Define control chart tape - SHEWHART X-R

Hi SAP Gurus,
exists any way how to implement SHEWHART X-R chart for statistical process control in SAP? I found some information about it here: How to implement X-R chart in Inspection.
Could anybody give me more detailed informations?
Regards
Lukas

Hello,
For Control limits your chart needs to closed. and offcourse for calculation u need to have more than one inspection lot. then system will calculate the same. UD is also required against lots.
Regards

Similar Messages

  • The control chart in the sampling method does not match the insp. char. Mes

    The control chart in the sampling method does not match the insp. char.
    Message no. QD240
    how solve?????

    You need to compare 'requirement for control chart' and 'control indicator of insp. characteristic'.
    1. Requirement for control chart
    QCC0 > Quality Planning > Basic Data > Sample, SPC > Statistical Process Control > Define Control Chart Type
    See detail for your control chart and check 'requirement' in characteristic type screen area.
    2. Control indicator of insp. characteristic
    QS24
    Check 'control indicator' is suitable for requirement.
    Regards, Do Wook KIM

  • Control Chart Query

    Dear Experts
    As part of SAP QM Implementation we are implementing control chart functionality to get graphical representation against measured values for pre-defined parameters. I am facing two issues mainly:
    1. When I try to calculate control limits (clicking calculator button) getting message "Control limits for track 1 could not be calculated". MICs has the upper limit and lower limit maintained which I can see in QAMV table for the inspection lots.
    2. In the attached control chart , I am getting Upper Limit, Lower Limit and the Valuated Result in graphical form, when I try to display the inspection date, for the characteristics against inspection lot, I get lost. System is showing some date 7/14/14 against all the characteristics which I am not sure how to achieve.
    Settings I made:
    Sampling type: Fixed sample
    Valuation mode: SPC inspection
    W/O inspection point
    Sample size: 5
    Chart type:115 Shewhart chart for X bar/USA
    MIC Settings:
    Quantitative / Lower / Upper Sp. Limit / Sampling Procedure / SPC Characteristics / Summerised Recording / Required Char.
    Inspection plan setting is:
    SPC criterion : 020 task list char/material
    Base qty : 1KG
    Control Chart Configurations:
    1. Control Chart Type -115
    a) Change Control Limit not checked
    b) Characteristics Type- Fixed Scope, Record measured values
    c) Reference Axis (x-axis) - Time of Creation ( Do I need to change here to "Object Number" or "Time Of Inspection" ?)
    Any input will be highly appreciated.
    Regards
    SK

    Hello,
    For Control limits your chart needs to closed. and offcourse for calculation u need to have more than one inspection lot. then system will calculate the same. UD is also required against lots.
    Regards

  • G/L account is not define in chart of account F5507 error in MIRO

    Hi,
      While doing MIRO as soon as We enter the PO number system gives the error message F5507 G/L account is not define in chart of account F5507,  I have check the G/L account in FS00 it isproperly mainatin also in COCD data Chart of account , controlling area, FM area are propley maiantain also message setting chekc in In OBMSG and OBA5  for application area F5 message 507  it not present in that but still I am getting this error in production server only.  in development I have with same material and G/L; account  but in development there is no problem system is not giving any error message in development.
      What can be the problem.
    regards,
    zafar

    HI,
    AS you check G/L is there in in chart of account .Which vendor you created the purchase order?  Go to vendor master (XK03)  for which you created PO&  check RECONSILIATION ACCOUNT. Now check the RECONSILIATION ACCOUNT (FS00) is there or not in chart of account
    Regards,
    Biju K

  • Print out of control chart

    how can i take the print out of the control chart and also the necessary data like Cp Cpk values.
    My exact requiremnt is, i want X-bar chart, R chart, all statistical values and also the results recorded of that characteristics on 1 page.
    How is it possible?
    Message was edited by:
            sandip raut
    Message was edited by:
            sandip raut
    Message was edited by:
            sandip raut

    Hi,
    you can use the t.code for OPK8-DEFINE PRINT CONTROL
    (SPRO> PRODUCTION> SHOP FLOOR CONTROL --> INTEGRATION --> DEFINE PRINT CONTROL.
    This is your mentioned requirement matched. pls check with this t.codeOPK8.
    Regards,
    Mohan R

  • Control Chart in Crystal Report

    Hi
    Is it possible to create control chart in crystal report XI (with upper level and lower level limit)
    if it possible, can you please let me know how to do?
    Thanks

    Not sure its possible in standard CR.
    It is possible with an add-in product:
    http://www.threedgraphics.com/tdg/enterprise/sap/crce/
    Or more specific example:
    http://www.threedgraphics.com/tdg/enterprise/sap/crce/images/shewhart.png
    -Dan

  • Change Diagram Type in Control Chart in QE51N

    Hi
    I'm using the QE51N to record the results.
    I press the Control Chart Button and it's OK.
    I change the Diagram Type from "Lines" to "XY" (Dispersion), but the change isn't keep it for the other characteristics, or if another day I execute the QE51N the Diagram type remains like "Lines"
    Is it possible to change the diagram type and keep it forever? I have used the "Save Mode" button but doesn't work.
    Thanks a lot for the answe.I will give the points.
    Take care,
    Francisco

