Decision Pop up while starting actual cost process

Hi,
Can anyone help me on this?
I am getting a Decision Pop up while starting actual cost process.
Prior Inventory period has not been closed. Cannot proceed.
By clicking on continue, the accept button became available and I launched the process.
However, we are uncomfortable with that situation since it looks like that February period is closed for all inventory accounting periods under that LE. It is also the first time that we are getting that pop up decision screen since we are testing under R12. We want to understand the reason for that.
Note: it is the first time that we were trying to close a period before fully completing it (closing Feb period on Feb 29).
NOTE: This is in UAT. This does not occur in any other instance (Dev, PPB, CRP).
We normally did not perform final cost update and the calendar assignments org periods will be always open.
Let me know if you need any more details.
Thanks & Regards,
Kannan Jay

Thanks for your quick response yesterday!  After chatting with our official IT guy, He lined some things out for me.  We are using SQL 2005.  We discussed working up a program to add our data directly, which is an option.  It will take some learning on my part, and I am willing to do it. 
It would be optimal, in my mind, to use our web version in conjunction with Labview.  But the more experienced person might know better.
When I call up our webpage on the front panel, I am able to navigate it by clicking around just like a normal browser.  Using this method, the refresh issue I mentioned in my original post is not a problem.  It refreshes with no pop-up.  BUT I lose the capability to place my data into the fields.  I am assuming the reference at the property node before the data placement is incorrect. (pictured below)
Is there a way to physically navigate a webpage and then use Labview to find the reference of whatever page I am currently on in order to place my data?  This might be the route I need to go.

Similar Messages

  • Error while running Actual Cost Process.

    Hi,
    Currently i am trying to implement Actual Costing with calculation type as (PMAC). when i run the actual cost process it is showing the error below.
    Errors:
    Warning: Cannot find the previous cost period record.
    Warning: Total allocated GL expense amount on item MN1-004 is zero or negative.
    Do please help me in Using Gl Expense allocation process like what are the steps involved and how system will allocate the cost to items.
    Thanks
    Amit

    For the currency you are converting to: XXX
    INPUTCURRENCY dimension must have XXX as a member with "REPORTING" property set to "Y"
    and
    RPTCURRENCY dimension must have XXX as a member with "REPORTING" property set to "Y" and "CURRENCY_TYPE" property set to "R"
    It needs to be in both dimensions with the right properties.  INPUTCURRENCY is the currency dimension in the RATE cube, RPTCURRENCY is the currency dimension in the financial or consolidations cube.

  • Actual Cost Process request run terminated with Error Signal 11

    Hi All
    Could not run Actual Cost Process as it is terminated with error signal 11. Please tell me the reason/cause if any one has come across this error before in your cost running process. Thanks in advance for your valuable suggestions.
    I am using PPAC cost method and on Release 11. I search in metalink and Apply Patch 5208603, 5475347 but But failed
    Pls Help me???

    Hi,
    Were you able to relink the executable file via adadmin successfully?
    Please see if these documents help.
    Note: 402805.1 - Actual Cost Process Fails With Error Message 'Signal 11'
    Note: 402829.1 - GMCACOST Actual Cost Process Completes In Signal 11 Error After Applying Patch 5386789
    Note: 375764.1 - Actual Cost Process terminated with Signal 11
    Note: 389970.1 - Actual Cost Process erroring out with Signal 11
    Note: 338230.1 - Actual Cost Process Failing With Signal 11 Error while processing inventory transfers
    Regards,
    Hussein

  • Actual Cost Process - ORA-00001

    Hi
    Is the anyone knows this error ORA-00001: Unique constraint (GMF.CM-CMPT_DTL_PK) violated.
    **** sy_etrap - FATAL_ERROR ****%N%NFunction: gmfaput_cm_cmpt_dtl_insert%N%NStatement: insert from cm_cmpt_dtl_raw%N%NError: ORA-00001: unique constraint (GMF.CM_CMPT_DTL_PK) violated
    Thanks

    Hi;
    What is EBS version?
    Please check below notes which could be helpful for your issue
    Actual Cost process Error ORA-00001: Unique Constraint (GMF.CM_CMPT_DTL_U1) Violated [ID 358603.1]
    Autoinvoice Error: ORA-00001: Unique Constraint [ID 1219263.1]
    OERR: ORA 1 unique constraint violated [ID 18222.1]
    Regard
    Helios

  • OPM Actual Cost Process not selecting all Inventory Movements

    We have completed 27 Move Immediate transactions (TRNI) but only 2 of the transactions appear in the Actual Cost Transactions View so our PMAC cost is not as expected. Those 2 transactions were in Sept '09. All other transactions happened in Apr, May, Jun of 2009. On July 7 the profile option "GMF: Include Inventory Movements in Actual Cost" was changed to YES. Does this mean that the Actual Cost Process will not pick up those move immediate transactions that occured before July 2009?
    Robert Lovell

    Hi Robert
    Yes...exactly, since you have closed all the said periods before u run your Actual cost process, and later you changed your profile option.
    If you want, that all the transactions (TRNI) to be in Actual process as View, Functionally (I mean from front end) it is not possible now, but u can make use of PL/SQL Language by means of technical help then you can open those periods from back end and then do the set up from front end, and then you may able to view those transactions.
    It is purely technical help and require some gud stuff to do this.
    Regards
    Raj

  • About Actual Cost Process Procedure

    Hai,
    I want know about , what procudure name oracle using to caluculate the Actual Cost Process item cost...Pls give me all Procedure and related table name.
    Because one Item Cost is calculate different from prevoius month.I want found all transactions for this items (OPM,Purchase,receipts ans all).
    I am using in Oracle OPM finanacials 11.5.8
    thanks,
    Thivan Syed Sulthan.

