Default employee cost center based on work center

Greetings,
How can I default an employee's home cost center in IT0001 based on their work center assignment?
I've tried linking both the employee's position and their org unit to the work center via CR02. This did create the IT1001 records. The work center does have a corresponding HR work center. I've even tried attaching a cost center to the HR work center with the IT1001-A011 relationship. No luck.
Seems like OM side is doing what it should, but we want to get the work center's cost center in the costing tab over to the employee.
Maybe there's an integration switch that I'm missing somewhere?
Thank you!

Thank you both for your thoughts. We have tried the ZXPADU0x exits, but it appears that SAP will not allow us to change an existing cost center value in IT0001 via defaults. I think this is because SAP wants to always keep OM and PA in sync, based on the A011 relationships in IT1001 on the position or org unit.
In terms of OP42, yes, we have tried adding relationships between the work center and position/org unit and also employee. And also have the cost center linked to the work center on the costing tab. But we're still not able to get that cost center to pull into IT0001.
I'm wondering if the integration between work centers and HCM is limited to relationship links on the OM side?

Similar Messages

  • Attendance Report based on Work Center

    Hi All,
    Do we have a standard report of getting the attendances/Abscences of an employee based on Work center.
    Either if it can be done by CATS also is fine.
    Kindly suggest.
    Thanks

    Hi,
    You can run the program RPTABS20 and in the further selection field u can add the org unit for your work cente.
    Regards,
    Kapil Kaushal

  • Cost Center assignment to Work Center(CRCO)

    Hi Experts,
    I was updating Costing data to Work center. I used standard LSMW 0260, 0000, RCRAPDX2, D., but i am getting error as 'Work Center already exists' since i am updating Costing seperately after loading Work Center.
    Please help me in updating this data with any standard program available. Otherthan prefering recording method of LSMW or BDC.
    Thanks,
    Maruthi Prasad

    Hi all,
        Iam really waiting for someone to see and  get the logic right  for this code.Iam completely stuck up.  i need ur help
    Thanks

  • Cost work center A to work center B

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, I want to transfer the cost the work center A to and other work center B.
    I want to keep the history u2018s confirmations on the work center A.
    The first confirmation CO11N on the order 1 and work center A => Quantity 1 hrs.
    Actually we transfer the cost by KB15N by at the level EOTP.
    We want to push the cost down at the work center.
    So we want this situation :
    The first confirmation CO11N on the order 1 and work center A => Quantity 1 hrs.
    The second confirmation on the order 1 and work center A=> Qauntity -1 hrs ( Itu2019s possible and how?)
    The third confirmation CO11N on the order 2 and work center 2 => Quantity 1 hrs.
    Thank you for your answer.
    Regards,
    Géraldine

    Hello,
    The user clock in his time by CO11N, for example 2 hrs, on the posting date 2011.02.01 (on the project A).
    After the cost transfer into CO.
    At the end of the project, on the posting date 2011.06.01 , we want to transfer 1 hrs and the cost to an other project B.
    I try two incorrects solutions :
    - The first : I can't use the CAT5 by negative value.
    - The second : The user don't want to modify or cancel the initial confirmation.
    How can i to deduct one hour from the initial project to the second project, and i want to keep the information work center ?
    Can you help me ?

  • Cost Center Mandatory in Work center

    Hi Experts,
    How to make the Cost center field mandatory in Work center creation.
    Regards,
    Kavvya

    Hi Experts,
    I tried your solution but unable to get the solution.
    Hi, Thyagrajan
    I tried t-code OPFA but failed to get the result.
    Hi Maheswaran,
    I used t-code SW01 and use the object type given by you, but unable to get the result.Can you please explain little bit in detail how to use BUS0011.
    Actually in my case while creating work center the cost center field is coming mandatory i want to remove the same.
    Regards,
    Kavvya

  • Confirmation based on Work center

    Hi,
    Can we do Confirmation of Qty based on Work cetner?
    Means that i have Order Qty for 100Pc.
    in the same order i want to confirm the Qty in WC1 for 60PC and another Workcenter WC2 for 40 PC.
    To check the utilization of Work centers
    is there any possibility?
    Please let me know
    Thanks
    Nag

    Hi
    Thanks for the response.
    i made the changes in Single Screen Entry.
    Here i need one clarification is that,
    I have defined Workcenter in Prod.Order as WC1.
    When  i go for Confirmation on the Operation wise, system has proposed WC1 (Which is from Prod.Order) for 100Qty.
    While doing confirmation -> below the Personal i have given once WC2 and Qty 40.
    I saved the confirmation.
    Next time while doing confirmation WC2 and Qty 60.
    These data where will be saved and while doing Capacity Calculation how the system is going to calculate the available Capacity or Utilized Capacity.
    Please let me know
    Thanks

  • PM Order - Change operations Work Center to Main Work Center

    Hi Experts,
    We have prepared a tool for client, which create Maintenance Plan and order in the background.
    The order created is having "Main Work Center" defined at header and "Work Center" at the operations level. In the current scenario the "Main Work Center" and "Work Center" are different say 'ABC' & u2018XYZu2019.
    Client has the requirement that work center maintained at operations should be same as the main work center.
    We need to implement the solution to take care of work center to be same as main work center while creation of the order in the background.
    Has anyone worked on the similar requirement before?
    I checked for existing USER EXITS for IW31/32/33 and found only one IWO10012. This doesnu2019t seem to be much useful.
    Please suggest any possible solution.
    Thanks,
    Ankur Sharma