    Dear Fransisco
    Try to change the same in the configuration. It might help
    SPRO > QM >Quality Control > Define Graphic Types for Evaluations of Original Documents > here choose 003 for control chart and change the chart type on the right hand side
    Regards
    Gajesh

  • Regarding SPC control chart

    Hi all & Happy frienship Day
                 Can anybody tell me how to create SPC control chart in QM module .
    Thanks & Regards
    AMIT

    You need to do two things
    1. Define char as SPC relevant and it should be of fixed scope.
    2. Sampling procedure : Define a sampling procedure of fixed sample size and assign a chart type in sampling procedure.
    Now you should be able get control chart for the char when inspection lot created

  • Is it possible to develop the control charts in WAD.

    Hi Gurus and Experts
    We need your suggestions to go futhure with our requirement.
    Right now KPI's are currently displayed in graphical form with the
    ability to drill down into WO's( Work orders) from the graph page. our
    new requirement is to get exactly the same set of information captured
    and presented in control chart form. This is to be an adjunct. to, not
    replace, the existing graphical set of data. Upper and lower control
    limits will be set initially by the business, and the same drill down
    functionality should be available from the control chart. The charts
    can be displayed seperately from the exisiting set of charts if this
    makes it easier.
    Can you please suggest us whether is it possible to develop the control
    charts and also have the functoinalities of the existing dashboards
    (example drill down of WO's using the control charts) in WAD or through
    viusal composer
    Waiting for your responses..
    Thanks
    Ravi...

    Hello dj_page!
    Thanks for the answer, but I know this already.
    My problem is, that the small picture in the side panel and the histogram in LR5 are bigger than in LR4.
    The two pictures are showing the difference between the versions.
    On the left hand (LR4) you can see a smaller preview and histogram than on the right hand (LR5).
    In each version you can change the size of the side panel only as small as the preview-window is.
    The pictures are also showing the smallest size of the side panel in each version.

  • Error G/L Account is not defined in Chart of Account INT

    Hi,
    I have create a company code by doing copy of SG01 in transaction EC01.
    I have also create a vendor under the newly created company code. When i try to do a testing in FB60 transaction it prompt me an error : G/L Account is not defined in Chart of Account INT.
    Did i miss out anything? How to resolve this issue?
    Best Regards,
    Rayden

    Hi Supriya,
    I have check the T-Code FSP0. It display as follow. it seem that the Chart of Account INT is there.
    [FSP0 Screenshot|http://i154.photobucket.com/albums/s248/evil_lord81/Untitled-1.jpg]
    Regards,
    Rayden
    Edited by: Rayden on Feb 25, 2008 3:05 PM
    Edited by: Rayden on Feb 25, 2008 3:06 PM

  • In MIRO G/L account is not defined in Chart of accounts

    HI Experts,
              when i am doing MIRO G/L account is not defined in Chart of accounts,HOW can i solve this problem pls suggest me.
    regards
    ramakrishna kakarala

    Hi,
    What is the error you are getting?
    For automatic account determination,you have to  Configure followings:
    1.OMSK: Valuation Class with Account catagory reference,
    2.OMWM: Active Valuation Grouping Code,
    3.OMWN: Active Movement type with G/L account,
    4.OMWD: Active Valuation Area,
    5.OMWB: Active Chart of account,Valuation Grouping Code,Account Grouping Code,Valuation Class and G/L acocounts
    For your problems follow the steps
    1.Go To T.Code: OMWB,
    2.Enter your Chart of account,
    3.See  Transaction key( your are getting error and click it) and assign G/L accounts.
    Or One steps futher
    4.Click Your Account Modifier , system will take you to next screen and then enter valuation modiofier, account modifier,Valuation Class,Debit G/L account and Credit G/L Account and Save.
    Hope this will helpful then reward and close it.
    Regards,
    Biju K

  • Implementing SPC/Control charts in Reporting Services/BI Solution

    Hello All
    I'm one of the BI specialists in our company - currently looking after our BI solution which incorporates SQL Server 2005, SSRS, SSIS, SSAS, Performance Point, Pro Clarity and various other bits and bobs etc.
    What I'm aiming to do, is establish a suite of SPC/Control charts for our portal, based on the suite of cubes we already have. At the moment, I'm thinking of producing these in the SSRS environment, but I'm open to suggestions!
    As a starting point, I've created the necessary charts in Excel (calculating averages, standard deviation, upper/lower control limit) etc, but now I'm looking at implementing it in our DWH.
    Third party software may be an option (such as Dundas, which keeps cropping up in my crusades!) but I'd like to perhaps generate these myself - if I'm not asking too much that is!
    Any advice greatly appreciated...
    Cheers
    Lee