    Hi
    In the cost screen there is a menu that shows all the transactions that the item has taken for the calculations of the cost. This can be done by the user himself
    REgards
    Girish

  • Actual cost process

    Hello to all! I wanted to know if somebody can help me with costs of OPM. I am working in a test instance and I will make inventory transactions: Purchase receptions, Transfer among werehauses, inventory adjustments. As well as, to report in WIP of production batches. I have ready standard cost of each item and I want to know if it is enough to copy it at the current cost before beginning to make the transactions and calculate actual costs or I have to make some other process.
    rgvel@

    Hi
    I am not sure what the purpose or itention is and hence the question becomes a bit unclear. Could you please elaborate on what is it that you want to achieve. You mention about actual cost and then you say you have standard cost available
    REgards
    Girish

  • Getting error while Startting a BPM process programmatically

    Hi Experts,
    I am getting an error while trying to start the BPM process programmatically. What i have done till now is
    1. Created a WS in process composer
    2. Binded this ws with start of the process
    3. Created input parameters
    4. Testing it in WS Navigator
    I am following this doc /people/arafat.farooqui/blog/2009/08/13/introduction-to-sap-netweaver-bpm-part-4
    and I am getting error while testing in WS Navigator. I am getting error at the last step i.e. in result step and the error is
    Web Service returned an error. Fault Code: "(http://schemas.xmlsoap.org/soap/envelope/)Client" Fault String: "No operation found using soap keys [], [cn_comments]. InterfaceMapping Object class: com.sap.engine.services.webservices.espbase.mappings.InterfaceMapping mappings: (BindingType=Soap, SEIName=NewWSDLFile, BindingQName=(http://www.example.org/NewWSDLFile/)NewWSDLFileSOAP, PortTypeQName=(http://www.example.org/NewWSDLFile/)NewWSDLFile, SoapVersion=SOAP11, Galaxy_SDO=true, InterfaceMappingID=45ffb27c:1237f972cd8:-7d7e)."
    If possible can any one help me out.
    Thanks and regards
    Pranav

    Hi Arafat,
    Thanks for replying. Yes i have completed the output mapping. Input parameters i need for this service are :
    1. cn_comments
    ca_comments
    2. cn_planningGroup
    ca_account
    ca_serialnumber
    and few more attributes
    Now, what i did was i have created a complex type and added elements in it. But to my surprise i was not able to get these nodes and elements in output mapping. So, i changed the type of "parameter" from "new operation" to my complex type. By doing this i was able to get my nodes and elements in output mapping. Now i tested the entire thing in WS Navigator and i got that error.
    Please suggest how o proceed.
    Regards
    Pranav

  • Login Error Window pops up while starting a JAVA Webstart Application

    Hello members,
    I am getting this Login Error window whenever I try to run a downloaded application of Java Web Start. Please help me regarding this.
    Since, I am not able to upload the picture here directly, I cant really show you the image of the error message.
    Please let me know, if you need further details regarding this error message. Kindly get back with a solution as this is critical for my project.

    Could you at least post textual parts of the window? By the way, you can upload the image everywhere in the net and link the url here in the forum.

  • Stopping Quickpay in Costing Process

    Hi All
    I want to include the regular payroll into the costing process but I want to exclude the Quickpay getting into Costing process. I don't want to do costing for quickpay at all.
    How can I do this?
    Regards
    Rahman

    I dont think there is any configuration available at Costing level to skip Quickpay actions to be processed. You can follow the below two workarounds to skip Quickpay actions to be processed.
    Soln I :
    1. Create a Consolidation Set, "Costing Skip Set", and use this consolidation set in the Quickpay screen while running Quickpay. In the Costing concurrent Program, pass the Original consolidation set as a Parameter. This solution might impact all other reports / processes which have Consolidation set is a Parameter.
    2. While running Quickpay provide reduce the Effective Date by 1 (e.g. For January -> pass 30-Jan-<YYYY> instead of 31-Jan-<YYYY>). While running the costing Process pass the Start and End Dates as the Normal Payment Date (e.g. 31-Jan-<YYYY>) and hence only Payroll runs are picked up.

