Decision Step

Hi,
I have to develop a decision step to multiple users at the same time and all users should be able to see this step irrespective of anybody Accepts or Rejects this workitem.
I tried creating a SubWorkflow in a loop at user table, but the SubWorkflow works Sequential, it waits for the first user in the list to either Accept or Reject it and then sends it to the next user. I want every user to see this workitem and either accept or reject it.  I can later on capture their rejections in a Workflow Container Element.
Also i have one more requirement, when they reject the worktitem i have to capture text in a custom table. Any Ideas on how to do this?
thanks
Udai

Hi Martin,
I think i solved the problem of Bursting E-mails to multiple approvers at the same time using a subworkflow and passing it a multiline element and the index of the multiline element to capture the agents for the task in Sub Workflow.
Regarding your suggestion to capture Rejection Text, should it be an activity in the rejection path after the Decision step?
If that is the case then will the user get the popup right away or will it be a new workitem in his inbox?
thanks
Udai

Similar Messages

  • Can we display custom error message in user decision step screen.

    Hi,
    My requirement is to display error message when approver selects reject button in user decision step.
    based on some condition i need to display error message in user decision screen when approver tries to
    reject .
    Please help
    Thanks,
    Phani

    Hi ibrahim,
    Thanks for your Replay.
    steps
    1. cretae global class with interface  IF_SWF_IFS_WORKITEM_EXIT.
    2. cretae Event with importing parameter.
    where i need to call EVENT_RAISED method ,do inned to call that method in
    IF_SWF_IFS_WORKITEM_EXIT ?
    how  SWRCO_EVENT_AFTER_EXECUTION value is passed to method EVENT_RAISED ?
    Thanks,
    phani

  • Decision Step In Work flow

    Hi Workflower's
    Thanks a lot for all your reply!
    I'm having one problem in Decision step when work item is generated and placed under SAP inbox while user select particular work item then decision option "Choose one of the following alternatives" Approve / Reject / Cancel need to be displayed under the same screen in down side but it's going to next screen and showing the Approve / Reject / Cancel.
    I should display these decision in the SBWP screen at downside instead of going through double clik and showing that
    Whether it's possible if please provide me details how to solve.

    Hi,
    Do you mean you want to show in the Reading pane of SBWP rather than double clicking the workitem in SBWP.
    Its not a mail... it will be a work item so you have to execute the work item.. and its a must. thats a difference between work item and a text mail
    Hope this would help you.
    Good luck
    Narin

  • Container variables in User decision Step in BPM

    Hello,
    I am using User decision Step in BPM.
    When i use only text in "Title for Display" the BPM is activated successfully and Status in SXI_CACHE also shows 0.
    If I use container variables in "Title for Display" the BPM is activated successfully but status in SXI_CACHE shows 99.
    It shows the below error
    "Problem updating an integration process with object ID 073AF2C620F43E839B2903344DEE29BB. Symbol 'CE/KO' expected at position 1 in expression ''
    Please suggest.
    Thanks,
    Shabari

    Hi Shabari, did you follow the steps for declaration of variables as in [SAP help for user decisions|http://help.sap.com/saphelp_nwpi71/helpdata/en/42/c2a19fb4511d65e10000000a1553f6/content.htm]? How did you define your variable?
    Maybe discussion [in this thread|BPM activation Error in SXI_cache; can help, it is unanswered though.
    Regards, Martin

  • Decision step with method before workitem execution

    I have a decision step, which uses method before workitem execute uses BO Bus2094 - 'Display' method.
    When an agent receives a workitem, try to execute the workitem 'Getting an information message 'Error when starting submethod'.
    When i see the information of the error -
    "At least one submethod could not be processed.
    See the technical Workflow log to determine the error cause."
    When i check technical log of workitem, 2 steps are in error mode.
    1.  Dialog work item executed - Error when starting submethod
    2. EXECUTE_METHODS  - System error in asynchronous method start
    This is happening in Quality system, not in DEV system.
    Any inputs to resolve this.