    Hi Lee,
    Based on your descriptions, you want to implement Statistical Process Control(SPC) chart in SQL Server Reporting Services. If I have misunderstood, please do not hesitate to let me know.
    By default, we only have Column, Line, Shape, Bar, Area, Range, Scatter, Polar charts in SQL Server Reporting Services. As a workaround, we can anaylze the data using SQL Server Analysis Services, and then use these chart to display the data in SQL Server Reporting Services. We can use parameters to filter data.
    Third party software may be an option. However, if you want to implement these charts by yourself, we can implement a custom report item in SQL Server Reporting Services. We can start it from here: http://msdn.microsoft.com/en-us/library/ms345231.aspx
    If you have any more questions, please feel free to ask.
    Thanks,
    Jin Chen
    Jin Chen - MSFT

  • How to generate control limits in control chart

    I want to generate a X bar chart with control limits, sample size is Fix- 1.
    SPC criterion I selected is 020 ie Task List characteristics/ Material.
    1)Sampling Procedure I used- Fixed-1
    2)Valuation mode I used- Attrib non conforming units/ manual.
    3)Control chart I am using is 110- Shewart chart for X bar.
    But when I click for control limits in chart it is saying control limits for track 1 could not be calculated.
    Could anyone guide me, how to generate control limits for this graph. Sammple size will alwyas be 1.
    Please let me know should I change control chart type in this case.

    Hi Jaison,
    You should use valuation mode - SPC valuation in sampling procedure.
    Also you have to use sampling procedure with inspection points.
    as practically every hour or depending on the frequency decided we collect the measurements and calculate the SPC.
    now after correction in the sampling procedure create new inspection lot and check SPC.
    try out and revert.
    Regards,
    Anil

  • G/L account  is not defined in chart of accounts

    Hello Experts,
    Can someone solve my problem. I have created an expense account in my Chart of Account (FSP0) and the same COA is assigned to my Co.Cd in OBY6. When I tried to post to this G/L account ( FB60 - Vendor Invoice posting ),  I got the following error.
    G/L account  is not defined in chart of accounts INT
    Message no. F5507
    Diagnosis
    The general master data of the G/L account  is not maintained in the chart of accounts
    INT.
    System Response
    Error.
    Procedure
    Please correct your entry or create the master record.
    I am not sure if I am missing anything.  Is there anyway to extend the G/L account that is created in COA to company code level apart from assigning the COA to company code in OBY6.
    Any help will be duly rewarded and appreciated.
    Regards,
    Sriram

    Hi,
    A single chart of accounts can be used by multiple company codes.
    If I have 20 company codes using the same chart of accounts in the system for which i need to create GL accounts. Instead of creating the GL accounts for 20 company codes individually  at COA level and Company code level, I can create at company code level only. The COA level will remain similar/constant for all the company codes.
    Hope Im clear
    Thanks
    Aravind
    <b>Assihn points if useful</b>

  • G/L account not defined in charts of account CATN... How to maintain it.

    Hi Gurus,
    While doing MIRO... I am entering
    1. company code
    2. Date
    3. Refrence number
    4. PO number
    when i enter i get the error as "G/L account not defined in charts of account CATN... "
    How do i maintain it and get this issue solved.? Please help
    Thanks,
    Forum

    Hi
    Creating New G/L Accounts  for the Chart of Accounts.
           1.      From the SAP Business One Main Menu, choose Financial ® Chart of Accounts.
    The Chart of Accounts window appears in Add mode.
           2.      Click on the drawer to which you want to add the new account.
           3.      Enter a unique code in the G/L Account field, and then enter all other relevant details.
           4.      Choose Add.
    Check out the link for more details
    http://web.mit.edu/sapr3/windocs/fomds01f.htm
    Regards
    Anand

Maybe you are looking for

  • K9N Platinum Supported CPU's

    Hi everyone, My question is fairly straightforward.  I currently have a MSI K9N Platinum AM2 NVIDIA nForce 570 Ultra MCP in my HTPC.  Long story short I found out that my CPU was not powerful enough to decode 1080p content so I have purchased a new C

  • How do I rename a RBS folder?

    Hi, Running SharePoint Server 2010, I got a separate SQL Server and I am using Remote BLOB to store data on a file server. So far, everything is working fine. However, I created a new web application and as I continued to set up RBS, I scr*wed up...

  • All About the iPhone 4

    Based on all of the rumors, some people apparently have the iPhone 4. If so, give me some details. How's the battery life on it and the scoop on everything? Pics please?

  • TS3772 Cannot sync my phone at all

    My iphone 4s doesn't appear in iTunes when i a plug it into my computer. I have just been to the apple store today and received this phone to replace one that had a wifi problem after the iOS 7 update. This phone now has iOS 7.0.2. Any suggestions?

  • Upgrade iPhoto 6

    My computer tells me I don't have iPhoto 6 when I try to install the upgrade. Does anyone have any ideas on how to get the upgrade to recognize the application. I had the same problem with iDVD and iMovie. Jo Hauser