    Hi,
         The work Center entered by default comes in operation work center, u can do validations while saving the Order :-using user exit : IWO10009 PM Order: Customer Check for 'Save' Event.
    regards
    pushpa

  • Cost Center Information amd Work Center Infor.,

    HI All,
    Please let me know what are all the T.Code used to get Active Cost center used and also let me know the table name used also.
    Regards,
    Nagaraj S

    Hi,
    Use T.code: OKB9 and link/ relate the Cost center with G/L Account & save.
    Regards,
    Biju K

  • Estimated Start time in notification based on Time defined in Work center

    Hi,
    Following Satish post- I am trying to find solution to the same  problem so i will appreciate any advise.
    When the notification is created ,the estimated start time should be based on priority .This in iteslf is pretty straight & simple. However if the reported time is after work hours or towards the end of work hours or weekends , the estimated start time should be reflected accordingly based on factory calender & work center time schedule.
    In other words the estimated start time should fall within the window of work hours available.
    Example:
    Presume the the working hours for the Organization are 8:00AM to 5:00 PM & a call comes for service at 4:00 PM. Also say , for high priority the defined response time is 5 hours. In such a instance the estimated start date should be set to next day at 11:00 AM.
    Appreciate your help for the configuration that need to be done
    Shirly

    Hi,
          I think ur talking about notification malfunction start time .. currently it just takes the system date and time by default .. and if you need work center timings i believe first u need the eqpt /F.loc to get the work center data in notificaiton ...
    I think u can get these dates can be modified while saving by using user exit  : QQMA0014 QM/PM/SM: Checks before saving a notification or BADI   IF_EX_NOTIF_EVENT_SAVE , but at the same time the eqpt or F.loc have work center details in master record ...or work center needs to be entered manually in notification ..., pls check up ..
    regrds
    pushpa

  • How to find cost center assigned to a work center

    Hi Guys,
                 I need to find cost center assigned to work center.
    from Which table I should to get it.
    Cheers
    S Kumar

    Hi,
    Please use the table CRHD to get the object ids and then go to the table CRCO with the object ids and get the Cost center assignment to resources.or you an create a query by SQVI and use it.
    regards,
    kaushik

  • Formula parameter in Work Center for 'Costing' tab

    Hi all
    In the 'costing' tab of the Work center I am using a formula which uses the operation quantity ' which has field name 'MGVRG'. Is there a way I can use an alternate unit of measure as an operation quanity in the formula? Let us say my Routing is defined in Cases and my operation qty is is in cases but I want to pass on the alternate unit of measure LB which is defined in the Material Master. Is there a way I can do it.
    thanks a lot

    Hi John,
    Not sure if i have understood your query correctly, but when you click on test forumla in the work center it does not display the UoM, so here you can pass the UoM as per your need. In OP52, for SAP_09 you can verify the same.
    If my understanding is not correct, please let me know.
    Regards,
    Vivek

  • Costing in Work Center

    Hi all,
    I have a work center with an activity assigned. The cost of the activity has been maintained in KP26. E.g. 30 dollar /hour.
    In the costing tab of the work center, i have added the activity and put in the formula SAP008.
    When i do a calculation of the costing formula, i entered 1 day as the work duration.
    The results for the calculation gives me 30*24 = 720. So it is giving me 1 day = 24 hours.
    In the capacity tab, i have maintained the start, end and break time. Thus the operating time is 8 hours. Base of unit of measure is put as Days.
    Any ideas where i would need to configure such that 1 day = 8 hours and the result of the calculation would be 30*8 =240?
    Appreciate any advice.

    Hi,
    I think this 24 hours is not directly related to 1 day equivalant hours.The time is coming from the formula you have used SAP008.
    Please create a formula which will take 24 hours as 8 hours for this resours.
    For an example
    Create a formuls x=SAP008/3
    As 8 hours is availabe hours for your resource.The formula SAP008 use Work (internal proc) as a entry.Divide it by 3 by which you can get the actual run hours.
    Hope this will help.
    Regards,
    kaushik

  • Multiple cost centers linked to one work center

    Hi all,
    is it possible to link multiple cost centers to one work center ?

    Dear Bjorn,
    1.For the same work center its possible to assign only cost center at a time or say for a validity period.
    2.Its possible assign different cost ccenter for the work center for different validity periods,provided the
    rates are also define properly in KP26.
    3.One cost center can be assigned to multiple work center.
    4.Its possible to define different rates for the same cost center and activity type combination only
    for different periods.
    3.Same activity type may be having different rates for a different cost center combination.
    4.Only one cost center can be valid for a work center.
    5.Same cost center may be linked to many work centers.
    Check and revert back.
    Regards
    Mangalraj.S

  • Work center creation in PP

    Please guide me step by step procedure to create work center in PP module so that if i reference the same in Poduction order it will generate all costs (estimated, planned , actual costs).
    Thanking you in advance.

    Hi,
    you can go to transaction CR 01 to create work center put plant work center name and then category of ur work center i.e. machine ,labour,production line 
    1. Basic data - general details of ur work center. -- category person responsible and with that standard value key with six parameters
    2 default values -- put ur control key,and unit of measurement for ur parameters like min. hour ,second.
    3. capacity - here you mention all the details of ur standard capacity details header details and capacity calculation formula
    4. scheduling - here you mention ur scheduling formula and standard queue time
    5. costing - here you put ur cost center and controlling area with validity period dates and activity types and formula for it
    Then save.
    reward points if you find it useful .
    regards
    pradeep

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

Maybe you are looking for