Default time frame for ICAL events

Ever since I upgraded to Lion, the default time frame for ICal events has been set to "entire day".  Is there any way to change this?

Hi,
If you add a time to the event description, like "meeting  11am tomorrow", it should create an event (with the title "meeting" on tomorrows date at 11am with a duration of 1 hour.
Best wishes
John M

Similar Messages

  • Can I set up a default time for iCal events?

    Can I set up a default time for iCal events?

    That's actually how Guest Access feature works. You can share internet to your guest/visitors without giving them access to your local network. You may configure the Guest Access settings on the router using Linksys Smart Wifi through the local access interface; check this site for the instructions, http://www6.nohold.net/Cisco2/ukp.aspx?vw=1&docid=b509a1805dd6416ebb0e35a7e5a58937_Configuring_Guest...
    Added Info:
    Guest Network Frequently Asked Questions
    http://www6.nohold.net/Cisco2/ukp.aspx?vw=1&docid=f35bd58fda4148929ac482f3c7968e04_Guest_Network_Fre...

  • IPod changes times for iCal events

    My iPod seems to be changing the time of my iCal events. For example, the event in iCal is set for 1 p.m., but when I use iSync to sync, it shows up on my iPod as starting at 8 a.m.
    Anyone else have this problem?

    Thanks for the response. Do you know how I can match time zones? I've got my iMac set up on the Central time zone, and my iPod also shows the correct Central time zone. I haven't been able to find a time zone setting in iSync.

  • Time Frame for Costing

    Hi
    Can any one tell me "What is the time frame for configuring the complete product costing"
    and majority of the events and its time consumption.
    thanks in advance.
    regards
    Adi

    Hi There,
    Consider using a structure of key figure to arrage you data, with the time characteristic on top of the structure for flexibility.
    John Hawk

  • Default "time spot" for vendor in PO

    Hi,
    Is there a way to have a default "Time spot" for a vendor when creating PO?
    I want vendor X to deliver the goods in the morning and vendor Y at noon, for example.
    I will send this data via EDI to vendor with all other data of PO.
    tnx,
    Lior

    What about using texts?
    You can maintain the texts , if they are vendor specific, in vendor master and get it copied to PO header text.

  • Any time frame for when we will be getting the Android 5.0 upgrade on the Verizon G3?Type your question

    Any time frame for when we will be getting the Android 5.0 upgrade to the G3 on Verizon?

    No one from Verizon can or will give you a timeline. They have no idea. Verizon can't even test 5.0 until they get it from LG first so perhaps you should be asking them.

  • Implementation methodology and time frame for EHS implementation

    Hi Gurus
    Can you please share what implementation methodology we follow in EHS implementation?
    Is it the same ASAP methodology or any new?
    What is the average time frame for EHS implementation if we do it in one phase & time requirement for each component like product safety or waste mgt?
    Thanks in advance

    Hi Bhupesh,
    i can suggest you to try with following links, found useful several times ....
    [http://help.sap.com/saphelp_47x200/helpdata/en/a7/2879200a6c11d28a220000e829fbbd/frameset.htm]
    [http://help.sap.com/saphelp_ehs27b/helpdata/en/A5/3ADD4643BE11D188FE0000E8322F96/frameset.htm]
    [https://www.sdn.sap.com/irj/scn/articles-90days?prtmode=print&startindex=181]
    regards,
    mahesh

  • Wrong Time for iCal events

    I am running System 10.7.5.
    I am running iCal 5.0.3.
    When ever I want to schedule an event on the half hour, iCal refuses to post the proper time.
    For example, I want to schedule an event at 8:30 PM; iCal schedules it for 8 or 7:30 PM.
    It even stubbronly reverts to 19:30 (military time, which I usually use) when I want to
    schedule it at 8:00 PM or 20:00 (military time again).
    BTW, the System Clock is accurate to the second, so that is not the problem.

    You have to change your time zone to Arabia Standard Time. It will help you now.

  • ICal setting default message alarm for all events

    I want to change when I get message/alarms for all events (birthdays, etc.) from 2 days before to 4 days before. I find that I can only change this for single events (e.g., a specific person's birthday rather than all persons' birthdays). Is there a way to change the default so that I get my warning alarm message for all events 4 days in advance instead of 2 days?

    I miss appointments b/c of this too.
    And no, Apple does not read these forums UNLESS you comment on how pathetic and Mickey Mouse certain elements of their software is - like no 'default' setting for alarms in iCal, and not being able to resize windows from all edges (vs. the little annoying corner) etc etc.
    I hope they fix it with the new software package in Leopard. I'm somewhat afraid it's going to be 'Leper' at first though. We'll see...

  • Setting default opening date for iCal calendar to be some future date?

    Is it possible to set the default date at which an iCal calendar opens to be some specified future date?
    I want to enter multiple events for a week-long program that begins on November 1, 2008, into a special iCal calendar for that program, as the dates and times for those events become known between now and then. So, each time I click on that calendar's icon, I'd like to have it open at 1 Nov 08, instead of having to step forward to that date each time I re-open the calendar.
    Any way to do this?

    christ. no answer to this?
    i just did this on a trip to boston and i /thought/ i had it fixed when i went to paris recently.
    perhaps getting a new motherboard on my MBP means i have to set my settings again to get this to work? does anyone know if this only works by setting a /combination/ of settings on iCloud and in iCal preferences...?

