Defining more than one Target transport system

Is it possible to have more than one Target Transport systems defined for a single source System in SLD at one time?

On a similar note with a 3 tier XI landscape (DEV, QAS, PRD) which of the following two scenarios is preferable?
1. In the SLD define each DEV Business System with a target of the corresponding QAS Business System and define each QAS Business System  with a target of the corresponding PRD Business System.
DEV ---> QAS ---> PRD
This means that we export ID objects from DEV and then import them into QAS. The objects then need to be exported from QAS for import into PRD
2. In the SLD define the DEV Business Systems with 2 target systems relating to corresponding QAS and PRD Business Systems.
DEV --> QAS
DEV --> PRD
This means that the same export from DEV can be used for import to both QAS and PRD.
Currently we have scenario 1 implemented but I am thinking of changing this to scenario 2 which I believe is a better solution as only one export is required and it is guaranteed that the same objects are being imported into QAS and PRD.
Any Comments?

Similar Messages

  • Is it possible to monitor more than one target/Host with one agent in OEM 12c?

    Hi,
    Is it possible to monitor more than one target/Host with one agent in OEM 12c? Please assist me on this

    Since by definition a single EM agent must reside on a single database host, then, no, you can't monitor multiple hosts.
    Unless you mean that you want to monitor multiple virtual hosts from a single physical host ... but in that case, you'd still need one host per database host.
    That's just the way EM works. Always has, probably always will.

  • How can I define more than one baseline in a line chart??

    How can I add more than one straight line across a graph to indicate a target value? The values are percentages.
    Thanks a lot!!!

    When I have needed to indicate a target line on a chart, I have written a formula that would return a negative or positive number for each group. Then when I chart on the formula, it creates a baseline, with those groups beating the target above the baseline, and those failing to meat the target below the baseline. Percentage calculations work well on these types of charts.

  • EJB 3.0 / how to define more than one @QueryNamed for an entity

    I check the ejb 3.0 spec, the help and others but i didn't find the syntax that permit to determine more than one QueryNamed in an entity.
    Does somebode how to do and where it is described in the documentation ?

    This is exactly i have done also but i got an error during compilation
    C:\oracle\product\jdeveloper10g_3565\jdev\mywork\HRApp\EJB_Project\EJB_Project\src\buslogic\Departments.java
    Error(20,124): ) expected
    @Entity
    @NamedQueries(
    @NamedQuery(name="findDepartments", queryString="select object(o) from Departments o where o.department_id = :dept_id"),
    @NamedQuery(name="findAllDepartments", queryString="select object(o) from Departments o")
    @Table(name="DEPARTMENTS")
    public class Departments implements Serializable {
    private Long departmentId;
    private String departmentName;
    private Long locationId;
    private Collection<Employees> employeesCollection;
    private Employees employees;

  • How can I define more than one termination character for RS-232 interface communication?

    Hi,
    I have to communicate through the PC's RS-232 interface with a microprocessor board. I am using the "Advanced Serial Write and Read.vi" out of the LabVIEW examples and it works on principle.
    My problem is the termination character: It looks like I just can set one termination character, EITHER 0xA (so LF / newline) OR 0xD (CR / carriage return), but I have the need to react on various termination characters like "<CR> <LF> <CR> <LF> OK <CR> <LF>" or "<CR> <LF> <LF>"; which I would like to set in a control (this VI will be used in a TestStand sequence).
    Is there a way to do that, so that I can set wichever termination character(s) I need? The property node in "VISA configure serial port" just accepts an unsigned integer, nothing else. Sure I can get it running with the timeout - but this is not very nice and extends testing time unnecessarily.
    Thanks & Regards!
    Regards,
    gedi
    Solved!
    Go to Solution.

    That would be for the write. The poster is asking about the read. For the read you will need to write your own read routine. You will basically need to use a loop and inside the loop use the VISA Bytes at Serial Port to see if there's any bytes available. Read that many bytes, and append them to a string that you build up in a shift register. After concatenation check to see if you've got the termination characters. If so, the read is done. Fairly simple. Be sure to turn off the termination character enable in the VISA Configure.

  • Can I define more than one table in one External Content Type

    Hello,
    I am new to the BCS development using SharePoint Designer 2010.  I tried to create multiple SQL tables by referring to the same External Content Type with no success.  Since the External Content Type shows all my SQL tables in the same database,
    I though it would allow me to create a different list on another table from the same database.  Is this possible?  
    When I tried to use the same External Content Type for the second table, it refers back to the first table identifier unless I create another External Content Type refer to the same database but point to the different table.
    Please advise,
    Brian.
    Brian

    As far as I know you can only use one table per external content type.
    Please ensure that you mark a question as Answered once you receive a satisfactory response.

  • Can more than one SAP ERP system connect to the same PI system?

    HI Experts
    Well i am new to SAP Process Integration 7.1 and i have managed to point PI system to SAP DEV ERP , but i also want to add these other 2 systems SAP QAS ERP and SAP PRD ERP Using RFC Adapter. So is it possible to integrate SAP QAS and SAP PRD  ERP into the same PI system that is pointing to SAP DEV ERP. If possible what are the configuration steps that i should follow?.
    This project implementation is based on SAP MDM 7.1/ SAP PI 7.1/ ECC EHP6.

