Default cost element unexpected OKEP

Hi Experts,
I ask for your help in the following situation.
In transaction KO88, trying to settle an order, the "Message no. KD503 - Complete allocation structure Z1" arises.
"Diagnosis :
During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters). Cost element 5111900300 cannot be assigned to a settlement cost assignment in allocation structure Z1, and therefore it cannot be assigned to a settlement cost element."
This cost element "5111900300" is the default class for the controlling area (transaction OKEP).
The strange behaviur is that in past months the settle for this order never get to the Cost element indicated; to test the settle, the cost element was added to the allocation structure Z1, and it was found out that the FI docs refering to Down Payments are the ones that take this cost element into the settle, and it is strange because in past months the down payments in the same PO takes the correct cost class.
It is strange too that the corresponding FI doc for the Down Payment producing the error has not asociation with the Purchasing Document; that could be the reason it is not taking the cost class from the PO.
I know is a little complex, but I can not found out a note for this and support refers to this as a consulting issue.
Thanks in advance.

Hi..
System response is correct because in OKEP default cost element is posted without ref of PO.
If you want to post in ref of PO don't assign any cost element in OKEP.
kkumar

Similar Messages

  • OKEP - Maintain Default Cost Element (F-47)

    Hi,
    In OKEP an entry is maintained with Controlling area. Even though getting message maintain default cost elements? In F-47 if document posted without Purchase Order it is posted. If trying to post document with PO then this message is appearing. It is taking Production Order also along with PO in F-47 and it is not saved.. Please let me know the alteratives...Ramesh

    Hi
    Maintain a cost element in OKEP... This is required for name sake whether you use PS module or not
    While maintaining cost element in OKEP for your contrr area, you may face an error for Contr Area 0001... Resolve all those errors and then you wil be able to proceed
    br, Ajay M

  • Down payment problems Customer/Vendor - Assign default cost elements

    Helo Gurus,
    ive tried to execute TC: F-29 Customer and F-48 Vendor down payments.
    I enter all the data needed and additionaly Internal Order.
    Then i get a message saying:
    Maintain default revenue element in controlling area 5000
    Message no. FI661
    Diagnosis
    CO down payment update is active in controlling area 5000.  You must therefore maintain a default cost element and a default revenue element for down payments.
    Procedure
    Maintain the default cost elements for down payments for controlling area 5000 in the Project System implementation guide.
    The maintenance is done in TC: OKEP (project system)
    I created two revenue Cost elements and tried to assign them there, but it says CE are nore primary CE.
    I changed it from revenue to primary, then it says that CE isnt revenue...
    weird stuff
    What could be the problem?
    Regards
    Laurynas

    Hi,
    Please refer to SAP Note 388843.
    Regards,
    Srinu

  • Maintain Default Cost element in controlling Area

    I am getting the following error while working on Down payments :
    " CO down payment is active in the controlling area.You must therefore maintain default Cost elemnts and revenue elementsfor down payments.
    Maintain the default cost element for down payments for controlling area in the project system implementation guide.
    PS is not activated.
    How do we resolve the issue.?
    Cheers
    Kartik

    Hi Kalyan 
    Had a look , but why do we need to maintain default CE in OKEP ?
    We were able to raise PR then PO previously but something seems to have happened that we are getting this error message.
    Please advise.
    Cheers
    Kartik

  • Maintain default cost element in controlling area Message number FI660

    Hi All,
    We found the Down Pay Request (doc. booked by F-47)  cannot be picked up by F110. In Job log the error shown as Maintain default cost element in controlling area.
    Long text error details.
    Maintain default cost element in controlling area
    Message number FI660
    CO down payment update is active in controlling area WAPC. You  must  therefore maintain a default cost element and a revenue element  for down payments.
    Maintain the default cost element for dow payment for controlling area in the project system implementation guide.
    Kindly advice.
    Note
    In the define dafault cost elemens for down payments in Project system-OKEP  the CE for vendor and cusotmer downpayemnt  is missing

    hi srinivas
    OKEP configuration is necessary
    if while creating down payment request you have not assigned cost element
    maintain cost elements there.
    regards
    rohit

  • Maintain default cost element in controlling area USD

    Hi All,
    I were trying to clear vendor down payment with vendor invoice ( error)required me to Maintain default cost element in controlling area USD.
    Is that a way to do without making to default cost elemnt
    Thank you for your help
    Regards
    bali