    Hi,
    @Sivagami: I wonder, how a container element e.g. BUS2094 that was passed to a copy of the DECISION task is automatically executed just before the decision dialog? Good stuff, if it works like this, I'll try this at a later time.
    @Indira: Depending on the Release and such things I have expirienced several smaller bugs regarding the decision steps, especially when extending the data flow (from/to workitem), using the in-place-decision Workitem exit. So maybe you're already doing everything right, but just the inbox doesn't works as designed.
    To work around this problem, you could enter the object methods as a secondary method, which then will display the Sales document in a separate window,
    or you follow the proposal of Sivagami. If the Sales document doesn't seem to appear, you could enforce the display, by globally substitute the business object DECISION to one of your own, re-define the object's method Process that read the business object fromt the work item container and executes it's display method, which is basically the same result you'd like to have.
    Best wishes,
       Florin

  • Terminating Event with Decision Step

    Hi,
    In our purchase requisition approval workflow, I need to have a decision step in which to prompt approver to either approve the req. or reject the requisition.  In this decision step, I need for it to have terminating events for "SIGNIFICANTLYCHANGED", "RELEASE", "REJECT" and "RESET".
    First, I copy the generic decision task 8267 to my my own custom decision task.  Then I added a BUS2009 in the container, releasecode and other needed elements.  In this custom decision task, I was able to add these terminating events that has been defined in the BUS2009.  I was able to setup binding, except the one binding
    Terminating Event  ->   Task
    &_EVT_OBJECT&      ->   &_WI_OBJECT_ID&
    Since the &_EVT_OBJECT& for the terminating event is BUS2009.  And the custom decision task &_WI_OBJECT_ID& is DECISION business object. They're incompatable business object.  So I replaced that binding with
    Terminating Event     ->  Task
    &_EVT_OBJECT&    ->   &PURCHASE_REQ&
    After all the configuration has been setup.  I created a new purchase requisition.  Upon the RELEASESTEPCREATED event, it create a custom decision workitem in my agent's inbox.  When I triggered the "RELEASE" event, it is however not terminating my custom decision workitem.  The workitem still sits in the agent's inbox waiting to be execute.
    Is it possible to setup terminating events for decision step?  Any kind of suggestions or inputs would be greatly appreciated.
    Thank you.
    Jennifer Tran
    System Analyst

    I will suggest you to create a fork with 2 parallel branch and 1 necessary branch. Put the approval step in 1 branch and the wait for Release step event in another branch in this way you can suffice your requirment.
    Thanks
    Arghadip

  • How can i include  'Objects and Attachments' in the Decision Step ?

    i found some relevant threads for this particular topic but not able to solve my problem , so i thought of openeing new thread.
    My requirement is to fill the 'Objects and Attachments ' in Decision step with a  display method of purchase order number.
    From SAP Inbox , when i click on Objects and Attachments , it should navigate to Display method of my BOR object with the Purchase order number.

    Hi Sanju , i did exact the same way  ,
    &_EVT_OBJECT& --> &BUS2012&  ( This is done at the start of workflow )
    Now go to you task of the user decesion and make the following binding....
    &BUS2012& --->&_ATTACH_OBJECTS&  in the biding step between decession task and workflow container.
    I am getting this error message paul,
    The Object Types '[BO.ZIPARI]'  (source) and  '[BO.SOFM]' (target) are not compatible.
    i am trying to create a method in BOR and passing back the attachment back to task container but not succeeded yet .
    My requirement is , from SAP inbox before taking decision , approver wants to review for that i need to link the PO number clickble at 'Objects and Attachments'.

  • Display descirption in BO link in Decision step instead of keyfields

    Hi All,
    I have created a workflow in Records management which is integrated with SRM for the approval of documents. I have a user decision step in my workflow which has many documents displayed as links during approval. For this i copied the std decision task and created my own task and added the business object 'DOCUMENT' ( multi line element). Now it is displaying the documents correctly. but it shows the link as 'BO: key fields' . In this case the key fields are combination of document class and document guid.
    Now the requirement is to display the description of the document instead of keyfields. The description will be available as one of the attribute for the document BO.
    Can anyone help on this requirement?
    Thanks,
    Sivagami R

    Hi,
    Assign "Description as your default attribute in your BO basic data...
    this will work...
    Regards
    Gautam

  • Link in User Decision step not showing correctly in UWL

    Hi SAP Experts,
    I have a requirement to add a link in a user decision step, this link triggers a custom webdynpro for additional input. When I access the workitem from Business Workplace, the link is showing fine. But when I execute the workitem in UWL, the link is not displayed, instead the code is shown (<a>...</a>). Please advise on what I should do to have the link working. Thanks in advance.