    Hi Farai,
    Technically this is possible. But don't forget that all systems are then using the same ESR and ID. So changes on PI are also influencing ERP QAS and PRD. I don't recommend this. At least you should have 2 stages for PI: Development and QAS/PRD.
    You just need to maintain 2 connections in ERP: ESR connection and RFC connection. For using the interfaces in PI for all 3 stages you need to create 3 different configurations in Integration Builder of PI.
    Best Regards
    Harald

  • Can there be more than one transport targets for a business system in sld

    Hi All,
    I have a question about transport targets in sld for sap xi 3.0 sp19.
    We have a requirement where a business system needs to have two transport targets.In SLD i see that only one transport target can be assigned. Is there any way to assign more than one transport target to a business system?
    I know that there can be more than one source for a business system where more than one  different business systems have the same business system as the target.
    I am not sure if a business system can have more than one transport target .If yes , what is the way to add more than one ?
    Please help .
    Thanks,
    Padmaja

    Hello,
    I know that there can be more than one source for a business system where more than one different business systems have the same business system as the target.
    As far as I know, you would have to change the target everytime you will transport it to a different target e.g 3 target systems = 3 times you change the transport target in SLD.
    Regards,
    Mark

  • Connect more than one R/3 4.6c System with SAP TREX 6.1

    Hi,
    I'm using SAP TREX 6.1 together with an 4.6c System. Now I want to connect the TREX to more than one R/3 System, so that every R/3 System has got its own Index-Category on the TREX Host.
    Does somebody know what I have to enter in the ini files -->TREXRfcServer.ini and in the TREXDaemon.ini? Perhaps there are some other important things that have to be considered at the usage of TREX 6.1 with 2 or more connected SAP R/3 Systems?!
    I would be happy about every helpful answer!
    greetings,
    Chris

    Hi Edmond Wong,
    Follow the steps below and you should be able to connect via SAP Logon Ticket.
    1. Set your system definition in portal to read SAPLOGONTICKETS.
    2. Go to your R3 server and execute transaction SM30, maintain table view TWPSSO2ACL
    3. Create a new entry with your portal ID and client info. Subject name and Issuer name is extracted from your portal Key Administration under DN of Owner and DN or Issuer. Remember to enter your serial number (normally oo if you only have one portal instance on your server)save this entry.
    4. Next download your portal certificate in der format from your Key Administration page. Unzip the file and you should have a verify.der certificate.
    5. Execute STRUSTSSO2 in R3, import your verify.der certificate into R3, then click on add to certificate list, also click on add to ACL list. Save entry.
    6 As for ITS, all you need is to add the parameter ~myssocookies2 = 1, restart your ITS.
    7. remember to remove your user mapping befor testing the connectivity.
    Drop me an email should you have problems. [email protected]
    Ta!
    Fred

  • How is it possible to connect more than one SAP R/3 4.6c System to TREX 6.1

    Hi,
    I'm using SAP TREX 6.1 together with an 4.6c System. Now I want to connect the TREX to more than one R/3 System, so that every R/3 System has got its own Index-Category on the TREX Host.
    Does somebody know what I have to enter in the ini files -->TREXRfcServer.ini and in the TREXDaemon.ini? Perhaps there are some other important things that have to be considered at the usage of TREX 6.1 with 2 or more connected SAP R/3 Systems?!
    I would be happy about every helpful answer!
    greetings,
    Chris
    Message was edited by:
            Christian Blatt

    Hi Edmond Wong,
    Follow the steps below and you should be able to connect via SAP Logon Ticket.
    1. Set your system definition in portal to read SAPLOGONTICKETS.
    2. Go to your R3 server and execute transaction SM30, maintain table view TWPSSO2ACL
    3. Create a new entry with your portal ID and client info. Subject name and Issuer name is extracted from your portal Key Administration under DN of Owner and DN or Issuer. Remember to enter your serial number (normally oo if you only have one portal instance on your server)save this entry.
    4. Next download your portal certificate in der format from your Key Administration page. Unzip the file and you should have a verify.der certificate.
    5. Execute STRUSTSSO2 in R3, import your verify.der certificate into R3, then click on add to certificate list, also click on add to ACL list. Save entry.
    6 As for ITS, all you need is to add the parameter ~myssocookies2 = 1, restart your ITS.
    7. remember to remove your user mapping befor testing the connectivity.
    Drop me an email should you have problems. [email protected]
    Ta!
    Fred

  • Using more than one BI box in portal environment????

    Can we define only one BI system in the portal environment? If we want to define more than one BI boxes what should we do????

    Hi Pankaj,
    Check these links for creating system object
    http://help.sap.com/bp_epv260/EP_EN/documentation/EP/N03_BB_InstallGuide_EN_US.doc
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/24d8faf9-0701-0010-c99c-aabbdb7e95f4
    Regards
    Arun

  • More than one ATP Server

    Hello guys and gals,
    Is it possible to define more than one ATP server for one system?
    Like setting rdisp/atp_server = host1,host2
    Thanks,
    Martin.