    Hi,
    As process you should clear the down payment first and then vendor thry F-44.
    It should not be asking you for default cost centre untill there is validation rule set.
    hope this helps you.
    Regards
    Bharat

  • Default Cost element pick up despite there is no setting in config.defined

    Hi,
    During external services(control key PM03), system picks up default cost element in maintenance order. Irony is that I have set no default cost element in "External procurement service in Config". I have also checked there is no default user data, despite this default cost element system picks up.
    Please suggest me what to do.
    Thanks & Regards
    D.Singh

    Once you enter the control key PM03, you will get pop up for maintaining material group. If you have defined the material group in config, cost element will be picked up from that.
    Cost element will be picked up from the Material group which you mentioned in Order or in config.

  • Maintain Default cost element in Controlling area - FI660

    Dear All,
    We have implemented PS module for some company codes and hadn't implemented for others, when we are trying ot create a downpayment requrest its asking for default cost element assignment.
    We would like to know wheather this default cost element assignment at controlling area level will impact all the company codes or will it be applicable only to those company codes which are useing PS module.
    Please explain the detailed process flow if possilble.
    Thanks & Regards

    Hi
    It will not affect all company codes . Revenue will be generated for a particular company code for which you have created a project.
    SHASHANK

  • Down Payments: Default Cost Elements (OKEP Configuration)

    Hi,
    In the OKEP screen, if we assign a cost element for default vendor down payment, in what possibilities and scenarios will the system pickup this cost element. Kindly clarify on this matter.

    Hi
    It is just needed for commitment update in Project system... It is just a formality/ritual  to assign this.... you need nt worry on this front
    Ajay

  • Default Cost element in PR

    Dear Experts ,
    How can i default the cost element for a service PR based on .
    1. with using service master .
    2. Without using service master .
    Reagards
    Anis

    Anis,
    We can not default the Cost element for a service PR without using service master.
    Yes we can default the Cost element on to Service PR, if the PR is cretaed with service master.
    For this u have to create service master and in service master mainatin the Valuation class and this vaualtion class will be maintained for any GL account  in OBYC
    Regards,
    Manish

  • Default GL account (cost element) for external service contracts

    Hi everybody,
    question about GL being defaulted from contract for external services
    The requirement is to have GL (cost element) being defined per service sub item defaulting to work order. Account assignment is unknown,  because the costs might be settled later to cost center or AFE or else.
    You could default cost element either through material group (which doesn't enable cost element to contract) or with account assignment category 'K' or 'F'  which do not suit, cause the former requires cost center, that is unknown yet, whereas the latter requires assignment to order which doesn't make sense at all.  Theoretically, it could be done with acc assignment cat 'U' , but cost element is not enabled with that category..
    I was assuming that cost center which you are required to enter along with cost element while creating service sub item referring to some sort of internal accounting. The system also requires service sub item acc assignment category being aligned with requisition (which is 'F') and would in fact create PR referrencing actual work order number. But still, doesn't it make sense having contract referencing another order.. Also, we don't use default values for PM ext operation data.
    So, the question is how to accomplish the requirement with Unknown assignment category? what is the point of defining cost center in the contract in given circumstances? Is there any work around exists?
    Thanks in advance
    Sergey

    Hi,
    Try this: IMG -> Plant Maintenance and Customer Service -> Maintenance and Service Processing -> Maintenance and Service Orders -> Functions and Settings for Order Types -> Create Default Value Profiles for External Procurement.
    After that assign it to order type: Default Values for Task List Data and Profile Assignments.
    Regards,
    Rogério Reis

  • Maintain default revenue element in controlling area 1000

    Hi Experts,
    I am doing Customer Down Payment T Code:F-29
    We had PS Module implemented.
    So at the time of DP i put the network and Operation/Activity Number and also put the Work Breakdown Structure Element (WBS Element)
    At the Customer line item.
    that time system gives me following error.
    Maintain default revenue element in controlling area 1000
    Message no. FI661
    Diagnosis
    CO down payment update is active in controlling area 1000. You must therefore maintain a default cost element and a default revenue element for down payments.
    Procedure
    Maintain the default cost elements for down payments for controlling area 1000 in the Project System implementation guide.
    More information.
    If i click on More information then it will goes to T Code: OKEP
    But i am unable to no the OKEP screen what i have to assign there ?
    waiting for reply.
    Regards,
    J