    Hi,
    This same thing was just recently discussed. I just cannot find the thread anymore (well, in that thread there was not really any solution). Basically the hyperlinks in work item do not seem to work in UWL as they should. I don't know if there are any way to make them work. My suggestion is to not use the hyperlink at all and replace that with an action (=button) to the task in the UWL. This can be achieve quite easily by simple XML configuration in portal. If you have worked with UWL this should be quite straightforward for you, or if there is a consultant at the site, who is familiar with UWL, this should be simple for him/her.
    Regards,
    Karri

  • SOFM in user decision step - provide reason in UWL

    Hello Everyone,
    I'm working with a customer who wants to use a user decision step and add a reason for the rejection only.  This step will be executed in UWL - since UWL doesn't support syncrhonous dialog chains, it can't be implemented by adding another step with SOFM.  I have seen the 'template with attachment' in the user decision step, and have tried binding SOFM to the Reference in the container, but the user doesn't have the option.
    Perhaps this could be implemented with a secondard amodal method - which checks the user decision code and only implements if the decision was rejected.  I'd like to be able to put a condition on the secondary methods.
    If you've done something like this, please let me know!
    Regards
    Ginger

    Hi Ginger,
    Unfortunately it is not only synchronous dialog chains, but also secondary methods that are not supported in the UWL, so you're stuck both ways.
    Though, I have been told that the latest SP does support some kind of advance with dialog functionality (SP15 I think?).
    At one customer we used a custom ABAP-based decision step which executed in a wingui session - thus synchronous dialog chains worked as long as every subsequent step was wingui based (which SOFM.CREATE obviously is) - worked quite well.
    Let me know if you need more info.
    Cheers,
    Mike

  • Looping a single branch in User Decision Step

    Hi All,
    Can anyone tell me is looping possible for a single branch in user decision step in a workflow?
    If yes, How?
    I want like to loop the step cancel and keep workitem inbox.
    Whenever the user clicks cancel and keep workitem in inbox in a user decision and again executes the WI i would like the workflow to start execution from the step just above the user decision step, i.e; Display PR.
    This is my requirement. Tell me how can i implement it?
    Thanks,
    Raj

    Hi,
    instead of doing so, you could try to enter that method as "secondary method" or "before method" within the tab-strip "Methods".
    If you used your own coding for a decision, you could enable the exception 8015 of the method's result, which is the cancel-button. If you did so, you can enable that outcome in the workflow-activity's definition.
    Best wishes,
    Florin

  • User Decision Step in BPM - PI 7.1

    Hi All,
    I have posted a wiki for User Decision step in BPM in PI 7.1, Please go through it and post your queries, suggestions and comments here.
    The link for same is under:
    Part1 - https://www.sdn.sap.com/irj/scn/wiki?path=/display/xi/userDecisionstepinSAPPI7.1-Part+I
    Part2 - https://www.sdn.sap.com/irj/scn/wiki?path=/display/xi/userDecisionstepinSAPPI7.1-Part+II
    Regards,
    Sachin

    Hi Sachin,
    Nice job,
    During my practice on this scenario. I have got an error please kindly guide me on this, may this error also clear for the others
    *I got an error on SXI_MONITOR as:*
    <?xml version="1.0" encoding="UTF-8" standalone="yes" ?>
    - <!--  Call Adapter
      -->
    - <SAP:Error xmlns:SAP="http://sap.com/xi/XI/Message/30" xmlns:SOAP="http://schemas.xmlsoap.org/soap/envelope/" SOAP:mustUnderstand="">
      <SAP:Category>XIAdapter</SAP:Category>
      <SAP:Code area="BPE_ADAPTER">UNKNOWN_MESSAGE</SAP:Code>
      <SAP:P1 />
      <SAP:P2 />
      <SAP:P3 />
      <SAP:P4 />
      <SAP:AdditionalText />
      <SAP:Stack>No object type found for the message. Check that the corresponding process is activated</SAP:Stack>
      <SAP:Retry>M</SAP:Retry>
      </SAP:Error>
    The trace of the error as:
    <Trace level="1" type="B" name="CL_XMS_PLSRV_CALL_BPE-ENTER_PLSRV">
      <Trace level="1" type="T">could not create BPE proxy for message, no XML object definition found for message 72485F6BFC78416A29EEE3EE10D09BCE</Trace>
      </Trace>
      </Trace>
      <Trace level="1" type="System_Error">Error exception return from pipeline processing!</Trace>
      <Trace level="1" type="B" name="CL_XMS_MAIN-WRITE_MESSAGE_TO_PERSIST" />
    Please kindly guide me on this, Is the message has to validate at sender agreement? if not where is the error I am doing?