    Allright, here's the story.
    We're running ECC6.0 on AIX, ABAP Stack only.
    We are clustered using AIX's HACMP.
    We have four LPARs (Logical Partitions, or machines)
    Two are clustered and two are standalone supplemental application servers.
    Among the two that are clustered, one node is running Oracle (not RAC) and replicated enqueue (ERS), and the other node is running Central Services Instance for ABAP (ASCS) and a primary applicative instance (formerly CI).
    The two nodes are mutually redundant.
    The CI is actually our ATP server.
    If one of the nodes fails, obviously the a take-over occurs on the other node. However, not to overload the node that's taking over the other one, the ASCS instance is restarted but NOT the CI.
    The ASCS being the enqueue and message server, the system can run perfectly without the "CI" running as long as at least one supplemental app. server is running.
    BUT! This will NOT ensure that the ATP is redundant.
    I'm thinking of adding a third instance on the "CI" HACMP node exclusively used for ATP. So on that CI node, there will be ASCS, CI and ATP. Three different instances.
    HACMP would be configured to provide redundancy for ASCS and ATP and still not for CI. This would ensure that ATP is always there and respect the rule of not overloading the HACMP node that'll be taking over.
    This raises many other questions, like: what work processes do I need for ATP? Can it be a dialog-only instance? Of course it will not placed in any logon-groups...
    Martin.

  • More than one text area on a slide master... how?

    Is it possible to define more than one text area on a master slide? If so how?
    I want to have a layout with two columns of text - a fairly common layout in presentation packs - but can't persuade Keynote to accept this as a layout for a template. I realise that there can only be one 'body' area, but any attempt to produce a 'fake' second body area fails - whether I put in a text box or a shape with text in.
    If I put it in as a text box, I can't put a limit on how big the box is.
    If I put it in as a shape with text in, when I try to enable the shape as a text placeholder, it forces the whole text in box to have same format as 'top level' outline.
    Any ideas?

    If you want two columns of text, why not set up the Body textbox with two columns? Select the Body textbox on the slide master, then in the Text Inspector, in the Columns tab, set however many columns you want.

  • How can you create an activity as subsequent act. of more than one activity

    Hi.
    I want to create an activity as subsequent activity of more than one activity.
    I am using FM CRMXIF_ORDER_SAVE, but if I write data structure CRMXIF_DOC_FLOW with more than one item the system shows the error CRM_COPY 010 More than one predecessor was entered for data transfer.
    However I have customized multiple relationship allowed, and if I do multiples links in transaction crmd_order it works all right.
    Only it doesn't work with FM CRMXIF_ORDER_SAVE. I need create activities with FM because they are interface R/3. What FM can I use to create multiple subsequent activities?
    Thanks and best Regards
    Sorry for my english.

    Hi,
    I have got some activities creates in the system. (e.g. Act. 1, Act. 2, Act. 3 and Act. 4). With the FM CRMXIF_ORDER_SAVE  filled the structure CRMXIF_DOC_FLOW you can create subsequence activity of one of them (e.g. Act. X.1). I need create the same activity (Act X.1)  from another activity, (e.g. Act. 2). I know to do this in transaction CRMD_ORDER by link tab. But I don't know how to do this using FM or BADI or another thing.
    Act. 1     Act. 2      Act. 3     Act. 4 
    .....Act. X.1
    Thanks in advance.
    Edited by: Ana Isabel París on Jul 7, 2008 2:42 PM

  • How to use more than one JCo in one project?

    hi all,
    I want to use more than one r/3 systems and want to switch between them while running the application.
    For that, how can I use more than one JCo connection in one project and how to activate/deactivate them so as to switch in between them? And if that possible then what am I suppose to do in order to fetch the data from activated R/3 while running the application.
    Regards,

    Hi,
    Try this threads
    Multiple Client Logon in JCO
    Multiple JCO client connections
    Regards
    Saravanan K

Maybe you are looking for

  • Looping Cfdocument to produce a multiple page doc

    Can anyone point out where I can find information on producing a multiple page cfdocument (pdf) using a database to include unique information? I have a customer that wants mailers that have the customers name and special offer. I want to use CF to g

  • Problem in running forms 10g of 5 different departments

    Hi All, My company has 5 departments, and each department has its own database. Each department has some forms in them and has a top level form which calls another from from it, and some forms even calls reports when a button is pressed. The thing is

  • Firefox won't install on Windows 7 64-bit.

    I just installed a new hard drive on my system with Windows 7 64 Bit OS. Same that I used on the old hard drive that crashed. I downloaded the installer, and have tried to run it both with and without administrator permissions (by right clicking on t

  • Regarding workflow jumps

    Hi All, We have workflow scenario like this 1.Each step has a workflow approval limit for 5 days.If within 5 days the specified reviewer doesn't approve .Then mail will be notified to the respective reviewers and manager as well. For this we in the u

  • Opening pdf email attachments [was yogi baba]

    whenever i try to open a attachment in adobe reader a box pops up and asks for a pdf password. What is this pop up and what password is it asking for. Message subject line was edited by host