    Route determination uses the country code and transportation zone from the address records as some of the inputs into the route determination.  Dependent on the IS solution you are using and SAP version the configeration determines how the route is determined.
    If you are on a standard EEC 6.0 system try the configuration path (transaction SPRO)
    Materials Management -> Purchasing Purchase Order-> Set up Stock Transport Order -> Set Up Stock Transfer Between Storage Locations -> Set Up Storage-Location-Dependent Shipping Point Determination ->
    Define Rule for Determination of Shipping Point 
    Assign Shipping Points According to Storage Location
    Logistics Execution -> Shipping -> Basic Shipping Functions -> Routes -> Route Determination
    For an STO the from address record is take "from" the shipping point (determined from plant or storage location see configuration options above)   and the "to" this the receiving plant.
    James

  • Automatic determination of the route

    Hello experts.
    Is there any way to determine the automatic route for stock transfer between storage locations, using the shipping point of origin and destination?
    The automatic determination of the route is transport zone and country, being the center does not assign correct. Or I can use some user exit to change the route before the creation of delivery (shipping)?
    Thanks

    Dominique,
    Route determination uses the country code and transportation zone from the address records as some of the inputs into the route determination.  Dependent on the IS solution you are using and SAP version the configeration determines how the route is determined.
    If you are on a standard EEC 6.0 system try the configuration path (transaction SPRO)
    Materials Management -> Purchasing Purchase Order-> Set up Stock Transport Order -> Set Up Stock Transfer Between Storage Locations -> Set Up Storage-Location-Dependent Shipping Point Determination ->
    Define Rule for Determination of Shipping Point 
    Assign Shipping Points According to Storage Location
    Logistics Execution -> Shipping -> Basic Shipping Functions -> Routes -> Route Determination
    For an STO the from address record is take "from" the shipping point (determined from plant or storage location see configuration options above)   and the "to" this the receiving plant.
    James

  • Email Output type : No Automatic trigger of output type while saving doc.

    Hi Gurus - To trigger an email from the output type, I've configured a output type with medium as 5(external send) with communication strategy and created condition records with medium as 5 to trigger immediately.
    While creating corresponding document, the output is not automatically determined, it required to manually feed the output type every time. Can you please provide if any settings were missed to trigger immediately!!
    In Output analysis showing a message as "No print data determined for the communication strategy"
    Steps:
    1. Configured the output type with Medium as"5" and associated partner functions.
    2. Created the condition records with medium as 5 and trigger immediately.
    Thanks,
    Sree

    Hi ,
    while maintaining condition record for output type when you click on communication method, give logical destination as 'LP01'.Hope this will solve.PLease let me know if you have any issues on this.
    Thanks and regrads,
    Rajeshwar

Maybe you are looking for

  • Out of stock Sales Order Item to trigger a BDC to create a PO

    Dear ABAPers, I have a couple of questions: 1. In the sales order program code, how do you find out if an item being ordered is out of stock? Which tables and fields do you check? 2. when an item is determined to be out of stock,  we want to trigger

  • Error 10698 Virtual machine could not be live migrated to virtual machine host

    Hi all, I am running a fail over cluster of Host: 2 x WS2008 R2 Data Centre managed by VMM: VMM 2008 R2 Virtual Host: 1x windows 2003 64bit guest host/virtual machine I have attempted a live migration through VMM 2008 R2 and im presented withe the fo

  • Cost column in billing document is zero

    When i am doing billing, the cost column in the billing document screen is coming as zero. but the accounting documents are getting generated. Please help

  • Bank Chain development

    Hi, If somebody is having idea on bank chain development process or having documents on this, please share with me... Regards Harry

  • ISight producing mirror image in all apps

    Whenever I use anything that displays the video captured by the iSight camera, the image is a mirror. I cannot find anything that would permit me to configure the camera to show the image it's actually capturing. Is there a way I can do this?