Delete or change posting period

hello
We have a customer which was purchased by a large corporation.
Before the purchase, they created their calendar and Fiscal year according to the calendar year: Jan 1st to Dec 31st.
After the purchase, they need to run their Fiscal year from July 1st to June 30th.
2009  - was already closed.
2010 u2013 we have 12 periods one for each month.
2011 u2013 to be opened
We intend to:
Close year 2010 with only 6 months: Jan 1st to June 30th
Delete from period 2010 the periods of July 2010 till December 2010.
Create a new period of 12 months: July 1st 2010 to June 30th 2011
Create a new period indicator u201C2010-1011u201D and link the periods to it.
Link the document series to the new period indicator.
My question is:
Is it better to delete from period 2010 the periods of July 2010 till December 2010
OR
Is it better to set Juneu2019s period till June 24 and then use the other 6 periods, 1 for each day of June so no periods are deleted?
Thanks
Revital

Hello Revital,
You may check this thread first:
Re: Extending Fiscal Year
Thanks,
Gordon

Similar Messages

  • Can I change posting period variant after go live?

    Hi,
    I wonder if it is possible to change posting period variant after postings are done in the system? We are now having the same posting period variant for all company codes but I want to split it and have separate, one per company code. Is that possible now?
    Best regards Lisa

    Hi,
    Yes, it should be no problem if the fiscal year remains the same.
    Regards,
    Eli

  • Impact of Changing Posting Periods in FI on Assets Accounting

    Dear Friends,
    I did a testing by changing the No of normal posting periods from 12 to 13 in FI Fiscal Variant. I did a testing in different areas of GL, AR and AP and the posting was well with no error at all.
    I have a issue with Assets accounting, in the Assets Master Data, Usefull life was throwing error. Depreciation Posting was having the problem so is the reitrment ABAVN.
    Any body has idea, how to overcome the Assets accounting issues.
    Regards
    VK

    Thanks for watching

  • How to change posting period for a company code

    Hi Gurus,
    In MIGO while doing goods receipt i get this error " Posting only possible in periods 2006/05 and 2006/04 in company code 3000"
    How to change the posting period.
    I have serched in SDN, i tried transaction MMPV, and OB52 but i am not able to change as i dont know the basics of the screen as i am ABAPER.
    Can u tell me how to change. or give sme link with some snapshots.
    Thanks

    hi
    I think you need to check your fiscal year varian before you do the MMPV. Fiscal year is set up by the FI consultant and it is deciding in which fiscal year period your current month belongs to.(Transaction -OB29)
    Ex:
    if you use K4 fiscal year variant then this october month is treated as 2010-07 period. Because the fiscal year starts from April and 2010 fiscal year starts from 2009 april.
    Calendar Year                 Fiscal year
    2009 april                =       2010 - 01
    2009 may                =       2010 - 02
    2009 Oct                 =       2010 - 07
    So first get the fiscal year and period accurately (I suggest get it from your FI guy) and put it in the MMPV
    If you accidentally close a wrong period dont forget to follow these notes too.
    545952,369637 AND 487381
    thanks & BR
    sandun

  • Change Posting Period in already posted document

    Hi,
    I wanted to check is there any process where we can change the posting period of already posted documents. The external system unfortunately sent the documents in special periods 13, but it has to be 12. Now our client wants to change the posting period to 12.
    Can anyone of you suggest a suitable way in going forward.
    Thanks,
    Srini

    Hi,
    It is not possile to change the posting period in a posted document, alternatively you can park the document form the external system and it can be posted in SAP after review by the user.
    Thanks and regards
    K.R

  • How Can I Change Posting Periods using DI

    Hello All,
    How Can I Change Posting Periopds using DI.
    When Connecting to B1 Company DB , I would like to change default Posting Periods.
    My SBO is 2005B.PL41.
    Best Regards,
    TAK

    Hi,
    Please take a look at the CompanyService Object in the DI help file. and check for the UpdateFinancePeriod method.
    Hope it helps,
    Vasu Natari.

  • Change posting period

    Hello all,
    I am trying to to the good issue and system display tis message:
    <i>"Posting only possible in periods 2004/08 and 2004/07 in company code AB01"</i>
    What should I do. I am not FI then I need very detailed information.
    Many thanks,
    Barb

    Gurus,
    I went to tcode = OB52 however for this company code AB01 I have:
    First Posting Period Allowed (in Interval 1) = 7 /2005
    Last Posting Period Allowed (in Interval 1) = 7 / 2006
    and
    First Posting Period Allowed (in Interval 2) = 1 / 2999
    Last Posting Period Allowed (in Interval 2) = 16 / 2999
    I do not understand much but I think here in OB52 the period is correct. Am I right? And then what to do next?
    Thks,
    Barb

  • Idoc error:Posting period

    Hi when am trying to process an idoc am getting the error message as u201CAllowed posting periods:08 2008/ 07 2008/12 2007 for company code 1124 and date 09/29/2008.
    How to correct this error?How to change the posting period

    Hi
    if your IDoc is related to material documents.. you can change posting period in MMPV transaction. There you have to close previous posting period. then new period will come automatically from Config.
    Try this.