  • User Decision step- Upon reject, auto-popup text for reason

    In a user decision step, when the user clicks the reject button, open text for rejection reason within the workitem.
    i have done the following
    1) Create a new step
    2) Create a task based on SOFM.CREATE
    3) Binded  WIOBJECT_ID => (append table) ADHOCOBJECTS
    It works fine, when the user clicks the reject button a new work item with the reason for rejection lands in the user inbox, which when clicked brings up the doc.
    I want to make it seamless for the user where as soon as the reject button is clicked, the document <b>should open right away</b> without a new work item in the inbox
    Any help will be greatly appreciated

    Hi
    If you are using the portal/UWL then search the blogs for a solution otherwise give this a try, in your step definition for the 2 steps, go to the Details tab and tick 'Advance with dialog', this will work if you execute from the business workplace.
    Good Luck!
    Ravi

  • Need 2 Multiline elements for user decision step

    We are on SAP R/3 Enterprise version.
    I have this requirement to find agents based on the agent type and work center field.  So I created a responsibility rule for each type of agent type.  The responsibility rule is keyed on the work center, and HR positions are mapped to each responsibility rule’s work center field. 
    We have 50 agent types/responsibility rules, 60 work centers, and 1 or more positions for each agent type and work center combinations. Due to the total number of positions, I prefer to use 1 responsibility rule per agent type for ease of maintenance.
    I have a FM that reads the responsibility rule based on the agent type and work center field and retrieve the agent_list.  I used this FM/method/step prior to my user decision step and pass the agent_list to the UD step via container.
    In my user decision step, the ‘Other’ tab does not have Multiline element for me to enter my agent_list.  So I cannot use &agent_list[&_WF_PARFOREACH_INDEX&]& in my user decision agent assignment expression field.
    In my last job, we have SAP ECC 5.0, the UD step has a ‘Misc’ tab that has Multiline element, but our current SAP R/3 Enterprise version does not have ‘Misc’ tab, it only has ‘Other’ tab.
    Question:
    1.  How do I use [&_WF_PARFOREACH_INDEX&] without Multiline element for agent_list in UD step?
    2. I have to use the same way to retrieve my LED_agent_list as well, so I need 2 Multiline elements in my UD step. But normally in  ‘Other’ tab, it allows you to define only 1 Multiline element. How do I get around this restriction?
    3. My last resort is to use 1 responsibility rule, then I can use the rule in the agent assignment.  If that is the case, is there any limit on the number of entries in the rule?
    Thanks.
    Amy

    Sorry, I posted to the wrong forum.

  • Need Help on User decision step in BPM

    Hi All,
    I have a requirement to design the user to to system interaction in a partiular scenario.  I am trying to use the User decision step in BPM available in PI 7.1 server. I have used the User decision step and filled all the parametes as given in the sap documentation. When I am trying to execute the scenario, The outbound process is succesful but stops at the BPM workflow at the User decision step with the message (No Agent ready) .
    Can anybody help me in solving this issue.
    Thanks in advance,
    Kalpana