  • Actual cost disappeared

    Hi all,
    Please if any one can help me,
    After entering the standard and actual cost for the items for the opening period and run the revaluation by test subsidiary ledger update request I found that the actual costs for this period are disappeared , by the way I entered the actual cost by copying the standard cost for the same period.
    Thanks
    Tamer

    If you are copying from a Standard Cost Method into an Actual cost method, then you should not run Actual cost Process for that period. Actual Cost Process will clear out the existing cost of all items (under that cost method) and try to recalculate the cost (both Raw Material and Finished Good) using the Actual Transactions in that period.
    Thanks,
    Dinesh

  • Actual Costing - CKMLCP

    hi Experts,
    While running actual costing through CKMLCP in Multilevel Pric. Determinitaion Step i m getting following error;
    You must first allow price determination for period 012 / 2012
    Message no. C+830
    Diagnosis
    You are trying to perform a price determination before this step is allowed.
    Procedure
    Check your entry.
    If necessary, allow price determination for valuation area XXXX in period 012 in fiscal year 2012.
    looking for solution.
    thx in advance
    Ganu

    Use CKMF to allow price determination for the said period.

  • Updating Unit Cost by using Actual Cost Adjustments

    Hi,
    How can we adjust Unit Cost by using Actual Cost Adjustments Window?
    By giving Cost Adjustment without giving Adjustment Qty, the amount was adjusted to total quantity (transacted during the period). But I want to increase unit cost by a fixed amount. Is there any option?
    Thanks in advance.
    Regards,
    Ram

    Hi Ram,
    there are some patches released by oracle 5-6 months back(5003789 and 4735489) having this feature.
    There is also a meatalink note is available,expalins this cost adjustment type called Unit Cost Adjustment.This is the way it works.....
    The Actual Cost process now supports this new adjustment type where you adjust
    the actual unit cost of the item with the specified cost. The Actual Cost process
    calculates the cost of the item per the current logic and then applies this unit cost
    adjustment to calculate the new adjusted cost. This adjusted cost becomes the new actual cost of the item.First the New Unit Cost (without the Unit Cost Adjustment) is calculated.The Unit Cost Adjustment is included only after the Actual Cost is calculated based on the existing Adjustment types. Then, the New Unit Cost (with the Unit CostAdjustment) is calculated.
    Hope this helps...
    Rgds
    Shajahan

  • Expense allocation calculations on OPM Actual costing.

    Can any body provide a Document on Expense allocation calculation on OPM Actual Costing please.
    Regards
    Raj

    Jayabalan,
    Sorry for delay. I have to check the other setups too to determine the cause of this error.
    Please check if this item is transacted in prior period (Mar 2006) and ic_perd_bal table has any record for this item-whse.
    Else we have to involve Oracle Support through TAR to verify the log file and other setups to determine the cause of this error. They may need the Actual Cost Process log file with debug level 3 (profile: "GMF: Debug Flag")
    You can contact me through mail [email protected] if you want any help in debugging more in this.
    Thanks,
    Dinesh

  • Error while executing the CKMLCP (Actual Costing) Transaction

    Hi Expert,
    I am getting the following Error while executing the CKMLCP (Actual Costing) Transaction through my User ID in system. If we execute the same transaction  with other user id then there is no Error. same role is assign to both user. Try to check SU53 screen shot but it show no error
    See the below error for referance:-
    Internal error in program SAPLCKML_RUN_COCKPIT_ACT
    Message no. CKMLRUN004
    Diagnosis
    An unexpected situation has appeared in program SAPLCKML_RUN_COCKPIT_ACT.
    The problem has to do with a program error - the indirect result of a program error or an inconsistency in Customizing.
    System Response
    Processing had to be terminated.
    Procedure
    Inform your system administrator
    Thanks
    Dinesh

    Hi Shyam,
    Thanks Shyam,
    I check this note this is not applicable for my system, In mention note Correction delivered in Support Package 600.
    but support Package in my system SAP_APPL 603 SAPKH60303,
    Is there any other note or solution for 603 SP
    Thanks
    Dinesh

Maybe you are looking for

  • Changed IP address, how do I update the clients

    I've poked around but all I can find is info about how to change the IP address of a TC without additional information about what to do with existing clients. I'm not using a TC in this case (NAS frontended by a Mini providing AFP accesss), but I fig

  • Stop JPanel auto positioning and resizing in Netbeans

    Hi, I'm working on a Swing application in Netbeans. In my program I had several JPanels. At any one time, only one JPanel is visible. I dragged my JPanels to the JFrame in the Swing editor. Each time the user clicks on the switch function button, ano

  • Extending UIComponent, createChildren question

    All, I'm trying to make some simple components.  For the sake of making this exercise very simple, I'm using a callout control from Adobe posted here. http://www.adobe.com/devnet/flex/samples/fig_callout/ The source of that component can be viewed he

  • Having problems downloading OX updates.

    Hi I have a OS X version 10.8.5 mac. I have been trying to download updates  for the mac ,but have been unable to because it keeps saying error after a few minutes of downloading. Been having this problem since May. HELP!

  • I have not had any problems with iOS 4

    I don't know about you guys, but I have not had any problems yet for the new iOS 4 update on my iPhone 3g. I followed the instructions provided on apple's website on how to download the new update and also downloaded from apple's website the new vers