  • Wrong period indicator linked to 2011 posting periods

    Hello,
    My customer has created new series for 2011 and linked them to 2011 period indicator.
    The problem is that the posting period was linked to 2010 period indicator. They've already created several transactions and therefore the period indicator in the posting period window cannot be updated.
    Any ideas on how to solve it (except for restoring a backup and retyping the transactions)?
    Thanks in advance.
    Best regards,
    Maya
    Problem solved..
    Edited by: Maya Alon on Jan 4, 2011 2:10 PM

    HI Dixit Patel      
    If any transaction has been post in Data base so can't change Posting Period . Do one think Restore ur database Backup before posting period Creation and again create ur posting period correctly.
    Thanks
    Khan Imran

  • Posting Periods Error

    Hello Experts,
    My Customer Creating the Wrong Posting Period like
      01/01/2011 to 12/31/2020
    and My Customer  Posted the 2011 Year Transaction in this Period
    Now I want to Change the Posting period
    01/01/2011 to 12/31/2011
    then System can not allow the Changes,
    if i will updated in SQL OFPR Table then System give the Error Message
    "Transactions created before the %s were found in the system   [Message 636-7]"
    SO Please Guide me
    Dixit Patel
    (+91-9904375120)

    HI Dixit Patel      
    If any transaction has been post in Data base so can't change Posting Period . Do one think Restore ur database Backup before posting period Creation and again create ur posting period correctly.
    Thanks
    Khan Imran

  • Posting period in MM

    Can anyone please let me know how to change posting period for a given company code in MM. I am facing problem while issuing goods.
    Thanks & Regards,
    Nilesh Kumar

    go to mmpv
    give to   comapny code
    give month
    give year
    press enter and then press f8
    keep on doing this till current month
    and u can see the perio dto start from in tcode omsy

  • Posting period issue while deleting a confirmation posted for a limit PO

    Hi ..
    I am facing an issue whiel deleting a confirmation posted for a limit PO.
    Confirmation was posted for a limit PO in SRM and it created a service entry sheet in SAP. If I deleted that confirmation in the same posting period, then it is getting deleted. No issue here.
    But if I deleted that confirmation in the next posting period then the reversal document is going to error in process. RZ20 is showing the error "Positng only possible in periods 2012/2 and 2012/3".
    Posting date of reversal document is current date only and the backend posting period is 2012/3, but still it is failing with this posting period error.
    If I tried to delete a confirmation posted for a normal PO then I could able to delete it even in next posting period by just changing the posting date.
    Why this posting occurs while deleting the limit confirmation, even through the posting date is falls within the backenn posting periiod? Is it like, SAP system is trying to delete the service entry sheet in original posting period? Kindly help.
    I am in SRM 5.0 (server 5.5) SP12.
    Thanks,
    Arun

    OK.
    Well, if the variable is not used in any interval selection, then I would say "something happened to it".
    I would make a copy of the query and run it to check if I get the same problem with period 12.
       -> If not, something is wrong in the original query (you can proceed as below, if changes to original are permitted).
    If so, then try removing the variable completely from the query and hardcode restriction to 12.
       -> If problem still persists, I would have to do some thinking.
    If problem is gone, then add the variable again. Check.
       -> If problem is back, then the variable "is sick". Only quick thing to do, is to build an identical variable and use that one.
    If problem also happens with the new variable, then it's time to share this experience with someone else and consider raising an OSS.
    Good luck!
    Jacob
    P.S: what fisc year variant are you using?
    Edited by: Jacob Jansen on Jan 25, 2010 8:36 PM

  • Change the posting period

    Hi Gurus,
    Can any one help me with changing the posting period of the company which is by mistake take as 12/2009 and i want to change it to 08/2008. I ahve already done some material movement in this and the system is not letting me change it in OMSY. Can i use MMPV to close this period and the use MMPI to open the new period as 08/2008. As this will be in past if compared to the current period in system, will there be any problems??
    Please advise.
    Thanks in advance.
    Anoop