    Hi Shabarish and Swarup,
    I have defined the relevant user in  the Integration directory , also made sure that the user entered is defined on the integration server and there are not restrictions on the defined user. The workflow log is as follows:
    Workflow              File2File_BPM1
    Workflow instance     File2File_BPM1 http://File2File_BPMdemo
    Instance number       000000001046
    Start date            30.12.2008     Started by            WF-BATCH
    Start time            11:33:36       Current status        In Process
    View: Workflow chronicle
    Error       St Task                                          Result                                   Date       Time     Processing time
    Error Agent                     Executed Action                          Date       Time     Object               Object Name                    Object 2             Object name 2                  User Context
    File2File_BPM1 http://File2File_BPMdemo       Workflow started                         30.12.2008 11:33:36               -1s
    WF-BATCH                  Start message received                   30.12.2008 11:33:36 MIAB_BPM_OB2 / http: C532A7AB4D284B9011C0B0C7F8AFB                                                      WF-BATCH
    WF-BATCH                  Workflow started                         30.12.2008 11:33:36                                                                                WF-BATCH
    WF-BATCH                  Events Dispatcher Active                 30.12.2008 11:45:36 MIAB_BPM_OB2 / http: 597B946347C148AD03988B5D8BE2C                                                      WF-BATCH
    WF-BATCH                  Events Dispatcher Active                 30.12.2008 11:45:37 MIAB_BPM_OB1 / http: 6E0E09EE977E4F333D02DDDAE9A52                                                      WF-BATCH
    WF-BATCH                  Events Dispatcher Active                 30.12.2008 13:48:07 MIAB_BPM_OB2 / http: 9F5491FD9BC642E50486A6FED89DA                                                      WF-BATCH
    WF-BATCH                  Events Dispatcher Active                 30.12.2008 13:48:07 MIAB_BPM_OB1 / http: 1AE5BB06D72341AD01F8C45E6AA7E                                                      WF-BATCH
    WF-BATCH                  Events Dispatcher Active                 02.01.2009 05:34:58 MIAB_BPM_OB2 / http: CD698CDE5606436811BAB330011AF                                                      WF-BATCH
    WF-BATCH                  Events Dispatcher Active                 02.01.2009 05:34:59 MIAB_BPM_OB1 / http: 2D82C00C16E0447F1DF3B133470AD                                                      WF-BATCH
    'Good'{TYPE=SWFXST_STRING}'BAD'{TYPE=SWFXST                                           30.12.2008 11:33:37                0s         1046
    WF-BATCH                  Dialog work item created                 30.12.2008 11:33:37                                                                                WF-BATCH
    WF-BATCH                    EVALUATE_AGENT_VIA_EXPESSION           30.12.2008 11:33:37                                                                                WF-BATCH
    I hope this can help you in identifying the error.
    Thank you,
    Kalpana

  • User Decision step in BPM

    Hi,
    I have requirement.PI is reading data from source and after transformation sending one mail to approver .If Approver approves it then messgae will be sent to target system.For approval and rejection ,I am using user decision step in BPM.
    My question is if approver approves reqest in 15 days ,then what will happen in SXMB_MONI,Will the message got failed?

    PI should not be used for such scenarios.
    The User Decision step in BPM is merely thought for PI admins, if a message should retried or skipped. Not for end-users.
    Create a Wokflow in ECC or similar.

Maybe you are looking for

  • Using EXS24 as a multi-timbral instrument?

    Just wondering if there is any advantage to using the EXS24 as a multi-timbral. I've got a fairly muscular tower with 10 gigs of RAM, and have been using EXS simply as a single track plug-in, thus having three or four going at once. Any advantage to

  • Session Help...PLEASE!

    I have a "Shopping Cart" that i got from a tutorial. I made it work for our application but i found a problem. If i add a product to the cart with a product name of 12345 it will add this product fine. If i add another product with the same product n

  • How to print #ITEM.TYPE# DISPLAYNAME in an html/dynamicpage portlet.

    Hi, I want to print the item type displayname. The available placeholder is #ITEM.TYPE# but it prints the NAME column in WWSBR_ITEM_TYPES. I want the DISPLAY_NAME column that makes more sense IMHO. Any ideas? And if this can't be done, any idea how t

  • SRM 7.0 / NW 7.01 SR1 upgrade SP levels - Note 819722

    Hi, I'm preparing for an upgrade to SRM 7.0 / NW 7.01 SR1, and I want to include the latest SP Stack.  I need to know what SP level the upgrade delivers, so I can download just the delta SP Stacks rather than all of them. The upgrade guide states tha

  • Error on display page under VPN

    i have migrated some application apex from version 2.2.0.00.32 to 3.1.1.00.09 into another server. In lan there's no problem. If i try to access from our VPN (Juniper) in the browser appear the login page but when i try to login the browser give me t