    Hi,
    I think you need to maintian the default cost element for DP to vendor for WBS (Capex). For controlling area specific you need to assign the cost element of category 1. This you have to maintian in Development and transport the change thu quality to production.
    Controlling are   name, cost element for Vend DP.....
    Thanks
    Dinabandhu

  • Maintain default revenue element in controlling area

    Hi Experts,
    I am doing Customer Down Payment T Code:F-29
    We had PS Module implemented.
    So at the time of DP i put the network and Operation/Activity Number and also put the Work Breakdown Structure Element (WBS Element)
    At the Customer line item.
    that time system gives me following error.
    Maintain default revenue element in controlling area 1000
    Message no. FI661
    Diagnosis
    CO down payment update is active in controlling area 1000.  You must therefore maintain a default cost element and a default revenue element for down payments.
    Procedure
    Maintain the default cost elements for down payments for controlling area 1000 in the Project System implementation guide.
    More information.
    If i click on More information then it will goes to T Code: OKEP
    But i am unable to no the OKEP screen what i have to assign  there ?
    waiting for reply.
    Regards,
    J

    Hello nagesh simhadri ,
    I have the answer for your problem, i think that you already solved it but the answer will be useful for the others, because i had the same problem and i found your post...
    In fact, there is a customizing parameter to set:
    SPRO -> PROJET SYSTEM -> Costs -> Actual costs and Forecast -> Update down payments -> Define default cost elements for down payments
    or simply you can use the transaction code OKEP.
    I hope that this will help someone...
    Best regards,
    Yassine NEJMY

  • System does not accept Cost Element on External Activity

    Hi Experts,
    I have maintained the cost element in network profile under the activity type. When I create external activity in project builder system populates the default cost element entered in network profile BUT when I maintain Material Group in activity detailed data, system removes cost element and issues a message "Enter cost element".
    System does not accept any cost element in the field. Please guide if there is some setting that I have missed
    Thanking in advance
    Warm Regards

    Via txn OBYC also check if the VBR entry with a blank valuation class is missing
    If so get your FI/MM consultant to advise the entry details with relevant cost elements

  • Default account assignment in cost element creation

    hi,
    in the cost element creation transaction (KA01) I need the default account assignment to be the WBS element. but in the transaction only cost center and order is showing as dafault account assignment, how can I include the WBS as cost object?
    Thanks
    Edited by: gayani premawardena on Sep 3, 2010 12:24 PM

    Hi
    If you are aware of FI substitution or validation, it works the same way
    1. Go to OKC9 and click on New entries
    2. Enter your contr area and choose Event = Line Item and Save.. It would ask for a transport request
    3. Now click on the magnifying lens icon, then drill down on cost accounting > Line Item. Now click on Create Substitution icon and give it a name
    4. Now click on Create Step and write your substitution by choosing fields from the COBL structure
    It should like like, Prerequisites: IF COBL - BUKRS = XXXX and Cost Ele = YYYY,
    Action to be taken if Pre-req is met - Substitute WBS = ZZZZ
    Regards
    Ajay M

Maybe you are looking for

  • How do I move a purchased movie from one Mac to an Mac Air using iTunes

    How do I move a purchased movie from one Mac to an Mac Air using iTunes

  • Unable to see AVI files

    With OS X I cannot see AVI files with quick time 7 I had no problems with OS9 and quick time 6 in my old computer Please help MacBook Pro 2 GHz Intel Core Duo memory 1.5 GB

  • Video not transfering to Itunes

    Can someone help me, I'm having trouble transferring a couple of videos to itunes as well as my 60g video ipod. When I drag the file over it doesn't appear, even when i go to file -> add file it doesn't appear....I've transferred a couple of videos b

  • Get URL Variable

    I have two relevant pages - The first presents a list of choices in HTML, and allows the user to select one. Upon selection, a variable is passed to the URL for the second page. (?installer=foo) The second page contains the Flash movie. How may I gra

  • Two levels data links

    Hi everyone, I'm using reports 6i, In the data model I have a master group that have a data link with details group, In the layout model I made a master repeating frame and connected it to the master group, and Inside it I made another repeating fram