    It is possible to re-open a previously closed period. However, it is NOT advisable to do so because the valuation data of the previous period could be affected.
    In general, it is only safe to reopen a previously closed period when no material postings have been done after the period shifting to the new period.
    If there has already been postings after the period shifting to the new period, reverting the period back will cause database inconsistencies in the history tables.
    If you decide to proceed with this process, you can use the program RMMMINIT, but, please review the documentation of this program first!! and the check the SAP notes 487381 (for the error message that you are receiving) and the 369637 (for an explanation about the inconsistencies that will be generated.
    Steps are as below;
    Go to Transaction Code SE38
    Enter program name RMMMINIT
    Execute or press F8 function button
    Enter your company code (From and To)
    Enter relevant date: Say 01/03/2008 for Mar. 2008 month to be opened as of now
    That means, user can post for the month of Feb 2008 as well as Mar. 2008
    Refer SAP Note No. 487381 for more details.
    As per SAP Notes 487381 ( If the periods are opened in advance in mmpv to again change it to current period the following process should be follow ), Go to Tcode MMPI, then go to menu bar and select system -> user profile->owndata.In that screen , under the parameters tab enter MMPI_READ_NOTE in Parameter ID field and enter, then under short description you will get Initialise period. Next Save.
    Again go to MMPI enter company code, period and year and execute.
    XXXXXXXXXXXXXXXXXX
    Other way of doing it is follow these steps( But try this method in Sand box Only):
    1. Go to OX18, and delete the plants assigned to your CO.Cd and save.
    2. Go to OMSY and change the posting period to the one u want and save.
    3.Go to OX18 and assign the plants you have deleted in step 1.and save.
    regards,
    indranil

  • SEM-BCS Changing of posting periods

    Hi:
    In the Consolidation Monitor, by going to 'edit' function, we can open and close the posting periods.
    I have the following questions:
    a) How far we can go to open the posting periods? Say if you are in pp '7', can you open period '5' and post a manual data entry?
    b) If we make any corrections in the previous period, how does the system correct the cumulative figure in the consecutive periods?
    The above are important questions for the client and let me know your comments.
    Thanks.
    Virgo

    Hi Virgo,
    I usually have the posting period as a parameter at the top of my WB or monitor screen. I may just retype ANY OTHER PP and hit ENTER in order to enter there.
    Staying in ANY previous period I may do ANY tasks available in that period, i.e. manual entries, additional data input (with cumulative data corrections).
    But remember, if you changed something in a previous period, you MUST RERUN all the tasks in this and all consecutive periods!!! Manually!
    The system doesn't do it automatically.
    In my practice, almost all eliminating tasks/documents are to be reversed in the next period. It means that any I/U elims task run will effect the next period.
    So, be very carefully. SAP doesn't recommend to execute some separate task in previous periods. You may just broke the consistency of all consolidation.
    Hope this helps.

  • How to change the posting period !

    Hello everyone
    I get the problem with posting period. I ready open the posting period for 2014.  The posting periods should be set per month and have erroneously been defined as per year.
    I ready follow the guide, but it is only successful in my test of SAP and it is not working in our company SAP system. I can not restrict the curent posting date range to 30.04.2014 such as my picture below: Pleas help me. Thanks

    Hi Mr Son
    Nice to meet you. I read the guide about this problem and it said that we can change if we had postings in this period. And I try it in test of my SAP company and it is ok. but when i apply in my SAP company, it is not working, i don't know why. I am only normal accountant, and i don't know the user and pass to access to your link. if you are in Vietnam now, how i can contact with you? do you have any email or phone number or skype. Please help me solve this problem.
    Please check this file
    Business One in Action – How to Correct Posting Periods?
    And this is my result in testing SAP
    http://scn.sap.com/servlet/JiveServlet/showImage/2-14962466-431165/u2.png

Maybe you are looking for

  • How can I open a new window based upon input in an existing window

    Hi,    I'm pretty new to LabVIEW and I've run into a slight problem that I having trouble finding information about.  My LabVIEW application will present a user with several configuration options.  Depending upon the options the user chooses, a new w

  • How to set a dynamic textfield?

    How to set a dynamic textfield that can baseon the user input data to resize the textfield height and width? Beside, I would like to copy the MS word table into the Form textfeild with the original design, how to do that? Many thanks!

  • Where can I get my mac book repaired in gurgaon

    Mac book started giving trouble all of a sudden....booting took extremely long. After reacher the home screen any application u selected took forever to upload. Of late the mac book has run out of charge and does not

  • How do I disable http at the AP level with 5508 running 7.4.100.0

                       I have a 5508 with 7.4.100.0, with 76 3602I AP's connected. Each AP responds to an HTTP request, asking for username and password at the AP. How do you disable this, and not disable https:// at the WLC? This is the IP of the AP, no

  • Disk Utility has been Shrinking disk for several hours....

    I have an external HD (FW800/GUID) that has 2 partitions in it that I'm trying to reduce the size of one of the partitions to make room for a third without deleting anything on the drive. Disk Utility has been 'shrinking disk' for several hours and I