  • Time Constraint for Boundary Events

    Hi experts.
    I am pretty new to BPM (NetWeaver Developer Studio 7.1 SP04 BPM SP05) and I am just making a test process to try to get the time constraint concept right. So far I have three tasks in my process, very much like a textbook example. In my first task I have an input field in which you're supposed to type in your name, which is then saved to the context and triggers the second task when completed. That second task is nothing but a screen displaying "You successfully generated a second task, (with the name you entered in the first task here)."
    That works fine so far. Then there's the third task, which is linked to a boundary event on the second event with a start deadline which is critical exception. Here's the idea... You complete the first task (name input), then you fail to start the second task within a certain amount of time defined by an expression, so the process should go to the third task because of the deadline. By the way, it works fine when using a default time, so I must be doing something right so far, the problem is when trying to dynamically change the time with the expression.
    What I tried was to define a context attribute type time and date (I tried both) and assigning a time (current time plus whatever amount of minutes) to that attribute via Java coding at the time you click on the button which completes the task, then use that context element in the expression, but that didn't work. I also tried to make that context attribute an integer and set it to whatever amount of minutes I want to use for the deadline, then in the expression get the current time and add that afore mentioned integer to its minutes. That didn't work either.
    Please help, I have seriously done some research, and no success yet.
    Edited by: david.palafox on Jul 1, 2010 5:54 PM

    Figured it out.

  • Time Zone Vs. iCal Events

    I just moved from LA to NYC and when I changed the time zone on my Mac all of my iCal events switched to three hours earlier. I have up to ten events nearly every day for the next several months and can not go in and change them one by one. Can someone let me know if there is a comprehensive quick fix to this?

    I know this will sound strange but, go to ICAL/Preferences/Advanced and uncheck"Turn on time zone support" . That worked for me when we moved from NJ to CA. Good luck.

  • Time frame for SAP implementation query

    Hi guys,
    I am a university student and am currently trying to collect some information for my paper on development of ERP systems in industrial companies, particularly SAP. I'm meant to do some field research, but it is proving to be rather difficult, which is why I wanted to ask for some help from people who have experience in the implementation of the SAP system.
    What I'm looking for is the time frame that the SAP system takes to integrate into an industrial firm. Also, the scope of integration (ie how many and which modules were added on top of the core SAP system) and the number of users after the full implementation of the system.
    I don't need the name of particular companies, as I understand that that may be disclosing too much corporate information, but it would really help me if someone could give me a realistic time frame of the implementation process for SAP.
    Thank you, in advance!
    Anya

    Anya,
    Update to your queries:
    size of the company that this SAP implementation took place at:
    Answer : In terms of revenue $200 million +
    Interms of employees 6000+
    HR module in particular - whether it can be fully implemented separately and how long would it take?
    Answer:
    Definately, it can be fully implemeted and other modules may not be used
    Time period - 3+ months as Business packages are available in SAP.
    Regards,
    Ganga

  • Continuing alerts for iCal Events after canceling

    Hello everyone,
    I suspect what I'm about to describe is a bug, but hopefully I'm wrong and there is a setting for this. For any iCal Events I have, which are typically listed as all day events, I get continual reminder notifications even after CANCELLING.  Anyone seeing this?  Is there a way to stop it or do you think this is a bug. 
    FYI, I do have calendar turned on for iCloud, but not reminders.  This happens on both my Macbook Pro and my iMac. 

    OK...I've found the culprit and an easy workaround.  First, Desktop Manager for Mac is the problem.  If you set any event alert reminders in iCal to "Message and Sound" you'll get both the message and the sound on your Mac, but Desktop Manager for Mac mangles this somehow when the event is synched to the BB.  The event makes it over, but when the event is selected on the BB and opened, the alert is set to "None".
    To fix this, simply change all event alert reminders in iCal to "Message" (without the sound) and re-sync using Desktop Manager now the events on your BB have the same alert parameters as in iCal and their alerts now popup when scheduled and they have an audible sound.
    Come on, RIM...Mac users deserve better than this.  It took you 12 years to get us a real (well almost real) Desktop Manager, so now give it the same features as you provide in the Windows Desktop Manager.  But since I know nothing in this forum ever makes it to RIM...we'll have to hope they figure this out on their own.

  • Time Frame for re-installing Mountain Lion?

    I decided to completely re-install Mountain Lion using the reboot and holding down the command and R keys at the same time. The Download of the OS took about 1.5hrs-2hrs but the actually installation is still going.
    It's literally getting to about 9 hours since the actual install has begun. It is EXTREMELY slow. Each time frame that it gives me is inacurate. by the time it goes from "15 minutes remaining" to "14 minutes remainig" it's already been 30min-1hr. It's been at "about a minute" for almost an hour now.
    Am I doing something wrong or is this normal???
    I'm using a Macbook Pro that I just bought from the Apple store about 4 months ago. 500GB HDD and 4GB RAM.
    This is so frustrating. I've never had this type of issue with a PC before. 9+ hours to install an OS? That's laghable. $1500 paperweight sitting just infront of me.
    And the reason I decided to completely reinstall the OS is because my computer was slowing down and freezing. Found out it might be the indexing it was doing out of no where for spotlight but even after turning off indexing it still was running slow. Apple wanted to charge me $20 to fix the bugged "functionality".
    And also I have checked the HDD to make sure nothing is wrong with it.

    Wow, glad so many folks have read it but no one has replied except myself, I posted it. Guess no one knows out there and Apple reps aren't responding.
    Lots of folks complaining about slow issues but no fixes from Apple.
    Not good.

Maybe you are looking for